Item 1 Compound wall

(1) Excavation for foundation


1
5

0.45

0.76
X Rs
(SOR P. 22)
(2) Prov. & Laying P.C.C. (1:5:10)
1
5
0.45

0.45

0.75

75

0.45

0.2
X Rs.
(SOR P. 29)
(3) Prov. & Laying R.C.C. (1:2:4)
1
5
0.3

2395

0.25
X Rs.
(SOR P. 30)
(4) Labour cost for fitting at site

3903

0.76

cmt

57.00

0.2

Rs. 57.00

(A)

0.20

cmt

479.00

Rs. 479.00 (B)


0.3

0.55

0.25

cmt

975.75

Rs. 975.75 ( C )
Rs. 690.00

Rs. 690.00 (D)


(6) Carting charges for post & shaft at site

Total (A)+(B)+( C )+(D)+(E) =


7.95
X 1.5

Total
for

Rs. 90.00

per Rmt.

Rs. 90.00

(E)

Rs. 2,291.75
11.93
Smt

Rs.

192.10

Per Smt (F)

(5) Rate for Precast Post and Shaft


Post

0.15 X 0.15 X 2.05 mt.

0.15

0.15

2.05

0.23

cmt

Shaft

1.85 X 0.05 X 0.30 mt.

20

1.85

0.05

0.30

0.56
0.79
0
11.92
0.00

cmt
cmt

2.05

51.25

Rmt

1.85

148.00

Rmt

0.79

X
Rs.

Ms. Bar for Column 4mm dia

For Shaft

Per smt

199.25 X 0.1
Add West.
20.93

39.44

Total
Say Rs.

For 1.50 mt. height

Total

(D) + (F) =

1.5

X Rs.

Total Rs.
192.10
Say Rs.

199.25
19.93
1.00
20.93
825.28
11.92
69.24
69.24

Rmt
Kgs.
Kgs.
Kgs.

/ Smt. (G)
Smt (D)

192.10

Smt

288.15

Per Rmt.
Per Rmt.

Item 2 M.S. Compound Gate 3.00 m X 1.50 m


(1) Exavation for column
2

Qty

Rate

Per

Amt.

0.60 0.60
0.75
(SOR P. 22)

0.54

0.54

75.00

cmt

40.50

0.60 0.60
0.20
(SOR P. 29)

0.144

0.14

2395.00

cmt

344.88

0.22275
0.392

0.22
0.39

3903.00
3903.00

cmt
cmt

869.39
1529.98
2399.37

0.98
0.245

0.98
0.25

78.00
78.00

smt
smt

76.44
19.11
95.55

(2) P.C.C. 1:5:10


2

(3)R.C.C. 1:2:4 for column


2 footings
up to GL.
above GL.

2
2

0.45 0.45
0.55
0.35 0.35
1.60
(SOR P. 30)

(4) Cement plaster in CM 1:4


side
top

10mm thick
8
0.35
2
0.35

0.35
1.00
0.35
1.00
(SOR P. )

(5) M.S. bar for column


12mm
Rmt
2x4x2.15
17.20
6 mm Ring
2x15x1.45
43.50

wt / Rmt
0.89

0.22

15.31

=
kg

9.57
24.88
1.24
26.12
26.00

26.00

52.70

kg

1370.20

168.00

168.00

65.22

kg

10956.96

Add 5% Westage
Say

26.00
kg
(SOR P. 32)

(6) M.S. Gate including fabrication


1x(3.00 + 0.20) x 1.50
at 35 kg/sqmt

=
=

4.80
sqmt
168.00
(SOR P 132)

(7) Carting on Site, erecting & foxing in position, curing


1/2 meson
235.00

1 labour
176.00

411.00

411.00

Total cost pre Gate = (A)+(B)+( C )+(D)+(E)+(F)+(G) = Rs.

15618.46

(A)

(B)

(C)

(D)

(E)

(F)
234.6667

(G)