BTS INSTALLATION
(Site NO.21)
Contents
1.1 procedure
S tart
A n ten n a h oistin g
an d h an d lin g
D irection al O m n i- anten n a
an ten n a
n itia l a s s e m b lin g o f th e
d irec tio n al an ten n a
in s tallation ac ces so ries
I ni t i al f i x i ng of
t he omni - ant enna
In itial fix in g o f th e
d ire ctio n al an ten n a
V e rtica l a d ju s tm en t o f
th e o m n i-an ten n a
A d ju s tm en t of th e
d irectio n al an ten n a
d irectio n a n d tilt a n gle
A n tenn a fix in g
End
1.2 PICTURES
Antenna should be
fixed well
waterproof
self-conglutina
R>400mm
remark:
The normal distance between cable clips should be 3 steps on the cable tray.
But in the picture ,it is 2 steps.
remark:
Pay attention to the cable radius. It is should be more than 400mm.
remark: the lighting arrestor installation
C
B
A
remark:
A: CELL 1 ;
B: CELL 2;
C: CELL 3
The antenna degree according to the survey report.
3. BATTERY INSTALLATION
remark: when we install the battery, we should not put any tools or iron sticks
on the battery, it is very dangerous.
battery temperature
sensor
remark: each battery should be connected to one sensor, pay attention to the
sequence.
remark: battery cables arrangement
4. DDF INSTALLATION
E1 CABLE AND
GND CABLE
remark:
one E1 cable including 8 cores,4 pairs. The SN 1,2,…8. for instance,1,5 is
the first pair ,2,6 the second pair for 1E1.in the picture, the ground cable was
not connected yet.
5. RACKS INSTALLATION
remark: the face of the two racks should be the same plane. In this site, there are one rectifier rack
and one BTS rack.
7. AC DISTRIBUTION BOX
AC CABLE
remark: for equipment installation, we just need to consider the AC cables
8. GROUND CABLES
There are two GND systems. One for antenna and feeder cables, the other for inside
equipment(inside earthing system).
8.1 Inside eathing system
Input
remark: in the shelter, the two ground bars should be connected with cable( ).this two ground
bars are just for the equipment. All of the equipment ground cables should be connect to the two
ground bar.
When we install the GND cables, we should confirm the cable diameter and the length and the
color.
GND 1
GND 2
OUTSIDE GND BAR
GND 3
20 DDF
M8×15 bolts
Small bolts 20 Cable slot
Feeder cable GND 20 Feeder cable
clips
Cable slot 6m AC cable
GND cable 1m(16mm2) DDF BOX GND
DC CABLE(0V) 3m(25mm2) BTS DC POWER
DC CABLE(-48V) 3m(25mm2) BTS DC POWER
GND cable 10m(35mm2) BTS-GND YELLOW AND
RECTIFIER-GND(AC) GREEN