PAGU ANGGARAN

REKAPITULASI RENCANA ANGGARAN BIAYA


Pekerjaan

: Pemetaan Potensi Air Baku Kabupaten Asmat

Proyek

Tahun

NO.
I

II

URAIAN

JUMLAH BIAYA (Rp.)

BIAYA LANGSUNG PERSONIL

184,500,000.00

1.1. PROFESIONAL STAFF

125,000,000.00

1.2. SUB PROFESIONAL STAFF

37,000,000.00

1.3. SUPPORTING STAFF

22,500,000.00

BIAYA LANSUNG NON PERSONIL

237,225,000.00

2.1. PENGUMPULAN DATA

46,800,000.00

2.2. BIAYA TRANSPORTASI

52,000,000.00

2.3. BIAYA PERJALANAN KE LOKASI

26,600,000.00

2.4. ATK & PERALATAN KANTOR

74,175,000.00

2.5. PERALATAN SURVEY

11,000,000.00

2.6. BIAYA KOMUNIKASI

4,500,000.00

2.7. BIAYA BASE CAMP

15,000,000.00

2.8. BIAYA REPRODUKSI LAPORAN

Terbilang :

7,150,000.00
SUB TOTAL

421,725,000.00

PPN 10%

42,172,500.00

TOTAL

463,897,500.00

DIBULATKAN

463,897,000.00

EMPAT RATUS ENAM PULUH TIGA JUTA DELAPAN RATUS SEMBILAN PULUH TUJUH
JUTA RUPIAH

RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN

: Pemetaan Potensi Air Baku Kabupaten Asmat

PROYEK

TAHUN

I. BIAYA LANGSUNG PERSONIL


JUMLAH
NO.

POSISI

PERSONIL SATUAN
(ORANG)

LAMA

BEBAN BIAYA

JUMLAH

PENUGASAN

PERSONIL

BIAYA

(BULAN)

(Rp.)

(Rp.)

1.1. TENAGA PROFESIONAL


1. Team Leader

Bln/Org

6.00

7,500,000.00

45,000,000.00

2. Ahli Geologi

Bln/Org

3.00

4,000,000.00

12,000,000.00

3. Ahli lingkungan

Bln/Org

4.00

4,000,000.00

16,000,000.00

4. Ahli Hidrogeologi

Bln/Org

4.00

4,000,000.00

16,000,000.00

5. Geodetic Engineer/GIS

Bln/Org

3.00

4,000,000.00

12,000,000.00

6. Programmer

Bln/Org

3.00

4,000,000.00

24,000,000.00

SUB TOTAL

125,000,000.00

1.2. TENAGA SUB PROFESIONAL


1. Chief Surveyor

Bln/Org

3.00

3,000,000.00

9,000,000.00

2. Surveyor

Bln/Org

2.00

3,000,000.00

12,000,000.00

4. Draftman

Bln/Org

2.00

2,000,000.00

16,000,000.00

SUB TOTAL

37,000,000.00

JUMLAH
POSISI

NO.

PERSONIL SATUAN
(ORANG)

LAMA

BEBAN BIAYA

JUMLAH

PENUGASAN

PERSONIL

BIAYA

(BULAN)

(Rp.)

(Rp.)

1.3. TENAGA PENUNJANG


1. Sekretaris

Bln/Org

4.00

2,500,000.00

10,000,000.00

2. Typist / Operator Computer

Bln/Org

3.00

1,500,000.00

4,500,000.00

3. Tenaga Lapangan

Bln/Org

2.00

1,000,000.00

8,000,000.00

SUB TOTAL

22,500,000.00

II. BIAYA LANGSUNG NON PERSONIL


2.1. PENGUMPULAN DATA
NO.
1.

URAIAN

JUMLAH

SATUAN

HARGA
SATUAN
(Rp.)

JUMLAH
BIAYA
(Rp.)

PENGUMPULAN DATA
1. Data Penunjang Laporan

LS

1,500,000.00

1,500,000.00

2. Peta Skala 1 : 50.000 Hardcopy

100

sheet

50,000.00

5,000,000.00

3. Peta Skala 1 : 50.000 Softcopy

100

sheet

400,000.00

40,000,000.00

LS

300,000.00

300,000.00

4. Penggandaan Peta

SUB TOTAL

46,800,000.00

2.2. BIAYA TRANSPORTASI


NO.
1.

URAIAN

JUMLAH

SATUAN VOLUME
(Bulan)

HARGA
SATUAN
(Rp.)

JUMLAH
BIAYA
(Rp.)

SEWA & OPERASIONAL KENDARAAN


1. Tiket pesawat PP

Unit

7.00

3,500,000.00

49,000,000.00

2. Speed boat

Unit

1.00

1,500,000.00

3,000,000.00

SUB TOTAL

52,000,000.00

2.3. BIAYA PERJALANAN KE LOKASI


NO.
1.

2.

URAIAN

SATUAN VOLUME

HARGA
SATUAN
(Rp.)

JUMLAH
BIAYA
(Rp.)

PENGURUSAN DATA DIGITAL & ANALOG


1. Team Leader

OH

600,000.00

2,400,000.00

2. Geoditic Engineer

OH

350,000.00

1,400,000.00

1. Team Leader

OH

300,000.00

2,400,000.00

2. Ahli Geologi

OH

300,000.00

2,400,000.00

3. Ahli lingkungan

OH

10

300,000.00

3,000,000.00

4. Ahli Hidrogeologi

OH

10

300,000.00

3,000,000.00

5. Geodetic Engineer/GIS

OH

60

200,000.00

12,000,000.00

SUB TOTAL

26,600,000.00

LOKASI PEMETAAN

2.4. ATK & PERALATAN KANTOR


NO.
1.

NO.
2.

JUMLAH

SATUAN

LAMA
SEWA
(BULAN)

1. Komputer + Printer

Unit

3,000,000

36,000,000.00

2. Plotter

Unit

3,000,000

6,000,000.00

2. Camera Digital

Unit

600,000

600,000.00

SUB TOTAL

42,600,000.00

URAIAN

URAIAN

JUMLAH

SATUAN

HARGA
SATUAN
(Rp.)

JUMLAH
BIAYA
(Rp.)

BAHAN-BAHAN KANTOR
1. Kertas A4

15

Rim

45,000.00

675,000.00

2. Tinta Printer A0

10

Buah

500,000.00

5,000,000.00

20

Buah

4. ATK

Photo warna

Ls

5. Desk top

20

Buah

6. Training Staff Program GIS

NO.

URAIAN

ls

JUMLAH

SATUAN VOLUME

350,000.00

7,000,000.00

3,500,000.00

3,500,000.00

20,000.00

400,000.00

1,500,000.00

1,500,000.00

SUB TOTAL

18,075,000.00

HARGA
SATUAN
(Rp.)

JUMLAH
BIAYA
(Rp.)

SOFTWARE
1. ArcView GIS 3.3

4.

JUMLAH
BIAYA
(Rp.)

SEWA PERALATAN KANTOR

3. Tinta Printer

3.

BIAYA
SEWA
(Rp.)

Unit

1,500,000

1,500,000.00

Unit

12,000,000

12,000,000.00

SUB TOTAL

13,500,000.00

TOTAL 2.4

74,175,000.00

KOMPUTER
1. Laptop PIV. 2.8 Ghz.

2.5. PERALATAN SURVEY


NO.
1.

JUMLAH

SATUAN

LAMA
SEWA

1. Alat DGPS (Survey)

Hari

30

300,000.00

9,000,000.00

4. GPS HAND

unit

1,000,000.00

2,000,000.00

SUB TOTAL

11,000,000.00

URAIAN

HARGA
SATUAN
(Rp.)

JUMLAH
BIAYA
(Rp.)

PERALATAN SURVEY (GCPs)

2.6. BIAYA KOMUNIKASI


NO.
1.

URAIAN

JUMLAH

SATUAN

LAMA
SEWA
(BULAN)

Unit

BIAYA
SEWA
(Rp.)

JUMLAH
BIAYA
(Rp.)

PERALATAN KOMUNIKASI
1. Telepon dan Faximile

750,000

4,500,000.00

SUB TOTAL

4,500,000.00

2.7. BIAYA BASE CAMP


NO.
1.

URAIAN
1. Basecamp

JUMLAH

SATUAN

LAMA
SEWA
(BULAN)

Unit

BIAYA
SEWA
(Rp.)

JUMLAH
BIAYA
(Rp.)

2,500,000

15,000,000.00

SUB TOTAL

15,000,000.00

2.8. BIAYA REPRODUKSI LAPORAN


NO.
1.

URAIAN

SATUAN VOLUME

HARGA
SATUAN
(Rp.)

JUMLAH
BIAYA
(Rp.)

BIAYA REPRODUKSI DOKUMEN


1. Laporan Rencana Mutu Kontrak

Rangkap

50,000.00

250,000.00

2. Laporan Bulanan (4 bulan)

Rangkap

30

50,000.00

1,500,000.00

3. Laporan Pendahuluan

Rangkap

10

100,000.00

1,000,000.00

4. Laporan Akhir

Rangkap

10

150,000.00

1,500,000.00

5. Petunjuk Pengoprasian Software SIG

Rangkap

10

50,000.00

500,000.00

- Topografi

Rangkap

75,000.00

375,000.00

- Hidrogeologi

Rangkap

75,000.00

375,000.00

- Geologi

Rangkap

75,000.00

375,000.00

- Pelayanan Air Baku

6. Peta-peta :

Rangkap

75,000.00

375,000.00

6. Dokumentasi

Rangkap

75,000.00

150,000.00

7. External Disk

ls

750,000.00

750,000.00

SUB TOTAL

7,150,000.00