You are on page 1of 1

Production Resources/Tools

The business object production resources/tools (PRT) is a moveable operating resource that is used in production or plant maintenance.

Use
The R/3 System distinguishes between the following categories of production resources/tools according to their properties and business functions: Materials that are taken into account in materials management, for example, for inventory management, material requirements planning, and procurement Equipment, such as measuring devices and high-quality tools, that requires preventive maintenance Documents, such as drawings or programs, for which the document management system is used Miscellaneous production resources/tools (with a PRT master record) that require less maintenance

You can assign PRTs to the operations and phases in task lists (including standard networks and recipes), production and maintenance orders, and networks requiring them. If a production resource/tool is required for inspections during production, you can assign it as test equipment to the corresponding inspection characteristic in the task list. At the moment, you cannot use production resources/tools in the process order. Assigning the EQPT PRT to routing in PP here you need to maintain data in PRT tab in IE02 like control key , formulas etc to calculate the PRT usage value and need again to maintain counter ...and while assigning in PP you need to mention the usage value .. for details refer this Maintenance planning for PRTs

(http://help.sap.com/saphelp_470/helpdata/en/89/a427e9461e11d182b50000e829fbfe/frameset.ht m) (http://help.sap.com/saphelp_46c/helpdata/en/fe/67f9609d6f11d189b60000e829fbbd/frameset.ht m

Rambabu.K

You might also like