PERENCANAAN IRIGASI DAN BANGUNAN AIR

Oleh :
Kandiyas Sakta

PROGRAM STUDI TEKNIK SIPIL


FT-UWKS

Perencanaan Irigasi & Bangunan Air

DAFTAR ISI

HALAMAN JUDUL
KATA PENGANTAR .......................................................................................................

DAFTAR ISI ......................................................................................................................

iii

A. Elevasi crest bendung dan elevasi ambang intake ........................................................

B.

Merencanakan bendung mercu OGEE I dan stabilitasnya

.........................................

C.

Peredam energi ............................................................................................................

D. Perencanaan intake .......................................................................................................

11

a. Perencanaan kantong lumpur

...............................................................................

15

b. Perencanaan saluran pengendap ............................................................................. 16


E.

F.

Perencanaan saluran primer 1 dan 2 ............................................................................. 21


c. Perencanaan saluran primer 1

................................................................................ 21

d. Perencanaan saluran primer 2

................................................................................ 24

Perencanaan gorong-gorong di saluran primer 2 ......................................................... 27

GAMBAR DETAIL PERENCANAAN IRIGASI DAN BANGUNAN AIR ...............

Kandiyas Sakta

30

Perencanaan Irigasi & Bangunan Air

A. Menghitung Elevasi Crest Bendung dan Elevasi Ambang Intake

BB 1
SP 1

+ 96.7
SS 1

BB 2
SP 2

Gorong-gorong

+ 96.4

+ 95.9
SS 2

Kebutuhan elevasi air di Bangunan Bagi 2 (BB2)


BB2 = 96,4 m
SS2 = 95,9 m
BB2 = ambil elv. tertinggi antara BB2 dan SS2 + kehilangan tinggi energi di
Bangunan Bagi
= 96,4 m + 0,15 m
= 96,55 m
Kebutuhan elevasi di Saluran Primer 2 (SP2)
SP2

= Elv BB2 + kehilangan tinggi energi pada Gorong2 + (kemiringan akibat


beda tinggi x jarak dari BB1 ke BB2)
= 96,55 m + 0,1 m + (0,0004 x 400 m)
= 96,81 m

Kebutuhan elevasi air di Bangunan Bagi 1 (BB1)


SP2 = 96,81 m
SS1 = 96,70 m
BB1 = (diambil elv. Tertinggi antara SP2 dan SS1) + kehilangan tinggi energi di
Bangunan Bagi
= 96,81 m + 0,15 m
= 96,96 m
Kebutuhan elevasi di Saluran Primer 1 (SP1)
SP1 = elv. BB1 + (kemiringan akibat beda tinggi x jarak dari B.Utama ke BB1)
= 96,96 m + (0,0002 x 300 m)
= 97,02 m

Kandiyas Sakta

Perencanaan Irigasi & Bangunan Air

Kebutuhan elevasi Ambang Dasar Intake


= Elevasi SP1 + kehilangan tinggi energi di B.Utama
= 97,02 m + 0,2 m
= 97,22 m
Kebutuhan elevasi Crest Bendung
= Kebutuhan elv.ambang intake + (0,1 m agar air dapat langsung
masuk ke dalam jaringan irigasi)
= 97,22 m + 0,1 m
= 97,32 m

Kandiyas Sakta

Perencanaan Irigasi & Bangunan Air

B. Merencanakan Bendung Mercu OGEE I dan Stabilitasnya

Diketahui : Lebar dasar sungai (b)

: 29 m

Kemiringan talud (m)

: 0,7

Kemiringan dasar sungai (I)

: 0,0004

Koefisien Strickler (Ks)

: 35 m/det

Debit Banjir (Q)

: 105 m3/det

Debit Normal

: 65 m3/det

Debit pengambilan

: 4,0 m3/det

Penyelesaian :
Perumusan debit
Q = AxV
Q = (A) x (Ks x R2/3 x )
Q = (A) x (1/n x (A/P)2/3 x )
Mencari Luasan Bendung
A = (b + m.h)h
= (29 + 0,7.h)h
= 29h + 0,7h2
Mencari keliling basah saluran
2

P = b + 2h

= 29 + 2h
= 29 + 2,441h

Mencari kecepatan aliran


V = 1/n x R2/3 x
= 1/0.03 x [

] 2/3 x

Mencari tinggi saluran


Q = AxV
= (29h + 0,7h2) x

Kandiyas Sakta

1/0.03 x ( [

Perencanaan Irigasi & Bangunan Air

Dengan trial & error, didapatkan h = 2,814 m


A = 29h + 0,7h2
= (29 m x 2,814 m) + (0,7 x 2,8142 m)
= 87,149 m2
P = 29 + 2,441h
= 29 m + (2,441 x 2,814 m)
= 35,869 m2
V = 1/0.03 x [

] 2/3 x
-

= 1/0.03 x ( [

= 1,205 m/det
Check Kontrol
Q = AxV
= 87,149 m2 x 1,205 m/det
= 105,014 m3/det 105 m3/det

(OK)

Menentukan lebar bendung


LBendung = 1,2 x b
= 1,2 x 29 m
= 34,8 m 34 m dibulatkan ke bawah
Menentukan lebar pembilas
LPembilas =
=

x LBendung
x 34 m

= 3,4 m 3,5 m

dibulatkan ke atas

Direncanakan pembilas dengan 2 pintu


2 (pintu) x 1,25 m (lebar pintu) + 1,00 m (pilar) = 3,5 m

Di asumsikan lebar tubuh bendung tanpa pembilas & pilar


o

Luas Pembilas

= 3,5 m

Jumlah Pilar (n)

= 3

Tebal Pilar

= 1,5 m

Kandiyas Sakta

Perencanaan Irigasi & Bangunan Air

Bangunan
Pembilas
1.25
1.00

3.50

1.25
1.50

9.00

1.50
34.00
30.50
9.00

1.50

8.00

Alasan jumlah pilar (n) = 3


Karena jembatan terbuat dari rangka baja dengan masingmasing rangka baja
9,0 meter, jadi untuk menompang jembatan sepanjang 34 m, maka
diperlukan 3 pilar yang punya lebar masing masing 1,5 meter, maka :
= Lebar Bendung [Lebar pembilas + (n x Lebar pilar) ]

= 34 [ 3,5 m + (3 x 1,5 m) ]
= 26 m

Di asumsikan Koefisien kontraksi


o

Kp

= 0,01 Pilar berujung bulat

Ka

= 0,10 Pangkal tembok bulat

Lebar efektif bendung dengan 3 pilar


Leff = (lebar tubuh bendung tanpa pembilas & pilar) (((2n - 1) Kp) + Ka) x H1
= 26 * ( ,( (

= 26 ( (0,05 + 0,10) x H1 )
= 26 0,15 H1
Kandiyas Sakta

Perencanaan Irigasi & Bangunan Air

Persamaan debit mercu OGEE


Q = Cd x x (

) x Leff x H11,5

= Cd x 1,705 x (26 0,15 H1) x H11,5


= Cd x (44,330 H11,5 0,256 H12,5)
o

Perkiraan awal Cd = 1,285

Dengan trial and error, maka di dapatkan H1 = 1,5122 m

Menentukan tinggi rencana di atas mercu bendung :


Hd = H1 = 1,5122

)
(

= 1,438 m
o

Nilai C0 = 1,3 (konstanta)

Menentukan fungsi P/Hd dan H1/Hd (dari grafik) Nilai C1


-

P = Elv. Crest Bandung Elv. dasar hulu


= 97,32 m 96,00 m = 1,32 m

= 0,9179 m

= 1,052 m

Dari grafik didapat C1 = 0,9885 Lihat grafik C1

1.052

0.9885

Kandiyas Sakta

Perencanaan Irigasi & Bangunan Air

Menentukan C2 (dari grafik)


-

Untuk muka hulu vertikal C2 = 1

Check Kontrol
Cd = C0 x C1 x C2
= 1,3 x 0,9885 x 1
= 1,28505
1,285 = 1,285
o

(OK)

Maka lebar effisien-nya


Leff = lebar tubuh bendung tanpa pembilas dan pilar 0,15 H1
= 26 m 0,15 (1,5122 m)
= 25, 773 m

Bentuk Mercu OGEE I dengan kemiringan hulu vertikal


- X1 = 0,282 x Hd = 0,282 x (1,438 m) = 0,406 m
- X2 = 0,175 x Hd = 0,175 x (1,438 m) = 0,252 m
- R1 = 0,200 x Hd = 0,200 x (1,438 m) = 0,288 m
- R2 = 0,500 x Hd = 0,500 x (1,438 m) = 0,719 m
Tabel nilai K dan N, untuk kemiringan hulu vertikal
-

K = 2,000

N = 1,850

Y = (1,438) x

x.

= 0,367
Untuk pertemuan dengan garing kemiringan hilir 1:1, maka persamaannya :

= 1

= 1 = (0,367) x (1,850)

Kandiyas Sakta

= (0,367)

= 3,253 m

Perencanaan Irigasi & Bangunan Air

Maka nilai Y = 0,367


= (0.367) x (

= 3,254 m

Tabel koordinat Mercu OGEE I


X (m)

0,40

0,80

1,20

1,60

2,00

2,40

2,80

3,20

3,253

Y (m)

0,067

0,243

0,514

0,876

1,323

1,854

2,466

3,156

3,254

Kandiyas Sakta

Perencanaan Irigasi & Bangunan Air

C. Peredam Energi
Menghitung tinggi jatuh
Z = Elv. Crest Bendung Elv. dasar hilir
= 97,32 m 95,5 m
= 1.82 m
Menentukan kecepatan awal loncatan
V1 = ( ( )) (
= ( (

))

)
((

) (

= (

)
)

= 7,109 m/det
Menentukan kedalaman awal loncatan
-

=
= 4,074 m2/det

Y1

=
= 0,573 m

Menghitung Bilangan Froude (Fr)


Fr =
=

= 4,653

(Menggunakan USBR III bil Froude 4,5)

Menentukan kedalaman air di atas ambang ujung


Y2 = .
= .

/ x .
(

)/ x .

/
(

= (0,2865 m) x (12,198 m)
= 3,495 m
Kandiyas Sakta

10

Perencanaan Irigasi & Bangunan Air

Menentukan kolam olak tipe USBR III


Karena nilai dari bilangan Froude (Fr) 4,5 maka menggunakan USBR III dan
data dari grafik /gambar, di peroleh :

No

DEFINISI

BLOK MUKA
INISIAL

RUMUS

HASIL (m)

INISIAL

BLOK HALANG
RUMUS

HASIL (m)

1 Panjang lantai kolam

2,7 x (Y2)

=
=

2.7 x (3.495)
9.437

2,7 x (Y2)

=
=

2.7 x (3.495)
9.437

2 Jarak antara blok muka ke blok halang

0.82 x (Y2)

=
=

0.82 x (3.495)
2.866

0.82 x (Y2)

=
=

0.82 x (3.495)
2.866

Yu = Y1

0.573

Y1 x ( 4 + fr1 )
6

=
=

0.573 x ( 4 + 4.653)
6
0.826

3 Tinggi blok

Yu

h3

h3
4 Lebar blok

Yu

Yu = Y1

5 Tebal blok

0.5 x (Y1)

6 Jarak Tepi blok

7 Tinggi ambang ujung

Y1 x ( 18 + fr1 )
18

=
=
=
=

Kandiyas Sakta

0.573

0.5 x (0.573)
0.2865

h3

0.75 x (h3)

=
=

0.75 x (0.826)
0.620

h3

0.2 x (h3)

=
=

0.2 x (0.826)
0.165

0.375 x (h3)

=
=

0.375 x (0.826)
0.310

0.573 x ( 18 + 4.653))
18
0.721

11

Perencanaan Irigasi & Bangunan Air

D. Perencanaan Intake
Perencanaan Intake
Perumusan Debit
Q = AxV
Menentukan luasan
A = (b + mh) h
= 29 h + 0,7 h2
Menentukan luasan basah saluran
P = b+2h
= 29 + 2 h
= 29 + 2,441 h
Menentukan kecepatan aliran
V = Ks x

= 35 x . /

Menentukan tinggi bukaan pintu di Intake


Debit yang di gunakan adalah normal
Q = AxV
65 = (29 h + 0,7 h2) x (35 x .

Dengan cara trial and error, maka di dapatkan :

h = 1,84866 m

P = 33,983 m2

A = 62,119 m2

V = 1,047 m/det

Check control
Q =AxV
= 62,119 m2 x 1,047 m/det
= 65,039 65 m3/det
Mencari H1
o

Dari data Mercu OGEE, di dapatkan


Leff = 26 0,15 H1

Kandiyas Sakta

12

Perencanaan Irigasi & Bangunan Air

Persamaan Debitnya
Q = Cd x

x Leff x H11,5

Q = Cd x 1,704 x H11,5 (26 0,15 H1)


Q = Cd x (44,330 H11,5 0,256 H12,5)
o

Perkiraan awal Cd = 1,3

Dengan cara trial and error, maka di dapatkan


H1 = 1,0882 m

Hd = H1 = 1,0882 -

(
(

)
)

= 1,032 m
Menentukan nilai Co, C1 & C2
o

Nilai Co = 1,3 (konstanta)

Nilai C1
- P = Elv. Crest Bendung Elv.dasar hulu
= 97,32 m 96,00 m
= 1,32 m

=
= 1,2791 m

=
= 1,054 m

Kandiyas Sakta

13

Perencanaan Irigasi & Bangunan Air

1.047

0.995
Dari grafik C1 di dapatkan = 0,995

Nilai C2
Kemiringan hulu 1 : 0,67

=
= 1,213 m

1.005

1.213
Dari grafik C2 di dapatkan = 1,005
Check control
Q = Co x C1 x C2
= 1,3 x 0,995 x 1,005
= 1,2999 1,3 (ok)
Kandiyas Sakta

14

Perencanaan Irigasi & Bangunan Air

Menentukan tinggi bukaan pintu air maksimum


a = Hd + 0,1 m
= 1,032 + 0,1 m
= 1,132 m
Perumusan debit dari Intake
Q = m.a.b
Dimana :
-m

= Koefisien Debit (0,7)

-a

= Tinggi bukaan pintu (meter)

-b

= Lebar pintu (meter)

-z

= Selisih hulu hilir (meter)


= Elv. Ambang dasar intake Elv. SP1
= (+97,32 m) (+97,02 m)
= 0,2 m (dalam keadaan terbuka penuh)

Menentukan Q rencana
Diasumsikan tebal pilar = 1 meter
-

Q rencana = 1,2 x Q pengambilan


= 1,2 x (4,0 m3/det)
= 4,8 m3/det

- Q

= mxaxbx
(

)(

4,8

= 0,7 x 1,132 x b x

4,8

= 0,7973 x b x 1,981

= 3,040 m (diambil 3,00 m)

Sehingga lebar 1 pintu = 1,00 meter Jadi Ltotal Intake


Ltotal Intake

= Lebar 2 Pintu + L. Pilar


= (1,50 m x 2) + 1 m
= 4,00 meter

Kandiyas Sakta

15

Perencanaan Irigasi & Bangunan Air

Sket pintu intake

1.50

1.00

1.50

Perencanaan Kantong Lumpur


Diketahui

Qn = 4,0 m3/det
W = 0,004 m/det
T

= 1 minggu

Qs = 0,09 = 0,00009 Volume sedimen


Penyelesaian :

Menentukan Volume Sedimen = Qs x Qn x T


= (0,00009) x (4,0) x (7 x 24 x 3600)
= 217,728 m3

Menentukan Lebar kantong Lumpur


L.B =
=
= 1000 m2
Asumsi lebar dan panjang
ketentuan : L/B > 8

Kandiyas Sakta

16

Perencanaan Irigasi & Bangunan Air

B syarat =
=
= 11,18 m
(B) > ( B syarat = 11,18 m)
L syarat =
=
= 89,45 m
(L) > (L syarat = 89,445 m)
di ambil L = 89,69 m

> L syarat = 89,445 m

B = 11,15 m B syarat = 11,18 m

L/B =

= 8,044 > 8

( OK )

Perencanaan Saluran pengendap


Vn = 0,4 (untuk mencegah tumbuhnya vegetasi)
Ks = 55 (Pasangan batu kali)
Jenis Pasangan
Pasangan Bata
Pasangan Beton
Pasangan Batu Kali
Pasangan Tanah
Pasangan Besi

Koefisien Strickler
60
70
55
35 - 45
85

Menentukan luasan saluran pengendap


An =
=
= 10,0 m2

Kandiyas Sakta

17

Perencanaan Irigasi & Bangunan Air

Mencari lebar saluran (kemiringan talud 2 : 3) , (m) coba-coba = 0,67


-

hn =
=
= 0,897 m

Di ubah ke dalam saluran trapeium


-

= ( b + mh )h

10,0 = ( b + ( 2 x (

) x 0,897 m) x 0,897 m

10,0 = 0,897 b + 1,93


8,07 = 0,897 b
b = 9,00 m

Sket saluran pengendap


11.15

0.897

3
0.4
9.00

Menentukan keliling basah saluran


Pn = b + 2h
= 9 m + 2 (0,897 m) x

= 11,153 m

Kandiyas Sakta

18

Perencanaan Irigasi & Bangunan Air

Menentukan keliling hidrolis (Rn)


Rn =

=
`

= 0,897 m

Menentukan kemiringan saluran ( I )


In = .

= 0,0000611 = 6,11 x 10-5


Perencanaan Saluran pembilas lumpur
Diket : Qs = 1,2 x Qn
= 1,2 x 4,0 m3/det
= 4,8 m3/det
Vs = 1,5 m/det (tanah pasir kasar)
Penyelesaian :
Menentukan luasan saluran pembilas
As =
=
= 3,2 m2

Menentukan ketinggian saluran


hs =
=

Kandiyas Sakta

19

Perencanaan Irigasi & Bangunan Air

= 0,356 m

Menentukan jari-jari saluran


Rs =
=

)
(

= 0,329 m

Menentukan Kemiringan Saluran


Is = .
=

/
(

= 0,003275 = 3,275 x 10-3

Bilangan Froude < 1

=
=

= 0,470 < 1

Aliran Sub kritis

(OK)

Menentukan Dimensi Kantung Lumpur


Vs

= Vol. Persegi + Vol. Segitiga

217,728 = (L x b x hs) + ((0,5 x (Is In)) x (b x L.B))


217,728 = (L x 9 x 0,356) + ((0,5 x (3,725 x 10-3 6,11 x 10-5) x (L x L x 9)
217,728 = (3,204 L) + (0,0145 L2)

Dengan cara trial and error di dapatkan L = 54,415 m

Kandiyas Sakta

20

Perencanaan Irigasi & Bangunan Air

Sket Kantung Lumpur

0.897

+ 97.094

+ 97.09

In

0.356

In

+ 97.094

0.178

Is
54.415

Menentukan tinggi kemiringan saluran


= Is x L
= 0,003275 x 54,415 m
= 0,178 m

Pintu Intake

+ 97.22

+ 97.12

Saluran Pengantar

+ 97.1

Kantong Lumpur

+ 97.094

+ 97.09

+ 96.738
+ 96.00

Kandiyas Sakta

SP 1

+ 97.02

+ 96.556
54.415 m

21

+ 96.556

Perencanaan Irigasi & Bangunan Air

E. Perencanaan Saluran Primer 1 & 2

a) Saluran Primer 1
Diketahui

: Q = 4,0 m3/det
Ks = 55 (pasangan batu kali)
L = 300 m

Tabel Q dan Perbandingan b/h

Tabel V dan Kemiringan Talud (m)

Q ( m3 / det)

b/h

0.00 0.15

0.25 0.30

1:1

0.15 0.30

0.30 0.35

1:1

0.30 0.40

1.5

0.35 0.40

1:1

0.40 0.50

1.5

0.40 0.45

1:1

0.50- 0.75

0.45 0.50

1:1

0.75 1.50

0.50 0.55

1:1

1.50 3.00

2.5

SP 2

0.55 0.60

1 : 1,5

SP 2

3.00 4.50

SP 1

0.60 0.65

1: 1,5

SP 1

4.50 6.00

3.5

0.65 0.70

1 : 1,5

6.00 7.50

0.70

1 : 1,5

7.50 9.00

4.5

0.70

1 : 1,5

9.00 11.00

0.70

1 : 1,5

11.00 15.00

0.70

1:2

15.00 25.00

0.75

1:2

25.00 40.00

10

0.80

1:2

40.00 60.00

12

Tabel Q dan Tinggi Jagaan () tabel De Vos

1.00 1.50

0.6

0.00 0.30

0.3

1.50 2.50

0.75

0.30 0.50

0.4

> 2.50

1.0

0.50 1.00

0.5

Q (m3/det)

Kandiyas Sakta

22

Perencanaan Irigasi & Bangunan Air

Dari table De Vos , didapatkan :


-

V = 0,65
= 3 b=3h

m = 1 : 1,5

= 1

Untuk saluran bentuk trapesium

A = (b + m h) h
= (3 h + 1,5 h) h
= 3 h2 + 1,5 h2
= 4,5 h2 meter

P = b+2h
= 3h+2h
= 3 h + 3,61 h
= 6,61 h meter

Perumusan Debit
Q

= AxV

= (4,5 h2) x (0,65)

= 2,925 h2

= 1,169 m

Maka dapat diperoleh nilai nilai :


b = 3 h = 3 (1,169)
= 3,507 m
P = 6,61 h = 6,61 (1,169)
= 7,727 m2
A = 4,5 h2 = 4,5 (1,1692)
= 6,150 m2
R=

=
= 0,796 m

Kandiyas Sakta

23

Perencanaan Irigasi & Bangunan Air

Mencari kemiringan

V = Ks x R2/3 x
I

= .
= .

/
(

= 1,893 x 10-4 atau 0,0001893

h = I x L
= (0,0001893) x (300)
= 0,0568 m 0,057 m

Elevasi Awal Sp1 = Elv. Intake h bangunan utama


= 97,22 0,2
= 97,02 m

Elevasi Akhir Sp1 = Elv. awal Sp1 h


= 97,02 0,057
= 96,963 m

1.00

9.985

3.00

+ 99.189

+ 99.189
0.30

1.00

+ 98.189
1
1.5

1.169
0.30

1.169

+ 97.02
0.60
0.30

0.50

3.507

0.50

Gambar penampang awal Saluran primer 1

Kandiyas Sakta

24

Perencanaan Irigasi & Bangunan Air

1.00

9.985

3.00

+ 99.132

+ 99.132
0.30

1.00

+ 98.132
1
1.5

1.169

1.169

+ 96.963
0.30
0.30

0.50

3.507

0.50

Gambar penampang akhir saluran Primer 1

b) Saluran Primer 2
: Q = 3,0 m3/det

Diketahui

Ks = 55 (pasangan batu kali)


L = 400 meter
Dari table De Vos , didapatkan:
- V = 0,60 m/det
= 2,5 b = 2,5 h

- m = 1,5
- = 1
Untuk saluran bentuk trapesium

A = (b + m h) h
= (2,5 h + 1,5 h) h
= 2,5 h2 + 1,5 h2
= 6 h2 meter

P = b+2h
= 2,5 h + 2 h
= 2,5 h + 3,61 h
= 6,11 h meter

Perumusan Debit
Q
Kandiyas Sakta

= AxV

25

Perencanaan Irigasi & Bangunan Air

3,0 = (6 h2) x (0,60)


3,0 = 3,6 h2
h

= 0,913 m

Maka dapat diperoleh nilai nilai :


b = 2,5 h

= 2,5 (0,913)
= 2,283 m

P = 6,11 h = 6,11 (0,913)


= 5,578 m2
A = 6 h2

= 6 (0,9132)
= 5,001 m2

R=

= 0,897 m

Mencari kemiringan

V = Ks x R2/3 x
I

= .
= .

/
(

= 1,370 x 10-4 atau 0,000137

h = I x L
= (0,000137) x (400)
= 0,0548 m

Elevasi Awal Sp2 = Elv. Awal Sp1 h BB1


= 96,963 0,15
= 96,813 m

Elevasi Akhir Sp2 = Elv. Akhir Sp2 h gorong-gorong - h


= 96,813 0,1 0,0548
= 96,66 m

Kandiyas Sakta

26

Perencanaan Irigasi & Bangunan Air

1.00

7.996

3.00

+ 98.726

+ 98.726
0.30
1.00

1.00

+ 97.726
1
1.5

0.913

0.913

+ 96.813
0.30

0.60

0.50

2.283

0.50

Gambar penampang awal Saluran primer 2

1.00

7.996

3.00

+ 98.573

+ 98.573
0.30
1.00

1.00

+ 97.573
1
1.5

0.913

0.913

+ 96.66
0.30

0.50

0.60

2.283

0.50

Gambar penampang akhir Saluran primer 2

Kandiyas Sakta

27

Perencanaan Irigasi & Bangunan Air

F. Perencanaan Gorong-gorong di Saluran Primer 2


Diketahui :
-

Q gorong-gorong = 3 m3/det

h sp2 = h gorong-gorong = 0,913 m

V sp2 = V gorong-gorong = 0,60 m/det

Ks = 70 (gorong-gorong dari beton)

Direncanakan :
-

V rencana = 1,5 m/det

Direncanakan L gorong-gorong = 10 meter

Penyelesaian

Persamaan Debit :

Menentukan Luasan gorong gorong (A)


A=
A=
A=2 m

Menentukan lebar gorong gorong


A=bxh
b=
b = 2,19 m

Menentukan Keliling basah gorong gorong


P = b + 2.h
P = 2,19 + (2 x 0,913)
P = 4,016 m

Menentukan jari jari hidrolis gorong gorong


R=
R=
R = 0,498 m

Kandiyas Sakta

28

Perencanaan Irigasi & Bangunan Air

Menentukan kemiringan Gorong gorong


Apabila Ks = 70 (terbuat dari beton)
V = Ks x R x
I=(
I=(

)
(

I = 0,00116

Cek Bilangan Froude (Fr)


=

Fr =

= 0,409 < 1 aliran sub kritis (ok)

Kehilangan energi akibat gesekan (Hf)


Hf

= IxL
= 0.00116 x 10
= 0,0116 m

Menentukan Kehilangan Energi saat masuk gorong gorong (Hm)


Hm = 1 [

= 0,2 [

= 0,00826 m

Menentukan Kehilangan Energi saat keluar gorong gorong (Hk)


Hk = 3 [

= 0,4 [

= 0,0165 m

Total Kehilangan Energi


Z = Hf + Hm + Hk
= 0,0116 m + 0,00826 m + 0,0165 m
= 0,0364 m < 0,05 (asumsi awal)

Kandiyas Sakta

29

Perencanaan Irigasi & Bangunan Air

Menentukan Elevasi awal gorong gorong


elev awal = (elev awal SP2) (I sp2 x L Sp2-Sp1)
= 96,813 (0,000137 x 100)
= 96,813 0,0137
= 96,799 m

Menentukan Elevasi akhir gorong gorong


elev akhir = (elev awal gorong gorong) (Z)
= 96,799 0,0364
= 96,763 m

Kandiyas Sakta

30

Perencanaan Irigasi & Bangunan Air

Kandiyas Sakta

31

Perencanaan Irigasi & Bangunan Air

Kandiyas Sakta

32

Perencanaan Irigasi & Bangunan Air

Kandiyas Sakta

33

Perencanaan Irigasi & Bangunan Air

Kandiyas Sakta

34

Perencanaan Irigasi & Bangunan Air

Kandiyas Sakta

35

Perencanaan Irigasi & Bangunan Air

Kandiyas Sakta

36