You are on page 1of 110
GUIDELINES / REQUIREMENTS FOR ‘TRANSMISSION SUBSTATION BUILDINGS (For 66kV Standalone Substation only) Prepared by Transmission Engineering Section aon 7 sun 2088 FOR PROJECT DEVELOPMENT Developer! Project Engineer: Date lesued: & SP POWERGRID [GUIDELINES / REQUIREMENTS FOR TRANSMISSION SUBSTATION BUILDINGS, (FOR 66KV SUBSTATION ONLY) ¥ 1a 2 2a 8 34 32 2 24 35 38 37, 38 a9 310 ait 312 319 a6 218. 318 3a7 318 319 4 4a 42 4a 44 45 46 a7 4a 49 410 ant (GEVERAL INFORMATION. Inrodeton. ‘DEstan DEVELOPMENT PHASE. General Requirements, ‘MecrANoAL, AND ELECTRICAL REQURENMENTS. Emergency Supply or Lighting Ughting and Power Supay Lightning Protection Substation Earting Protecon. Cranes and Hoists. ‘Ot mercopor lle: Shuter Fre Protection Exhaust Fas Waring Ugh... [NC Supply for HV Equipment Testing, ‘Submersible Pumps. “Telocom Lines, Passenger Framers Lit Defects Lisbilty (For MAE Equipment instal}. at ‘Ai-Conaitioned Room. 2 ‘Substation Seeurly Systm 25 ther. 26 Network Rack Housing, 28 ‘BULING, GLAND STRUCTURAL REQUREMENTS Vertiation and Window. a7 Taps, Basin and Plumbing Fbawes 28 Columns, Beams and Expansion Jos Floor Openings and Floor Slab, Salety Moasures ‘Swtehroom Floor and Rendering Cable Trenches, Basements and Sunken Areas (Cable rary Pipes Bays fr Transformer, NGA & Shunt Reactor. Pot False Caiings 29 29 90 2 32 34 25 35 37 42 413 44 435 436 47 418 49 420 421 51 6s ma 72 73. 74 7s 78 7 an 82 83 a4 85. 87 aa eo. 810 ant aie ar Main Gato with Bator System and Fence Driveway Dra. Exernal Compound Wiall/ Foor Ting Doo for Equipment Acoaes. ‘Signage & Locations Plans. DeiectsLiabity (For Subetaion Bung Inclusive of AB Sct Wore) a Paint Others. SITE SUPERVISION. General Requirements, Hawoover oF SuastaTION BULONG, Handover of Substation Building Procedures. ATTACHMENT A~ USEFUL DATA AND INFORMATION RELATING TO ‘SUBSTATION BULLDOG narsesennennees ‘Typical Weights of Equipment Foor Loading for Switchrooms. Foor Heights. Doors or Equipment Access (0 Intercopor only if roquied by ENV). Liting Voids Height of Blast Wats ATIACINENT B= GENERAL GUDELINES FOR ELECTRICAL NSTALATNS ‘Substation Compound. Stairways. {6kV Transtomer Bay 22K and BGKV Transtomer Bay NGR Bay, ‘6kV Switctroom 22k Swithroom ‘ERY Swichroom | LV Room / Buldng Sarvices Main Swttzoom ‘Cable Flor and Cable Basoment/ Chamber, lay Room. ‘Communication Room. Battery Room, BRaEERE Bese ses aeezgags BIIBRSRLABBRRK

You might also like