Esti rizki 3311001054 1) Work Breakdown Structure a. Choose a project title b. Surveying c. Determine a background d.

Determine the use of application (fungsional) e. Determine the purpose of the software f. Make an Use Case Diagram g. Make a robustness diagram h. Build a form interface user i. Build the codes (coding) j. Testing k. Determine an error or weaknesses of the program l. Fix the program m. Install the software to library n. Prepare draft report o. Review draft report p. Write final report q. Finish

Esti rizki 3311001054

2) Hierarchy 1. Make a program Surveying Determine a background Determine the use of application based of background

Esti rizki 3311001054 Build a form interface Build the codes using function, etc Testing Determine an error or weaknesses of the program Fix the program

2. Make a proposal (report) Make proposal chapter I, II, III, IV, V, and Closing Make an Use Case, ERD, STD, and DFD diagram

Esti rizki 3311001054

Activities A. Choosing title B. Surveying C. Determine Background D. Determined functional specification E. Determined the goal of project F. Design an Usecase diagram G. Design Robustness Diagram H. Build User Interface I. Coding J. Testing K. Determining Error and weaknesses L. Fixing M. Installing N. Prepare draft report O. Review Draft Report P. Write final report

Duration (weeks) 2 1 1 1 1 1 1 3 3 1 1 2 1 5 1 1

Precedence

A A,B B C D F F,G I J K L N O