NO

Uraian Pekerjaan

Pekerjaan Pendahuluan
1.1 Pembersihan Lapangan
1.2 Memasang Bouwplank
II Pekerjaan Tanah
2.1 Pekerjaan Pondasi
2.1.1 Galian Tanah Pondasi
2.1.2 Urugan Pasir Bawah Pondasi
2.1.3 Pas. Pondasi Batu Kali
2.1.4 Urugan Tanah Kembali Bekas Galian
III Pekerjaan Pasangan
3.1 Pekerjaan Dinding dan Plesteran
3.1.1 Pasangan Dinding Batako ad. 1 : 5
3.1.2 Plesteran Kolom adukan 1 : 2
3.1.3 Plesteran Dinding Batako adukan 1 : 5
3.2 Pek Beton Bertulang ad. 1 : 2 : 3
3.2.1 Sloof Beton 15/20
3.2.2 Kolom Beton 20/20
3.2.3 Ring Balok
3.3 Pekerjaan Lantai
3.3.1 Urugan Pasir Bawah Lantai
3.3.2 Floor Lantai adukan 1 : 3 : 5
IV Pekerjaan Kayu
4.1 Pekerjaan Plafond dan Rangka
4.1.1 Pasangan Plafond Triplek 4 mm
4.1.2 List Plafond
4.2 Pekerjaan Pintu dan Jendela
4.2.1 Pintu Panel Kayu Kelas II
4.2.2 Jendela Kaca Polos Bayang t. 3 mm
V Pekerjaan Atap
5.1 Rangka Atap Baja Ringan
5.2 Atap Asbes Gelombang 1500 x 920 x 5 mm
5.3 Baut Konstruksi
VI Pekerjaan Cat
6.1 Pengecatan Dinding dan Kolom
6.3 Pengecatan Plafond Luar dan Dalam
VII Pekerjaan lain-lain
7.1 Kunci-kunci, Engsel dan Grendel Pintu
dan Jendela serta Teralis
Jumlah I s/d VII
Dibulatkan :
Terbilang : Seratus Enam Puluh Enam Juta Rupiah

Vol

Anls

Sat

Harga Satuan

90
46

m
m

6,649.50
11,471.55

38.58
6.43
16,075
9,645

m
m
m
m

41,393.00
111,597.20
499,717.80
137,006.76

168.11
103.5
336.22

m
m
m

83,338.05
46,007.80
30,705.05

1,929
3.45
0.96

m
m
m

2,794,576.54
2,794,576.54
2,794,576.54

6.7
3.35

m
m

111,597.20
1,144,151.00

104.92
105.8

m
m

123,790.48
10,806.05

78.12
28.8

m
m

383,515.00
282,128.00

113,205

50
1

m
lbr
Ls

150,000.00
48,000.00

439.72
104.92

m
m

Ls

2,500,000.00

28,765.00
20,873.25
12,800,000.00

Baturaja, 9 September 2012


Mengetahui

Dibuat Oleh

A. Rivai Agung, R

Agus Karsa Yudha

Jumlah Harga

598,455.00
527,691.30

1,596,941.94
717,570.00

8,032,963.64
1,321,430.20

14,009,959.59
4,761,807.30
10,323,651.91
5,390,738.15
9,641,289.06
2,682,793.48
747,701.24
3,832,905.85

12,988,097.16
1,143,279.88
29,960,191.80
8,125,286.40
16,980,750.00
2,400,000.00
2,500,000.00
12,648,545.80
2,190,021.39

12,800,000.00
165,922,071.07
166,000,000.00
Baturaja, 9 September 2012

HARGA PERHITUNGAN SENDIRI ( HPS )


PERHITUNGAN RAB RUMAH DI KABUPATEN BOGOR, JAWA BARAT
PEKERJAAN PERSIAPAN
PEMBERSIHAN LAHAN
Dilakukan dengan cara menghitung luas gedung keseluruhan
= 10 m x 9 m = 90 m
PASANGAN BOUWPLANK / PENGUKURAN
Panjang Bouwplank = 8 m + 7 m + 4 m + 4 m + 10 m + 3.5 m + 2 m + 5 m + 1 m + 1.5 m = 46 m
PEKERJAAN PONDASI
GALIAN TANAH PONDASI
Panjang galian = 64.3 m
Luas Penampang galian = ( 1 x 0.6 ) = 0.6 m
Volume galian = 64.3 m x 0.6 m = 38.58 m
URUGAN PASIR BAWAH PONDASI
Luas penampang urugan = ( 0.1 m x 1 m ) = 0,1 m
Panjang galian pondasi = 64,3 m
Volume urugan pasir = 0,1 m x 64,3 m = 6,43 m
PASANGAN PONDASI TAPAK / TELAPAK DAN PONDASI BATU KARANG
PONDASI A
Luas pen. pondasi = 4,26 m
Panjang pondasi = 22,5 m
Volume pondasi = 4,26 m x 22,5 m = 95,85 m
PONDASI B
Luas pen. pondasi = 0,266 m
Panjang pondasi = 41,5 m
Volume pondasi = 0,266 m x 41,5 m = 11,039 m
TOTAL A + B = 95,85 m + 11,039 m = 106,889 m
URUGAN KEMBALI TANAH BEKAS GALIAN
Volume galian tanah = 1842,225 m
Volume urugan tanah kembali = x 1842,225 m = 460,556 m
PEKERJAAN BETON BERTULANG ad. 1 : 2 : 3
v SLOOF BETON 15/20
Lebar sloof = 0,15 m
Tinggi sloof = 0,20 m
Panjang sloof = 98,5 m
Volume sloof = 0,15 m x 0,20 m x 98,5 m = 2,955 m
v KOLOM BETON 20/20
Lebar kolom = 0,2 m
Panjang kolom = 0,2 m
Tinggi kolom = 3,5 m
Jumlah kolom = 31 bh
Volume kolom = 0,2 m x 0,2 m x 3,5 m x 31 = 4,34 m
v RING BALOK 10/15
Lebar ring balok = 0,1 m
Tinggi ring balok = 0,15 m
Panjang ring balok = 172,5 m
Volume ring balok = 0,1 m x 0,15 m x 172,5 m = 2,5875 m
PEKERJAAN DINDING DAN PLESTERAN
v PASANGAN DINDING BATU BATA ad. 1 : 4

Tinggi dinding = 3,5 m


Pintu = 10,16 m
Panjang dinding = 172,5 m 10,16 m = 162,34 m
Luas dinding = 3,5 m x 162,34 m = 568,19 m
v PLESTERAN KOLOM ad. 1 : 2
Keliling penampang kolom = 4 x 0,2 m = 0,8 m
Tinggi kolom = 3,5 m
Jumlah kolom = 31 bh
Luas plesteran kolom = 0,8 m x 3,5 m x 31 bh = 86,8 m
v PLESTERAN DINDING BATU BATA ad. 1 : 4
Luas plesteran dinding = 2 x luas dinding = 2 x 568,19 m = 1136,38 m
v PLESTERAN LANTAI ad. 1 : 4
Luas plesteran lantai = 5 m x 13 m = 65 m
v ACIAN
Luas acian lantai = 5 m x 13 m = 65 m

5 m = 46 m

DAFTAR ANALISA PEKERJAAN


Analisa 10 m Pembersihan Lokasi
0.75
Pekerja
0.0375
Mandor

@
@

52,800.00
71,720.00

39,600.00
26,895.00
66,495.00
6,649.50
598,455.00

@
@
@
@
@
@
@

423,500.00
5,445.00
16,500.00
60,500.00
74,030.00
52,800.00
71,720.00

21,175.00
21,780.00
1,650.00
48,400.00
5,922.40
14,784.00
1,004.08
114,715.48
11,471.55
527,691.30

Untuk 1 m = 1 / 10
Harga 90 m Pembersihan Lokasi adalah 90 x
Analisa 10 m Pasangan Bouwplank
0.05
m
Kayu Kelas IV
4.00
btg Kayu Gelam
0.1
Kg
Paku biasa
0.8
Tukang
0.08
Kepala Tukang
0.28
Pekerja
0.014
Mandor
Untuk 1 m = 1 / 10
Harga 46 m Pasangan Bouwplank adalah 46 x
Analisa 1 m Galian Tanah
0.75
Pekerja
0.025
Mandor

@
@

Harga 38,58 m Galian Tanah adalah 38,58 x


Analisa 1 m Urugan Pasir Urug
1.2
m
Pasir Urug
0.3
Pekerja
0.01
Mandor

@
@
@

Harga 6,43 m Urugan Pasir Urug adalah 6,43 x


Analisa 1 m Pasangan Pondasi Batu Kali ad. 1 : 4
1.2
m
Batu belah 15/20
202.00
Kg
Portland Cement
0.485
m
Pasir pasangan
0.6
Tukang Batu
0.06
Kepala Tukang
1.5
Pekerja
0.075
Mandor

@
@
@
@
@
@
@

@
@
@

Harga 9,645 m Urugan Tanah bekas Galian adalah


Analisa 1 m Pekerjaan Beton Bertulang
a. Analisa 1 m Beton ad. 1 : 2 : 3
6.4
zak PC BTA 50 Kg
0.54
m
Pasir pasangan
0.82
m
Koral Beton
1.00
Tukang Batu
0.10
Kepala Tukang

79,200.00
52,800.00
71,720.00
=

Harga 16,075 m Pas. Pondasi Batu Kali adalah 16,075 x


Analisa 1 m Urugan Tanah Urug Biasa
1.2
m
Tanah Urug
0.3
Pekerja
0.033
Mandor

52,800.00
71,720.00

354,700.00
1,400.00
145,200.00
60,500.00
74,030.00
52,800.00
71,720.00
=

99,000.00
52,800.00
71,720.00
=

@
@
@
@
@

70,000.00
145,200.00
385,332.00
60,500.00
74,030.00

39,600.00
1,793.00
41,393.00
1,596,941.94

95,040.00
15,840.00
717.20
111,597.20
717,570.00

21,175.00
282,800.00
70,422.00
36,300.00
4,441.80
79,200.00
5,379.00
499,717.80
8,032,963.64

118,800.00
15,840.00
2,366.76
137,006.76
1,321,430.20

448,000.00
78,408.00
315,972.24
60,500.00
7,403.00

6.00
0.30

Pekerja
Mandor

b. Analisa Tulang Besi ( Upah / 100 Kg / m )


110.00
Kg
Besi beton
2.00
Kg
Kawat Pengikat
6.75
Tukang
2.25
Kepala Tukang
6.75
Pekerja

@
@

52,800.00
71,720.00

316,800.00
21,516.00
1,248,599.24

@
@
@
@
@

15,000.00
18,000.00
60,500.00
74,030.00
52,800.00

96,000.00
9,720.00
408,375.00
166,567.50
356,400.00
1,037,062.50

c. Analisa Upah Bekisting ( Kayu Cetakan ) / m Balok dan Kolom


0.4
m
Kayu Kelas IV
@
70,000.00
4.00
Kg
Paku biasa
@
145,200.00
5.00
Tukang
@
60,500.00
0.50
Kepala Tukang
@
74,030.00
2.00
Pekerja
@
52,800.00
0.10
Mandor
@
71,720.00

28,000.00
580,800.00
302,500.00
37,015.00
105,600.00
7,172.00
1,061,087.00

d. Upah Pembongkaran Bekisting


4.00
Pekerja

52,800.00

211,200.00

Harga 1 m Beton Bertulang 1 : 2 : 3


1.00
Kl
a
1.00
Kl
b
0.40
Kl
c
0.40
Kl
d

@
@
@
@

1,248,599.24
1,037,062.50
1,061,087.00
211,200.00

1,248,599.24
1,037,062.50
424,434.80
84,480.00
2,794,576.54

Harga 1 m Sloof Beton Bertulang 1 : 2 : 3 adalah

1.929

Harga 1 m Kolom Beton Bertulang 1 : 2 : 3 adalah

3.45

Harga 1 m Ring Balok Beton Bertulang 1 : 2 : 3 adalah

0.96 x

Analisa 1 m Pasangan Dinding Batako 1 : 5


12.5
bh
Batako semen
0.23
zak Portland Cement
0.082
m
Pasir pasang / bersih
0.098
Tukang Batu
0.015
Kepala Tukang Batu
0.25
Pekerja
0.01
Mandor

2,750.00
70,000.00
145,200.00
60,500.00
74,030.00
52,800.00
71,720.00

@
@
@
@
@
@
@

Harga 168,11 m Pasangan Dinding Batako adalah 168,11 x


Analisa 1 m Plesteran Kolom ad. 1 : 2
0.112
zak Semen Portland
0.014
m
Pasir pasang
0.2
Tukang Batu
0.02
Kepala Tukang Batu
0.4
Pekerja
0.02
Mandor
Harga 103,5 m Plesteran Kolom adalah 103,5 x

@
@
@
@
@
@

70,000.00
145,200.00
60,500.00
74,030.00
52,800.00
71,720.00
=

2,794,576.54
5,390,738.15
2,794,576.54
9,641,289.06
2,794,576.54
2,682,793.48

34,375.00
16,100.00
11,906.40
5,929.00
1,110.45
13,200.00
717.20
83,338.05
14,009,959.59

7,840.00
2,032.80
12,100.00
1,480.60
21,120.00
1,434.40
46,007.80
4,761,807.30

Analisa 1 m Plesteran ad. 1 : 5


4.32
Kg
Portland Cement
0.022
m
Pasir pasang
0.15
Tukang Batu
0.015
Kepala Tukang Batu
0.2
Pekerja
0.01
Mandor

@
@
@
@
@
@

Harga 336,22 m Plesteran dinding Batako adalah 336,22 x


Analisa 1 m Urugan Pasir Urug
1.2
m
Pasir Urug
0.3
Pekerja
0.01
Mandor
Harga 6,7 m Urugan Pasir bawah Lantai adalah
Analisa 1 m Beton Tumbuk ad. 1 : 3 : 5
4.00
zak Semen Portland ( PC )
0.5
m
Pasir pasang
1.00
m
Koral Beton
1.00
Tukang Batu
0.1
Kepala Tukang Batu
6.00
Pekerja
0.3
Mandor

@
@
@
6,7 x

@
@
@
@
@
@
@

Harga 3,35 m Floor Lantai adalah 3,35 x


Analisa 1 m Plafond Plywood 4 mm
1.00
m
Plywood 4 mm
0.01
m
Kayu Kelas II
0.2
Kg
Paku biasa
0.05
Kg
Paku Plywood
0.8
Tukang Batu
0.08
Kepala Tukang
0.28
Pekerja
0.014
Mandor

@
@
@
@
@
@
@
@

79,200.00
52,800.00
71,720.00
=

70,000.00
145,200.00
385,332.00
60,500.00
74,030.00
52,800.00
71,720.00

66,550.00
2,783,000.00
16,500.00
27,500.00
60,500.00
74,030.00
52,800.00
71,720.00
=

@
@
@
@
@
@

Untuk 1 m' = 1 / 10
Harga 105,8 m Plafond Plywood adalah 105,8 x
Analisa 1 m Pintu Panel Kayu Kelas II
0.04
m
Papan Kayu Kelas II
0.5
Kg
Lem Kayu
3.00
Tukang Kayu
0.3
Kepala Tukang Kayu
1.00
Pekerja
0.05
Mandor

Harga 104,92 m Plafond Plywood adalah 104,92 x


Analisa 10 m' List Profil Kayu N/K 1
10.00
m'
List Profil N/K 1
0.1
Kg
Paku biasa
0.8
Tukang Batu
0.08
Kepala Tukang
0.28
Pekerja
0.014
Mandor

1,400.00
145,200.00
60,500.00
74,030.00
52,800.00
71,720.00

3,630.00
16,500.00
60,500.00
74,030.00
52,800.00
71,720.00

@
@
@
@
@
@

2,783,000.00
24,200.00
60,500.00
74,030.00
52,800.00
71,720.00

6,048.00
3,194.40
9,075.00
1,110.45
10,560.00
717.20
30,705.05
10,323,651.91

95,040.00
15,840.00
717.20
111,597.20
747,701.24

280,000.00
72,600.00
385,332.00
60,500.00
7,403.00
316,800.00
21,516.00
1,144,151.00
3,832,905.85

21,175.00
27,830.00
3,300.00
1,375.00
48,400.00
5,922.40
14,784.00
1,004.08
123,790.48
12,988,097.16

36,300.00
1,650.00
48,400.00
5,922.40
14,784.00
1,004.08
108,060.48
10,806.05
1,143,279.88

111,320.00
12,100.00
181,500.00
22,209.00
52,800.00
3,586.00
383,515.00

Harga 78,12 m Pintu panel kayu kelas II adalah 78,12 x

Analisa 1 m membuat dan memasang daun Pintu / Jendela kaca kayu


0.024
m
Kayu Kelas II
@
2,783,000.00
0.3
Kg
Lem Kayu
@
24,200.00
2.4
Tukang Kayu
@
60,500.00
0.24
Kepala Tukang Kayu
@
74,030.00
0.8
Pekerja
@
52,800.00
0.04
Mandor
@
71,720.00
Harga 28,8 m Jendela Kaca Polos t. 3 mm adalah 28,8 x
Analisa 10 m Pengecatan Tembok 3 x Sapu
3.5
Kg
Cat Tembok
2.00
Kg
Plamir Tembok
2.00
Lbr Amplas biasa
2.00
Tukang
0.2
Kepala Tukang
1.5
Pekerja
0.075
Mandor

@
@
@
@
@
@
@

Untuk 1 m = 1 / 10
Harga 439,72 m Pengecatan Tembok adalah 439,72 x
Analisa 10 m Pengecatan Plafond Luar dan Dalam 3 x Sapu
2.8
Kg
Cat Tembok
@
1.00
Ls
Steiger / Alat Bantu
@
1.5
Tukang
@
0.15
Kepala Tukang
@
1.00
Pekerja
@
0.05
Mandor
@
Untuk 1 m = 1 / 10
Harga 104,92 m Pengecatan Plafond Luar & Dalam adalah

10,890.00
9,075.00
5,500.00
60,500.00
74,030.00
52,800.00
71,720.00

10,890.00
20,000.00
60,500.00
74,030.00
52,800.00
71,720.00

29,960,191.80

66,792.00
7,260.00
145,200.00
17,767.20
42,240.00
2,868.80
282,128.00
8,125,286.40

38,115.00
18,150.00
11,000.00
121,000.00
14,806.00
79,200.00
5,379.00
287,650.00
28,765.00
12,648,545.80

30,492.00
20,000.00
90,750.00
11,104.50
52,800.00
3,586.00
208,732.50
20,873.25
2,190,021.39

You might also like