RENCANA ANGGARAN BIAYA (RAB)

Proyek
: CondongCatur
Kavling
: Konstruksi Rumah Tinggal
Jenis Pek : PEMBANGUNAN RUMAH TINGGAL

NO
I

URAIAN PEKERJAAN

54

SAT

VOLUME

HARGA
SATUAN

HARGA

BOBOT

PEKERJAAN BONGKARAN
1

Bongkar Keramik

ls

1.00

750,000
SUB TOTAL

750,000

4.81

750,000

II PEKERJAAN KERAMIK KM/WC


1 Keramik Km/Wc

m2

4.50

101,569

457,061

2.93

2 Dinding Km/wc

m2

29.70

98,090

2,913,273

18.69

3 Pasang Closet Duduk

ls

1.00

1,600,000

1,600,000

10.26

4 Tempat Sabun

ls

1.00

250,000

250,000

1.60

5 Listelo

m'

12.00

150,000

1,800,000

11.55

6 Mainan
m2

2.20

525,000

1,155,000

7.41

7 Jaringan Air Panas Km/wc&heater

- Mozaik

ls

1.00

2,000,000

2,000,000

12.83

8 Jaringan Air Dingin

ls

1.00

300,000

300,000

1.92

9 Kran Panas Dingin

ls

1.00

550,000

550,000

3.53

10 Kran Biasa

ls

1.00

65,000

65,000

0.42

11 Pasang Floordrain

ls

1.00

85,000

85,000

0.55

12 Pompa Pendorong

unit

1.00

1,300,000

1,300,000

8.34

ls

1.00

65,000

65,000

0.42

13 toilet Shower

SUB TOTAL

12,540,334

III PEKERJAAN INSTALASI LISTRIK


1 Instilasi Listrik
- titik lampu

ttk

1.00

150,000

150,000

0.96

- titik stop kontak (Broco)

ttk

3.00

150,000

450,000

2.89

SUB TOTAL

600,000

IV PEKERJAAN ACESORIS (PINTU TRALIS,RAILING&CANOPY)


1 Pasang Tutup Watertorn

ls

1.00

400,000

400,000

2.57

2 Modif Canopy

ls

1.00

300,000

300,000

1.92

4 Pasang Tralis depan

ls

1.00

1,000,000

1,000,000

6.41

SUB TOTAL
JUMLAH
JASA PEMBORONG 10 %
JUMLAH TOTAL
PEMBULATAN
Terbilang : Tujuh Belas Juta Seratus Ribu Rupiah

1,700,000
15,590,334
1,559,033
17,149,367
17,100,000

100

ANALISA SATUAN PEKERJAAN


NO
1
1 PEKERJAAN PERSIAPAN
1 m2 Membersikan lokasi
0.1 org Pekerja
0.05 org Mandor

NO
1

NO
1

Rp.
Rp.

JENIS PEKERJAAN
2
1 m1 Pengukuran / uizet dan bouwplank
0.02 kg Paku
Rp.
0.004 m3 Papan cor
Rp.
0.05 org Tukang kayu
Rp.
0.05 org Kepala tk kayu
Rp.
0.05 org Pekerja
Rp.
0.005 org Mandor
Rp.

JENIS PEKERJAAN
2
PEKERJAAN GALIAN DAN URUGAN
m3 Galian tanah
0.833 org Pekerja
Rp.
0.083 org Mandor
Rp.

NO
1

UPAH
3

30,000.00
50,000.00

13,500.00
950,000.00
45,000.00
45,000.00
30,000.00
50,000.00

NO
1

Rp.
Rp.

JENIS PEKERJAAN
2
m3 Urugan pasir
1.1 m3 Pasir
0.3 org Pekerja
0.01 org Mandor

Rp.
Rp.
Rp.

JENIS PEKERJAAN

2,250.00
2,250.00
1,500.00
250.00
6,250.00

BAHAN
4

BAHAN
4

5,760.00
950.00
6,710.00

UPAH
3
90,000.00
30,000.00
50,000.00

4,070.00

24,990.00
4,150.00
29,140.00
UPAH
3

30,000.00
50,000.00

BAHAN
4
270.00
3,800.00

UPAH
3

30,000.00
50,000.00

BAHAN
4

3,000.00
2,500.00
5,500.00

UPAH
3

JENIS PEKERJAAN
2
1 m1 Urugan kembali
0.192 org Pekerja
0.019 org Mandor

NO

JENIS PEKERJAAN
2

BAHAN
4
99,000.00

9,000.00
500.00
9,500.00

UPAH

99,000.00

BAHAN

NO
1

NO
1

NO
1

2
PEKERJAAN PASANGAN
m3 Pasangan pondasi 1 Pc : 10 Ps
1.1 m3 Batu belah
61 kg Semen
0.492 m3 Pasir pasang
0.6 org Tukang batu
0.06 org Kepala tk batu
1.5 org Pekerja
0.075 org Mandor

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

JENIS PEKERJAAN
2
m2 Pasangan bata merah tebal 1/2 bata 1 Pc : 10 Ps
70 bh Bata merah
Rp.
9 kg Semen
Rp.
0.1 m3 Pasir pasang
Rp.
0.1 org Tukang batu
Rp.
0.01 org Kepala tukang
Rp.
0.32 org Pekerja
Rp.
0.015 org Mandor
Rp.

JENIS PEKERJAAN
2
m2 Plesteran 1 Pc : 9 Ps tebal 15 mm
4 kg Semen
Rp.
0.014 m3 Pasir pasang
Rp.
0.15 org Tukang batu
Rp.
0.015 org Kepala tukang
Rp.
0.2 org Pekerja
Rp.
0.01 org Mandor
Rp.

120,000.00
1,050.00
90,000.00
45,000.00
45,000.00
30,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

27,000.00
2,700.00
45,000.00
3,750.00
78,450.00

1,050.00
90,000.00
45,000.00
45,000.00
30,000.00
50,000.00

4,500.00
450.00
9,600.00
750.00
15,300.00

BAHAN
4

49,950.00

BAHAN
4
4,200.00
1,260.00

6,750.00
675.00
6,000.00
500.00
13,925.00

UPAH
3
1,050.00
45,000.00
45,000.00
30,000.00
50,000.00

240,330.00

31,500.00
9,450.00
9,000.00

UPAH
3

JENIS PEKERJAAN
2
m2 Acian dinding
5.5 kg Semen
0.15 org Tukang batu
0.015 org Kepala tukang
0.2 org Pekerja
0.01 org Mandor

132,000.00
64,050.00
44,280.00

UPAH
3
450.00
1,050.00
90,000.00
45,000.00
45,000.00
30,000.00
50,000.00

5,460.00

BAHAN
4
5,775.00

6,750.00
675.00
6,000.00
500.00
13,925.00

5,775.00

JUMLAH PEKERJAAN PLESTER ACI

NO

JENIS PEKERJAAN

UPAH

BAHAN

2
PEKERJAAN BETON
Pekerjaan beton bertulang 1 Pc : 3 Ps 5 : Kr
A. Beton cor 1 pc : 3 ps : 5 kr
B. Besi tulangan 100 kg
C. Cetakan memakai papan ( 10 m2 )
D. Membongkar cetakan

Rp.
Rp.
Rp.
Rp.

UPAH
3

BAHAN
4

812,350.00
1,487,500.00
346,600.00
120,000.00
2,766,450.00

NO
1
A

JENIS PEKERJAAN
2
3
1.0000 m Membuat beton bertulang, 1 Pc : 3 Ps : 5 Kr
9.0000 zak PC
Rp.
41,000.00
3
0.5400 m Pasir beton
Rp.
90,000.00
3
1.0000 m Kerikil beton
Rp.
175,000.00
0.5000 org Tukang batu
Rp.
45,000.00
0.0500 org Kepala tukang batu
Rp.
45,000.00
6.0000 org Pekerja
Rp.
30,000.00
0.3000 org Mandor
Rp.
50,000.00

NO
1
B

NO
1
C

NO
1
D

369,000.00
48,600.00
175,000.00
22,500.00
2,250.00
180,000.00
15,000.00
219,750.00

JENIS PEKERJAAN
2
1.0000
4.0000

m3 Membongkar cetakan
org Pekerja

UPAH
3

Rp.

30,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

BAHAN
4

120,000.00
120,000.00

JENIS PEKERJAAN
2
Besi Tulangan 100 Kg
100 kg Besi beton
2 kg Kawat Beton
2.25 org Kepala Tukang Besi
6.75 org Tukang Besi
6.75 org Pekerja

592,600.00

UPAH
3
Rp
Rp
Rp
Rp

JENIS PEKERJAAN
2
1 m3 beton memerlukan 10m2 kayu cetakan
0.4 m3 Papan cetakan meranti
Rp. Rp
4 kg paku
Rp. Rp
5 org Tukang kayu
Rp.
0.5 org Kepala Tukang kayu
Rp.
2 org pekerja
Rp.
0.1 org mandor
Rp.
4 org Pekerja pembongkar
Rp. Rp

8,500.00
15,000.00
45,000.00
45,000.00
30,000.00

Rp
Rp
Rp
Rp

101,250.00
303,750.00
202,500.00
607,500.00

BAHAN
4
Rp
Rp

850,000.00
30,000.00

Rp

880,000.00

UPAH
3
950,000.00
13,500.00
45,000.00
45,000.00
30,000.00
50,000.00
30,000.00

BAHAN
4
Rp
Rp

Rp
Rp
Rp
Rp
Rp

225,000.00
22,500.00
60,000.00
5,000.00
120,000.00

380,000.00
54,000.00

Rp
pemakaian diambil faktor pengali .

NO
1

0.4

JENIS PEKERJAAN
2
m1
Plesteran skoneng 1 Pc : 2 Ps
0.5000 kg PC
3
0.0020 m Pasir pasang
0.0380 org Tukang batu
0.0380 org Kepala tukang batu
0.0570 org Pekerja
0.0020 org Mandor

NO
1

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.

Rp

434,000.00

Rp 173,000.00

Rp

173,600.00

UPAH
3

1,050.00
90,000.00
45,000.00
45,000.00
30,000.00
50,000.00

JENIS PEKERJAAN
2
PEKERJAAN BETON
Pekerjaan beton bertulang 1 Pc : 3 Ps 5 : Kr
A. Beton cor 1 pc : 3 ps : 5 kr
B. Besi tulangan 150 kg
C. Cetakan memakai papan ( 10 m2 )
D. Membongkar cetakan

432,500.00

BAHAN
4

525.00
180.00
1,710.00
1,710.00
1,710.00
100.00
5,230.00

705.00

UPAH
3

BAHAN
4

UPAH
3

BAHAN
4

812,350.00
1,912,500.00
346,600.00
120,000.00
3,191,450.00

NO
1
A

JENIS PEKERJAAN
2
3
1.0000 m Membuat beton bertulang, 1 Pc : 3 Ps : 5 Kr
9.0000 zak PC
Rp.
41,000.00
3
0.5400 m Pasir beton
Rp.
90,000.00
3
1.0000 m Kerikil beton
Rp.
175,000.00
0.5000 org Tukang batu
Rp.
45,000.00
0.0500 org Kepala tukang batu
Rp.
45,000.00
6.0000 org Pekerja
Rp.
30,000.00
0.3000 org Mandor
Rp.
50,000.00

NO
1
B

NO

JENIS PEKERJAAN
2
1.0000
4.0000

m3 Membongkar cetakan
org Pekerja

Rp.

JENIS PEKERJAAN

369,000.00
48,600.00
175,000.00
22,500.00
2,250.00
180,000.00
15,000.00
219,750.00

UPAH
3
30,000.00

592,600.00

BAHAN
4

120,000.00
120,000.00

UPAH

BAHAN

1
C

NO
1
D

2
Besi Tulangan 150 Kg
150 kg Besi beton
2 kg Kawat Beton
2.25 org Kepala Tukang Besi
6.75 org Tukang Besi
6.75 org Pekerja

NO
1

Rp.
Rp.
Rp.
Rp.
Rp.

Rp
Rp
Rp
Rp

JENIS PEKERJAAN
2
1 m3 beton memerlukan 10m2 kayu cetakan
0.4 m3 Papan cetakan meranti
Rp. Rp
4 kg paku
Rp. Rp
5 org Tukang kayu
Rp.
0.5 org Kepala Tukang kayu
Rp.
2 org pekerja
Rp.
0.1 org mandor
Rp.
4 org Pekerja pembongkar
Rp. Rp

pemakaian diambil faktor pengali .

NO
1

3
8,500.00
15,000.00
45,000.00
45,000.00
30,000.00

JENIS PEKERJAAN
2
m2 Pasang dinding batu Candi
1.05 m2 Batu Candi(sisir)
Rp.
11.75 kg Semen
Rp.
0.035 m3 Pasir pasang
Rp.
0.35 org Tukang batu
Rp.
0.035 org Kepala tukang
Rp.
0.3 org Pekerja
Rp.
0.03 org Mandor
Rp.

Rp 1,275,000.00
Rp
30,000.00
Rp
Rp
Rp
Rp

101,250.00
303,750.00
202,500.00
607,500.00

Rp 1,305,000.00

UPAH
3
950,000.00
13,500.00
45,000.00
45,000.00
30,000.00
50,000.00
30,000.00

0.4

JENIS PEKERJAAN
2
m2 Pasang dinding batu Candi
1.05 m2 Batu Candi
Rp.
11.75 kg Semen
Rp.
0.035 m3 Pasir pasang
Rp.
0.35 org Tukang batu
Rp.
0.035 org Kepala tukang
Rp.
0.3 org Pekerja
Rp.
0.03 org Mandor
Rp.

Rp
Rp

380,000.00
54,000.00

225,000.00
22,500.00
60,000.00
5,000.00
120,000.00
432,500.00

Rp

434,000.00

Rp 173,000.00

Rp

173,600.00

Rp
Rp
Rp
Rp
Rp
Rp

UPAH
3
95,000.00
1,050.00
90,000.00
45,000.00
45,000.00
30,000.00
50,000.00

BAHAN
4
99,750.00
12,337.50
3,150.00

15,750.00
1,575.00
9,000.00
1,500.00
27,825.00

UPAH
3
120,000.00
1,050.00
90,000.00
45,000.00
45,000.00
30,000.00
50,000.00

BAHAN
4

115,237.50

BAHAN
4
126,000.00
12,337.50
3,150.00

15,750.00
1,575.00
9,000.00
1,500.00
27,825.00

141,487.50

NO
1

JENIS PEKERJAAN
2
m2 Pasang dinding batu susun sirih
1.05 m2 Batu susun sirih
Rp.
15.75 kg Semen
Rp.
0.035 m3 Pasir pasang
Rp.
1.1 org Tukang batu
Rp.
0.1 org Kepala tukang
Rp.
0.75 org Pekerja
Rp.
0.3 org Mandor
Rp.

UPAH
3
110,000.00
1,050.00
90,000.00
45,000.00
45,000.00
30,000.00
50,000.00

115,500.00
16,537.50
3,150.00
49,500.00
4,500.00
22,500.00
15,000.00
91,500.00

NO
1

JENIS PEKERJAAN
2
1.0000
2.2000
6.0000
0.1500

m2
m1
m1
kg

UPAH
3

Pasang usuk 5/7 kayu Bengkirai, reng 2/3 kayu bengkirai


Usuk kayu Bengkirai 5/7
Rp.
22,750.00
Reng kayu bengkirai 2/3
Rp.
4,000.00
Paku usuk
Rp.
13,500.00

kg Paku reng

Rp.

13,500.00

1,350.00

0.1000

org Tukang kayu

Rp.

45,000.00

4,500.00

0.0100

org Kep. Tk. Kayu

Rp.

45,000.00

450.00

0.1000

org Pekerja

Rp.

30,000.00

3,000.00

0.0025

org Mandor

Rp.

50,000.00

125.00
9,425.00

JENIS PEKERJAAN
2
1.0000
0.5000
0.0150
0.0190
0.2500
0.4000
0.0250
0.0400
0.0013

m1
lbr
kg
m3
kg
org
org
org
org

NO
1
1.0000
4.0000
0.0152
1.5240
0.2000

m1
lbr
m3
kg
org

UPAH
3

Pasang talang miring, seng BJLS 28, papan kayu bengkirai


Seng plat 3' x 6' BJLS 28
Rp.
44,000.00
Paku biasa 1/2" - 1"
Rp.
15,000.00
Kayu bengkirai papan
Rp.
6,500,000.00
Flincoat
Rp.
40,000.00
10,000.00
Tukang kayu
Rp.
45,000.00
18,000.00
Kepala tukang kayu
Rp.
45,000.00
1,125.00
Pekerja
Rp.
30,000.00
1,200.00
Mandor
Rp.
50,000.00
62.50
30,387.50

JENIS PEKERJAAN
2
Pasang bubungan genteng beton Natural
Bubungan genteng beton natural
Rp.
3,250.00
Pasir pasang
Rp.
90,000.00
PC
Rp.
1,050.00
Tukang batu
Rp.
45,000.00

135,187.50

BAHAN
4
50,050.00
24,000.00
2,025.00

0.1000

NO
1

BAHAN
4

UPAH
3

76,075.00

BAHAN
4
22,000.00
225.00
123,500.00

145,725.00

BAHAN
4
13,000.00
1,368.00

1,600.20
9,000.00

0.0200
0.4000
0.0200

org Kep. Tk. Batu


org Pekerja
org Mandor

NO
1

45,000.00
30,000.00
50,000.00

JENIS PEKERJAAN
2
1.0000
0.0048
0.0600
0.1000
0.0100
0.1000
0.0050

NO
1

Rp.
Rp.
Rp.

m1
m3
kg
org
org
org
org

NO
1

UPAH
3

Pasang lisplank ukuran (2 x 20) cm, kayu bengkirai


Kayu bengkirai papan
Rp.
6,500,000.00
Paku biasa 2" - 5"
Rp.
13,500.00
Tukang kayu
Rp.
45,000.00
Kepala tukang kayu
Rp.
45,000.00
Pekerja
Rp.
30,000.00
Mandor
Rp.
50,000.00

JENIS PEKERJAAN
2
m2 Pasang keramik 40/40 (PLATINUM KW I)
6 m2 Keramik 40/40
Rp.
11.38 kg Semen
Rp.
0.042 m3 Pasir pasang
Rp.
1.5 kg Semen putih
Rp.
0.35 org Tukang batu
Rp.
0.035 org Kepala tukang
Rp.
0.3 org Pekerja
Rp.
0.03 org Mandor
Rp.

8,500.00
1,050.00
90,000.00
1,500.00
45,000.00
45,000.00
30,000.00
50,000.00

NO
1

m2
m2
kg
m3
kg
org
org
org
org

Pasang tegel keramik 20/20


Tegel keramik (pegasus)
PC
Pasir pasang
Semen putih
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

JENIS PEKERJAAN
2
1.0000
1.0000
9.3000

m2 Pasang keramik dinding 20/25


m2 Tegel keramik (pegasus)
Rp.
kg PC
Rp.

4,500.00
450.00
3,000.00
250.00
8,200.00

15,750.00
1,575.00
9,000.00
1,500.00
27,825.00

32,010.00

BAHAN
4

68,979.00

BAHAN
4
64,000.00
4,284.00
810.00
900.00

22,500.00
2,250.00
7,500.00
625.00
10,375.00

UPAH
3
62,000.00
1,050.00

BAHAN
4

51,000.00
11,949.00
3,780.00
2,250.00

UPAH
3
64,000.00
1,050.00
90,000.00
1,500.00
45,000.00
45,000.00
30,000.00
50,000.00

14,368.00

31,200.00
810.00

UPAH
3

JENIS PEKERJAAN
2
1.0000
1.0000
4.0800
0.0090
0.6000
0.5000
0.0500
0.2500
0.0125

900.00
12,000.00
1,000.00
24,500.20

69,994.00

BAHAN
4
62,000.00
9,765.00

1.5000
0.6500
0.0650
0.3200
0.0160

NO
1

kg
org
org
org
org

Semen putih
Tukang batu
Kep. Tk. Batu
Pekerja
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.

1,500.00
45,000.00
45,000.00
30,000.00
50,000.00

2,250.00
29,250.00
2,925.00
9,600.00
800.00
13,325.00

JENIS PEKERJAAN
2
PEKERJAAN PLAFOND / LANGIT LANGIT KAYU KAMPER
m2 Plafond gypsum
3
0.0130 m Kayu kamper
Rp.
5,500,000.00
0.3600 lbr Gypsum board 9 mm
Rp.
55,000.00
0.0500 roll Kasa gypsum
Rp.
12,500.00
0.4500 kg Tepung gypsum
Rp.
6,000.00
0.0030 kg Alkasit
Rp.
300,000.00
0.0500 kg Paku gypsum
Rp.
18,000.00
0.1200 kg Paku usuk
Rp.
1,500.00
0.3700 org Tukang kayu
Rp.
45,000.00
0.0370 org Kepala tukang kayu
Rp.
45,000.00
0.2400 org Pekerja
Rp.
30,000.00
0.0120 org Mandor
Rp.
50,000.00

NO
1

UPAH
3

1.0000

m3
m3
org
org
org
org

16,650.00
1,665.00
7,200.00
600.00
26,115.00

UPAH
3

Membuat kusen pintu / jendela kayu jati (lokal) 6/12


Kayu jati (lokal)
Rp.
8,500,000.00
Tukang kayu
Rp.
45,000.00
Kepala tukang kayu
Rp.
45,000.00
Pekerja
Rp.
30,000.00
Mandor
Rp.
50,000.00

m1 Kusen Pintujendela

NO
1

10,355,000.00

JENIS PEKERJAAN
2

BAHAN
4

71,500.00
19,800.00
625.00
2,700.00
900.00
900.00
180.00

JENIS PEKERJAAN
2
1.0000
1.1000
20.0000
2.0000
6.0000
0.3000

74,015.00

96,605.00

BAHAN
4
9,350,000.00
900,000.00
90,000.00

180,000.00
15,000.00
15,000.00

dibagi

10,340,000.00

140 m1

UPAH
3

BAHAN
4

PEKERJAAN CAT-CATAN
2
1.0000 m
0.0500 kg
0.1500 org
0.0025 org

Scrap / mengerok permukaan cat tembok lama


Soda api
Rp.
20,500
Pekerja
Rp.
30,000.00
Mandor
Rp.
50,000.00

NO
1

JENIS PEKERJAAN
2
PEKERJAAN PENGECATAN

1,025.00
4,500.00
125.00
4,625.00

UPAH
3

1,025.00

BAHAN
4

10 M2 Cat tembok CATYLAX Incld pembersihan dan plamir


2.600 kg Cat Catylax
Rp.
15,000.00
1.000 kg Plamir
Rp.
7,500.00
2.000 lbr Ampelas
Rp.
3,500.00
2.000 org Tukang cat
Rp.
40,000.00
0.075 org Kepala tukang cat
Rp.
40,000.00
1.500 org Pekerja
Rp.
30,000.00
0.075 org Mandor
Rp.
50,000.00

1 M2
jasa diambil 3/4

NO
1

JENIS PEKERJAAN
2

UPAH
3

1 M2
jasa diambil 3/4

JENIS PEKERJAAN
2

Rp.
Rp.

80,000.00
3,000.00
45,000.00
3,750.00
131,750.00

UPAH
3

27,000.00
45,000.00

5,350.00
4,012.50

BAHAN
4

37,900.00

3,790.00
2,842.50

BAHAN
4

129,000.00
7,500.00
7,000.00

13,175.00

JENIS PEKERJAAN
2
PEKERJAAN CAT-CATAN
2
1.0000 m Mengecat genteng
0.3600 kg Cat genteng air Express
0.0630 org Tukang cat

80,000.00
3,000.00
45,000.00
3,750.00
131,750.00

UPAH
3

1 M2
jasa diambil 3/4

53,500.00

23,400.00
7,500.00
7,000.00

13,175.00

PEKERJAAN PENGECATAN
10 M2 Cat tembok DULUX Incld pembersihan dan plamir
2.000 kg Cat DULUX whitershield Rp.
64,500.00
1.000 kg Plamir
Rp.
7,500.00
2.000 lbr Ampelas
Rp.
3,500.00
2.000 org Tukang cat
Rp.
40,000.00
0.075 org Kepala tukang cat
Rp.
40,000.00
1.500 org Pekerja
Rp.
30,000.00
0.075 org Mandor
Rp.
50,000.00

NO
1

80,000.00
3,000.00
45,000.00
3,750.00
131,750.00

13,175.00

PEKERJAAN PENGECATAN
10 M2 Cat tembok MAXILITE Incld pembersihan dan plamir
2.600 kg Cat Maxilite
Rp.
9,000.00
1.000 kg Plamir
Rp.
7,500.00
2.000 lbr Ampelas
Rp.
3,500.00
2.000 org Tukang cat
Rp.
40,000.00
0.075 org Kepala tukang cat
Rp.
40,000.00
1.500 org Pekerja
Rp.
30,000.00
0.075 org Mandor
Rp.
50,000.00

NO
1

39,000.00
7,500.00
7,000.00

143,500.00

14,350.00
10,762.50

BAHAN
4

9,720.00
2,835.00

0.0063
0.0200
0.0025

Rp.
Rp.
Rp.

org Kep. Tk. Cat


org Pekerja
org Mandor

NO
1

45,000.00
30,000.00
50,000.00

UPAH
3

JENIS PEKERJAAN
2
PEKERJAAN CAT-CATAN
2
1.0000 m Pelaburan bidang kayu dengan politur
0.1500 ltr Politur
Rp.
0.3720 ltr Thiner
Rp.
2.0000 lbr Amplas
Rp.
0.0600 org Tukang cat
Rp.
0.0160 org Kepala tukang cat
Rp.
0.0025 org Mandor
Rp.

NO
1

55,000.00
15,000.00
3,500.00
45,000.00
45,000.00
50,000.00

JENIS PEKERJAAN
2
m2 couting batu alam
0.15 kg Minyak couting
0.3720 ltr Thiner
0.04 org Pekerja
0.063 org Tukang cat
0.063 org Kepala tukang cat
0.0025 org Mandor

NO
1

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

65,000.00
15,000.00
30,000.00
45,000.00
45,000.00
50,000.00

m1
m1
x
org
org
org
org

NO
1

Memasang pipa PVC tipe AW diameter 4"


Pipa PVC
Rp.
35,000.00
Harga pipa (Perlengkapan)
Rp.
35,000.00
Tukang batu
Rp.
45,000.00
Kepala tukang batu
Rp.
45,000.00
Pekerja
Rp.
30,000.00
Mandor
Rp.
50,000.00

JENIS PEKERJAAN
2
1.0000
1.2000
35%
0.1350
0.0135

m1
m1
x
org
org

Memasang pipa PVC tipe AW diameter 3"


Pipa PVC
Rp.
20,000.00
Harga pipa (Perlengkapan)
Rp.
20,000.00
Tukang batu
Rp.
45,000.00
Kepala tukang batu
Rp.
45,000.00

9,720.00

BAHAN
4

8,250.00
5,580.00
7,000.00
2,700.00
720.00
125.00
10,545.00

UPAH
3

JENIS PEKERJAAN
2
1.0000
1.2000
35%
0.1350
0.0135
0.0810
0.0410

283.50
600.00
125.00
3,843.50

13,830.00

BAHAN
4
9,750.00
5,580.00

1,200.00
2,835.00
2,835.00
125.00
6,995.00

UPAH
3

15,330.00

BAHAN
4
42,000.00
12,250.00

6,075.00
607.50
2,430.00
2,050.00
11,162.50

UPAH
3

54,250.00

BAHAN
4
24,000.00
7,000.00

6,075.00
607.50

0.0810
0.0410

org Pekerja
org Mandor

NO
1

30,000.00
50,000.00

JENIS PEKERJAAN
2
1.0000
1.2000
35%
0.1350
0.0135
0.0810
0.0410

m1
m1
x
org
org
org
org

NO
1
1.0000
1.0000
0.1000
0.0100
0.0100
0.0050

bh
bh
org
org
org
org

NO
1
1.0000
1.0000
0.1500
0.0150
0.0150
0.0008

bh
bh
org
org
org
org

NO
1
1.0000
1.0000
0.1000
0.0100
0.0100
0.0050

NO
1

Rp.
Rp.

bh
bh
org
org
org
org

UPAH
3

Memasang pipa PVC tipe AW diameter 3/4"


Pipa PVC
Rp.
5,500.00
Harga pipa (Perlengkapan)
Rp.
5,500.00
Tukang batu
Rp.
45,000.00
Kepala tukang batu
Rp.
45,000.00
Pekerja
Rp.
30,000.00
Mandor
Rp.
50,000.00

JENIS PEKERJAAN
2
Memasang floor drain
Floor drain
Rp.
Tukang batu
Rp.
Kepala tukang batu
Rp.
Pekerja
Rp.
Mandor
Rp.

JENIS PEKERJAAN
2
Pasang engsel pintu
Engsel pintu
Rp.
Tukang kayu
Rp.
Kepala tukang kayu
Rp.
Pekerja
Rp.
Mandor
Rp.

JENIS PEKERJAAN
2
Pasang engsel jendela
Engsel jendela
Rp.
Tukang kayu
Rp.
Kepala tukang kayu
Rp.
Pekerja
Rp.
Mandor
Rp.

JENIS PEKERJAAN
2

2,430.00
2,050.00
11,162.50

6,075.00
607.50
2,430.00
2,050.00
11,162.50

BAHAN
4

57,500.00

BAHAN
4
24,000.00

6,750.00
675.00
450.00
37.50
7,912.50
UPAH
3

18,000.00
45,000.00
45,000.00
30,000.00
50,000.00

8,525.00

57,500.00
4,500.00
450.00
300.00
250.00
5,500.00

UPAH
3
24,000.00
45,000.00
45,000.00
30,000.00
50,000.00

BAHAN
4
6,600.00
1,925.00

UPAH
3
57,500.00
45,000.00
45,000.00
30,000.00
50,000.00

31,000.00

24,000.00
BAHAN
4
18,000.00

4,500.00
450.00
300.00
250.00
5,500.00

UPAH
3

18,000.00

BAHAN
4

1.0000
1.0000
0.2000
0.0200
0.0200
0.0100

bh
bh
org
org
org
org

NO
1
1.0000
1.0000
0.2000
0.0200
0.0200
0.0100

bh
bh
org
org
org
org

Pasang engsel angin


Engsel angin
Tukang kayu
Kepala tukang kayu
Pekerja
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.

JENIS PEKERJAAN
2
Pasang Grendel
Grendel Jendela
Rp.
Tukang kayu
Rp.
Kepala tukang kayu
Rp.
Pekerja
Rp.
Mandor
Rp.

12,000.00
45,000.00
45,000.00
30,000.00
50,000.00

12,000.00
9,000.00
900.00
600.00
500.00
11,000.00

UPAH
3
7,500.00
45,000.00
45,000.00
30,000.00
50,000.00

12,000.00

BAHAN
4
7,500.00

9,000.00
900.00
600.00
500.00
11,000.00

7,500.00

JUMLAH
5

5,500.00

JUMLAH
5

10,320.00

JUMLAH
5

29,140.00
JUMLAH
5

6,710.00

JUMLAH
5

108,500.00

JUMLAH

318,780.00

JUMLAH
5

65,250.00

JUMLAH
5

19,385.00

JUMLAH
5

19,700.00

39,085.00

JUMLAH

2,766,450.00

JUMLAH
5

812,350.00

JUMLAH
5

120,000.00

JUMLAH
5

Rp 1,487,500.00

JUMLAH
5

Rp

346,600.00

JUMLAH
5

5,935.00

JUMLAH
5

3,191,450.00

JUMLAH
5

812,350.00

JUMLAH
5

120,000.00

JUMLAH

Rp 1,912,500.00

JUMLAH
5

Rp

346,600.00

JUMLAH
5

143,062.50

JUMLAH
5

169,312.50

JUMLAH
5

226,687.50

JUMLAH
5

85,500.00

JUMLAH
5

176,112.50

JUMLAH
5

38,868.20

JUMLAH
5

40,210.00

JUMLAH
5

96,804.00

JUMLAH
5

80,369.00

JUMLAH
5

87,340.00

JUMLAH
5

122,720.00

JUMLAH
5

10,355,000.00
73,964.00

JUMLAH
5

5,650.00

JUMLAH
5

17,187.50

JUMLAH
5

16,017.50

JUMLAH
5

23,937.50
6,750.00
JUMLAH
5

13,563.50

JUMLAH
5

24,375.00

JUMLAH
5

22,325.00

JUMLAH
5

65,412.50

JUMLAH
5

42,162.50

JUMLAH
5

19,687.50

JUMLAH
5

63,000.00

JUMLAH
5

31,912.50
JUMLAH
5

23,500.00

JUMLAH
5

23,000.00

JUMLAH
5

18,500.00

RENCANA ANGGARAN BIAYA (RAB)


Proyek
:
Kavling
:
Jenis Pek : PEMBANGUNAN RUMAH TINGGAL
NO
I

URAIAN PEKERJAAN

SAT VOLUME

HARGA
SATUAN

PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi

m2

256.50

3,800

2 Uitzet bowplank

m'

37.50

5,100
SUB TOTAL

II PEKERJAAN BONGKARAN
1

Bongkaran Tembok

m2

169.30

15,000

Bongkaran Plat Beton Tangga& Kolom

m3

2.67

200,000

Bongkar Carport

ls

1.00

200,000

Bongkar Pintu Garasi

ls

1.00

150,000

Bongkar Jendela

unit

6.00

15,000

Bongkar Pintu

unit

6.00

15,000

Bongkar Rabat carport

m2

13.50

20,000

Bongkar Atap

ls

1.00

2,250,000

10

Bongkar Eternit

m2

57.00

7,000

11

Bongkar Keramik

m2

82.25

4,000

12

Bongkar Pagar

ls

1.00

750,000

14

Bongkar Water torn

ls

1.00

250,000
SUB TOTAL

III PEKERJAAN TANAH


1 Galian tanah

m3

20.40

23,000

2 Urug pasair bawah pondasi

m3

1.71

108,500

3 Pondasi batu kali

m3

2.67

300,000

4 Urug tanah kembali

m3

20.40

6,500

6 Rollag

m'

7.00

22,500

7 Peninggian peil lantai

m3

1.95

43,000
SUB TOTAL

IV PEKERJAAN DINDING
1 Sloof 15/20

m3

0.45

2,500,000

2 Kolom 15/15

m3

0.61

2,500,000

3 Ring balk atas 15/20

m3

0.80

2,500,000

4 Kolom 15/30

m3

3.06

3,191,450

5 Ring Balok 15/25

m3

2.95

3,191,450

6 Cor Plate Lantai

m3

4.27

3,191,450

7 Pasangan dinding 1/2 bt

m2

85.00

65,250

8 Plesteran-aci

m2

170.00

39,085

9 Sponengan

m'

491.00

5,500

- Profil beton

m'

45.50

20,000

- Bt. Candi 20x20

m2

45.60

140,000

- Batu susun sirih 1X15

m2

6.11

226,688

- Plat beton

m3

0.75

1,278,950

- Konsol beton

unit

10.00

45,000

10 Pilar teras

10 Plat beton canopy

SUB TOTAL
V

PEKERJAAN ATAP
1 Genteng Penutup Atap (Genteng Beton)

m2

92.60

47,000

2 Usuk 5/7 & reng 2/3 bengkirai

m2

59.00

85,500

3 Gording, nok, mirplat & jurai, Bengkirai 6/12

m'

103.00

70,000

4 Talang Jurai (papan Bengkirai)

m'

8.00

176,113

5 Genteng bubungan

m'

18.00

35,000

6 Lispalank 2/20

m'

22.00

35,000

7 Rangka Baja Ringan (Rangka Atap Bluescope)

m2

44.00

160,000
SUB TOTAL

VI PEKERJAAN KERAMIK
1 Keramik 40 x 40

m2

141.25

96,804

2 Lantai rabat

m2

25.50

125,000

- Keramik 20 x 20

m2

6.00

61,369

- Mozaik

m2

4.00

395,000

- Listelo

m'

10.00

12,500

3 Keramik Mini Bar

SUB TOTAL
VII PEKERJAAN PLAFOND
1 Plafond dalam Gypsum LT I (Kayu Kamper)

m2

85.00

122,720

3 Plafond luar eternit

m2

18.60

90,000

4 List Gypsum plafond dalam

m'

146.95

10,000

5 List plafond luar

m'

18.60

8,500

6 Compound

m2

103.60

10,000
SUB TOTAL

VIII PEKERJAAN KUSEN & DAUN


1 Pasang Kusen lama

unit

12.00

40,000

2 Kusen Pintu Jendela (Jati Lokal)

m'

46.00

70,000

3 Daun jendela (baru) kayu jati lokal

bh

9.00

275,000

4 Daun pintu panil ( baru ) kayu ajti lokal

bh

4.00

650,000

5 Kaca jendela 5mm (kaca BV)

m2

1.00

90,000

6 Roster 20/20

bh

20.00

12,500

7 Pekerjaan Pasang Kembali pintu garasi

ls

1.00

400,000
SUB TOTAL

IX PEKERJAAN CAT-CATAN
1 Cat dinding (Cat Catylax)

m2

375.00

17,000

2 Cat plafond (cat Maxilte)

m2

103.60

15,500

3 Cat genteng (Cat Genteng Express)

m2

142.60

13,564

4 Cat politur kayu (Mowilex)

m2

120.60

24,375

6 Coating bt candi (Mowillex)

m2

51.71

22,325
SUB TOTAL

PEKERJAAN SANITASI
1 Sal. Air bersih ( D wavin)

m'

25.00

10,000

2 Sal. Air hujan (D wafin)

m'

22.00

55,000

3 Sal. Air kotor (D wafin)

m'

17.00

35,000

4 Kran (KIG)

bh

3.00

50,000

5 Sumur Peresapan ( dalam 3 m )

unit

2.00

500,000

6 Pasang Conblock

m2

9.00

50,000

7 Bak kontrol

unit

2.00

225,000

8 Pekerjaan water profing (Aquaproof)

m2

45.50

27,500

9 Wastafel (INA)

unit

1.00

400,000
SUB TOTAL

XI PEKERJAAN INSTALASI LISTRIK


1 Instilasi Listrik
- titik lampu down light

ttk

8.00

250,000

- titik lampu Spoot

ttk

3.00

300,000

- titik lampu + Lampu

ttk

9.00

150,000

- titik stop kontak (Broco)

ttk

5.00

150,000

- Box Mcb

ttk

- Penyatuan arus listrik

unit
SUB TOTAL

XII PEKERJAAN PASANG (TANPA BAHAN) PENGGANTUNG&PENGUNCI


1 Pasang Engsel pintu

bh

8.00

15,000

2 Pasang Hak angin

bh

18.00

15,000

3 Pasang Sloot

bh

4.00

15,000

4 Pasang Grendel jendela

bh

9.00

15,000

5 Pasang Engsel jendela

bh

18.00

15,000

6 Pasang handle pintu utama

bh

1.00

15,000

7 Pasang Slot pintu uTama

bh

1.00

15,000
SUB TOTAL

XIII PEKERJAAN TAMAN & KOLAM

1 Lampu Taman

ttk

4.00

250,000

2 Cor rabat setapak

pcs

25.00

35,000
SUB TOTAL

XIV PEKERJAAN ACESORIS


1 Pasang Tangga Putar

m1

3.50

950,000

2 Pasang Canopy

m2

20.00

265,000

3 Pasang Talang Canopy (Talang plat Besi)

m1

7.00

82,500

4 Pasang Lampu Kolom

ttk

4.00

350,000

5 Pasang Pagar Pengaman

m2

6 Pasang Tralis dipagar

m1
SUB TOTAL

XV PEKERJAAN PAGAR
1 Pasangan Bata Pagar

m2

34.20

65,250

2 Plester aci

m2

68.40

39,085

3 Sponengan

m1

109.00

5,500

4 Pasang Batu alam

m2

12.00

140,000

5 Pasang Lampu pagar

ttk

7.00

140,000
SUB TOTAL

XVI PEKERJAAN PEMBUATAN MINIBAR


1 Pasang Meja bar & rak

m1

5.00

1,100,000

2 Pasang Top table ( marmer)

m2

4.00

800,000

ls

1.00

2,000,000

3 Acesories

SUB TOTAL
JUMLAH
JASA PEMBORONG 10 %
JUMLAH TOTAL
PEMBULATAN
Terbilang : DUA RATUS SEMBILAN BELAS JUTA SEMBILAN RATUS RIBU RUPIAH

HARGA

974,700
191,250
1,165,950
2,539,500
534,000
200,000
150,000
90,000
90,000
270,000
2,250,000
399,000
329,000
750,000
250,000
7,851,500
469,200
185,535
801,000
132,600
157,500
83,850
1,829,685
1,125,000
1,525,000
2,000,000
9,765,837
9,406,799
13,633,874
5,546,250

6,644,450
2,700,500
910,000
6,384,000
1,385,061
959,213
450,000
62,435,983
4,352,200
5,044,500
7,210,000
1,408,900
630,000
770,000
7,040,000
26,455,600
13,673,565
3,187,500
368,214
1,580,000
125,000
18,934,279
10,431,200
1,674,000
1,469,500
158,100
1,036,000
14,768,800
480,000
3,220,000
2,475,000
2,600,000
90,000

250,000
400,000
9,515,000
6,375,000
1,605,800
1,934,155
2,939,625
1,154,426
14,009,006
250,000
1,210,000
595,000
150,000
1,000,000
450,000
450,000
1,251,250
400,000
5,756,250

2,000,000
900,000
1,350,000
750,000
5,000,000
120,000
270,000
60,000
135,000
270,000
15,000
15,000
885,000

1,000,000
875,000
1,875,000
3,325,000
5,300,000
577,500
1,400,000

10,602,500
2,231,550
2,673,414
599,500
1,680,000
980,000
8,164,464
5,500,000
3,200,000
2,000,000
10,700,000
199,949,017
19,994,902
219,943,919
219,900,000

PENAMBAHAN ANGGARAN BIAYA (RAB)


Proyek
: Rehab Bangunan Rumah Tinggal Lantai 2 Ibu Nurjanah
Lokasi
: CondongCatur
Jenis Pek : Konstruksi Rumah Tinggal
NO
I

URAIAN PEKERJAAN

SAT VOLUME

HARGA
SATUAN

PEKERJAAN BONGKARAN
1

Bongkaran Tembok

m2

19.89

15,000
SUB TOTAL

II PEKERJAAN TANAH
1 Galian tanah

m3

12.00

23,000

2 Urug pasair bawah pondasi

m3

0.80

108,500

3 Pondasi batu kali

m3

16.20

300,000

4 Urug tanah kembali

m3

12.00

6,500

5 Rollag

m'

10.50

22,500

6 Lantai Kerja Footplate

pcs

6.00

250,000
SUB TOTAL

III PEKERJAAN DINDING


1 Sloof 15/20

m3

0.40

2,500,000

2 Kolom 15/15

m3

1.07

2,500,000

3 Ring balk atas 15/20

m3

1.29

2,500,000

4 Kolom 15/30

m3

0.94

3,191,450

5 Ring Balok 15/25

m3

0.68

3,191,450

6 Cor Plate Lantai

m3

3.84

3,191,450

7 Cor Dinding Watertorn

m3

2.81

3,191,450

8 Cor Rabat Peninggian Lantai 2

m3

1.80

812,350

9 Pasangan dinding 1/2 bt

m2

16.10

65,250

10 Plesteran-aci

m2

62.20

39,085

11 Sponengan

m'

175.00

5,500

- Plat beton

m3

0.30

1,278,950

- Konsol beton

unit

2.00

45,000

m3

1.30

2,766,450

12 Plat beton canopy

13 Plat Tangga Darurat

SUB TOTAL
IV PEKERJAAN ATAP
1 Genteng Penutup Atap (Genteng Beton)

m2

44.00

47,000

2 Genteng bubungan

m'

3.50

35,000

3 Baja Ringan

m2

44.00

160,000
SUB TOTAL

PEKERJAAN KERAMIK

1 Keramik 40 x 40

m2

3.00

96,804

2 Keramik Km/Wc

m2

10.50

61,369

3 Dinding Km/wc

m2

32.00

70,340

4 Pasang Bath ub

ls

1.00

250,000

5 Pasang Closet Duduk

ls

2.00

150,000

6 Jaringan Air Panas Km/wc Utama

ls

1.00

2,000,000

7 Listelo

m'

16.00

12,500
SUB TOTAL

VI PEKERJAAN PLAFOND
1 Plafond dalam Gypsum LT I (Kayu Kamper)

m2

18.00

122,720

2 List Gypsum plafond dalam

m'

65.00

10,000

3 Compound Duk

m2

32.00

35,000

4 Pasang Center panel 50

pcs

2.00

120,000

5 Compound

m2

36.00

10,000
SUB TOTAL

VII PEKERJAAN KUSEN & DAUN


1 Kusen Pintu Jendela (Jati Lokal)

m'

17.00

70,000

2 Daun pintu panil ( baru ) kayu ajti lokal

bh

2.00

650,000

3 Daun jendela (baru) kayu jati lokal

bh

2.00

275,000

4 Kaca jendela 5mm (kaca Jendela)

m2

0.54

90,000

5 Pengadaan rel Pintu Dorong (Km/wc Utama)

pcs

1.00

750,000

6 Pemasangan Baru Rel Pintu Gantung (pintu Garasi)

pcs
SUB TOTAL

VIII PEKERJAAN CAT-CATAN


1 Cat dinding (Cat Catylax)

m2

62.00

17,000

2 Cat plafond (cat Maxilte)

m2

32.00

15,500

3 Cat genteng (Cat Genteng Express)

m2

44.00

13,564

4 Cat politur kayu (Mowilex)

m2

35.00

24,375
SUB TOTAL

IX PEKERJAAN SANITASI
1 Sal. Air bersih ( D wavin)

m'

17.00

10,000

2 Sal. Air hujan (D wafin)

m'

7.00

55,000

3 Sal. Air kotor (D wafin)

m'

9.50

35,000

4 Kran (KIG)

bh

2.00

50,000

5 Pekerjaan water profing (Aquaproof)

m2

33.50

27,500
SUB TOTAL

PEKERJAAN INSTALASI LISTRIK


1 Instilasi Listrik
- titik lampu down light (untuk lantai atas)

ttk

4.00

250,000

- titik lampu + Lampu

ttk

7.00

150,000

- titik stop kontak (Broco)

ttk

4.00

150,000
SUB TOTAL

XI PEKERJAAN ACESORIS
1 Pasang Canopy

m2

6.00

265,000

2 Pasang Pagar Pengaman

m2

107.25

52,500

3 Pasang Tralis dipagar

ls

1.00

1,500,000

4 Tangga Putar

m'

3.50

950,000

5 Pasang Pintu Dorong

m'

5.00

485,000
SUB TOTAL

JUMLAH
PENGURANGAN ITEM BIAYA PEKERJAAN
JUMLAH HASIL PENGURANGAN
JASA PEMBORONG 10 %
JUMLAH TOTAL
PEMBULATAN
Terbilang : Tujuh Puluh Enam Juta Enam ratus Ribu Rupiah
JUMLAH TOTAL

Rp

81,700,000.0

PENAMBAHAN ITEM HARGA DAUN PINTU

Rp

1,500,000.0

JUMLAH

Rp

83,200,000.0

PENGURANGAN ITEM PEKERJAAN MINI BAR

Rp

10,700,000.0

Rp

72,500,000.0

Yogyakarta,
Disetujui Oleh

Ibu Nurjanah

2009

HARGA

298,350
298,350
276,000
86,800
4,860,000
78,000
236,250
1,500,000
7,037,050
1,000,000
2,662,500
3,225,000
2,999,963
2,154,229
12,255,168
8,975,953
1,462,230
1,050,525
2,431,087
962,500
377,290
90,000
3,601,918
43,248,363
2,068,000
122,500
7,040,000
9,230,500

290,412
644,375
2,250,880
250,000
300,000
2,000,000
200,000
5,935,667
2,208,960
650,000
1,120,000
240,000
360,000
4,578,960
1,190,000
1,300,000
550,000
48,600
750,000
3,838,600
1,054,000
496,000
596,794
853,125
2,999,919
170,000
385,000
332,500
100,000
921,250
1,908,750

1,000,000
1,050,000

600,000
2,650,000
1,590,000

11,145,625

5,630,625
1,500,000
3,325,000
2,425,000
14,470,625
86,966,284
13,889,584
73,076,699
8,696,628
81,773,328
81,700,000

81,700,000.00
1,500,000.00
83,200,000.00
10,700,000.00
72,500,000.00

2009

Rp 8,320,000.00

RENCANA ANGGARAN BIAYA (RAB)


Proyek
Pemilik
Lokasi

: Rehabilitasi Rumah Tinggal 2 Lantai


: IBU Nurjanah
: Condong Catur

NO
I

URAIAN PEKERJAAN

SAT VOLUME

PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi

m2

256.50

2 Uitzet bowplank

m'

37.50

II PEKERJAAN BONGKARAN
1

Bongkaran Tembok

m2

189.19

Bongkaran Plat Beton Tangga& Kolom

m3

2.67

Bongkar Carport

ls

1.00

Bongkar Pintu Garasi

ls

1.00

Bongkar Jendela

unit

6.00

Bongkar Pintu

unit

6.00

Bongkar Rabat carport

m2

13.50

Bongkar Atap

ls

1.00

10

Bongkar Eternit

m2

57.00

11

Bongkar Keramik

m2

82.25

12

Bongkar Pagar

ls

1.00

13

Bongkar Water torn

ls

1.00

1 Galian tanah

m3

32.40

2 Urug pasair bawah pondasi

m3

2.51

3 Pondasi batu kali

m3

18.87

4 Urug tanah kembali

m3

32.40

6 Rollag

m'

17.50

7 Peninggian peil lantai

m3

1.95

8 Lantai Kerja Footplate

pcs

6.00

1 Sloof 15/20

m3

0.85

2 Kolom 15/15

m3

1.68

3 Ring balk atas 15/20

m3

2.09

4 Kolom 15/30

m3

4.00

5 Ring Balok 15/25

m3

3.62

6 Cor Plate Lantai

m3

8.11

III PEKERJAAN TANAH

IV PEKERJAAN DINDING

7 Pasangan dinding 1/2 bt

m2

101.10

8 Plesteran-aci

m2

232.20

9 Sponengan

m'

666.00

- Profil beton

m'

45.50

- Bt. Candi 20x20

m2

45.60

- Batu susun sirih 1X15

m2

6.11

- Plat beton

m3

0.46

- Konsol beton

unit

12.00

m3

1.30

1 Genteng Penutup Atap (Genteng Beton)

m2

92.60

2 Usuk 5/7 & reng 2/3 bengkirai

m2

59.00

3 Gording, nok, mirplat & jurai, Bengkirai 6/12

m'

103.00

4 Talang Jurai (papan Bengkirai)

m'

8.00

5 Genteng bubungan

m'

18.00

6 Lispalank 2/20

m'

22.00

1 Keramik 40 x 40

m2

144.25

2 Lantai rabat

m2

25.50

- Keramik 20 x 20

m2

6.00

- Mozaik

m2

4.00

- Listelo

m'

10.00

2 Keramik Km/Wc

m2

10.50

3 Dinding Km/wc

m2

32.00

4 Pasang Box shower

ls

1.00

5 Pasang Closet Duduk

ls

2.00

6 Jaringan Air Panas Km/wc Utama

ls

1.00

7 Listelo

m'

16.00

1 Plafond dalam Gypsum LT I (Kayu Kamper)

m2

103.00

2 Plafond luar eternit

m2

83.60

3 List Gypsum plafond dalam

m'

211.95

4 List plafond luar

m'

18.60

5 Compound Duk

m2

32.00

10 Pilar teras

11 Plat beton canopy

12 Plat Tangga Darurat


V

PEKERJAAN ATAP

VI PEKERJAAN KERAMIK

3 Keramik

VII PEKERJAAN PLAFOND

6 Compound

m2

67.60

unit

12.00

2 Kusen Pintu Jendela (Jati Lokal)

m'

63.00

3 Daun jendela (baru) kayu jati lokal

bh

11.00

4 Daun pintu panil ( baru ) kayu ajti lokal

bh

6.00

5 Kaca jendela 5mm (kaca BV)

m2

1.54

6 Roster 20/20

bh

20.00

7 Pengadaan rel Pintu Dorong

pcs

1.00

ls

1.00

VIII PEKERJAAN KUSEN & DAUN


1 Pasang Kusen lama

8 Pekerjaan Pasang Kembali pintu garasi


IX PEKERJAAN CAT-CATAN

1 Cat dinding (Cat Catylax)

m2

437.00

2 Cat plafond (cat Maxilte)

m2

135.60

3 Cat genteng (Cat Genteng Express)

m2

98.60

4 Cat politur kayu (Mowilex)

m2

155.60

6 Coating bt candi (Mowillex)

m2

51.71

1 Sal. Air bersih ( D wavin)

m'

42.00

2 Sal. Air hujan (D wafin)

m'

29.00

3 Sal. Air kotor (D wafin)

m'

26.50

4 Kran (KIG)

bh

5.00

5 Sumur Peresapan ( dalam 3 m )

unit

2.00

6 Pasang Conblock

m2

9.00

7 Bak kontrol

unit

2.00

8 Pekerjaan water profing (Aquaproof)

m2

79.00

9 Wastafel (INA)

unit

1.00

- titik lampu down light

ttk

12.00

- titik lampu Spoot

ttk

3.00

- titik lampu + Lampu

ttk

16.00

- titik stop kontak (Broco)

ttk

9.00

PEKERJAAN SANITASI

XI PEKERJAAN INSTALASI LISTRIK


1 Instilasi Listrik

XII PEKERJAAN PASANG (TANPA BAHAN) PENGGANTUNG&PENGUNCI


1 Pasang Engsel pintu

bh

8.00

2 Pasang Hak angin

bh

18.00

3 Pasang Sloot

bh

4.00

4 Pasang Grendel jendela

bh

9.00

5 Pasang Engsel jendela

bh

18.00

6 Pasang handle pintu utama

bh

1.00

7 Pasang Slot pintu uTama

bh

1.00

1 Lampu Taman

ttk

4.00

2 Cor rabat setapak

pcs

25.00

2 Pasang Canopy

m2

26.00

3 Pasang Talang Canopy (Talang plat Besi)

m1

7.00

4 Pasang Lampu Kolom

ttk

4.00

5 Pasang Pagar Pengaman

m2

107.25

6 Pasang Tralis dipagar

m1

1.00

7 Pasang Pintu Dorong

m'

5.00

1 Pasangan Bata Pagar

m2

34.20

2 Plester aci

m2

68.40

3 Sponengan

m1

109.00

4 Pasang Batu alam

m2

12.00

5 Pasang Lampu pagar

ttk

7.00

XIII PEKERJAAN TAMAN & KOLAM

XIV PEKERJAAN ACESORIS

XV PEKERJAAN PAGAR

JUMLAH
JASA PEMBORONG 10 %
JUMLAH TOTAL
PEMBULATAN
TERBILANG :

HARGA
SATUAN

HARGA

3,800

974,700

5,100

191,250

SUB TOTAL

1,165,950

15,000

2,837,850

200,000

534,000

200,000

200,000

150,000

150,000

15,000

90,000

15,000

90,000

20,000

270,000

2,250,000

2,250,000

7,000

399,000

4,000

329,000

750,000

750,000

250,000

250,000

SUB TOTAL

8,149,850

23,000

745,200

108,500

272,335

300,000

5,661,000

6,500

210,600

22,500

393,750

43,000

83,850

250,000

1,500,000

SUB TOTAL

8,866,735

2,500,000

2,125,000

2,500,000

4,187,500

2,500,000

5,225,000

3,191,450

12,765,800

3,191,450

11,561,028

3,191,450

25,889,042

65,250

6,596,775

39,085

9,075,537

5,500

3,663,000

20,000

910,000

140,000

6,384,000

226,688

1,385,061

1,278,950

581,922

45,000

540,000

2,766,450

3,601,918

SUB TOTAL

94,491,583

47,000

4,352,200

85,500

5,044,500

70,000

7,210,000

176,113

1,408,900

35,000

630,000

35,000

770,000

SUB TOTAL

19,415,600

96,804

13,963,977

125,000

3,187,500

61,369

368,214

395,000

1,580,000

12,500

125,000

80,369

843,875

87,340

2,794,880

250,000

250,000

150,000

300,000

2,000,000

2,000,000

12,500

200,000

SUB TOTAL

25,613,446

122,720

12,640,160

90,000

7,524,000

10,000

2,119,500

8,500

158,100

35,000

1,120,000

10,000
SUB TOTAL

676,000
24,237,760

40,000

480,000

70,000

4,410,000

275,000

3,025,000

900,000

5,400,000

90,000

138,600

12,500

250,000

750,000

750,000

400,000

400,000

SUB TOTAL

14,853,600

17,000

7,429,000

15,500

2,101,800

13,564

1,337,361

24,375

3,792,750

22,325

1,154,426

SUB TOTAL

15,815,337

10,000

420,000

55,000

1,595,000

35,000

927,500

50,000

250,000

500,000

1,000,000

50,000

450,000

225,000

450,000

27,500

2,172,500

400,000

400,000

SUB TOTAL

7,665,000

250,000

3,000,000

300,000

900,000

150,000

2,400,000

150,000

1,350,000

SUB TOTAL

7,650,000

15,000

120,000

15,000

270,000

15,000

60,000

15,000

135,000

15,000

270,000

15,000

15,000

15,000

15,000

SUB TOTAL

885,000

250,000

1,000,000

35,000

875,000

SUB TOTAL

1,875,000

265,000

6,890,000

82,500

577,500

350,000

1,400,000

52,500

5,630,625

1,500,000

1,500,000

485,000

15,998,125

SUB TOTAL

31,996,250

65,250

2,231,550

39,085

2,673,414

5,500

599,500

140,000

1,680,000

140,000

980,000

SUB TOTAL

8,164,464
270,845,574
27,084,557
297,930,132
297,900,000

RENCANA TAMBAH KURANG ANGGARAN BIAYA


Proyek
Pemilik
Lokasi

: Rehabilitasi Rumah Tinggal 2 Lantai


: IBU Nurjanah
: Condong Catur

NO
I

HARGA
SATUAN

URAIAN PEKERJAAN

SAT

VOL

JUMLAH HARGA

PEKERJAAN TAMBAH
VOLUME

JUMLAH HARGA

TOTAL HARGA
PEK.TAMBAH-KURANG

PEKERJAAN SANITASI
1 Kran Shower

290,000

pcs

1.00

290,000.00

1.00

290,000.00

2 Toilet Shower

85,000

pcs

2.00

170,000.00

2.00

170,000.00

3 Tempat Sabun

220,000

pcs

1.00

220,000.00

1.00

220,000.00

55,000

pcs

3.00

165,000.00

3.00

165,000.00

500,000

ls

1.00

500,000.00

1.00

4 Stop Kran
5 Bongkar AC & Ganti Selang

1,345,000.00

JUMLAH

500,000.00

1,345,000.00

II PEK. PAS PENGGANTUNG&PENGUNCI


1 Hak Angin Salon ( Bahan)

11,000

bh

12.00

12.00

2 Hak angin Kait ( Bahan)

18,000

bh

4.00

4.00

72,000.00

3 Grendel Jendela ( Bahan)

9,000

bh

22.00

22.00

198,000.00

4 Engsel Jendela ( Bahan)

18,500

bh

12.00

12.00

222,000.00

5 Engsel Pintu ( Bahan)

27,000

bh

3.00

3.00

81,000.00

6 Handle ( Bahan)

175,000

bh

1.00

1.00

175,000.00

7 Slot Pintu ( Bahan)

135,000

bh

3.00

3.00

405,000.00

30,000

bh

2.00

2.00

60,000.00

120,000

bh

1.00

1.00

120,000.00

8 Tutup Kunci ( Bahan)


9 Bel Rumah
JUMLAH

JUMLAH
JUMLAH TOTAL

132,000.00

1,465,000.00

2,810,000.00

2,810,000.00
2,810,000.00

RENCANA TAMBAH KURANG ANGGARAN BIAYA


Proyek
Pemilik
Lokasi

: Rehabilitasi Rumah Tinggal 2 Lantai


: IBU Nurjanah
: Condong Catur

NO
I

HARGA
SATUAN

URAIAN PEKERJAAN

SAT

VOLUME
RENC REALISASI

JUMLAH HARGA

PEKERJAAN KURANG
VOL

JUMLAH HARGA

PEKERJAAN TAMBAH
VOL

JUMLAH HARGA

PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi

3,800

m2

256.50

256.50

974,700.00

2 Uitzet bowplank

5,100

m'

37.50

37.50

191,250.00

2,837,850.00

7.81

117,150.00

534,000.00

1.08

216,000.00

JUMLAH
II PEKERJAAN BONGKARAN
1

Bongkaran Tembok

15,000

m2

189.19

197.00

Bongkaran Plat Beton Tangga& Kolom

200,000

m3

2.67

3.75

Bongkar Carport

200,000

ls

1.00

Bongkar Pintu Garasi

150,000

ls

1.00

Bongkar Jendela

15,000

unit

6.00

10.00

90,000.00

4.00

60,000.00

Bongkar Pintu

15,000

unit

6.00

10.00

90,000.00

4.00

60,000.00

Bongkar Rabat carport

20,000

m2

13.50

13.50

270,000.00

Bongkar Atap

29.50

118,000.00

2,250,000

200,000.00
150,000.00

ls

1.00

1.00

2,250,000.00

10

Bongkar Eternit

7,000

m2

57.00

45.00

399,000.00

12.00

84,000.00

11

Bongkar Keramik

4,000

m2

82.25

111.75

329,000.00

12.75

51,000.00

12

Bongkar Pagar

750,000

ls

1.00

1.00

750,000.00

13

Bongkar Water torn

250,000

ls

1.00

1.00

250,000.00

135,000.00

JUMLAH

571,150.00

III PEKERJAAN TANAH


1 Galian tanah

23,000

m3

32.40

27.00

745,200.00

2 Urug pasair bawah pondasi

108,500

m3

2.51

2.51

272,335.00

3 Urug Pasir bawah carport

108,500

m3

1.59

1.59

172,515.00

4 Pondasi batu kali

300,000

m3

18.87

7.20

6,500

m3

32.40

22,500

m'

17.50

5 Urug tanah kembali


6 Rollag

5.40

124,200.00

5,661,000.00

11.67

3,501,000.00

27.00

210,600.00

5.40

35,100.00

17.50

393,750.00

1.59

172,515.00

7 Peninggian peil lantai

43,000

m3

1.95

12.11

83,850.00

10.16

436,880.00

8 Lantai Kerja Footplate

250,000

pcs

6.00

19.00

1,500,000.00

13.00

3,250,000.00

JUMLAH

3,660,300.00

3,859,395.00

TOTAL HARGA
PEK.TAMBAH-KURANG

IV PEKERJAAN DINDING & BETON


1 Sloof 15/20

2,500,000

m3

0.85

1.23

2,125,000.00

2 Kolom 15/15

2,500,000

m3

1.68

1.68

4,200,000.00

3 Ring balk atas 15/20

2,500,000

m3

2.09

2.09

5,225,000.00

4 Kolom 15/30

3,191,450

m3

4.00

4.09

12,765,800.00

5 Ring Balok 15/25

3,191,450

m3

3.62

3.36

11,553,049.00

6 Cor Kolom 35/35

3,191,450

m3

0.72

3.24

7 Cor Plate Lantai

3,191,450

m3

8.11

10.14

8 Pasangan dinding 1/2 bt

65,250

m2

101.10

189.00

9 Plesteran-aci

39,085

m2

232.20

5,500

m'

20,000

- Bt. Candi 20x20


- Batu susun sirih 1X15

10 Sponengan

0.38

950,000.00

0.09

287,230.50

2,297,844.00

2.52

8,042,454.00

25,882,659.50

2.03

6,478,643.50

6,596,775.00

87.90

5,735,475.00

378.00

9,075,537.00

145.80

5,698,593.00

666.00

450.00

3,663,000.00 216.00

m'

45.50

12.00

910,000.00

140,000

m2

45.60

57.90

6,384,000.00

12.30

1,722,000.00

226,688

m2

6.11

6.11

1,385,060.63

1,278,950

m3

0.46

1.27

588,317.00

0.81

1,035,949.50

45,000

unit

12.00

0.00

540,000.00

11 Mainan

0.26

1,188,000.00

- Profil beton

12 Plat beton canopy

33.50

670,000.00

- Plat beton
- Konsol beton

12.00

540,000.00

3,227,777.00

JUMLAH
V

829,777.00

29,950,345.50

PEKERJAAN ATAP
1 Genteng Penutup Atap (Genteng Beton)

47,000

m2

92.60

22.00

4,352,200.00

2 Pasang Kembali Genteng Lama

15,000

m2

115.50

115.50

1,732,500.00

115.50

1,732,500.00

3 Usuk 5/7 & reng 2/3 bengkirai

85,500

m2

59.00

96.25

5,044,500.00

37.25

3,184,875.00

4 Gording, nok, mirplat & jurai, Bengkirai 6/12

70,000

m'

51.50

33.00

3,605,000.00

5 Talang Jurai (papan Bengkirai)

70.60

18.50

3,318,200.00

1,295,000.00

176,113

m'

8.00

13.00

1,408,900.00

5.00

880,562.50

6 Genteng bubungan

35,000

m'

18.00

30.00

630,000.00

12.00

420,000.00

7 Lispalank 2/20

35,000

m'

22.00

28.00

770,000.00

6.00

210,000.00

8 Pasang Kuda-kuda

80,000

40.20

40.20

40.20

3,216,000.00

1,500,000

ls

1.00

1.00

9 Pasang konstruksi kremona


JUMLAH

1,500,000.00

1.00

4,613,200.00

1,500,000.00

11,143,937.50

VI PEKERJAAN KERAMIK
1 Keramik 40 x 40

96,804

m2

144.25

219.00

13,963,977.00

125,000

m3

25.50

25.50

3,187,500.00

61,369

m2

6.00

368,214.00

- Mozaik

395,000

m2

4.00

1,580,000.00

- Listelo

2 Lantai rabat
3 Keramik

35.00

3,388,140.00

74.75

7,236,099.00

6.00

368,214.00

2.20

135,011.80

4.00

1,580,000.00

5.50

480,370.00

2.00

300,000.00

2.50

287,500.00

- Keramik 20 x 20

12,500

10.00

125,000.00

10.00

125,000.00

2 Keramik Km/Wc

80,369

m2

10.50

8.25

843,874.50

2.25

180,830.25

3 Dinding Km/wc

87,340

m2

32.00

37.50

2,794,880.00

10.50

917,070.00

4 List km/wc

15,000

1.00

15,000.00

1.00

15,000.00

5 Pasang Box shower

250,000

ls

1.00

1.00

6 Pasang Closet Duduk

150,000

ls

1.00

3.00

150,000.00

2,000,000

ls

1.00

1.00

2,000,000.00

115,000

6.00

8.50

690,000.00

7 Jaringan Air Panas Km/wc Utama


8 Listelo Lantai
9 Mainan Dinding km/wc

250,000.00

- Mozaik

395,000

m2

2.00

2.00

790,000.00

2.00

6,574,254.25

JUMLAH

790,000.00

9,228,980.80

VII PEKERJAAN PLAFOND


1 Plafond dalam Gypsum LT I (Kayu Kamper)

95,000

m2

103.00

64.94

9,785,000.00

38.06

3,615,700.00

2 Plafond luar eternit

90,000

m2

83.60

23.40

7,524,000.00

60.20

5,418,000.00

3 List Gypsum plafond dalam

10,000

211.95

211.95

2,119,500.00

4 List plafond luar

8,500

18.60

23.40

158,100.00

4.80

40,800.00

5 Compound Duk

35,000

m2

32.00

58.54

1,120,000.00

26.54

928,900.00

10,000

m2

67.60

56.00

676,000.00

120,000

pcs

5.00

5.00

600,000.00

6 Compound
7 Pasang Center 50

11.60

116,000.00
5.00

9,149,700.00

JUMLAH

600,000.00

1,569,700.00

VIII PEKERJAAN KUSEN & DAUN


1 Pasang Kusen lama & Baru

40,000

unit

12.00

22.00

480,000.00

10.00

400,000.00

2 Kusen Pintu Jendela (Jati Lokal)

70,000

m'

63.00

65.50

4,410,000.00

2.50

175,000.00

3 Daun jendela (baru) kayu jati lokal

275,000

bh

11.00

14.00

3,025,000.00

3.00

825,000.00

4 Daun pintu panil ( baru ) kayu ajti lokal

900,000

bh

6.00

3.00

5,400,000.00

71.00

887,500.00

250,000.00

3.00

2,700,000.00

1.00

750,000.00

6 Kaca jendela 5mm (kaca BV)

90,000

m2

1.50

1.50

135,000.00

7 Roster 20/20

12,500

pcs

20.00

91.00

250,000.00

8 Pengadaan rel Pintu Dorong

750,000

ls

1.00

9 Pekerjaan Pasang Kembali pintu garasi

400,000

ls

1.00

1.00

250,000

ls

1.00

1.00

1.00

50,000

pcs

5.00

5.00

5.00

10 Perbaikan Kusen Garasi & Belakang


11 Perbaikan Daun Pintu
JUMLAH

750,000.00
400,000.00

3,450,000.00

250,000.00

2,787,500.00

IX PEKERJAAN CAT-CATAN
1 Cat dinding (Cat Dulux)

23,938

m2

437.00

618.50

10,460,687.50

7.50

2 Cat plafond (cat Maxilte)

15,500

m2

135.60

167.75

2,101,800.00

2.25

3 Cat genteng (Cat Genteng Express)

13,564

m2

98.60

136.00

1,337,361.10 136.00

4 Cat Melamine kayu kusen

24,375

155.60

326.75

5 Cat Melamine daun pintu kayu

45,000

m2

51.71

6 Coating bt candi (Mowillex)

22,325

m2

49.39

7 Cat Lisplank ( Cat Minyak "Emco")

25,000

m2

7.50

7.50

4,344,656.25

34,875.00

32.15

1,844,636.00

37.40

507,274.90

3,792,750.00

171.15

4,171,781.25

48.70

2,326,950.00

3.01

135,450.00

57.90

1,102,631.75

8.51

189,985.75

7.50

JUMLAH
X

179,531.25 181.50

498,325.00

187,500.00

10,034,973.15

2,059,042.25

PEKERJAAN SANITASI
1 Sal. Air bersih ( D wavin)

10,000

42.00

42.00

420,000.00

2 Sal. Air hujan (D wafin)

55,000

29.00

29.00

1,595,000.00

3 Sal. Air kotor (D wafin)

35,000

26.50

26.50

927,500.00

4 Kran (KIG)

50,000

bh

5.00

5.00

250,000.00

500,000

unit

2.00

2.00

1,000,000.00

5 Sumur Peresapan ( dalam 3 m )


6 Pasang Conblock
7 Bak kontrol
8 Pekerjaan water profing (Aquaproof)

50,000

m2

9.00

450,000.00

9.00

450,000.00

225,000

unit

2.00

1.00

450,000.00

1.00

225,000.00

27,500

m2

45.50

49.00

1,251,250.00

3.50

675,000.00

JUMLAH

96,250.00

96,250.00

XI PEKERJAAN INSTALASI LISTRIK


1 Instilasi Listrik
- titik lampu down light

250,000

ttk

12.00

10.00

3,000,000.00

- titik lampu Spoot

300,000

ttk

3.00

3.00

900,000.00

2.00

- titik lampu + Lampu

150,000

ttk

16.00

16.00

2,400,000.00

- titik stop kontak (Broco)

150,000

ttk

9.00

30.00

1,350,000.00

21.00

- Titik Kabel TV

150,000

ttk

4.00

4.00

600,000.00

4.00

600,000.00

- Saklar single

150,000

ttk

11.00

11.00

1,650,000.00

11.00

1,650,000.00

- Saklar Double

150,000

ttk

8.00

8.00

1,200,000.00

8.00

1,200,000.00

- Lampu Tiang

350,000

ttk

4.00

2.00

1,400,000.00

2.00

500,000.00

700,000.00

1,200,000.00

JUMLAH

3,150,000.00

6,600,000.00

XII PEK. PAS PENGGANTUNG&PENGUNCI


1 Pasang Engsel pintu

15,000

bh

8.00

12.00

120,000.00

4.00

60,000.00

2 Pasang Hak angin

15,000

bh

18.00

22.00

270,000.00

4.00

60,000.00

3 Pasang Sloot

15,000

bh

4.00

9.00

60,000.00

5.00

75,000.00

4 Pasang Grendel jendela

15,000

bh

9.00

22.00

135,000.00

13.00

195,000.00

5 Pasang Engsel jendela

15,000

bh

18.00

22.00

270,000.00

4.00

60,000.00

6 Pasang handle pintu utama

15,000

bh

1.00

3.00

15,000.00

2.00

30,000.00

7 Pasang Slot pintu uTama

15,000

bh

1.00

0.00

15,000.00

JUMLAH

1.00

15,000.00

15,000.00

480,000.00

XIII PEKERJAAN TAMAN & KOLAM


1 Lampu Taman

250,000

ttk

4.00

2.00

1,000,000.00

35,000

pcs

25.00

25.00

875,000.00

3 Koral Skat

150,000

m2

4 Water Wall

400,000

m2

2 Cor rabat setapak

2.00

500,000.00

500,000.00

JUMLAH
XIV PEKERJAAN ACESORIS
1 Pasang Canopy Stainless

375,000

m2

18.13

18.13

6,798,750.00

2 Pasang Talang Canopy (Talang plat Besi)

150,000

9.80

9.80

1,470,000.00

3 Pasang Pagar Pengaman (jeruji)

210,000

m2

38.30

38.30

8,043,000.00

4 Pasang Tralis dipagar

225,000

m2

4.32

4.32

972,000.00

5 Railing Tangga

125,000

10.20

10.20

1,275,000.00

6 Pintu Dorong

300,000

m2

8.36

8.36

2,508,000.00

7 Pintu Kecil

300,000

m2

1.19

1.19

357,000.00

8 Canopy Lantai Atas

260,000

m2

15.33

15.33

3,985,800.00

75,000

3.60

3.60

270,000.00

10 Pasang Glassblock

9 Asesoris ( tombak )

120,000

m2

12.00

12.00

1,440,000.00

11 Tutup Wather thorn

750,000

ls

1.00

1.00

750,000.00

12 Acecories depan

800,000

ls

1.00

1 Pasangan Bata Pagar

65,250

m2

34.20

34.20

2,231,550.00

2 Plester aci

39,085

m2

68.40

68.40

2,673,414.00

3 Sponengan

5,500

109.00

109.00

599,500.00

4 Pasang Batu alam

140,000

m2

12.00

12.00

1,680,000.00

5 Pasang Lampu pagar

800,000.00

JUMLAH
XV PEKERJAAN PAGAR

140,000

ttk

7.00

7.00

980,000.00

6 Pekerjaan Camport

19,385

m2

23.40

23.40

453,609.00

7 Pekerjaan Pasang Profil

12,000

44.40

44.40

532,800.00

JUMLAH

JUMLAH

33,200,231.25

76,322,231.95

43,122,000.70

JUMLAH TOTAL

43,122,000.70

PEMBULATAN

43,100,000.00

TERBILANG :

RENCANA TAMBAH KURANG ANGGARAN BIAYA


Proyek
Pemilik
Lokasi

: Rehabilitasi Rumah Tinggal 2 Lantai


: IBU Nurjanah
: Condong Catur

NO
I

HARGA
SATUAN

URAIAN PEKERJAAN

SAT

VOLUME
RENC

REALISASI

PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi

3,800

m2

256.50

256.50

2 Uitzet bowplank

5,100

m'

37.50

37.50

15,000

m2

189.19

197.00
3.75

JUMLAH
II PEKERJAAN BONGKARAN
1

Bongkaran Tembok

Bongkaran Plat Beton Tangga& Kolom

200,000

m3

2.67

Bongkar Carport

200,000

ls

1.00

Bongkar Pintu Garasi

150,000

ls

1.00

Bongkar Jendela

15,000

unit

6.00

10.00

Bongkar Pintu

15,000

unit

6.00

10.00

Bongkar Rabat carport

20,000

m2

13.50

13.50

Bongkar Atap

ls

1.00

1.00

2,250,000

10

Bongkar Eternit

7,000

m2

57.00

45.00

11

Bongkar Keramik

4,000

m2

82.25

124.50

12

Bongkar Pagar

750,000

ls

1.00

1.00

13

Bongkar Water torn

250,000

ls

1.00

1.00

23,000

m3

32.40

27.00

2 Urug pasair bawah pondasi

108,500

m3

2.51

2.51

3 Urug Pasir bawah carport

108,500

m3

1.59

1.59

4 Pondasi batu kali

300,000

m3

18.87

7.20

6,500

m3

32.40

27.00

6 Rollag

22,500

m'

17.50

17.50

7 Peninggian peil lantai

43,000

m3

1.95

12.11

8 Lantai Kerja Footplate

250,000

pcs

6.00

19.00

1 Sloof 15/20

2,500,000

m3

0.85

1.23

2 Kolom 15/15

2,500,000

m3

1.68

1.68

3 Ring balk atas 15/20

2,500,000

m3

2.09

2.09

4 Kolom 15/30

3,191,450

m3

4.00

4.09

5 Ring Balok 15/25

3,191,450

m3

3.62

3.36

JUMLAH
III PEKERJAAN TANAH
1 Galian tanah

5 Urug tanah kembali

JUMLAH
IV PEKERJAAN DINDING & BETON

6 Cor Kolom 35/35

3,191,450

m3

0.72

3.24

7 Cor Plate Lantai

3,191,450

m3

8.11

10.14

8 Pasangan dinding 1/2 bt

65,250

m2

101.10

189.00

9 Plesteran-aci

39,085

m2

232.20

378.00

5,500

m'

666.00

450.00

20,000

m'

45.50

12.00

- Bt. Candi 20x20

140,000

m2

45.60

57.90

- Batu susun sirih 1X15

226,688

m2

6.11

6.11

1,278,950

m3

0.46

1.27

45,000

unit

12.00

0.00

1 Genteng Penutup Atap (Genteng Beton)

47,000

m2

92.60

22.00

2 Pasang Kembali Genteng Lama

15,000

m2

115.50

115.50

3 Usuk 5/7 & reng 2/3 bengkirai

85,500

m2

59.00

96.25

4 Gording, nok, mirplat & jurai, Bengkirai 6/12

70,000

m'

51.50

33.00

176,113

m'

8.00

13.00

6 Genteng bubungan

35,000

m'

18.00

30.00

7 Lispalank 2/20

35,000

m'

22.00

28.00

8 Pasang Kuda-kuda

80,000

40.20

40.20

1,500,000

ls

1.00

1.00

96,804

m2

144.25

254.00

125,000

m3

25.50

25.50

61,369

m2

6.00

- Mozaik

395,000

m2

4.00

- Listelo

12,500

10.00

2 Keramik Km/Wc

80,369

m2

10.50

10.50

3 Dinding Km/wc

87,340

m2

32.00

48.00

4 List km/wc

15,000

1.00

5 Pasang Box shower

250,000

ls

1.00

1.00

6 Pasang Closet Duduk

150,000

ls

1.00

3.00

2,000,000

ls

1.00

1.00

115,000

6.00

8.50

96,804

18.65

18.65

10 Sponengan
11 Mainan
- Profil beton

12 Plat beton canopy


- Plat beton
- Konsol beton
JUMLAH
V

PEKERJAAN ATAP

5 Talang Jurai (papan Bengkirai)

9 Pasang konstruksi kremona


JUMLAH
VI PEKERJAAN KERAMIK
1 Keramik 40 x 40
2 Lantai rabat
3 Keramik
- Keramik 20 x 20

7 Jaringan Air Panas Km/wc Utama


8 Listelo Lantai
9 List Dinding Bawah
10 Mainan Dinding km/wc

- Mozaik

395,000

m2

2.00

2.00

1 Plafond dalam Gypsum LT I (Kayu Kamper)

95,000

m2

103.00

64.94

2 Plafond luar eternit

90,000

m2

83.60

23.40

3 List Gypsum plafond dalam

10,000

211.95

211.95

4 List plafond luar

8,500

18.60

23.40

5 Compound Duk

35,000

m2

32.00

58.54

6 Compound

10,000

m2

67.60

56.00

120,000

pcs

5.00

5.00

1 Pasang Kusen lama & Baru

40,000

unit

12.00

22.00

2 Kusen Pintu Jendela (Jati Lokal)

70,000

m'

63.00

65.50

3 Daun jendela (baru) kayu jati lokal

275,000

bh

11.00

14.00

4 Daun pintu panil ( baru ) kayu ajti lokal

900,000

bh

6.00

3.00

6 Kaca jendela 5mm (kaca BV)

90,000

m2

1.50

1.50

7 Roster 20/20

12,500

pcs

20.00

91.00

8 Pengadaan rel Pintu Dorong

750,000

ls

1.00

9 Pekerjaan Pasang Kembali pintu garasi

400,000

ls

1.00

1.00

250,000

ls

1.00

1.00

50,000

pcs

5.00

5.00

1 Cat dinding (Cat Dulux)

23,938

m2

437.00

626.00

2 Cat plafond (cat Maxilte)

15,500

m2

135.60

170.00

3 Cat genteng (Cat Genteng Express)

13,564

m2

98.60

272.00

4 Cat Melamine kayu kusen

24,375

155.60

326.75

5 Cat Melamine daun pintu kayu

45,000

m2

51.71

48.70

6 Coating bt candi (Mowillex)

22,325

m2

49.39

57.90

7 Cat Lisplank ( Cat Minyak "Emco")

25,000

m2

7.50

7.50

1 Sal. Air bersih ( D wavin)

10,000

42.00

42.00

2 Sal. Air hujan (D wafin)

55,000

29.00

29.00

3 Sal. Air kotor (D wafin)

35,000

26.50

26.50

4 Kran (KIG)

50,000

bh

5.00

5.00

500,000

unit

2.00

2.00

50,000

m2

9.00

225,000

unit

2.00

JUMLAH
VII PEKERJAAN PLAFOND

7 Pasang Center 50
JUMLAH
VIII PEKERJAAN KUSEN & DAUN

10 Perbaikan Kusen Garasi & Belakang


11 Perbaikan Daun Pintu
JUMLAH
IX PEKERJAAN CAT-CATAN

JUMLAH
X

PEKERJAAN SANITASI

5 Sumur Peresapan ( dalam 3 m )


6 Pasang Conblock
7 Bak kontrol

1.00

8 Pekerjaan water profing (Aquaproof)

27,500

m2

45.50

49.00

400,000

ls

1.00

1.00

10 Kran Shower

290,000

pcs

2.00

2.00

11 Toilet Shower

85,000

pcs

3.00

3.00

12 Tempat Sabun

220,000

pcs

2.00

2.00

55,000

pcs

3.00

3.00

500,000

ls

1.00

1.00

- titik lampu down light

250,000

ttk

12.00

10.00

- titik lampu Spoot

300,000

ttk

3.00

3.00

- titik lampu + Lampu

150,000

ttk

16.00

16.00

- titik stop kontak (Broco)

150,000

ttk

9.00

30.00

- Titik Kabel TV

150,000

ttk

4.00

4.00

- Saklar single

150,000

ttk

11.00

11.00

- Saklar Double

150,000

ttk

8.00

8.00

- Lampu Tiang

350,000

ttk

4.00

2.00

1 Pasang Engsel pintu

15,000

bh

8.00

12.00

2 Pasang Hak angin

15,000

bh

18.00

22.00

3 Pasang Sloot

15,000

bh

4.00

9.00

4 Pasang Grendel jendela

15,000

bh

9.00

22.00

5 Pasang Engsel jendela

15,000

bh

18.00

22.00

6 Pasang handle pintu utama

15,000

bh

1.00

3.00

7 Pasang Slot pintu uTama

15,000

bh

1.00

0.00

8 Hak Angin Salon ( Bahan)

11,000

bh

12.00

12.00

9 Hak angin Kait ( Bahan)

18,000

bh

4.00

4.00

10 Grendel Jendela ( Bahan)

9,000

bh

22.00

22.00

11 Engsel Jendela ( Bahan)

18,500

bh

12.00

12.00

12 Engsel Pintu ( Bahan)

27,000

bh

3.00

3.00

13 Handle ( Bahan)

175,000

bh

1.00

1.00

14 Slot Pintu ( Bahan)

135,000

bh

3.00

3.00

30,000

bh

2.00

2.00

250,000

ttk

4.00

2.00

35,000

pcs

25.00

25.00

150,000

m2

9 Wastafel (TOTO)

13 Stop Kran
14 Bongkar AC & Ganti Selang
JUMLAH
XI PEKERJAAN INSTALASI LISTRIK
1 Instilasi Listrik

JUMLAH
XII PEK. PAS PENGGANTUNG&PENGUNCI

15 Tutup Kunci ( Bahan)


JUMLAH
XIII PEKERJAAN TAMAN & KOLAM
1 Lampu Taman
2 Cor rabat setapak
3 Koral Skat

4 Water Wall

400,000

m2

1 Pasang Canopy Stainless

375,000

m2

18.13

18.13

2 Pasang Talang Canopy (Talang plat Besi)

150,000

9.80

9.80

3 Pasang Pagar Pengaman (jeruji)

210,000

m2

38.30

38.30

4 Pasang Tralis dipagar

225,000

m2

4.32

4.32

5 Railing Tangga

125,000

10.20

10.20

6 Pintu Dorong

300,000

m2

8.36

8.36

7 Pintu Kecil

300,000

m2

1.19

1.19

8 Canopy Lantai Atas

260,000

m2

15.33

15.33

9 Asesoris ( tombak )

75,000

3.60

3.60

120,000

m2

12.00

12.00

JUMLAH
XIV PEKERJAAN ACESORIS

10 Pasang Glassblock
11 Tutup Watnoren

m2

12 Acecories depan

m
JUMLAH

XV PEKERJAAN PAGAR
1 Pasangan Bata Pagar

65,250

m2

34.20

34.20

2 Plester aci

39,085

m2

68.40

68.40

3 Sponengan

5,500

109.00

109.00

4 Pasang Batu alam

140,000

m2

12.00

12.00

5 Pasang Lampu pagar

140,000

ttk

7.00

7.00

6 Pekerjaan Camport

19,385

m2

23.40

23.40

7 Pekerjaan Pasang Profil

12,000

44.40

44.40

JUMLAH

JUMLAH
JASA PEMBORONG 10 %
JUMLAH TOTAL
PEMBULATAN

TERBILANG : TIGA RATUS TUJUH PULUH SATU JUTA SERATUS RIBU RUPIAH

JUMLAH HARGA

PEKERJAAN KURANG
VOLUME

JUMLAH HARGA

PEKERJAAN TAMBAH
VOLUME

JUMLAH HARGA

974,700.00
191,250.00

1,165,950.00
2,837,850.00

7.81

117,150.00

534,000.00

1.08

216,000.00

90,000.00

4.00

60,000.00

90,000.00

4.00

60,000.00

42.25

169,000.00

200,000.00
150,000.00

270,000.00
2,250,000.00
399,000.00

12.00

84,000.00

329,000.00
750,000.00
250,000.00

8,149,850.00
745,200.00

84,000.00
5.40

622,150.00

124,200.00

272,335.00
172,515.00

1.59

172,515.00

83,850.00

10.16

436,880.00

1,500,000.00

13.00

3,250,000.00

5,661,000.00

11.67

3,501,000.00

210,600.00

5.40

35,100.00

393,750.00

9,039,250.00

3,536,100.00

2,125,000.00

3,859,395.00
0.38

950,000.00

0.09

287,230.50

4,200,000.00
5,225,000.00
12,765,800.00
11,553,049.00

0.26

829,777.00

2,297,844.00

2.52

8,042,454.00

25,882,659.50

2.03

6,478,643.50

6,596,775.00

87.90

5,735,475.00

9,075,537.00

145.80

5,698,593.00

12.30

1,722,000.00

0.81

1,035,949.50

3,663,000.00

216.00

1,188,000.00

33.50

670,000.00

910,000.00
6,384,000.00
1,385,060.63
588,317.00
540,000.00

12.00

93,192,042.13
4,352,200.00

540,000.00

3,227,777.00
70.60

29,950,345.50

3,318,200.00

1,732,500.00

115.50

1,732,500.00

5,044,500.00

37.25

3,184,875.00

1,408,900.00

5.00

880,562.50

630,000.00

12.00

420,000.00

770,000.00

6.00

210,000.00

40.20

3,216,000.00

1.00

1,500,000.00

3,605,000.00

18.50

1,295,000.00

1,500,000.00

19,043,100.00

4,613,200.00

13,963,977.00

11,143,937.50
109.75

10,624,239.00

3,187,500.00
368,214.00

6.00

368,214.00

2.20

135,011.80

1,580,000.00

4.00

1,580,000.00

125,000.00

10.00

125,000.00
16.00

1,397,440.00

2.00

300,000.00

690,000.00

2.50

287,500.00

1,805,394.60

18.65

1,805,394.60

843,874.50
2,794,880.00
15,000.00

1.00

15,000.00

250,000.00
150,000.00
2,000,000.00

790,000.00

2.00

28,563,840.10

2,088,214.00

9,785,000.00

38.06

3,615,700.00

7,524,000.00

60.20

5,418,000.00

790,000.00

15,339,585.40

2,119,500.00

158,100.00

4.80

40,800.00

1,120,000.00

26.54

928,900.00

676,000.00

11.60

116,000.00

600,000.00

5.00

21,982,600.00

9,149,700.00

600,000.00

1,569,700.00

480,000.00

10.00

400,000.00

4,410,000.00

2.50

175,000.00

3,025,000.00

3.00

825,000.00

71.00

887,500.00

1.00

250,000.00

5.00

250,000.00

5,400,000.00

3.00

2,700,000.00

135,000.00
250,000.00
750,000.00

1.00

750,000.00

400,000.00

14,850,000.00

750,000.00

2,787,500.00

10,460,687.50

189.00

4,524,187.50

2,101,800.00

34.40

533,200.00

1,337,361.10

173.40

2,351,910.90

3,792,750.00

171.15

4,171,781.25

2,326,950.00

3.01

135,450.00

1,102,631.75

8.51

189,985.75

7.50

187,500.00

21,122,180.35

12,094,015.40

420,000.00
1,595,000.00
927,500.00
250,000.00
1,000,000.00
450,000.00

9.00

450,000.00

450,000.00

1.00

225,000.00

1,251,250.00

3.50

96,250.00

2.00

580,000.00

3.00

255,000.00

2.00

440,000.00

3.00

165,000.00

1.00

500,000.00

400,000.00

6,743,750.00

3,000,000.00

675,000.00

2.00

2,036,250.00

500,000.00

900,000.00
2,400,000.00
1,350,000.00

21.00

3,150,000.00

600,000.00

4.00

600,000.00

1,650,000.00

11.00

1,650,000.00

1,200,000.00

8.00

1,200,000.00

1,400,000.00

2.00

12,500,000.00

700,000.00

1,200,000.00

6,600,000.00

120,000.00

4.00

60,000.00

270,000.00

4.00

60,000.00

60,000.00

5.00

75,000.00

135,000.00

13.00

195,000.00

270,000.00

4.00

60,000.00

15,000.00

2.00

30,000.00

12.00

132,000.00

4.00

72,000.00

22.00

198,000.00

12.00

222,000.00

3.00

81,000.00

1.00

175,000.00

3.00

405,000.00

2.00

60,000.00

15,000.00

1.00

885,000.00
1,000,000.00
875,000.00

15,000.00

15,000.00
2.00

500,000.00

1,825,000.00

1,875,000.00

500,000.00

6,798,750.00
1,470,000.00
8,043,000.00
972,000.00
1,275,000.00
2,508,000.00
357,000.00
3,985,800.00
270,000.00
1,440,000.00
-

27,119,550.00
2,231,550.00
2,673,414.00
599,500.00
1,680,000.00
980,000.00
453,609.00
532,800.00

9,150,873.00

275,382,985.58

25,838,991.00

87,827,878.80
8,782,787.88
96,610,666.68
96,600,000.00

15,973,925.00

TOTAL HARGA

1,165,950.00

8,688,000.00

9,362,545.00

119,914,610.63

25,573,837.50

41,815,211.50

14,402,600.00

16,887,500.00

33,216,195.75

8,105,000.00

17,900,000.00

2,695,000.00

1,375,000.00

27,119,550.00

9,150,873.00

337,371,873.38
33,737,187.34
371,109,060.71
371,100,000.00

RENCANA ANGGARAN BIAYA (RAB)


Proyek
: CondongCatur
Kavling
: Konstruksi Rumah Tinggal
Jenis Pek : PEMBANGUNAN RUMAH TINGGAL

NO
I

URAIAN PEKERJAAN

54

SAT

PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi

m2

2 Uitzet bowplank

m'

II PEKERJAAN BONGKARAN
1

Bongkaran Tembok

m2

Bongkaran Plat Beton Tangga& Kolom

m3

Bongkar Carport

ls

Bongkar Pintu Garasi

ls

Bongkar Jendela

unit

Bongkar Pintu

unit

Bongkar Rabat carport

m2

Bongkar Atap

ls

10

Bongkar Eternit

m2

11

Bongkar Keramik

m2

12

Bongkar Pagar

ls

14

Bongkar Water torn

ls

III PEKERJAAN TANAH


1 Galian tanah

m3

2 Urug pasair bawah carport

m3

3 Pondasi batu kali

m3

4 Urug tanah kembali

m3

6 Rollag

m'

7 Peninggian peil lantai

m3

8 Lantai Kerja Footplate

m3

IV PEKERJAAN DINDING & BETON


1 Sloof 15/20

m3

2 Kolom 15/15

m3

3 Ring balk atas 15/20

m3

4 Kolom 15/30

m3

5 Ring Balok 15/25

m3

6 Cor Kolom 35/35

m3

7 Cor Plate Lantai

m3

8 Cor Dinding Watertorn

m3

9 Cor Rabat Peninggian Lantai 2

m3

10 Pasangan dinding 1/2 bt

m2

11 Plesteran-aci

m2

12 Sponengan

m'

13 Pilar teras
- Profil beton

m'

- Bt. Candi 20x20

m2

- Batu susun sirih 1X15

m2

14 Plat beton canopy


- Plat beton

m3

- Konsol beton

unit

15 Plat Tangga Darurat


V

m3

PEKERJAAN ATAP
1 Genteng Penutup Atap (Genteng Beton)

m2

2 Usuk 5/7 & reng 2/3 bengkirai

m2

3 Gording, nok, mirplat & jurai, Bengkirai 6/12

m'

4 Talang Jurai (papan Bengkirai)

m'

5 Genteng bubungan

m'

6 Lisplank 2/20

m'

7 Pasang Konstruksi Kremona

ls

VI PEKERJAAN KERAMIK
1 Keramik 40 x 40

m2

2 Lantai rabat

m2

3 Keramik Km/Wc

m2

4 Dinding Km/wc

m2

5 List km/wc

m'

6 Pasang Closet Duduk

ls

7 Jaringan Air Panas Km/wc Utama

ls

8 Listelo

m'

9 List Dinding

m2

10 Mainan Lantai
- batu-batuan

m2

- Mozaik

m2

VII PEKERJAAN PLAFOND

1 Plafond dalam Gypsum

m2

3 Plafond luar eternit

m2

4 List Gypsum plafond dalam

m'

5 List plafond luar

m'

6 Compound Duk

m2

7 Pasang Center panel 50

pcs

8 Compound

m2

VIII PEKERJAAN KUSEN & DAUN


1 Pasang Kusen lama

unit

2 Kusen Pintu Jendela (Jati Lokal)

m'

3 Daun jendela (baru) kayu jati lokal

bh

4 Daun pintu panil ( baru ) kayu ajti lokal kaca 5 mm

bh

5 Kaca jendela 5mm (kaca BV)

m2

6 Pengadaan rel Pintu Dorong (Km/wc Utama)

pcs

7 Pekerjaan Pasang Kembali pintu garasi

ls

IX PEKERJAAN CAT-CATAN

1 Penguranagan Harga Satuan dari Cat Cathylac & Cat Dulux

m2

2 Cat plafond (cat Maxilte)

m2

3 Cat genteng (Cat Genteng Express)

m2

4 Cat politur Kusen kayu

m2

5 Cat politur Daun Pintu kayu

m3

6 Coating bt candi (Mowillex)

m2

PEKERJAAN SANITASI
1 Sal. Air bersih ( D wavin)

m'

2 Sal. Air hujan (D wafin)

m'

3 Sal. Air kotor (D wafin)

m'

4 Kran (KIG)

bh

5 Sumur Peresapan ( dalam 3 m )

unit

6 Pasang Conblock

m2

7 Bak kontrol

unit

8 Pekerjaan water profing (Aquaproof)

m2

9 Wastafel (INA)

unit

XI PEKERJAAN INSTALASI LISTRIK


1 Instilasi Listrik
- titik lampu down light

ttk

- titik lampu Spoot

ttk

- titik lampu + Lampu

ttk

- titik stop kontak (Broco)

ttk

- Titik Kabel TV

ttk

- Saklar single

ttk

- Saklar Double

ttk

XII PEKERJAAN PASANG PENGGANTUNG&PENGUNCI


1 Pasang Engsel pintu

bh

2 Pasang Hak angin

bh

3 Pasang Sloot

bh

4 Pasang Grendel jendela

bh

5 Pasang Engsel jendela

bh

6 Pasang handle pintu utama

bh

7 Pasang Slot pintu uTama

bh

XIII PEKERJAAN TAMAN & KOLAM


1 Lampu Taman

ttk

2 Cor rabat setapak

pcs

XIV PEKERJAAN ACESORIS (PINTU TRALIS,RAILING&CANOPY)


1 Pasang Canopy Stainless

m2

2 Pasang Talang Canopy (Talang plat Besi)

m1

3 Pasang Pagar Pengaman

m2

4 Pasang Tralis dipagar

pcs

5 Railing Tangga

m1

6 Pintu Dorong

m2

7 Pintu Kecil

m2

8 Canopy Lantai Atas

m2

9 Asesoris ( tombak )

m1

10 Pasang Glassblock

m2

XV PEKERJAAN PAGAR
1 Pasangan Bata Pagar

m2

2 Plester aci

m2

3 Sponengan

m1

4 Pasang Batu alam

m2

5 Pasang Lampu pagar

ttk

6 Pek Camprot

m2

7 Profil Beton

m1

JUMLAH
JASA PEMBORONG 10 %
JUMLAH TOTAL
PEMBULATAN
Terbilang :Delapan Puluh Dua Juta Rupiah

NO

URAIAN PEKERJAAN

Rab Total Pekerjaan Penambahan & Pek.Pintu,Railing,Canopy


1 Penguranagan Pekerjaan Tralis,Canopy,Railing & Pagar Pintu (harga lama)
2 Pengurangan Titik Downlight
PENGURANGAN
PEMBULATAN

Terbilang :

SAT

VOLUME

HARGA
SATUAN

HARGA

BOBOT

3,800

5,100

SUB TOTAL

27.00

15,000

405,000

0.39

1.92

200,000

383,700

0.37

200,000

150,000

4.00

15,000

60,000

0.06

2.00

15,000

30,000

0.03

20,000

1.00

2,250,000

2,250,000

2.16

24.00

7,000

168,000

0.16

4,000

750,000

250,000

SUB TOTAL

1.59

0.40

3,296,700

23,000

108,500

172,786

300,000

6,500

22,500

43,000

250,000

100,000

SUB TOTAL

0.17

0.10

272,786

2,500,000

0.68

2,500,000

1,700,000

1.63

0.84

2,500,000

2,100,000

2.02

0.81

3,191,450

2,585,075

2.48

0.36

3,191,450

1,132,965

1.09

0.72

3,191,450

2,297,844

2.21

2.11

3,191,450

6,721,194

6.46

3,191,450

812,350

42.70

65,250

2,786,175

2.68

85.40

39,085

3,337,859

3.21

48.00

5,500

264,000

0.25

9.25

20,000

185,000

0.18

21.90

140,000

3,066,000

2.95

11.38

226,688

2,578,570

2.48

0.88

1,278,950

1,119,081

1.08

6.00

45,000

270,000

0.26

0.16

2,766,450

431,566

0.41

SUB TOTAL

30,575,329

15.00

47,000

705,000

0.68

30.00

85,500

2,565,000

2.46

24.00

70,000

1,680,000

1.61

12.00

176,113

2,113,350

2.03

14.00

35,000

490,000

0.47

24.00

35,000

840,000

0.81

1.00

2,000,000

2,000,000

1.92

SUB TOTAL
10.70

10,393,350

96,804

1,035,803

125,000

2.25

61,369

138,080

0.13

9.45

70,340

664,713

0.64

6.00

15,000

90,000

0.09

150,000

2,000,000

6.00

45,000

270,000

0.26

16.43

96,804

1,590,490

1.53

0.32

61,369

19,638

0.02

0.64

495,000

316,800

0.30

SUB TOTAL

4,125,524

1.00
-

9.1

122,720

90,000

2,813,400

10,000

60.59

8,500

515,015

0.49

28.54

35,000

998,900

0.96

5.00

120,000

600,000

0.58

10,000

31.26

SUB TOTAL

22.00
1.00

1.00

2.70
-

4,927,315

40,000

70,000

1,540,000

275,000

1,250,000

1,250,000

90,000

750,000

400,000

400,000

SUB TOTAL

1.48
1.20

0.38

3,190,000

437.00

6,750

2,949,750

2.83

28.32

15,500

438,960

0.42

30.00

13,564

406,905

0.39

171.15

24,375

4,171,781

4.01

48.70

40,000

1,948,000

1.87

49.39

22,325

1,102,520

1.06

SUB TOTAL

1.00

1.00

10,000

55,000

35,000

50,000

500,000

500,000

50,000

225,000

27,500

400,000

400,000

SUB TOTAL

2.00

11,017,916

0.48

0.38

900,000

250,000

500,000

300,000

0.48
-

6.00

150,000

900,000

0.86

23.00

150,000

3,450,000

3.32

2.00

100,000

200,000

0.19

11.00

150,000

1,650,000

1.59

8.00

150,000

1,200,000

1.15

SUB TOTAL

7,900,000

6.00

31,913

191,475

0.18

16.00

23,000

368,000

0.35

2.00

15,000

30,000

0.03

8.00

18,500

148,000

0.14

19.00

23,500

446,500

0.43

1.00

15,000

15,000

0.01

1.00

15,000

15,000

0.01

SUB TOTAL

1,213,975

250,000

35,000

SUB TOTAL

18.62

375,000

6,982,500

6.71

9.80

150,000

1,470,000

1.41

22.58

180,000

4,064,040

3.91

7.00

225,000

1,575,000

1.51

10.20

125,000

1,275,000

1.23

8.36

300,000

2,508,000

2.41

1.19

300,000

357,000

0.34

13.68

260,000

3,557,580

3.42

3.60

60,000

216,000

0.21

12.00

120,000

1,440,000

1.38

SUB TOTAL

23,445,120

65,250

39,085

5,500

140,000

1,814,400

140,000

23.40

19,385

453,609

0.44

44.40

12,000

532,800

0.51

12.96

SUB TOTAL

2,800,809

1.74
-

104,058,824
10,405,882
114,464,707
114,400,000

VOLUME

HARGA
SATUAN

HARGA

114,400,000
11,145,625
500,000
102,754,375
102,754,000

100