You are on page 1of 25

Autodesk Simulation

David Truyens
2012 Autodesk

Part Multiphysics Frame Analysis

Fluid Flow

Assembly

Thermal

Motion

Fatigue

Optimization

Drop Test
2012 Autodesk

Plastic Flow

Mold Cooling

Shrinkage & Warpage

Every Designer Needs Simulation


The Value of Optimizing Early
Cost per problem
20,000

1,000x 20,000x

Design Change Cost

100

100x
10

10x
Design Prototype Market

Development phase

Source: Aberdeen
2012 Autodesk

Dynamic Simulations and FEA analysis

2012 Autodesk

FEA Optimisation

2012 Autodesk

Mechanics

2012 Autodesk

2012 Autodesk

2012 Autodesk

2012 Autodesk

2012 Autodesk

Simulation CFD

2009 Autodesk

2012 Autodesk

2012 Autodesk

2012 Autodesk

2012 Autodesk

2012 Autodesk

2012 Autodesk

CFD

2012 Autodesk

Simulation Has Traditionally Been

2012 Autodesk

What is Autodesk 360?


Broad

Autodesk SIM 360


Autodesk BIM 360

Autodesk PLM 360

set of features, cloud services and cloud-enabled products improve the way you design, visualize, and simulate your work with others anytime, anywhere

Dramatically

Share

2012 Autodesk

What is Autodesk Simulation 360? Proven Simulation Technology in the Cloud

2012 Autodesk

Simulation 360: Gain Competitive Advantage

Compute Power Optimization within reach of the masses

Total Cost of Ownership Reduced capital costs Access & Experience Install and login from anywhere

2012 Autodesk

Infinite Computing Power and Optimization in the Cloud

Solve Scenario 1

Desktop

Solve Scenario 1 Solve Scenario 2 Solve Scenario 3 Solve Scenario 4

Solve Scenario 5

Cloud
2012 Autodesk

Autodesk Simulation 360:

Fast

and accurate

Flexible Affordable
2012 Autodesk

Secure

2012 Autodesk

You might also like