You are on page 1of 1

JADWAL WAKTU PELAKSANAAN

PEKERJAAN PEMBANGUNAN JARINGAN IRIGASI D.I. KRUENG JREUE/KEULILING PAKET-II


SELUAS 83,15 HA (662 HA)
SATUAN KERJA
KEGIATAN
TAHUN ANGGARAN

:
:
:

NO.

SNVT PELAKSANAAN JARINGAN PEMANFAATAN AIR SUMATERA - I


IRIGASI DAN RAWA-II
2012

URAIAN KEGIATAN

SATUAN
UKURAN

WAK T U PEL AK SAN AAN


KUANTITAS

JUMLAH HARGA (Rp)

BOBOT (%)
1

BULAN - I
2
3

BULAN - II
2
3

BULAN - III
2
3

BULAN - IV
2
3

BULAN - V
2
3

BULAN - VI
2
3

KET.

BULAN - VII
2
3

4
100

DAFTAR 1 : MATA PEMBAYARAN UMUM

Mobilisasi dan Demobilisasi

Ls

1.00

17,160,000.00

0.53

Barak Pekerja

Ls

1.00

3,000,000.00

0.09

Dewatering/Pengalihan Air

Ls

1.00

35,000,000.00

1.07

II

DAFTAR 2 : MATA PEMBAYARAN PEKERJAAN UTAMA

PEKERJAAN SALURAN AIR

Galian Tanah Biasa (MP)

M3

474.70

20,560,206.40

0.63

Galian Tanah (AB)

M3

24,064.07

623,548,181.84

19.10

Urug Kembali

M3

3,609.61

51,815,951.55

1.59

Timbunan tanah hasil galian dipadatkan (AB)

M3

7,325.29

212,352,831.81

6.51

Timbunan tanah hasil galian (diangkut 250m) dan dipadatkan (AB)

M3

7,746.17

232,834,377.86

7.13

Pembuangan tanah hasil galian diratakan

M3

4,309.36

137,705,598.80

4.22

Pasangan batu 1 : 4

M3

1,477.59

764,844,911.70

23.43

Plesteran 1 : 3, t = 15 mm

M2

5,303.51

161,502,486.52

Beton K-225

M3

42.76

46,330,203.44

10

Pekerjaan Pembesian (besi polos) (upah + bahan)

Kg

6,071.49

79,342,231.32

2.43

11

Bekisting

M2

196.60

24,000,534.80

0.74

12

Drain hole dia. 1,5" (lengkap ijuk)

Bh

1,318.00

20,042,826.00

0.61

PEKERJAAN BANGUNAN

Galian Tanah Biasa (MP)

M3

50.00

2,165,600.00

0.07

Galian Tanah (AB)

M3

277.50

7,190,580.00

0.22

Urug Kembali

M3

31.00

445,005.00

0.01

Pasangan batu 1 : 4

M3

213.00

110,255,190.00

3.38

Plesteran 1 : 3, t = 15 mm

M2

350.00

10,658,200.00

0.33

Beton K-175

M3

16.00

15,512,544.00

0.48

Pekerjaan Pembesian (besi polos) (upah + bahan)

Kg

1,760.00

22,999,680.00

0.70

Bekesting

M2

264.00

32,228,592.00

Drain hole dia. 1,5" (lengkap ijuk)

Bh

100.00

1,520,700.00

10

Pintu sorong baja 2 (dua) draat stang/spindle 3 (tiga) set roda gigi

0.175

0.175
0.046

0.175
0.046
0.134

0.134

0.134

0.134

0.134

0.134

0.134

0.134
90

0.315

0.315
2.388

2.388

2.388

2.388

2.388

2.388

2.388

80

2.388
0.397

0.397

0.397

2.130

2.130

2.130

2.130

4.95

1.237

1.237

1.237

1.237

1.42

0.710

0.710

0.056

0.056

0.033

0.033

1.626

1.626

1.626

1.626

1.427

1.427

2.130

1.427

2.130

1.427

1.427

1.055

1.055

1.055

1.055

2.130

2.130

2.130

2.130

1.215

0.056

0.056

0.056

0.056

0.056

0.056

0.397

70

2.130

1.215

60

0.368

0.368

0.056

0.056

0.056

0.110

50

0.110
0.014
1.689

1.689

40

0.327
0.238

0.238

0.99

0.494

0.494

0.05

0.023

0.023

0.705

30

(pengadaan, sand blasting, printing, angkut dan pemasangan)


B=1,50 m; H=1,20 m; Ht =2,30 m
11

Bh

1.00

44,000,000.00

1.35

0.674

0.674

B=1,00 m; H=1,20 m; Ht =2,30 m

Bh

1.00

41,000,000.00

1.26

0.628

0.628

B=0,70 m; H=1,15 m; Ht =2,20 m

Bh

2.00

70,000,000.00

2.14

1.072

1.072

B=0,5 m; H=1,00 m; Ht =2,20 m

Bh

3.00

99,000,000.00

3.03

1.516

1.516

B=0,40 m; H=0,60 m; Ht =1,70 m

Bh

8.00

240,000,000.00

7.35

3.676

3.676

M2

4,786.54

137,306,686.44

4.21

Pintu sorong baja 1 (satu) draat stang/spindle no gear


20

(pengadaan, sand blasting, printing, angkut dan pemasangan)

DAFTAR 3 : MATA PEMBAYARAN LAIN-LAIN

Gebalan Rumput

1.402

10

1.402

1.402
0

TOTAL BOBOT

3,264,323,119.48

100.00

Progres Rencana Mingguan (%)

0.18

0.22

0.36

2.70

2.39

2.39

2.39

2.39

4.01

4.01

5.57

5.37

3.61

4.67

4.80

3.37

4.46

3.77

4.63

4.66

3.85

4.67

3.08

10.47

8.98

1.40

1.40

0.18

Progres Rencana Komulatif Mingguan (%)

0.18

0.40

0.76

3.46

5.85

8.24

10.62

13.01

17.02

21.04

26.61

31.99

35.60

40.27

45.07

48.44

52.90

56.67

61.30

65.96

69.82

74.48

77.57

88.04

97.02

98.42

99.82

100.00

Banda Aceh, 02 Februari 2012


PT. USAHA SEJAHTERA MANIKAM

T. ALI BADRISYAH
Direktur Utama