Revision Record
Date
Version Description
2010-9-28
2.2
2012-07-21
Initial
HUAWEI Confidential
Review
Author
Lishucheng
2010-9-28
Page2, Total25
Content
1 Introduction...................................................................7
2 Workflow.......................................................................8
3 Evaluation information collection....................................9
1.1 Complaint Information Collection............................................................................................9
1.2 Statistic data Collection...........................................................................................................10
5 DT preparation.............................................................12
1.4 Specific drive test measurement tools.....................................................................................12
1.5 External Antenna and Attenuator Requirement.......................................................................12
1.6 Cluster definition.....................................................................................................................13
1.7 Route definition.......................................................................................................................15
1.8 Test Methodology....................................................................................................................16
6 Drive Test.....................................................................17
7 DT data procession.......................................................18
1.9 Coverage KPI..........................................................................................................................18
1.9.1 Rx-lev log file....................................................................................................................18
1.9.2 Rx-lev Distribution............................................................................................................18
1.9.3 Rx-lev Coverage................................................................................................................18
1.9.4 Rx-Qual log file.................................................................................................................19
1.9.5 Rx-Qual Distribution.........................................................................................................19
1.9.6 Rx-Qual Coverage.............................................................................................................19
1.10 Accessibility KPI...................................................................................................................19
1.10.1 Call Setup Success Rate of MS Origination log file.......................................................19
1.10.2 Origination Call Setup Success Rate...............................................................................20
1.10.3 Call Setup Success Rate log file......................................................................................20
2012-07-21
HUAWEI Confidential
Page3, Total25
8 Summary......................................................................24
2012-07-21
HUAWEI Confidential
Page4, Total25
Figures
Workflow of Network Evaluation........................................9
Complaints percentage....................................................11
Top view for install Ext ANT..............................................13
Cluster border ................................................................14
Test Route.......................................................................16
Rx-lev Coverage..............................................................18
Rx-Qual Coverage............................................................19
Drop Call Location-1.......................................................23
Drop Call Reason-2.........................................................24
2012-07-21
HUAWEI Confidential
Page5, Total25
Tables
Timelines of Performance Evaluation..................................7
Complaint Information.......................................................9
Pre-swap statistic data....................................................10
Cluster sites list..............................................................14
Origination Call Setup Success Rate.................................20
Call Setup Success Rate..................................................20
Call Drop Rate.................................................................21
Handover Statistics.........................................................24
Drive Test KPI summary...................................................24
2012-07-21
HUAWEI Confidential
Page6, Total25
Introduction
Before a radio network swapping, a well evaluation of the original network should
be carried out. The evaluation result will be the benchmark of the swapped network.
This report will discuss about methodology of evaluation and give an example to
represent real status of the network.
Evaluation will be done in 3 aspects as follows:
For the previous 2 tasks the main work are collect information from operator and
classify them into tables that can be reference after the swapping. Thus the key task
in this report is the last one Drive Test evaluation, it will be discuss in detail.
Scope of This Report:
DT preparation
Drive Test
DT data procession
Summary
Items
Duration
1
2
3
4
5
6
7
0.2 week
0.4 week
0.4 week
0.4 week
7 week
6 week
0.6week
2012-07-21
HUAWEI Confidential
weekly progress
1st 2nd 3rd 4th 5th 6th 7th 8th
Page7, Total25
Workflow
Legend
START
Data-In-001
Huawei
001
Operator
Collect Existing
Radio Network
Information
Huawei &
Operator
Doc-Out-001
002
NOC
OS
003
Drive Test
OS/
RD
004
DT Data Post Process
005
Generate Evaluation
Report
Doc-Out-002
END
2012-07-21
OS
Out Sourcing
RD
Remote Delivery
HUAWEI Confidential
Page8, Total25
Problem
Problem
Problem
Related
Related
Related
Related
Trouble
Analysis
Solution
REMAR
Detail
Area
time
RNC ID
CELL ID
SITE
CLUSTER
shooting
conclusion
& result
DT data &
Missing
Adding
Trace
neighbor
neighb
NAME
Call
xx
hh:mm,
drop/Ca
buildin
dd-
INTHRA
ll setup
g,
mm-
EXPRESS
xx
2012-07-21
10
1001
RAM
data
HUAWEI Confidential
or
Page9, Total25
fail/Low
street,
through
xx
yyyy
WAY
cells
cells,
the
put
district,
proble
xx
city/xx
disapp
cross
eared.
road,
xx
district,
xx city
This table need keep same with the Complaint Information sheet of the <
GRFSDTXXXXX-Radio Network complaint Information>
Call
2010-10-12
2010-10-13
2010-10-14
2010-10-15
2010-10-16
2010-10-17
1%
Call
Setup
Success Rate
97%
Soft
Hand
Over Success
Rate
98%
2012-07-21
HUAWEI Confidential
Page10, Total25
The KPI items here are just for example, the exact ones need negotiated with
operator in the KPI Mapping phase.
Subscriber complaint
2012-07-21
HUAWEI Confidential
Page11, Total25
DT preparation
In case of some KPI acceptance items are special in other vendors test and analyze
tool, validate whether them can be realized in Huaweis tool also. If not TEMS/Pilot
Fleet will be recommended or need choose other tool, that means DT tool
purchasing flow need to be started. Pay attention the operation guide of the test tools
from other vendor should be considered also.
Setup:
MS: CS Calls using a National Roaming disabled SIM. MS is set as GSM mode
only and locked on operator network (2G->3G cell reselection is not allowed)
Data Card for PS, SIM card special requirement:
Support EGPRS
Vehicle
DC to AC converter
HUAWEI Confidential
Page12, Total25
S P
TM
S P
+
A N
A MN
TS
2012-07-21
HUAWEI Confidential
Page13, Total25
NodeB Name
Cell Name
10350
IESSW08
IESSX
10357
25
10350
IESSW08
IESSY
10358
06
10350
IESSW08
IESSZ
10359
57
10360
MALLSURW08
MALLSURX
10367
18
10360
MALLSURW08
MALLSURY
10368
09
10360
MALLSURW08
MALLSURZ
10369
20
10390
SAIBAW08
SAIBAX
10397
38
10390
SAIBAW08
SAIBAY
10398
10390
SAIBAW08
SAIBAZ
10399
17
11070
CGUEVARAW08
CGUEVARAX
11077
60
11070
CGUEVARAW08
CGUEVARAY
11078
11070
CGUEVARAW08
CGUEVARAZ
11079
52
2012-07-21
HUAWEI Confidential
Cluster
Cell ID
Frequenc
y
Page14, Total25
2012-07-21
HUAWEI Confidential
Page15, Total25
2012-07-21
HUAWEI Confidential
Page16, Total25
Drive Test
During the DT a Protocol-File should be written which captures all the problems
like broken cable, loose cable, mobile error and any other equipment error, unusual
behaviour or lunch break.
The protocol shall as well capture the DT-engineers name and vehicle number.
Pre and Post DT shall be done using the same vehicle and measurement equipment.
The DT-Engineer has to check the stability and functionality of the equipment
during the DT.
In case of major problems during the DTs the DT Engineers should contact Huawei
technical assistance personnel.
It is important to check if the right network is measured.
Information: Tests will be done by using National Roaming disabled SIM-Cards.
The Log-Files should not be too big. A proper splitting of files length is necessary.
Recommend every log file less than 20M.
2012-07-21
HUAWEI Confidential
Page17, Total25
DT data procession
HUAWEI Confidential
Page18, Total25
2012-07-21
HUAWEI Confidential
Page19, Total25
Result
Rate
26
100.0%
Total Drops
7.7%
23
88.5%
26
100.0%
0.0%
26
100.0%
7.7%
26
100.0%
0.0%
Result
Rate
23
100.0%
Total Drops
0.0%
22
95.7%
2012-07-21
HUAWEI Confidential
Page20, Total25
23
100.0%
0.0%
23
100.0%
0.0%
23
100.0%
0.0%
Result
Rate
26
100.0%
Total Drops
7.7%
23
88.5%
26
100.0%
0.0%
26
100.0%
7.7%
2012-07-21
HUAWEI Confidential
Page21, Total25
26
100.0%
0.0%
One drop call was not only caused by the normal release from DL_DCCH but
also traffic time was 120sec should be excluded from the KPI
The other drop call was caused by the Abis interface problems between BSC
501 and BSC 403.
2012-07-21
HUAWEI Confidential
Page22, Total25
2012-07-21
HUAWEI Confidential
Page23, Total25
1.12 Handover
1.12.1 Handover Statistics log file
PSDL_070620_Toapayoh_1.gen
Total
490
Total Handover
Performed
Total Handover
Success
489
99.80%
Handover Success
Rate
Summary
2012-07-21
Contractual KPI
criteria
HUAWEI Confidential
Acceptance
Results
Page24, Total25
Rx-lev
97.62%@-100dBm
>=96%@-95dBm
Rx-Qual
97.52%@-12dB
>=96%@-12dB
100.00%
4.17%
1%
100.00%
KPI: Means Drive Test KPI items agreed by both Huawei and operator.
Original network Test Results: Means the original network KPI test values.
Contractual KPI criteria: Means Drive Test KPI criteria agreed by both Huawei and
operator.
Acceptance Results: It will fill with the KPI test values that test from the swapped
network.
Please note when Acceptance Results of one KPI item achieves any one of the
Original network Test Results or Contractual KPI criteria, that KPI item is passed.
2012-07-21
HUAWEI Confidential
Page25, Total25