You are on page 1of 30

2/11/2013

PRINSIPPEMBENTUKANJERATAN

2/11/2013

CUCUKANPADAGUIDEBAR(DIAGRAMBENANG)

LAPPINGDANJERATAN

2/11/2013

DOUBLEBED(24,46/42,20)
DEPAN

DI BED DEPAN
BELAKANG

PILLAR STITCH 2-4/4-2

DI BED BELAKANG DIBUAT 4-6/2-0

DOUBLENEEDLEBARRASCHEL

2/11/2013

KNITTINGTUBULAR

PILEFABRICS(3BAR)

2/11/2013

PILEFABRICS(5BAR)

SISIPANPAKAN(WEFTINSERTION)

2/11/2013

SISIPANPAKAN(WEFTINSERTION)

MULTIAXIAL

2/11/2013

MULTIAXIAL

MULTIAXIAL

2/11/2013

MULTIAXIAL

MULTIAXIAL

2/11/2013

HASILMULTIAXIAL

MONOAXIAL

2/11/2013

19

PillarLap

20

10

2/11/2013

1and1Lap(TricotLap)

1 0 1 2closed1and1stitch

21

2and1Lap(TUCH)
Swingthrough swing back 0 swingback0 swingthrough swingback3 swingthrough swingback0 1

22

11

2/11/2013

3and1Lap(SATIN)
Swingthrough 1 swingback 0 swingthrough 3 swingback 4 swingthrough 0 swingback 1 swingthrough 4 swingback 3

2/11/2013

23

4and1Lap(SAMT)
Swingthrough swingback 0 4 1

swingthrough swingback 5

24

12

2/11/2013

Atlas
Lappingmovement
01/21/32/43/54/34/23/12/ 0 1/2 1/3 2/4 3/5 4/3 4/2 3/1 2/

25

KOMBINASIJERATAN(LAPPING DANSTITCH)

26

13

2/11/2013

StitchDiagramandNotation? (LATIHAN.)

27

14

2/11/2013

WARPING RATIO DAN PRODUKSI KAIN RAJUT

SEGMENTBENANG(FADENTEILE)

PERBANDINGAN PANJANG BENANG YANG HARUS DIHANI ANYAMAN YG DIGUNAKAN

BAHAN BAKU

KONDISI MESIN

MULUR, MENGKERET DAN SIFAT BENANG

15

2/11/2013

PERHITUNGAN(KONSENSUS)

PREDIKSI

SEGMENTBENANG(FADENTEILE)

0,75 1

0,5

0,5

16

2/11/2013

CONTOHPERHITUNGAN MEMBUATKAINDENGANKOMBINASI3(TIGA) ANYAMANMACAMDASAR

TRICOT TERTUTUP

TUCH TERTUTUP
8

PILLAR TERBUKA

TRICOTDANTUCH

+ PILLAR TERBUKA

17

2/11/2013

SISTEM PERBANDINGAN SEGMENT

2 1 1 2

I II GUIDE BAR

III

SOALDANSOLUSI

18

2/11/2013

LANJUTAN

JACQUARD

19

2/11/2013

MESINJACQUARD

JACQUARD MACHINE(JACQUARDDANDROPPERPIN)

0-0-0-0-4-4/4-4-4-4-0-0 2-2-2-0-4-4/6-6-6-4-0-0

0-2-2-2-4-4/4-2-2-2-2-2 0-0-0-0-2-2/4-0-0-0-0-0

20

2/11/2013

KERTASDESAINUNTUKMRL

DASARTULLE

21

2/11/2013

CONTOHMENGGAMBAR LACE dasarTULLE

22

2/11/2013

LACEDENGANDASARTULLE

SISTEMPENOMORAN PADAKERTASDESAIN

23

2/11/2013

ELS PROGRAMPENGATURANBARSISTEMKOMPUTER

MODELSINKER

24

2/11/2013

MESINTRICOT LIBAMASCHINEN

MAINTENANCE DAN PRODUKSI

25

2/11/2013

PEMELIHARAAN MESIN (MAINTENANCE)

SUATU KEGIATAN UNTUK MEMELIHARA ATAU MENJAGA FASILITAS/ PERALATAN/SPARE PART,DAN PERBAIKAN, PENYETELAN, LUBRIKASI, DAN MEMPERSIAPKAN MESIN UNTUK KEGIATAN PRODUKSI

DAMPAKMAINTENANCE

KONTUINITASPRODUKSITERJAMIN,BAIK KUANTITAMAUPUNKUALITA MESINDANSEMUAPERALATANNYATERPELIHARA DENGANBAIK ADAJAMINANKESELAMATANKERJA

26

2/11/2013

KONDISIMESIN
MAINTENANCEBENAR:MESIN TERPELIHARAPRODUKVITAS MENINGKAT TAKBENAR:PRODUKTIVITAS MENURUN

JENIS JENISMAINTENANCE
1.PREVENTIVEMAINTENANCE (Pemeliharaansebelumterjadikerusakan) 2.CORRECTIVE/BREAKDOWN MAINTENANCE(Pemeliharaansesudah adakerusakan)

27

2/11/2013

PREVENTIVEMAINTENANCE

Sangatefektifdalammenanganiperalatanyang termasukgolonganCriticalUnit

Contoh: Peralatanyangmembahayakankesehatan Peralatanyangmerusak/dapatmenurunkan kualitasuatuproduk Peralatanyangdapatmemacetkanseluruh prosesproduksi Peralatantersebutsangatmahalharganyadan langkadipasaran

2(DUA)PERSOALANDALAMPELAKSANAAN MAINTENANCE
TEKNIS TEKNISyangharusdikerjakan? yang harus dikerjakan ? EKONOMIS

BiayasukucadangGangguanharusdi &servistanggulangi ProduksiLancar Produksi Lancar

TinjauandariSegiBiaya : ApakahdikerjakanpreventiveatauCORRECTIVEM Alatdiperbaiki/Diganti Mesindiperbaiki/digantiDenganperhitungan

28

2/11/2013

Guide Bar Dasar

MRSEJ 43/1 SU

SU

MRSEJ 73/1 Stitch Forming

Sisipan (Weft Laying)

OILING DAN GREASING

29

2/11/2013

HASILKAINRAJUTLUSI

MRSEJF53/1/24

MRPJ43/1

FL 20/16 Textronic . Contoh Hasil Kain Rajut Lusi

30

You might also like