You are on page 1of 4

Name of the Project : Package No.

084 (MUW,DW & FFW system) Date :Name of the agency : JUSCO
Sl. No. Activity / Area BOQ Unit Cum. Till last month Cum upto previous day of the Month Progress for the Plan Actual

DAILY REPORT FOR SITE ACTIVITIES (QUANTITATIVE PHYSICAL)


Saturday, July 07, 2012

Plan for next day

Plan for Cum. In Cum. up to the month this month date

Summary-Structures
Excavation PCC 1:4:8 Reinforcement C (Cutting,bending, laying) D Shuttering E M-25 Grade Concrete A. Over Head Tank 1 Over Head Tank A Excavation B PCC 1:4:8 Reinforcement C (Cutting,bending, laying) A B 51,000 250 290 13,850 2,533 cum cum MT sqm. cum. 48,973 250 257 11,853 2,322 420 6 2,275 190 30 2 210 3 30 2 210 3 40 1 140 2,000 30 4,300 120 450 8 900 12 49,423 265 12,753 2,334

2,625 25 110

cum cum MT

2,677 25 89

1 1

20

2,677 92

Shuttering

4,400

sqm.

3,078

250

100

100

1,000

350

3,428

E M-25 Grade Concrete B. Main Pump House & Allied Structures A Earth Work Excavation B PCC( 1:4:8) Reinforcement C (Cutting,bending, laying) D Shuttering E M-25 Grade Concrete C. OBBP Pump House A Earth Work Excavation B PCC( 1:4:8) Reinforcement C (Cutting,bending, laying) D Shuttering E M-25 Grade Concrete

883 9,500 200 160 8,200 1,500 1,125 25 20 1,250 150

cum. cum cum MT sqm. cum. cum cum MT sqm. cum.

742 9,500 200 150 7,702 1,440 1,155 25 18 1,073 140

6 4 400 40 3

2 1 100

2 1 100

70 10 3,000 50 300 -

750 9,500 -

1 100

5 500 50 4

155 8,202 1,440 1,155 18 1,123 144

10 1 10 1

40

0 0 0.8 110 7

July 07, 2012

Remarks

RESOURCE MOBILISATION PLAN


Name of the Project : Package No. 084 Sl. No. A B C D Civil works Structural fabrication work Structural erection work Pipe line work 140 135 137 4 1 4 4 Area Manpower Reqd. Prev. On per day day date 150 137 134 Date : Machineries Conrete Excavator Dumper Dozer Water Pump Mixer 1 1 2 3 Saturday, July 07, 2012 Conrete Pump 1 Tractor 1 Winch Machine HYDRA ( 14MT ) 1 Remarks

For JUSCO

Page 4 of 4

(Sivaji Priya)

You might also like