COMBINED FOOTING SBC of Soil = Depth of foundation = Density of soil = Fck = Fy = Footing ID CF1 Columns PEDESTAL SIZES Column

ID WIDTH mm C5 500 C6 500 Center to center between column Area required 26.58 Length 7.8 Breadth 3.6 Area Provided 28.08 PROVIDED AREA IS OKAY C.G x = Total P = Maximum soil pressure Minimum soil pressure < Check for SBC Satisfied Ohz 1.56 Mu 449 d = 831 Enter Overall Depth D = 850 dz = 776 Therefore, k= 0.75 Shear Force and Bending Moment

250 1.5 20 25 415

kN/m m 3 kN/m 2 N/mm 2 N/mm

z 1.14

C5 1.1 0.5
x

DEPTH P mm kN 1100 2650 950 3128 4.075 m 2 m m m 2 m

Mz kN-m -100 72

Mx kN-m 72 -60

4.075 0.5
C6 1.55 0.95 1.56

2.21 m 6589.65 kN = = m kN-m mm mm mm Ohx Mu d 247.2 222.1 kN/m2 kN/m2 < > k b k = Mu/bd2 250 0 0.65 1000

Check for SBC = P/A Mxx/Zxx Mzz/Zzz

1.55 m 445 kN-m 828 mm

dx

792 0.71

3128kN 1.56 m a 4.075 m e

2650 kN
1.14 m c -100 kN-m d

72 kN-m

DESIGN Longer Direction pt = Ast = Select the Dia of the Bar Bar Dia Spacing = Provide Spacing No. of bars Area Provided One way Shear Check Shear force = in longer direction

0.22 % 2 1685 mm 200.96 119 125 29 1608 mm mm mm Nos. mm2

DESIGN Shorter Direction pt = 0.22 Ast = 1671 Select the Dia of the Bar Bar dia 200.96 Spacing = 120 125 63 1608

% mm2 mm mm mm Nos. mm2

289.3 kN 0.37 > 0.330 Unsafe ( for col

Shear force = 287.0 kN in Shorter direction 0.37

>

0.330 Unsafe

Two way shear check Perimeter Area for punching Shear Stress Permissible Shear Stress 0.25fck

6004 mm 2 4659104 mm
2 0.67 N/mm 2 1.25 N/mm

C6

Safe Summary
footing length = 7.8 m

Tension Moment at Top Max tension at top Moment Mu

3.51 m from a -836.282 kN-m

footing width = 3.6 m depth = 850 mm Bottom Bar dia(mm)Spacing(mm) No of bars(Nos.)