Professional Documents
Culture Documents
TABLE OF CONSTRUCT
Construct Aspect Instrument : : : S10 LA5.S10.1 Program Development Apply Program Development Phases To Develop A Problem-Solving Program Practical Session
MARK
1.
CRITERIA
Problem Analysis a. Write the problem statement. b. List all the required input items c. Write the expected output. d. Write the formula to be used. Program Design a. Write the pseudocode. OR Draw the flowchart. b. Sketch the user interface design for input. c. Sketch the user interface design for output. Coding Develop a program based on (1) and (2). Write the name of the project file. Testing and Debugging a. State the test data used for each input item listed in 1(b). b. Write the output based on 4(a) c. Compile the program. Write down the name of the executable file. Documentation Submit report and soft
EVIDENCE
NOTE
Duration of practical session: 2 periods Choose any of the suggested projects (refer to APPENDIX B) or propose a new project. Submit executable file and/or project file and form(s). During evaluation, assessor runs the candidates program to validate the output in 4(b) using the data in 4(a). Values: 1. 2. 3. 4.
2.
3. 2
4.
5.
20
TOTAL MARK