Following items should be included in the proposal: Process description Technical specification of equipment for: Process and mechanical

l equipment Electrical system Control and automation Fluid and utility system Laboratory equipment Workshop equipment Civil works and buildings First fill and consumables Guarantee figures Vendor list Spare part List Time schedule Manning Training program

However it seems that following items are not considered by the FSTCO. Emergency diesel generator Laboratory Workshop and Warehouse Main substation