Escuela Profesional de Ingenieria Civil

Consorcio Vial Rio Salas

COSTO TOTAL DE BADEN (ACTUAL)


ITEM
9.01
9.02
9.03
9.04
9.05

DESCRIPCION
DEMOLICION DE PAVIMENTO DE CONCRETO, e = 8"
SOLADO DE CONCRETO f'c = 100 kg/cm2, e = 2"
CONCRETO EN LOSAS DE PISO f'c = 210 kg/cm2
ENCOFRADO Y DESENCOFRADO DE LOSAS
ACERO GRADO 60, fy = 4200 kg/cm2

UNIDAD
m2
m2
m3
m2
kg

METRADO
49.20
190.67
47.58
34.60
1630.46

COSTO UNITARIO (S/.) SUBTOTAL


7.00
344.40
8.68
1655.02
337.68
16066.81
44.51
1540.05
4.67
7614.25
TOTAL (S/.)
27220.52

COSTO TOTAL DE BADEN (CONTRACTUAL)


ITEM
9.01
9.02
9.03
9.04

DESCRIPCION
DEMOLICION DE PAVIMENTO DE CONCRETO, e = 8"
CONCRETO EN LOSAS DE PISO f'c = 210 kg/cm2
ENCOFRADO Y DESENCOFRADO DE LOSAS
ACERO GRADO 60, fy = 4200 kg/cm2

Informe de Practicas Preprofesionales N 02

UNIDAD
m2
m3
m2
kg

METRADO
168.30
45.72
48.12
2008.89

COSTO UNITARIO (S/.) SUBTOTAL


7.00
1178.10
337.68
15438.73
44.51
2141.82
4.67
9381.52
TOTAL (S/.)
28140.17

Julio 2009

Escuela Profesional de Ingenieria Civil

Consorcio Vial Rio Salas

METRADO DE BADEN
9.01 DEMOLICION DE PAVIMENTO DE CONCRETO, e = 8"
CANTIDAD
4

LONGITUD
ANCHO
3.75
3.28
TOTAL (m2)

ALTURA

m2
AREA (m2)
49.20
49.20

9.02 SOLADO DE CONCRETO f'c = 100 kg/cm2, e = 2"


CANTIDAD
1
4

LONGITUD
ANCHO
60.20
2.35
3.75
3.28
TOTAL (m2)

ALTURA

m2
AREA(m2)
141.47
49.20
190.67

9.03 CONCRETO EN LOSAS DE PISO f'c = 210 kg/cm2


CANTIDAD
1
1
1
1
1
1
1
4

LONGITUD
60.20
60.20
60.20
2.19
2.19
2.24
2.24
3.75

ANCHO
2.215
0.2
0.25
0.2
0.25
0.2
0.25
3.28
TOTAL (m3)

ALTURA 1
0.2
0.45
0.2
0.45
0.2
0.45
0.2
0.2

m3
ALTURA 2

0.45
0.45
0.45

9.04 ENCOFRADO Y DESENCOFRADO DE LOSAS


CANTIDAD
1
2
1
1
2
1

Informe de Practicas Preprofesionales N 02

LONGITUD
ANCHO
60.20
0.45
2.665
0.45
7.5
0.2
60.2
0.05
2.265
0.05
7.5
0.05
TOTAL (m2)

VOLUMEN (m3)
26.67
5.42
4.89
0.20
0.18
0.20
0.18
9.84
47.58

m2
ALTURA

AREA (m2)
27.09
2.40
1.50
3.01
0.23
0.38
34.60

Julio 2009

Escuela Profesional de Ingenieria Civil

Consorcio Vial Rio Salas

9.05 ACERO GRADO 60, fy = 4200 kg/cm2

kg

LOSA PISO
N VECES
16

DISEO
3.65

DIAMETRO

0.1

CANTIDAD CANT. TOT. LONGITUD

LONG. TOT.

KG/ML

PESO (KG)

0.1

(A1)
3/8"
16

14

224

3.85

862.40

0.56

482.94

304

2.765

840.56

0.56

470.71
953.66

LONG. TOT.

KG/ML

PESO (KG)

2.565
0.1

0.1

(A2)
3/8"

19
SUBTOTAL (kg)

UAS
N VECES
16

DISEO
0.25

DIAMETRO

CANTIDAD CANT. TOT. LONGITUD

0.25

0.34
(A3)

0.43
0.14

16

3/8"

19

304

1.41

428.64

0.56

240.04

3/8"

32

3.85

123.20

0.56

68.99

3/8"

32

3.85

123.2

0.56

68.99

3/8"

14

28

1.41

39.48

0.56

22.11

3/8"

2.765

11.06

0.56

6.19

2.765

11.06

0.56

6.19
412.52

3.65
0.1

0.1

(A4)
16

3.65
0.1

0.1

(A5)
2

0.25

0.25

0.34
(A3')

0.43
0.14

2.565
0.1

0.1

(A4')
2

2.565
0.1

0.1

(A5')
3/8"

Informe de Practicas Preprofesionales N 02

2
SUBTOTAL (kg)

Julio 2009

Escuela Profesional de Ingenieria Civil

Consorcio Vial Rio Salas

PAOS POR RECONSTRUIR


N VECES
4

DISEO
3.65
0.1

DIAMETRO

CANTIDAD CANT. TOT. LONGITUD

LONG. TOT.

KG/ML

PESO (KG)

0.1

(A6)
3/8"
4

17

68

3.85

261.80

0.56

146.61

76

2.765

210.14

0.56

117.68
264.29

2.565
0.1

0.1

(A7)
3/8"

19
SUBTOTAL (kg)

TOTAL ACERO GRADO 60, fy = 4200 kg/cm2 (kg)

Informe de Practicas Preprofesionales N 02

1630.46

Julio 2009