com PDF processed with CutePDF evaluation edition www.CutePDF.com PDF processed with CutePDF evaluation edition www.CutePDF.com PDF processed with CutePDF evaluation edition www.CutePDF.com PDF processed with CutePDF evaluation edition www.CutePDF.com PDF processed with CutePDF evaluation edition www.CutePDF.com PDF processed with CutePDF evaluation edition www.CutePDF.com PDF processed with CutePDF evaluation edition www.CutePDF.com PDF processed with CutePDF evaluation edition www.CutePDF.com PDF processed with CutePDF evaluation edition www.CutePDF.com PDF processed with CutePDF evaluation edition www.CutePDF.com
LAPORAN TELAAHAN STAFF
EVALUASI PEMERATAAN BEBAN UNTUK
MENEKAN LOSSES J ARI NGAN TEGANGAN RENDAH
DI GARDU E311P dan GARDU PM 213














DISUSUN OLEH:
PRASETYA ULAH SAKTI
B / ED / 00481
SISWA OJ T S1/D3 BIDANG ENGINEERING DISTRIBUTION
ANGKATAN VIII



PT PLN(PERSERO)
DI STRI BUSI J AKARTA RAYA DAN TANGERANG
AREA J ARI NGAN KRAMATJ ATI
2008

ii
LEMBAR PERSETUJ UAN

LAPORAN TELAAHAN STAFF DENGAN JUDUL:


EVALUASI PEMERATAAN BEBAN UNTUK MENEKAN LOSSES
J ARINGAN TEGANGAN RENDAH DI GARDU E311P DAN PM 213



Telah diperiksa dan disetujui untuk diajukan dalam sidang Telaahan Staff Siswa
On The Job Training Bidang Engineering Distribusi PT PLN (Persero) Distribusi
Jakarta Raya dan Tangerang




Jakarta, Februari 2008
iii
KATA PENGANTAR


Puji syukur kami panjatkan kehadirat Allah SWT, yang telah memberikan
rahmat, hidayah dan karunianya, sehingga penyusun dapat menyelesaikan laporan
Telaahan Staff ini. Penyusunan laporan ini adalah sebagai bahan evaluasi
pelaksanaan On The Job Training(OJT) Angkatan Ke VIII siswa prajabatan
S1/D3 PT PLN (Persero).
Laporan Telaahan Staff ini membahas tentang losses yang terjadi bila
jaringan tegangan rendah mengalami ketidakseimbangan beban, dengan fokus
pada losses yang terjadi di hantaran netral. Pada penyusunan laporan ini,
penyusun melakukan praktek penyeimbangan beban di gardu E 311P Area
Pelayanan Condet dan gardu PM 213 Area Pelayanan Pasar Minggu, Area
Jaringan KramatJati.
Dalam penyusunan laporan ini, penyusun banyak mendapatkan masukan dan
bantuan dari berbagai pihak, khususnya seluruh karyawan atau pegawai
outsourcing di Area J aringan KramatJati terutama staff di posko gangguan area
Condet dan Pasar Minggu. Sehingga melalui kesempatan ini penyusun
mengucapkan banyak terimakasih pada semua pihak yang telah membantu dalam
penyusunan laporan ini.
Penyusun menyadari bahwa dalam laporan ini ada beberapa kekurangan dan
ketidaksempurnaan, sehingga penyusun menerima kritik dan saran yang sifatnya
memperbaiki laporan ini.
Akhirnya penyusun berharap, semoga laporan ini dapat berguna dan
bermanfaat, khususnya bagi kalangan PT PLN(Persero) untuk peningkatan
pelayanan pelanggan.

Jakarta, Februari 2008


Penyusun

iv
ABSTRAK


Sistem Distribusi Tenaga Listrik pada dasarnya adalah suatu proses
untuk menyalurkan tenaga listrik dari sistem transmisi tenaga listrik 150 kV ke
pelanggan pelanggan listrik(konsumen) baik konsumen 20 kV ataupun konsumen
380/220 V. Sistem distribusi yang lebih kompleks jaringannya adalah sistem
distribusi Tegangan Rendah (380/220V), karena jaringan sistem distribusi
tegangan rendah mempunyai cakupan jaringan yang sangat luas.
Hal ini seringkali menyebabkan sistem Distribusi Tegangan Rendah
menjadi tidak seimbang/merata, karena pada umumnya pelanggan rumah tangga
memanfaatkan tenaga listrik satu phase. Apabila wiring / penyambungan
pelanggan ke sistem distribusi tegangan rendah tidak memperhatikan beban di
masing - masing phase, pada akhirnya sistem distribusi tegangan rendah akan
mengalami kepincangan dalam pembebanan di hantaran phase.
Akibat dari sistem distribusi tegangan rendah yang tidak seimbang
tentunya akan berpengaruh terhadap banyak hal, seperti: kinerja trafo, panas
berlebih pada phase beban lebih, arus mengalir pada kawat netral, drop tegangan
ujung pada jaringan phase beban lebih. Dan pada akhirnya kualitas tenaga listrik
di tingkat konsumen menurun.
Arus netral yang berlebih yang timbul akibat pembebanan yang tidak
seimbang diantara hantaran phase, akan menyebabkan panas berlebih pada
hantaran netral. Panas ini tentunya merupakan suatu losses yang seharusnya
tidak perlu terjadi. Sehingga secara tidak langsung ikut menyumbang losses, yang
sedang gencar diminimalisir oleh PT PLN Distribusi J akarta Raya Dan
Tangerang.



Kata kunci: Beban Tak Seimbang, J aringan Tegangan Rendah, Arus Netral


v
DAFTAR ISI


Halaman J udul ......................................................................................... i
Lembar Persetujuan ................................................................................ ii
Kata Pengantar ........................................................................................ iii
Abstrak ..................................................................................................... iv
Daftar Isi .................................................................................................. v
Daftar Gambar ......................................................................................... vii
Daftar Tabel .............................................................................................viii
BAB I PENDAHULUAN ......................................................................... 1
1.1. Latar Belakang ............................................................................... 1
1.2. Batasan Masalah ............................................................................. 1
1.3. Metodologi Penyusunan .................................................................. 2
BAB II PRA ANGGAPAN ...................................................................... 3
BAB III DASAR TEORI ......................................................................... 4
3.1. Sistem Distribusi ........................................................................... 4
3.2. Jaringan Tegangan Menengah ......................................................... 6
3.2.1. Sistem / pola radial .................................................................... 6
3.2.2. Sistem / pola open loop ............................................................. 6
3.2.3. Sistem / pola close loop ............................................................. 7
3.2.4. Sistem / pola Spindel ................................................................. 7
3.2.5. Sistem / pola Cluster .................................................................. 8
3.3. Transformator Distribusi ................................................................. 9
3.4. Jaringan Tegangan Rendah ............................................................. 9
3.4.1. Saluran Udara Tegangan Rendah ............................................... 9
3.4.2. Saluran Kabel Tegangan Rendah ............................................... 11
3.5. Rak TR ........................................................................................... 11
3.6. Beberapa Komponen JTR .............................................................. 11
3.7. Sistem Tiga Fase ............................................................................ 12
3.7.1. Sistem Y dan Delta .................................................................... 14
3.7.2. Beban Seimbang Terhubung Delta ............................................. 15
vi
3.7.3. Beban Seimbang Terhubung Y .................................................. 15
3.7.4. Beban Tak Seimbang Terhubung Delta ...................................... 15
3.7.5. Beban Tak Seimbang Terhubung Y ........................................... 16
3.8. Losses Pada Jaringan Distribusi ...................................................... 18
3.8.1. Losses Pada Penghantar Phase ................................................... 18
3.8.2. Losses Akibat Beban Tidak Seimbang ....................................... 18
3.8.3. Losses Pada Sambungan Tidak Baik .......................................... 19
BAB IV PEMBAHASAN ......................................................................... 20
4.1. Metode Pengumpulan Data ............................................................. 20
4.2. Pembahasan Pemerataan Beban Di Gardu E 311 P .......................... 21
4.2.1. Kegiatan Pemerataan Beban J urusan C Gd E 311P(SKTR) ....... 22
4.2.2. Kegiatan Pemerataan Beban Jurusan B Gd E 311P(SUTR) ........ 25
4.2.3. Perhitungan Penekanan Losess Arus Netral Di Jrsn C ................ 27
4.2.4. Perhitungan Penekanan Losses Arus Netral Di Jurusan B ......... 29
4.2.5. Analisa Vektoris ........................................................................ 33
4.2.6. Daya Yang Disalurkan Sebelum Pemerataan Beban................... 36
4.2.7. Daya Yang Disalurkan Sesudah Pemerataan Beban ................... 37
4.2.8. Presentase Losses Terhadap Total Daya Yang Disalurkan.......... 38
4.2.8.1. Prosentase losses pada hantaran netral .................................. 38
4.2.8.2 Prosentase losses pada hantaran phase .................................. 39
4.2.9. Kajian Finansial Pemerataan Beban Di Gardu E 311P ............... 40
4.3. Pembahasan Pemerataan Beban Di Gardu PM 213 .......................... 43
4.3.1. Perhitungan Penekanan Losses .................................................. 44
BAB V PENUTUP .................................................................................... 54
5.1. Kesimpulan ..................................................................................... 54
5.2. Saran .............................................................................................. 54
DAFTAR PUSTAKA ............................................................................... 55
LAMPIRAN LAMPIRAN ..................................................................... 56




vii
DAFTAR GAMBAR


Gambar 3.1. Gambaran Umum Distribusi Tenaga Listrik ...................... 5
Gambar 3.2. Sistem Radial .................................................................... 6
Gambar 3.3. Sistem Open Loop ............................................................. 7
Gambar 3.4. Sistem Close Loop ............................................................ 7
Gambar 3.5. Sistem Spindel .................................................................. 8
Gambar 3.6. Sistem Cluster ................................................................... 8
Gambar 3.7. Sistem tiga fase sebagai tiga sistem fase tunggal ................ 13
Gambar 3.8. Bentuk gelombang pada sistem tiga fase ............................ 13
Gambar 3.9. Sistem Y dan Sistem Delta ................................................ 14
Gambar 3.10. Beban tak seimbang terhubung Delta ............................... 16
Gambar 3.11. Beban tak seimbang terhubung bintang empat kawat ....... 17
Gambar 3.12. Diagram Fasor Beban tak Seimbang ................................ 17
Gambar 3.13. Sambungan Kabel ........................................................... 19
Gambar 4.1. Panel CDT 16409 beban tidak merata ................................ 24
Gambar 4.2. Panel CDT 16409 Setelah Pemerataan Beban .................... 25
Gambar 4.3. Gambar Topografi Gardu E 311P Jurusan B ...................... 32
Gambar 4.4. Penyederhanaan Rangkaian JTR ........................................ 33
Gambar 4.5. Diagram Fasor Arus dan Tegangan Jurusan B
Sebelum Pemerataan Beban .............................................. 34
Gambar 4.6. Diagram Fasor Arus dan Tegangan Jurusan B
Setelah Pemerataan Beban ................................................ 35








viii
DAFTAR TABEL


Tabel 3.1. Karakteristik Twisted Kabel Alumunium (NFA 2x) .............. 10
Tabel 4.1. Pengukuran Gardu Oleh Petugas Posko Condet ..................... 21
Tabel 4.2. Tabel Hasil Ukur Beban Gardu Dari Survey .......................... 22
Tabel 4.3. Hasil Ukur Beban Pelanggan ................................................. 23
Tabel 4.4. Perencanaan Pemerataan Beban Jurusan C Gd E 311P .......... 24
Tabel 4.5. Pemindahan Phase Sambungan Rumah ................................. 26
Tabel 4.6. Hasil Pengukuran Beban Setelah Pemerataan Beban ............. 27
Tabel 4.7. Data Elektrikal Kabel NYFGBY Konduktor Tembaga .......... 29
Tabel 1. Data Pelanggan Jurusan B Gardu E 311P ................................. 44
Tabel 2. Perhitungan Arus Netral(Sesuai Daya Kontrak) Sebelum
Pemerataan Beban Jurusan B.................................................... 48
Tabel 3. Losses Pada Hantaran Netral Sebelum Pemerataan Jurusan B .. 49
Tabel 4. Perhitungan Arus Netral(Sesuai Daya Kontrak) Sesudah
Pemerataan Beban Jurusan B.................................................... 50
Tabel 5. Losses Pada Hantaran Netral Sesudah Pemerataan Jurusan B ... 51
Tabel 6. Losses Pada Hantaran Phase Sebelum Pemerataan Jurusan B ... 52
Tabel 7. Losses Pada Hantaran Phase Sesudah Pemerataan Jurusan B ... 53
Tabel 8. Losses Pada Hantaran Netral Sebelum Pemerataan Jurusan C .. 54
Tabel 9. Losses Pada Hantaran Netral Sesudah Pemerataan Jurusan C ... 54
Tabel 10. Losses Pada Hantaran Phase Sebelum Pemerataan Jurusan C.. 55
Tabel 11. Losses Pada Hantaran Phase Sesudah Pemerataan Jurusan C .. 55






PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
1

BAB I
PENDAHULUAN


1.1. Latar Belakang
PT PLN merupakan perusahaan penyedia listrik untuk umum satu-
satunya di Indonesia. Permasalahan utama yang dihadapi PLN adalah mulai
terjadinya krisis energi yang mengglobal. Harga bahan bakar minyak di tingkat
internasional terus meningkat. Hal ini menyebabkan PT PLN harus melakukan
efisiensi di segala sektor, dan yang paling utama adalah di sektor penyediaan
tenaga listrik.
Salah satu langkah efisiensi yang dilakukan PT PLN adalah menekan
losses seminimal mungkin, baik losses teknik maupun non teknik. Penekanan
losses teknik yang dilakukan oleh PT PLN Distribusi Jakarta Raya dan Tangerang
salah satunya adalah dengan pemeliharaan jaringan listrik semaksimal mungkin,
sehingga losses teknik akibat jaringan dapat diminimalisir.
Berdasarkan perhitungan dari kwh beli dari P3B dan kwh jual ke
pelanggan, di AJ Kramatjati terjadi selisih antara energi yang terjual dan energi
digunakan pelanggan sebesar 12,1%. Hal ini mengindikasikan losses yang terjadi
di AJ KramatJati sedemikian besar. Losses ini terdiri dari losses teknik dan non
teknik.
Untuk memberikan kontribusi dalam hal efisiensi, dalam telaahan staff
ini mencoba mengevaluasi peran pemerataan beban dalam program pengurangan
losses teknik, dengan jalan mengurangi arus balikan yang melalui hantaran netral.


1.2. BATASAN MASALAH
Penyusunan Laporan Telaahan Staff ini difokuskan pada analisis beban
tak seimbang pada sistem distribusi tegangan rendah. Program meminimalisir arus
yang melewati hantaran netral adalah arus yang timbul karena beban tidak
seimbang. Dalam beberapa perhitungan digunakan beberapa asumsi, antara lain
penggunaan arus oleh pelanggan diwakili dengan daya kontrak pelanggan,
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
2

penggunaan arus oleh pelanggan terus-menerus 24 jam nonstop. Asumsi lain
adalah pembagian arus netral yang melalui suatu konduktor di sepanjang jaringan
dilakukan secara proporsional sesuai dengan besar daya kontrak dan pengukuran
arus di gardu.

1.3. Metodologi Penyusunan
Penyusunan Laporan ini, menggunanakan metode:
1. Metode Pengumpulan data:
Pengumpulan data dilakukan dengan jalan mengukur beban gardu ke
lapangan. Selain data beban juga diperlukan data pencatatan kwh pantau dan
kwh pelanggan, sebelum dan sesudah kegiatan pemerataan beban.
2. Studi Pustaka
Mengumpulkan bahan-bahan literatur yang berkaitan dengan beban tak
seimbang dan losses akibat beban tak seimbang.
3. Wawancara
Konsultasi langsung dengan orang orang terkait yang sudah berpengalaman
di jaringan tegangan rendah.













PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
3

BAB II
PRA ANGGAPAN


Pemerataan beban merupakan salah satu cara untuk menekan losses
teknik. Penekanan losses terjadi dengan prinsip mengurangi arus yang mengalir di
hantaran netral. Idealnya arus yang mengalir di sepanjang hantaran netral adalah
nol, tetapi karena pengaruh dari beban yang tidak seimbang maka hantaran netral
akan berarus. Sedangkan hantaran netral merupakan konduktor yang memiliki
nilai resistansi, sehingga arus yang melalui hantaran ini sebagian berubah menjadi
panas yang didisipasikan ke lingkungan sekitar sebagai losses.
Meskipun di sepanjang jaringan tegangan rendah, pada beberapa titik
terdapat pentanahan netral. Tetapi hasil ukur arus netral di gardu E 311P dan
PM213 menunjukkan suatu nilai yang cukup signifikan. Hal ini terjadi karena
pentanahan netral tidak mampu membuang arus netral yang cukup besar akibat
dari beban yang tidak seimbang. Sehingga permasalahan ini harus dapat
diselesaikan oleh PT PLN(Persero).
Salah satu cara yang paling mudah adalah dengan pemerataan beban pada
jaringan tegangan rendah. Pemerataan beban dilakukan dengan jalan, memindah
beban(sambungan rumah) dari phase yang berat(pada JTR) ke phase yang lebuh
ringan. Arus yang mengalir dari tiap phase akan melalui hantaran netral dengan
melalui peralatan pelanggan terlebih dahulu(menjadi arus netral). Ketika beban
menjadi lebih seimbang, maka arus netral ini akan memiliki nilai yang relatif
kecil, karena arus dari tiap phase akan saling meniadakan. Proses saling
meniadakan terjadi karena arus dari tiap phase akan memiliki beda phase kurang
lebih sebesar 120 (tergantung dari besar faktor daya dari masing masing beban).






PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
4

BAB III
DASAR TEORI


3.1. SISTEM DISTRIBUSI
Awalnya tenaga listrik dihasilkan di pusat pusat pembangkit listrik
seperti PLTA, PLTU, PLTG, PLTGU, PLTP dan PLTD dengan tegangan yang
biasanya merupakan tegangan menengah 20 kV. Pada umumnya pusat
pembangkit tenaga listrik berada jauh dari pengguna tenaga listrik, untuk
mentransmisikan tenaga listrik dari pembangkit ini, maka diperlukan penggunaan
tegangan tinggi 150/70 kV (TT), atau tegangan ekstra tinggi 500 kV (TET).
Tegangan yang lebih tinggi ini diperoleh dengan transformator penaik tegangan
(step up transformator).
Pemakaian tegangan tinggi ini diperlukan untuk berbagai alasan efisiensi,
antara lain, penggunaan penampang penghantar menjadi efisien, karena arus yang
mengalir akan menjadi lebih kecil, ketika tegangan tinggi diterapkan.
Setelah saluran transmisi mendekati pusat pemakaian tenaga listrik, yang
dapat merupakan suatu daerah industri atau suatu kota, tegangan, melalui gardu
induk (GI) diturunkan menjadi tegangan menengah (TM) 20kV. Setiap GI
sesungguhnya merupakan Pusat Beban untuk suatu daerah pelanggan
tertentu, bebannya berubah-rubah sepanjang waktu sehingga daya yang di-
bangkitkan dalam pusat-pusat Listrik harus selalu berubah. Perubahan daya
yang dilakukan di pusat pembangkit ini bertujuan untuk mempertahankan
tenaga listrik tetap pada frekuensi 50 Hz. Proses perubahan ini
dikoordinasikan dengan Pusat Pengaturan Beban (P3B).
Tegangan menengah dari GI ini melalui saluran distribusi primer, untuk
disalurkan ke gardu - gardu distribusi(GD) atau pemakai TM. Dari saluran
distribusi primer, tegangan menengah (TM) diturunkan menjadi tegangan rendah
(TR) 220/380 V melalui gardu distribusi (GD). Tegangan rendah dari gardu
distribusi disalurkan melalui saluran tegangan rendah ke konsumen tegangan
rendah.

PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
5




























Gambar 3.1. Gambaran Umum Distribusi Tenaga Listrik

TM
TT/TET
TM
Pembangkit
Listrik
GI
Trafo
Penaik
GI
Trafo
Penurun
Ke Pemakai
TM
Ke GD
GD Trafo
Distribusi
TR
KWh
meter
Instalasi
Pemakai TR
Pembangkit
Saluran
Transmisi
Saluran Distribusi
Primer
Saluran Distribusi
Sekunder
Utilisasi
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
6

3.2. J ARINGAN TEGANGAN MENENGAH
Jaringan Tegangan Menengah adalah jaringan tenaga listrik yang berfungsi
untuk menghubungkan gardu induk sebagai suplay tenaga listrik dengan gardu-
gardu distribusi. Sistem tegangan menengah yang digunakan di Distribusi Jakarta
Raya dan Tangerang pada umumnya adalah 20 kV. Jaringan ini mempunyai
struktur/pola sedemikian rupa, sehingga dalam pengoperasiannya mudah dan
handal.
3.2.1. Sistem / pola Radial
Pola ini merupakan pola yang paling sederhana dan umumnya banyak
digunakan di daerah pedesaan / sistem yang kecil. Umunya menggunakan
SUTM(Saluran Udara Tegangan Menengah), Sistem Radial tidak terlalu rumit,
tetapi memiliki tingkat keandalan yang rendah.








Gambar 3.2. Sistem Radial

3.2.2. Sistem / pola open loop
Merupakan pengembangan dari sistem radial, sebagai akibat dari
diperlukannya kehandalan yang lebih tinggi dan umumnya sistem ini dapat
dipasok dalam satu gardu induk. Dimungkinkan juga dari gardu induk lain tetapi
harus dalam satu sistem di sisi tegangan tinggi, karena hal ini diperlukan untuk
manuver beban pada saat terjadi gangguan.




150/20kV
Busbar 20 kV
Gardu Distribusi
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
7











Gambar 3.3. Sistem Open Loop

3.2.3. Sistem / pola Close Loop
Sistem close loop ini layak digunakan untuk jaringan yang dipasok dari
satu gardu induk, memerlukan sistem proteksi yang lebih rumit biasanya
menggunakan rele arah(bidirectional). Sistem ini mempunyai kehandalan yang
lebih tinggi dibanding sistem yang lain.








Gambar 3.4. Sistem Close Loop
3.2.4. Sistem / pola Spindel
Sistem ini pada umumnya banyak digunakan di Distribusi Jakarta Raya
dan Tangerang. Memiliki kehandalan yang relatif tinggi karena disediakan satu
expres feeder / penyulang tanpa beban dari gardu induk sampai gardu hubung.
Biasanya pada tiap penyulang terdapat gardu tengah (middle point) yang
berfungsi untuk titik manufer apabila terjadi gangguan pada jaringan tersebut.
PMT
150/20
OPEN LOOP
DARI 2 GI
150/20kV
Busbar 20 kV
150/20kV
Gardu Distribusi
OPEN LOOP
DARI 1 GI
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
8

PMT
150/20 kV
EXPRESS FEEDER


Gambar 3.5. Sistem Spindel

3.2.5. Sistem / pola Cluster
Sistem cluster sangat mirip dengan sistem spindel, juga disediakan satu
feeder khusus tanpa beban(feeder expres).

Gambar 3.6. Sistem Cluster
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
9

3.3. TRANSFORMATOR DISTRIBUSI
Trafo distribusi yang umum digunakan adalah trafo step down 20/0,4 kV,
tegangan fasa-fasa sistem JTR adalah 380 Volt, karena terjadi drop tegangan
maka tegangan pada rak TR dibuat diatas 380 Volt agar tegangan pada ujung
beban menjadi 380 Volt.
Pada kumparan primer akan mengalir arus jika kumparan primer
dihubungkan ke sumber listrik arus bolak-balik, sehingga pada inti transformator
yang terbuat dari bahan ferromagnet akan terbentuk sejumlah garis-garis gaya
magnet ( flux =
Karena arus yang mengalir merupakan arus bolak-balik maka flux yang
terbentuk pada inti akan mempunyai arah dan jumlah yang berubah-ubah. J ika
arus yang mengalir berbentuk sinus maka flux yang terjadi akan berbentuk sinus
pula. Karena flux tersebut mengalir melalui inti yang mana pada inti tersebut
terdapat lilitan primer dan lilitan sekunder maka pada lilitan primer dan sekunder
tersebut akan timbul ggl ( gaya gerak listrik ) induksi, tetapi arah dari ggl induksi
primer berlawanan dengan arah ggl induksi sekunder sedangkan frekuensi
masing-masing tegangan tersebut sama dengan frekuensi sumbernya. Hubungan
transformasi tegangan adalah sebagai berikut :
a
N
N
E
E
2
1
2
1

atau E
1
=a E
2
E
1
I
1
=E
2
I
2

atau I
1
N
1
=I
2
N
2


3.4. J ARINGAN TEGANGAN RENDAH
Berdasarkan penempatan jaringan, jaringan tegangan rendah dibedakan
menjadi dua:
3.4.1. Saluran Udara Tegangan Rendah(SUTR)
Saluran ini merupakan penghantar yang ditempatkan di atas tiang(di
udara). Ada dua jenis penghantar yang digunakan, yaitu penghantar tak
berisolasi(kawat) dan penghantar berisolasi(kabel).
Penghantar tak berisolasi mempunyai berbagai kelemahan, seperti rawan
pencurian dan rawan terjadi gangguan phase-phase maupun phase-netral. Tetapi
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
10

memiliki keunggulan harga yang relatif murah dan mudah dalam hal pengusutan
gangguan. Sedang penghantar berisolasi memiliki keuntungan dan kerugian yang
saling berlawanan dengan penghantar tak berisolasi.
Pada umumnya PT PLN Distribusi Jakarta Raya dan Tangerang,
menggunakan SUTR dengan isolasi(kabel pilin), dengan inti alumunium. Standar
ukuran kabel yang digunakan adalah 3x 70 + 50 mm
2
. Dengan karakteristik
elektris sebagai berikut:

Tabel 3.1. Karakteristik Twisted Kabel Alumunium (NFA 2x)
Phase Neutral Public Lighting
Resistance Max Current Resistance Resistance Max Current Size of Cable
ohm/km A ohm/km ohm/km A
2x10 3,08 54 3,08 - -
2x16 1,91 72 1,91 - -
2x25+1x25 1,2 130 1,38 - -
2x35+1x25 0,868 125 1,38 - -
2x50+1x25 0,641 154 0,986 - -

2x70+1x50 0,443 196 0,69 - -
2x95+1x70 32 242 0,45 - -

3x25+1x25 1,2 130 1,38 - -
3x35+1x25 0,868 125 1,38 - -
3x50+1x35 0,641 154 0,986 - -

3x70+1x50 0,443 196 0,69 - -
3x95+1x70 0,32 242 0,45 - -

3x25+1x25+2x16 1,2 130 1,38 1,91 72
3x35+1x25+2x16 0,868 125 1,38 1,91 72
3x25+1x35+2x16 0,641 154 0,986 1,91 72

3x70+1x50+2x16 0,433 196 0,69 1,91 72
3x95+1x70+2x16 0,32 242 0,45 1,91 72

3x25+1x25+16 1,2 130 1,38 1,91 72
3x35+1x25+16 0,868 125 1,38 1,91 72
3x50+1x35+16 0,641 154 0,986 1,91 72

3x70+1x50+16 0,443 196 0,69 1,91 72
3x95+1x70+16 0,32 242 0,45 1,91 72
Sumber: Overhead Transmission And Distribution Line Conductor
PT Jembo Cable Company


PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
11

3.4.2. Saluran Kabel Tegangan Rendah (SKTR)
Saluran ini menempatkan kabel di bawah tanah. Tujuan utama penempatan
di bawah tanah pada umumnya karena alasan estetika, sehingga penggunaan
SKTR umumnya adalah kompleks perumahan dan daerah perindustrian.
Keuntungan penggunaan kabel ini adalah estetika yang lebih indah, tidak
terganggu oleh pengaruh-pengaruh cuaca. Kelemahan kabel ini adalah jika terjadi
gangguan sulit menemukan lokasinya dan jika terjadi pencurian dengan suntikan
di bawah tanah petugas P2TL kesulitan mengungkapnya.

3.5. RAK TR
Merupakan Perangkat Hubung Bagi (PHB) tegangan rendah gardu
distribusi. Rak TR terpasang pada gardu distribusi pada sisi tegangan rendah atau
sisi hulu dari instalasi tenaga listrik. Fungsinya adalah sebagai alat penghubung
sekaligus sebagai pembagi tenaga listrik ke instalasi pengguna tenaga
listrik(konsumen). Kapasitas Rak TR yang digunakan harus disesuaikan dengan
besarnya trafo distribusi yang digunakan.
Rak TR terdiri dari beberapa jurusan yang akan dibagi-bagi ke pelanggan.
RAK TR terhubung dengan trafo pada sisi sekunder menggunakan kabel single
core TR dengan diameter 240 mm
2
.

3.6. BEBERAPA KOMPONEN J ARINGAN TEGANGAN RENDAH
Adalah peralatan yang digunakan pada Jaringan Tegangan Rendah (JTR),
sehingga JTR dapat menjalankan fungsinya sebagai penyalur energi listrik ke
pelanggan. Komponen pada J TR antara lain:
1. Kabel Schoen
Kabel Schoen digunakan untuk menghubungkan rel pada panel hubung
bagi dengan penghantar kabel tegangan rendah (kabel obstyg). Kabel Schoen
dipres pada kabel obstig dan dibaut di rel panel hubung bagi.
2. Konektor
Adalah peralatan yang digunakan untuk menghubungkan (meng-connect)
penghantar dengan penghantar. Misal antara kabel obstyg dan TIC-Al, TIC-Al
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
12

dengan SR(Sambungan Rumah). Jenis konektor yang umum digunakan PT
PLN(Persero) Distribusi J akarta Raya Dan Tangerang ada dua jenis:
1. Konektor kedap air (piercing connector)
Konektor ini dapat dipasang dalam kondisi jaringan bertegangan dan tanpa
mengupas isolasinya. Konduktansi terjadi karena pada konektor ini
terdapat gigi penerus arus.Sehingga gigi penerus arus ini harus tajam dan
tegak untuk dapat menembus bagian isolasi kabel, serta harus diberi
gemuk untuk melindungi bagian kontak dari korosi.
2. Konektor Pres
Pemasangan konektor jenis ini, biasanya harus tanpa tegangan, karena
diperlukan pengupasan isolasi kabel untuk membentuk konduktifitas.
Konduktivitas yang dihasilkan konektor jenis ini lebih baik, karena luas
permukaan kontak lebih besar.

3.7. SISTEM TIGA FASE
Kebanyakan sistem listrik dibangun dengan sistem tiga fase. Hal tersebut
didasarkan pada alasan-alasan ekonomi dan kestabilan aliran daya pada beban.
Alasan ekonomi dikarenakan dengan sistem tiga fase, penggunaan penghantar
untuk transmisi menjadi lebih sedikit. Sedangkan alasan kestabilan dikarenakan
pada sistem tiga fase daya mengalir sebagai layaknya tiga buah sistem fase
tunggal, sehingga untuk peralatan dengan catu tiga fase, daya sistem akan lebih
stabil bila dibandingkan dengan peralatan dengan sistem satu fase.
Sistem tiga fase atau sistem fase banyak lainnya, secara umum akan
memunculkan sistem yang lebih kompleks, akan tetapi secara prinsip untuk
analisa, sistem tetap mudah dilaksanakan.
Sistem tiga fase dapat digambarkan dengan suatu sistem yang terdiri dari
tiga sistem fase tunggal, sebagai berikut :
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
13

+
-
3
2
j
Ve
+
-
3
2
j
Ve
+
-
V
V
a
V
b
V
c
+
+
+
-
-
-


Gambar 3.7. Sistem tiga fase sebagai tiga sistem fase tunggal.

3
2
cos
3
2
cos
cos
t V v
t V v
t V v
c
b
a

Sedangkan bentuk gelombang dari sistem tiga fase yang merupakan fungsi
waktu ditunjukkan pada gambar berikut.


Gambar 3.8 Bentuk gelombang pada sistem tiga fase
-1.5
-1
-0.5
0
0.5
1
1.5
VR
VS
VT
V
P

-V
P



PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
14

Pada gambar nampak bahwa antara tegangan fase satu dengan yang
lainnya mempunyai perbedaan fase sebesar 120
o
atau 2 /3. Pada umumnya fase
dengan sudut fase 0
o
disebut dengan fase R, fase dengan sudut fase 120
o
disebut
fase S dan fase dengan sudut fase 240
o
disebut dengan fase T. Perbedaaan sudut
fase tersebut pada pembangkit dimulai dari adanya kumparan yang masing-
masing tersebar secara terpisah dengan jarak 120
o
.
3.7.1. SISTEM Y DAN DELTA
Sistem Y merupakan sistem sambungan pada sistem tiga fase yang
menggunakan empat kawat, yaitu fase R, S, T dan N. Sistem sambungan tersebut
akan menyerupai huruf Y, yang memiliki empat titik sambungan yaitu pada
ujung-ujung huruf dan pada titik pertemuan antara tiga garis pembentuk huruf.
Sistem Y dapat digambarkan dengan skema berikut.

S
R
T
N
Z
T
Z
S
Z
R
SSTEM Y
R
S T
Z
R
Z
S
Z
T
SSTEM
DELTA

Gambar 3.9 Sistem Y dan Sistem Delta
Sistem hubungan atau sambungan Y, sering juga disebut sebagai
hubungan bintang. Sedangkan pada sistem yang lain yang disebut sebagai sistem
Delta, hanya menggunakan fase R, S dan T untuk hubungan dari sumber ke
beban, sebagaimana gambar diatas.Tegangan efektif antar fase umumnya adalah
380 V dan tegangan efektif fase dengan netral adalah 220 V.



PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
15

3.7.2. BEBAN SEIMBANG TERHUBUNG DELTA
Pada sitem delta, bila tiga buah beban dengan impedansi yang sama
disambungkan pada sumber tiga fase, maka arus di dalam ketiga impedansai akan
sama besar tetapi terpisah dengan sudut sebesar 120
o
, dan dikenal dengan arus
fase atau arus beban. Untuk keadaan yang demikian, maka dalam rangkaian akan
berlaku :
sin
cos
3 3 3
3
3
2
2
S Q
S P
Z I
Z
V
I V a I V S
I
V
I
V
Z
I
I
V V
a delt e lin
delta
e lin
e lin e lin delt delta delta
line
line
delta
a delt
delta
line
delta
line delta



3.7.3. BEBAN SEIMBANG TERHUBUNG Y
Untuk sumber dan beban yang tersambung bintang (star) atau Y,
hubungan antara besaran listriknya adalah sebagai berikut :
sin
cos
3 3 3
3
3
2
2
S Q
S P
Z I
Z
V
e I V I V S
I
V
I
V
Z
I I
V
V
star line
star
line
lin line star star star
line
line
star
star
star
line star
line
star


3.7.4. BEBAN TAK SEIMBANG TERHUBUNG DELTA
Penyelesaian beban tak seimbang tidaklah dapat disamakan dengan beban
yang seimbang sebagaimana dijelaskan diatas. Penyelesaiannya akan menyangkut
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
16

perhitungan arus-arus fase dan selanjutnya dengan hukum arus Kirchhoff akan
didapatkan arus-arus saluran pada masing-masing fase.
R
S
T

RS

TR

ST

T

Gambar 3.10. Beban tak seimbang terhubung Delta

i
RS
=V
RS
/Z
RS

i
TR
=V
TR
/Z
TR

i
ST
=V
ST
/Z
ST


i
R
=i
RS
- i
TR

i
S
=i
ST
- i
RS

i
T
=i
TR
- i
ST


3.7.5. BEBAN TAK SEIMBANG TERHUBUNG Y
Pada sistem ini masing-masing fase akan mengalirkan arus yang tak
seimbang menuju Netral (pada sistem empat kawat). Sehingga arus netral
merupakan penjumlahan secara vector arsu yang mengalir dari masing-masing
fase.
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
17

S
R
T
N

T
Z
S

R

Gambar 3.11. Beban tak seimbang terhubung bintang empat kawat
Pada sistem dengan empat kawat, akan berlaku :
i
R
=V
RN
/Z
R
i
S
=V
SN
/Z
S
i
T
=V
TN
/Z
T

i
N
=i
R
+

i
S
+i
T
Diagram fasor untuk beban tak seimbang dengan tiga kawat, salah satu
contohnya adalah sebagai berikut :
VR
VT
VS
R
S
T
R+S
N=R+S+T

Gambar 3.12 Diagram Fasor Beban tak Seimbang
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
18

3.8. LOSSES PADA J ARINGAN DISTRIBUSI
Yang dimaksud losses adalah perbedaan antara energi listrik yang
disalurkan ( Ns) dengan energi listrik yang terpakai (NI).

% 100
Ns
NI Ns
Losses

3.8.1. LOSSES PADA PENGHANTAR PHASE
J ika suatu arus mengalir pada suatu penghantar, maka pada penghantar
tersebut akan terjadi rugi-rugi energi menjadi energi panas karena pada
penghantar tersebut terdapat resistansi. Rugi-rugi dengan beban terpusat di ujung
dirumuskan:
L R I P
L X R I V
. . . 3
) sin cos (
2

Sedangkan jika beban tersebar merata di sepanjang jaringan maka rugi
energi yang timbul adalah:
L R
I
P
L X R
I
V
. .
2
. 3
) sin cos .(
2
2
2

Dengan:
I : Arus yang mengalir pada penghantar (Ampere)
R : Tahanan pada penghantar (Ohm / km)
X : Reaktansi pada penghantar (Ohm /km)
cos : Faktor daya beban
L : panjang penghantar (km)

3.8.2. LOSSES AKIBAT BEBAN TIDAK SEIMBANG
Akibat pembebanan di tiap phase yang tidak seimbang, maka akan
mengalir arus pada hantaran netral. J ika di hantaran pentanahan netral terdapat
nilai tahanan dan dialiri arus, maka kawat netral akan bertegangan yang
menyebabkan tegangan pada trafo tidak seimbang.
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI

PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007
19

Arus yang mengalir di sepanjang kawat netral, akan menyebabkan rugi
daya di sepanjang kawat netral sebesar:
R I P
N
.
2




3.8.3. LOSSES PADA SAMBUNGAN TIDAK BAIK(LOSS CONTACT)
Losses ini terjadi karena pada sepanjang J TR terdapat beberapa
sambungan, antara lain:
1. Sambungan antara kabel obstyg dan kabel TIC-Al
2. Sambungan saluran JTR, antar kabel TIC-Al
3. Percabangan saluran J TR
4. Percabangan Untuk Sambungan Pelayanan




Gambar 3.13. Sambungan Kabel
Besarnya rugi-rugi energi pada sambungan dirumuskan:
R I P .
2


P =Losses yang timbul pada konektor
I =Arus yang mengalir melalui konektor
R =Tahanan konektor.




I
R
I
R
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



20
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


BAB IV
PEMBAHASAN


Dalam penyusunan Laporan Telaahan Staff ini, diperlukan data data
pendukung antara lain hasil ukur beban, peta topografi J aringan Tegangan
Rendah, data konsumen gardu, data karakteristik kabel tembaga (NYFGBY), data
karakteristik kabel alumunium(NFA2X), dan data pengukuran beban sebelum dan
sesudah pemerataan beban
Data hasil ukur beban dari bidang Operasi Distribusi, digunakan sebagai
acuan untuk mencari dan menentukan gardu yang memiliki beban tidak merata.
Pada umumnya beban yang tidak merata dapat diindikasikan dengan mudah,
dengan melihat hasil pengukuran arus netral. Apabila didapatkan data arus netral
yang lebih besar atau sama dengan arus pada phase, maka jaringan tersebut patut
dicurigai memiliki beban yang tidak seimbang. Indikasi beban tidak seimbang
dapat pula dilihat dari besar arus di masing masing phase (R-S-T) memiliki
perbedaan yang besar.
4.1. Metode Pengumpulan Data
Metode pengumpulan data dilakukan dengan:
1. Mencari data ukur beban dari Unit Operasi Distribusi(posko gangguan)
2. Melakukan survey dan pengukuran langsung di lapangan(pengukuran beban
dan cos ). Hasil pengukuran cos digunakan untuk analisa vektoris.
3. Melakukan pemerataan beban di gardu E 311P dan PM 213, dengan jalan re-
distribusi beban.
4. Mencari data peta Jaringan Tegangan Menengah dari aplikasi Mister2000,
untuk mengetahui rute dan panjang jaringan.
5. Mencari data konsumen di gardu E 311P dan PM 213 dari aplikasi
TOAD(merupakan aplikasi untuk download database Mister 2000)
6. Mencari data karakteristik kabel dari unit Logistik.

PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



21
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


4.2. Pembahasan Pemerataan Beban Di Gardu E 311 P
Hasil pengukuran beban gardu E 311 P dari unit Operasi Distribusi pada
bulan September 2007 adalah sebagai berikut:
Tabel 4.1. Pengukuran Gardu Oleh Petugas Posko Condet

Data di atas digunakan untuk menentukan gardu mana yang layak
digunakan sebagai bahan penelitian pemerataan beban. Dari data pengukuran
beban ini terlihat, bahwa Jurusan B dan Jurusan C mempunyai arus netral yang
lebih besar daripada arus phasenya. Sehingga gardu E 311P layak untuk dilakukan
penelitian evaluasi losses arus netral akibat beban tidak seimbang.
Sebelum dilakukan pemerataan beban dilakukan pengukuran ulang,
didapat data yang ditampilkan dalam tabel 4.2. Pada tabel 4.2 ini terlihat bahwa,
beban di jurusan B dan C masih memiliki perbedaan yang sangat besar dan
memiliki arus netral yang sangat besar, bahkan melebihi arus phase.
Pada kasus di gardu E 311P ini, jurusan B merupakan Saluran Udara
Tegangan Rendah(SUTR) dengan kabel NFA2X atau kabel twisted, dengan
A R U S ( Amper )
KETERANGAN GARDU JRS
R S T N R+S+T
TEGANGAN
SEKUNDER TRAFO
(Volt)
Gardu : E 311 P TRAFO A 99 84 72 18 255 R - S = 387
Type : RMU KVA : 400 kVA B 186 193 94 94 473 R - T = 387
Penyulang : PENA Merk : TRAFINDO C 17 38 0 26 55 S - T = 387
J ml Trap : No.Seri / Thn : D 137 140 124 33 401
Trap ke : Cubicle : SIEMENS
439 455 290 171 1184
Tgl Ukur : 29/09/2007 RAK TR
J am Ukur : 19:15 J ml J urusan : 4 bh R - N = 225
J rsn Terpakai : 4 bh S - N = 225
Alamat : J L. RY TENGAH T - N = 225
GEDONG ASRI
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



22
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


konduktor alumunium 3 x 70 +50 mm
2
. Sedangkan pada jurusan C merupakan
Saluran Kabel Tegangan Rendah yang ditanam di bawah tanah dengan type
NYFGBY, dengan konduktor tembaga 2 x 10 mm
2
.
Tabel 4.2. Tabel Hasil Ukur Beban Gardu Dari Survey
A R U S ( Amper ) COS Procentage Unbalance
JRS
R S T N MEAN R S T R S T
A 80 73,5 69,5 18 74,33 0,96 0,92 0,948 7,62% -1,12% -6,50%
B 207 172 107,2 79 162,07 0,975 0,952 0,94 27,73% 6,13% -33,85%
C 13 67 0 57 26,67 0,977 0,98 0,996 -51,25% 151,25% -100,00%
D 123 130 114,3 24 122,43 0,973 0,975 0,97 0,46% 6,18% -6,64%
423 442,5 291 178 TGL UKUR 11 NOPEMBER 2007 JAM 19:00

4.2.1. Kegiatan Pemerataan Beban J urusan C Gd E 311 P (SKTR)
Kegiatan pemerataan beban di jurusan C lebih mudah dan cepat, karena
semua pelanggan langsung tersambung ke panel pembagi melalui MCB-MCB,
sebagai pembatasnya. Wiring pada panel CDT 16409 sebelum pemerataan beban
dapat digambarkan dalam gambar 4.1.
Dari gambar terlihat bahwa phase T tidak mendapat beban sama sekali,
sehingga pada hasil pengukuran terbaca beban T di jurusan C adalah 0 (tabel 4.2),
dan phase S mempunyai beban yang sangat besar, sehingga beban terpusat di
phase S. Hal inilah yang menyebabkan arus yang mengalir di kawat netral
menjadi besar, bahkan lebih besar dari pada arus yang mengalir di phase R(lihat
tabel 4.2).
Pada jaringan SKTR, semua beban(pelanggan) langsung terhubung ke
panel, dan pada panel terdapat busbar kecil sesuai dengan urutan phase (R-S-T).
sehingga pemerataan beban pada jaringan ini lebih mudah, dan pemindahan beban
dilakukan dengan acuan beban yang sedang digunakan pelanggan saat itu. Beban
yang sedang digunakan pelanggan dapat dengan mudah diukur dengan tang
ampere. Hasil pengukuran beban pelanggan adalah sebagai berikut:


PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



23
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


Tabel 4.3. Hasil Ukur Beban Pelanggan
ID PEL NAMA PELANGAN Arus Phase
547103959167 DRS UMAR SHAHAB 1,8 R
547103939177 SJECH AL DJOEFFRE 2,4 R
547103791774 SOFYAN AHMAD MAHFUD 6 S
547103827582 DRS.HASAN LATF 4,2 S
547103898466 MUHAMMAD HUSEN 3,1 S
547103766504 HASYM MOHD ALKAFF 7,5 R
547103791741 DRA RATNA DJAUHAR 4,2 S
547103791733 TRSAN WJAYA 11,4 S
547103791766 ACHMAD SYAFQ 2,1 S
547103766512 ACHMAD SYAFQ/B 2,3 S
547103766490 ACHMAD SYAFQ 1,2 R
547103766482 KE FARDA 8,2 S
547104053797 NNNG SURANA 1 R
Jam ukur = 10:00
17 November 2007

Dari hasil ukur beban yang sedang digunakan pelanggan, dapat disusun
suatu perencanaan pemerataan beban. Perencanaan pemerataan beban dilakukan
sebagai berikut, pelanggan di phase S dengan beban masing masing 6; 4,2; 8,2 A
dipindah ke phase T dan pelanggan di phase S dengan beban 2,1 A dan 2,3 A
dipindah ke phase R. Perencanaan pemeratan beban di panel CDT 16409
ditabelkan dalam tabel 4.4
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



24
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


32A 32A 32A 32A
32A 32A 32A 32A 32A 32A 32A
32A
R S T
BREAKER
1,8 A
2,4 A
1 A
7,5 A
1,2 A
3,1 A
11,4 A
4,2 A
2,1 A
6 A
4,2 A
2,3 A
8,2 A
547103959167
547103939177
547104053797
547103766504
547103766490
547103898466
547103791733
547103827582
547103791766
547103791774
547103791741
547103766512
547103766482
CDT 16409

Gambar 4.1. Panel CDT 16409 beban tidak merata
Tabel 4.4. Perencanaan Pemerataan Beban J urusan C Gd E 311P
Sebelum Pemerataan Rencana Pemerataan

Arus Pengukuran Arus Pengukuran
ID PEL
R S T
ID PEL
R S T
547103959167 1,8 547103959167 1,8
547103939177 2,4 547103939177 2,4
547103791774 6 547103791774 6
547103827582 4,2 547103827582 4,2
547103898466 3,1 547103898466 3,1
547103766504 7,5 547103766504 7,5
547103791741 4,2 547103791741 4,2
547103791733 11,4 547103791733 11,4
547103791766 2,1 547103791766 2,1
547103766512 2,3 547103766512 2,3
547103766490 1,2 547103766490 1,2
547103766482 8,2 547103766482 8,2
547104053797 1 547104053797 1
TOTAL 13,9 41,5 0 TOTAL 18,3 18,7 18,4

PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



25
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


Sesuai dengan perencanaan pemerataan beban seperti di atas, wiring
sambungan rumah pelanggan di panel CDT 16409 diubah menjadi berikut ini:
32A 32A 32A 32A
32A 32A 32A
32A 32A 32A 32A
R S T
BREAKER
1,8 A
2,4 A
1 A
7,5 A
1,2 A
3,1 A
11,4 A
4,2 A
2,1 A
6 A
4,2 A
2,3 A
8,2 A
32A
547103959167
547103939177
547104053797
547103791766
547103766504
547103766490
547103766512
547103898466
547103791733
547103827582
547103791774
547103791741
547103766482
CDT 16409

Gambar 4.2. Panel CDT 16409 Setelah Pemerataan Beban
4.2.2. Kegiatan Pemerataan Beban J urusan B Gd E 311P(SUTR)
Berbeda dengan jaringan SKTR, pada jaringan SUTR pelaksanaan
kegiatan pemerataan beban lebih sulit, karena jaringan(kabel) bercampur menjadi
satu. Selain hal itu, di sepanjang jaringan kita tidak dapat menentukan phase suatu
kabel, bahkan kesulitan membedakan jurusan kabel.
Untuk memudahkan penelusuran kabel, maka dibutuhkan peta jaringan
yang sudah dibuat di Mister 2000. Ternyata data Mister 2000 tidak dapat
sepenuhnya diandalkan, karena ketika penelusuran jurusan di lapangan, terjadi
kesalahan data yang ditunjukkan oleh Mister 2000. Data mister 2000
menggambarkan tiang CDT 10081 merupakan tiang ujung jurusan B gd E 311P.
Ternyata setelah dilakukan pengecekan di lapangan, dengan mematikan sementara
salah satu fuse phase di Jurusan B, tiang CDT 10081 bukan jurusan B. karena
pada tiang CDT 10081 semua phase masih bertegangan.
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



26
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


Setelah dilakukan penelusuran, dapat ditemukan jurusan B, ternyata
jurusan B tertukar dengan jurusan D pada data mister 2000. Setelah rute kabel
ditentukan maka langkah selanjutnya adalah pemerataan beban di tiang jurusan B.
Dengan melihat peta di mister 2000 dapat ditentukan tiang mana saja yang
terdapat banyak sambungan rumah(SR), sehingga dapat memindahkan beban
phase yang berat ke phase yang ringan.
Data phase pelanggan yang ditunjukkan oleh Mister2000 juga banyak
yang tidak valid, sehingga data phase pelanggan di Mister 2000 tidak dapat
digunakan sebagai acuan untuk pemerataan beban.
Program pemerataan beban pada penelitian untuk penyusunan laporan
telaahan staff ini dilakukan terhadap 5 tiang di Jurusan B. Data tiang yang
dipindah phase sambungan rumahnya ditampilkan dalam tabel 4.4.
Pelaksanaan pemerataan beban memerlukan data phase pelanggan yang
akurat. Sedangkan data teknik dari Mister 2000 tidak dapat digunakan, karena
data yang ditampilkan tidak valid. Sehingga dalam program pemerataan beban ini,
penentuan phase dengan manual, dengan jalan mematikan salah satu fuse phase di
gardu, kemudian di atas tiang di cek kabel mana yang tidak bertegangan.

Tabel 4.5. Pemindahan Phase Sambungan Rumah
NO TIANG ID PEL AWAL PINDAH KE
10090 547103754820 R T
10090 547103984035 R T
10091 547102748132 R T
10091 547103900337 R T
10091 547100467758 R T
10091 547100185716 R T
10091 547103900329 S T
10091 547103967736 S T
10091 547101029812 S T
10095 547101695187 S T
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



27
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


10095 547100672146 S T
10094 547100183729 R T
10094 547103695351 S T
10052 547103514420 R T
10052 547101057553 R T

Cara manual ini sangat mengganggu pemakaian listrik oleh pelanggan,
karena listrik padam nyala beberapa saat. Idealnya digunakan alat utuk
mendeteksi phase dalam keadaan jaringan tetap nyala. Ketiadaan alat semacam ini
menyebabkan kegiatan pemerataan beban ini belum optimal.
Meskipun kurang optimal, tetapi dari hasil pemerataan beban ini didapat
hasil berupa penurunan arus netral di Jurusan B dan C. Sehingga penurunan arus
netral ini merupakan penekanan losses dengan jalan pemerataan beban
Hasil pengukuran beban gardu setelah pekerjaan pemerataan beban adalah:
Tabel 4.6. Hasil Pengukuran Beban Setelah Pemerataan Beban
A R U S ( Amper ) COS Procentage Unbalance
JRS
R S T N MEAN R S T R S T
A 111 85 64 36 86,67 0,985 0,922 0,947 28,08% -1,92% -26,15%
B 180 143 133 27 152,00 0,966 0,929 0,966 18,42% -5,92% -12,50%
C 24,7 26 25 13 25,23 0,962 0,941 0,973 -2,11% 3,04% -0,92%
D 149 132 126 33 135,67 0,978 0,969 0,965 9,83% -2,70% -7,13%
465 386 348 109 399,57 TGL UKUR 5 DESEMBER 2007 JAM 19:00
4.2.3. Perhitungan Penekanan Losses Arus Netral Di J urusan C
Pengukuran arus netral dilakukan pada rak TR, sehingga hasil ukur arus
netral ini merupakan arus netral total keseluruhan dari jaringan tegangan rendah
akibat impedansi beban yang tidak seimbang.
Perhitungan losses disini, merupakan suatu perhitungan metode
pendekatan, karena arus netral yang mengalir dari setiap pelanggan sukar untuk
diukur secara bersamaan. Sehingga perhitungan dilakukan secara proporsional
berdasar besar MCB pembatas arus pelanggan sesuai daya kontrak.
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



28
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


Perhitungan arus netral dilakukan dengan jalan menghitung arus yang
mengalir melalui hantaran netral SR pelanggan. Besar arus netral tiap pelanggan
ini sama dengan arus yang mengalir di hantaran phase SR. Perhitungan arus netral
dilakukan dengan perbandingan arus netral (sesuai daya kontrak) dengan arus
netral pengukuran dari gardu, sehingga dirumuskan sebagai berikut:
) (
) (
) (
) ( UKR N
KTRK N
KTRK N
Pelanggan N
I
I
I
I

) (KTRK N
I
: Arus Netral sesuai dengan besar MCB (daya kontrak)
masing-masing pelanggan
) (KTRK N
I :
Total arus netral sesuai daya kontrak pada jurusan C
) (UKR N
I
: Arus Netral Pengukuran dari gardu

Untuk menghitung losses di kawat netral, maka harus diketahui
panjangnya penghantar netral untuk menentukan besarnya tahanan penghantar.
Panjang penghantar jaringan diperoleh dari peta topografi jaringan dari mister
2000(terlampir), diukur dengan mistar, kemudian panjang sebenarnya disesuaikan
dengan skala. Skala yang digunakan adalah 1 : 2700.
Selain data panjang penghantar diperlukan pula data karakteristik dari
kabel yang digunakan. Data karakteristik kabel ini didapat dari data sheet kabel
yang dikeluarkan oleh pihak pabrik kabel Tranka( PT Terang Kita). Pada Jurusan
C gardu E 311P menggunakan kabel SKTR dengan type NYFGBY dengan
penampang kabel 10 mm
2
.







PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



29
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


Tabel 4.7. Data Elektrikal Kabel NYFGBY Konduktor Tembaga

Current carrying
Capacity at 30 C
Conductor Short Circuit
Current Capacity at:
Size Resistance
in ground in air 0,1 s 0,5 s 1,0 s
mm2 ohm/km A A kA kA kA
4 4,61 41 34 1,8 0,80 0,57
6 3,08 52 44 2,69 1,20 0,85
10 1,83 69 60 4,49 2,01 1,42
16 1,15 89 80 7,18 3,21 2,27
25 0,727 116 105 11,23 5,02 3,55
35 0,524 138 130 15,72 7,03 4,97
50 0,387 165 160 22,45 10,04 7,10
70 0,268 205 200 31,43 14,06 9,94
95 0,193 245 245 42,66 19,08 13,49
Perhitungan tahanan untuk sambungan rumah ke panel adalah sebagai
berikut:
0,19764
100000
10800 83 , 1
l
km
R

Sehingga perhitungan losses akibat beban tak seimbang di hantaran netral
dapat diperhitungkan dengan menggunakan rumus sebagai berikut:
R I P
N
2

Perhitungan lengkap arus netral, losses netral, losses di hantaran phase
jurusan C ditampilkan di tabel lampiran.

4.2.4. Perhitungan Penekanan Losses Arus Netral Di J urusan B
Perhitungan arus netral di Jurusan B hampir mirip dengan perhitungan
arus netral di jurusan C. Perhitungan arus netral di jurusan B dilakukan per tiang
yang mempunyai beban(segmen). Perhitungan arus netral dilakukan dengan
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



30
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


perbandingan arus netral maksimal(sesuai daya kontrak pelanggan) dengan arus
netral pengukuran di gardu. Dirumuskan:
UKR
MAX
MAX
SGMN
IN
IN
IN
IN
SGMN
IN : Arus Netral Pada Segmen-n
max
IN : Total Perhitungan Arus Netral Jurusan B sesuai dengan daya
kontrak pelanggan
UKR
IN : Arus Netral Pengukuran di Gardu
MAX
IN : Hasil Perhitungan Arus Netral Pada Segmen-n sesuai dengan
daya kontrak pelanggan
Segmen adalah antara tiang yang mempunyai beban(pelanggan), sehingga
perhitungan losses tidak melibatkan tiang tanpa pelanggan (lihat gambar 4.3).
Perhitungan arus netral pada segmen-n sesuai daya kontrak pelanggan adalah
perhitungan arus netral dengan menggunakan arus phase sesuai dengan besar
MCB yang terpasang di pelanggan. Perhitungan arus netral ini menggunakan
besar sudut sesuai dengan pengukuran faktor daya di gardu (tabel 4.2 dan tabel
4.5).
Perhitungan arus netral menggunakan metoda penjumlahan Pythagoras
komponen imaginer dan komponen real dari arus phase pada tiap segmen.
2
Re
2
Im al ag MAX
I I IN
MAX
IN : Arus Netral Pada Segmen-n sesuai dengan daya kontrak
pelanggan
ag
I
Im
: Komponen Imaginer Arus
al
I
Re
: Komponen Real Arus
Komponen imaginer dan real didapat dari perhitungan sebagai berikut:
sin sin sin
cos cos cos
Re
Im
T S R al
T S R ag
I I I I
I I I I

PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



31
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


R
I : Arus phase R pada segmen-n(Sesuai Daya Kontrak)
S
I : Arus phase S pada segmen-n(Sesuai Daya Kontrak)
T
I : Arus phase T pada segmen-n(Sesuai Daya Kontrak)
Untuk mendapatkan data panjang kabel antar tiang yang
berbeban(segmen), maka digunakan peta jaringan dari mister 2000, sehingga
sebagai contoh perhitungan sebagai berikut:
Pada peta mister 2000 jarak antara tiang CDT 10093 ke CDT 10090
adalah 1,5 cm dengan skala 1:2700, jadi jarak sebenarnya adalah:
m
cm
skala L L
P R
5 , 40
4050
2700 5 , 1

Sehingga resistansi antara tiang CDT 10093 ke CDT 10090 adalah
0,027945
4050
100000
69 , 0
l
km
R

Dengan perhitungan tersebut diatas dapat dilakukan perhitungan losses
pada hantaran netral, hantaran phase sebelum dan sesudah pemerataan beban(lihat
lampiran).
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



32
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007




Gambar 4.3 Gambar Topografi Gardu E 311 P J urusan B

SEGMEN 4
SEGMEN 3
SEGMEN 2
SEGMEN 1
10091
10053
10060
10059
10055 10056
10084
10086
10089
10088
10090
10093
10096
10095
10094
10087
10085
10079
10068
10066
10065
10049
10054
119
10057
10058
10061
10062
10063 10064
10052 10050
E 311 P
10092
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



33
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


4.2.5. Analisa Vektoris
Arus yang mengalir di kawat netral sebenarnya adalah total jumlah arus
(secara vektoris) yang mengalir di hantaran phase. Di lapangan arus netral ini sulit
untuk menjadi nol, karena beban dari tiap pelanggan tidak mungkin tepat sama
persis pada saat yang bersamaan. Tetapi kita dapat merencanakan suatu
pemerataan beban, dengan berdasar daya kontrak pelanggan.
Sehingga secara diagram, jaringan tegangan rendah dapat digambarkan
sebagai berikut:

Gambar 4.4. Penyederhanaan Rangkaian J TR
Gambar 4.4. menggambarkan suatu penyederhanan rangkaian JTR mulai
dari rak TR(V), JTR dan akhirnya ke peralatan pelanggan (Z). Dari gambar
terlihat, bahwa setiap perangkat satu phase pelanggan mengalirkan arus ke netral
dengan besar :
R
R
R
Z
V
I ;
S
S
S
Z
V
I ;
T
T
T
Z
V
I
Dalam satu jurusan, setiap pelanggan terhubung ke masing-masing phase,
sehingga arus netral didapat dari penjumlahan secara vektoris arus yang melalui
penghantar phase.
Dari data beban jurusan B pada tabel 4.2 dan tabel 4.5 dapat dibuat suatu
diagram fasor antara arus tiap phase dan besar arus netral berikut besar sudutnya:
Z
R
Z
S
Z
T
N

V
R
V
S
V
T
I
R
I
S
I
T
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



36
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


Gambar 4.5. dan gambar 4.6. dibuat dengan software AutoCad, yang
bertujuan untuk mendapatkan nilai yang presisi. Penggambaran dilakukan dengan
menggunakan skala 1:1. Artinya pada gambar AutoCad 1 mm mewakili 1A dan
1V. Dengan melihat dimensi yang ditunjukkan dengan software AutoCad kita
dapat menentukan besarnya arus netral berikut dengan besar sudutnya.
Berdasarkan gambar besar arus netral adalah:
Sebelum pemerataan beban:

48 , 32 96 . 98
N
I

Sesudah pemerataan beban:

87 , 0 28 , 59
N
I

Dari gambar terlihat, arus netral merupakan penjumlahan vektoris antara
arus phase R, phase S, dan phase T. Apabila ketiga arus ini mempunyai besar
yang sama dan terpisah satu sama lain dengan sudut yang sama (120), maka arus
yang mengalir di kawat netral menjadi nol. Hasil arus netral yang didapat dengan
menggambarkan dengan diagram vektor ini, berbeda dengan arus netral
pengukuran. Hal ini disebabkan karena data yang digunakan untuk menggambar
secara vektoris diambil, tidak pada saat yang tepat sama.

4.2.6. Daya yang disalurkan sebelum pemerataan beban
Daya yang disalurkan pada jurusan B sebelum pemerataan:
22269,73W
94 . 0 2 . 107 221
36023,68W
952 . 0 172 220
44603,33W
975 . 0 207 221
cos
T
P
S
P
R
P
VI P


PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



37
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


Daya yang disalurkan pada jurusan C sebelum pemerataan beban:
0W
996 . 0 0 221
14425,50W
98 . 0 67 7 , 219
2794,22W
977 . 0 13 220
cos
T
P
S
P
R
P
VI P

Sehingga total daya yang disalurkan jurusan B dan jurusan C, sebelum
pemerataan beban adalah:
W 120116,455
0 5 , 14425 22 , 2794 73 , 22269 68 , 36023 33 , 44603 P


4.2.7. Daya yang disalurkan sesudah pemerataan beban
Total daya yang disalurkan jurusan B sesudah pemerataan beban adalah:
28008,20W
966 . 0 133 218
29359,19W
929 . 0 143 221
38079,72W
966 . 0 180 219
cos
T
P
S
P
R
P
VI P



Total daya yang disalurkan jurusan C sesudah pemerataan beban adalah:
5327,18W
973 . 0 25 219
5406,99W
941 . 0 26 221
5213,25W
962 . 0 7 , 24 4 , 219
cos
T
P
S
P
R
P
VI P

PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



38
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


Sehingga total daya yang disalurkan jurusan B dan jurusan C, sesudah
pemerataan beban adalah:
111394,52W
5327,18 5406,99 5213,25 28008,20 29359,19 38079,72 P


4.2.8. Presentase Losses Terhadap Total Daya Yang Disalurkan
Prosentase losses terhadap daya yang disalurkan adalah perbandingan
losses terhadap daya yang disalurkan dalam prosen. Data besar losses tercantum
dalam tabel 3, tabel 5, tabel 6, tabel 7, tabel 8, tabel 9, tabel 10, tabel 11.
4.2.8.1. Presentase losses pada hantaran netral
Besar losses yang terjadi di hantaran netral Jurusan B sebelum pemerataan
beban ditampilkan dalam tabel 3, dan losses pada hantaran netral di jurusan C
ditampilkan dalam tabel 8. Sehingga total losses pada hantaran netral sebelum
pemerataan beban adalah sebesar:

att 1048,0468W
41,5918 1006,455
N
Losses

Total losses pada hantaran netral sesudah pemerataan beban adalah
sebesar:
tt 125,0534Wa
2,1634 122,890 '
N
Losses

Prosentase losses terhadap daya yang disalurkan, sebelum pemerataan
beban adalah sebesar:

0,87%
% 100
120116,455
1048,0468
% 100 %
TOT
P
LOSSES
P
Losses

PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



39
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


Prosentase losses terhadap daya yang disalurkan, sesudah pemerataan
beban adalah sebesar:
0,11%
% 100
111394,52
125,0534
% 100 ' %
TOT
P
LOSSES
P
Losses


Sehingga penekanan losses di hantaran netral dengan program pemerataan
beban ini adalah sebesar:
% 76 , 0
% 11 , 0 % 87 , 0
' % % Losses Losses Losses

Prosentase penekanan losses ini jika dibandingkan dengan daya yang
disalurkan sebelum pemerataan beban, maka akan didapatkan penekanan losses di
hantaran netral (dalam watt) sebesar:
912,88W
100
0,76
120116,455 ) (W Losses

4.2.8.2. Prosentase losses pada hantaran phase
Losses yang terjadi di hantaran phase sebelum pemerataan beban adalah
sebesar:
att 9085,7467W
76,8467 9008,900
P
Losses

Losses yang terjadi di hantaran phase sesudah pemerataan beban adalah
sebesar:
tt 7583,184Wa
75,3750 7507,809 '
P
Losses


PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



40
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


Prosentase losses terhadap daya yang disalurkan, sebelum pemerataan
beban adalah sebesar:

% 56 , 7
% 100
120116,455
9085,7467
% 100 %
TOT
P
LOSSES
P
Losses

Prosentase losses terhadap daya yang disalurkan, sesudah pemerataan
beban adalah sebesar:
% 81 , 6
% 100
111394,52
7583,184
% 100 ' %
TOT
P
LOSSES
P
Losses


Sehingga penekanan losses di hantaran netral dengan program pemerataan
beban ini adalah sebesar:
% 75 , 0
% 81 , 6 % 56 , 7
' % % Losses Losses Losses

Prosentase penekanan losses ini jika dibandingkan dengan daya yang
disalurkan sebelum pemerataan beban, maka akan didapatkan penekanan losses di
hantaran phase (dalam watt) sebesar:
900,87W
100
0,75
120116,455 ) (W Losses

4.2.9. Kajian Finansial Pemerataan Beban Di Gardu E 311P
Sub bab ini, mengkaji mengenai kelayakan pekerjaan pemerataan beban
secara finansial. Pada dasarnya kajian finansial membandingkan antara biaya yang
dikeluarkan dengan manfaat yang diperoleh dari suatu pekerjaan. Dalam
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



41
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


pelaksanaan pekerjaan pemerataan beban di gardu E 311P, diperlukan biaya-biaya
sebagai berikut:
BIAYA YANG DIKELUARKAN

BIAYA MATERIAL
1. KONEKTOR SR (10 BUAH)
15 x Rp 9680 = Rp 145.200,00

BIAYA JASA
2. PELAKSANA D LAPANGAN
2 x 100000 = Rp 200.000,00

BIAYA LAIN - LAIN
3 AKOMODAS DAN TRANSPORTAS
1 x HAR = Rp 100.000,00

TOTAL = Rp445.200,00

Perhitungan rupiah yang berhasil diselamatkan adalah dari penekanan
losses di hantaran phase. Perhitungan rupiah ini menggunakan asumsi penggunaan
tenaga listrik oleh pelanggan sebesar yang terukur sesuai tabel 4.2 dalam waktu
24 jam sehari, 30 hari sebulan.
Energi yang berhasil diselamatkan adalah sebesar:
kWH 648,626
WH 648626,4
30 24 87 , 00 9
t P W

Dengan besar Tarif Dasar Listrik sebesar Rp. 650,00 didapat penekanan
losses dengan pemerataan beban ini sebesar:
421607,16
650 626 , 648
TDL W Rp

Dari perhitungan biaya yang dikeluarkan dan besar penekanan losses yang
diperoleh, dapat dibuat suatu kajian finansial. Dalam kajian finansial ini,
dibandingkan antara biaya yang dikeluarkan dengan nilai keuntungan yang
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



42
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


diperoleh tiap bulan. Dalam kajian finansial ini digunakan suku bunga inflasi
sebesar 12% per tahun.
Tabel 4.8. Kajian Finansial Pekerjaan Pemerataan Beban Di Gardu E 311P
Bulan
ke- Modal / Biaya Keuntungan
Bulan
(n) F=P.(1+i)n F=P.[ ((1+i)
n
-1) / i ]
(Rp) (Rp)
Nop 0 445200 0,00
Des 1 449.652,00 421.607,16
Jan 2 454.148,52 847.430,39
Feb 3 458.690,01 1.277.511,86
Mar 4 463.276,91 1.711.894,13
Apr 5 467.909,67 2.150.620,24
Mei 6 472.588,77 2.593.733,60
Jun 7 477.314,66 3.041.278,09
Jul 8 482.087,81 3.493.298,03

0
500000
1000000
1500000
2000000
2500000
3000000
3500000
4000000
Nop Des Jan Feb Mar Apr Mei Jun Jul
biaya
keuntungan

Gambar 4.7. Grafik Kajian Finansial Pemerataan Beban Gardu E 311P

Apabila diasumsikan ketidakseimbangan beban terjadi setiap 6 bulan
sekali, maka dari garfik terlihat, di bulan kedua didapat keuntungan yang lebih
besar daripada biaya yang dikeluarkan. Sehingga kegiatan pemerataan beban ini,
secara finansial layak untuk dilakukan minimal 2 bulan sekali.
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



43
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


4.3. Pembahasan Pemerataan Beban Di Gardu PM 213
Kegiatan pemerataan beban di gardu PM 213 dilakukan untuk dapat
dilakukan evaluasi penekanan losses dengan pemerataan beban dengan metode
pengumpulan data dari bagian catat meter dan kwh meter pembanding di gardu.
Sebelum dilakukan pekerjaan pemerataan beban, hasil ukur beban di gardu
PM 213 adalah sebagai berikut:

Tabel 4.9. Tabel Hasil Ukur Beban Gardu PM 213
BEBAN (AMPERE) AVERAGE
PHASE UNBALANCE
(%)
JUR
R S T N R+S+T (R+S+T)/3 R S T
A 56 45 54 17 155 51,67 8% -13% 5%
B 62 60 35 30 157 52,33 18% 15% -33%
C 37 65 40 31 142 47,33 -22% 37% -15%
D 186 143 157 40 486 162,00 15% -12% -3%
E 75 164 61 84 300 100,00 -25% 64% -39%
F 196 165 196 51 557 185,67 6% -11% 6%
612 642 543 253 1797

Selain mengukur beban, juga diukur pentanahan netral di gardu PM 213.
berdasar hasil pengukuran didapat nilai pentanahan netral sebesar 0,5 . Nilai ini
masih sesuai dengan persyaratan SPLN no 3 tahun 1978, yang mensyaratkan
tahanan pentanahan netral maksimal 5 .
Setelah dilakukan pemerataan beban di jurusan B didapat hasil:
BEBAN (AMPERE) AVERAGE PHASE UNBALANCE (%)
JUR
R S T N R+S+T (R+S+T)/3 R S T
A 36 53 42 15 146 36,50 -1% 45% 15%
B 70 51 57 19 197 59,33 18% -14% -4%
C 26 59 28 32 145 36,25 -28% 63% -23%
D 193 151 126 36 506 126,50 53% 19% 0%
E 77 159 48 77 361 90,25 -15% 76% -47%
F 221 162 196 57 636 159,00 39% 2% 23%
623 635 497 236 1991

PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



44
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


4.3.1. Perhitungan Penekanan Losses
Perhitungan penekanan losses dengan pemerataan beban dilakukan dengan
jalan menghitung selisih stand meter antara kwh meter pembanding di gardu
dengan kwh meter pelanggan.Di gardu PM 213 semua pelanggan di jurusan B
menggunakan meter AMR dengan sistem PLC(Power Line Carrier), sehingga
data stand meter pelanggan dapat didownload dari central. Data stand meter
periode bulan desember 2007 dari bagian catat meter adalah sebagai berikut:
NO
IDPEL Nama Pelanggan Daya
Stand
Awal
Stand
Akhir
Pemakaian
1 547102975821 KOMP DPR R /MATV 15 450 127,83 133,94 6,11
2 547102975870 Komp DPRR/ MTV 20 450 129,33 135,39 6,06
3 547101462091 Hayani sman Soetojo 3500 6866,29 7091,76 225,47
4 547101462154 Tiurlan B Hutagaol ,S 3500 11705,03 12458,95 753,92
5 547101462139 RK Sembiring M 3500 4804,79 4899,63 94,84
6 547101462113 Ruth Nina M Kedang 3500 2376,37 2481,63 105,26
7 547101462105 ST DRS JANSEN H,SE,M 3500 17339,5 17993,9 654,4
8 547103836674 NUAH TORANG 3500 21950,9 22409,45 458,55
9 547101462083 rmadi Lubis 3500 7516,31 7745,36 229,05
10 547101462147 Aria Bima 7700 27201,12 28382,57 1181,45
11 547101462266 H ASEP RUCHMAT S 3500 22176,81 23370,61 1193,8
12 547101462258 Drs Ade Komarudin 3500 8601,23 8777,7 176,47
13 547101462241 Drs HM rsyad Djuwae 3500 12434,65 12436,86 2,21
14 547101462312 John M Toisuta 3500 26401,07 27925,24 1524,17
15 547101462338 DR AHMAD FARHAN H,MS 3500 12637,21 13145,43 508,22
16 547101462346
DRS HM SARP
HUTAHURU
3500 21685,9 22439,52 753,62
17 547101462320 CAROL D KADANG SE M 3500 31284,75 32325,38 1040,63
18 547101462274 r chwan shak, Msi 3500 10345,09 10683,66 338,57
19 547101462304 Narsril Bahar 3500 18579,21 19442,57 863,36
20 547101462282 Prof Dr Didik J Rach 3500 2950,85 2969,11 18,26
21 547101462290 r Hj A Yuliani P,MS 3500 22794,3 24069,28 1274,98
22 547101462162 Constant MP,SH 3500 13133,12 13708,73 575,61
23 547101462233 RETNA ROSMANTA S 3500 3461,64 3539,55 77,91
24 547101462170 HM MALKAN AMN 3500 4403,43 6562,5 2159,07
25 547101462225 R APR HANANTO 3500 12524,61 13051,02 526,41
26 547101462217
WALWAN S ,S,H, MM,
MBA
3500 4044,3 4615,97 571,67
27 547101462209 Drs Hasurungan S 3500 16359,54 16879,94 520,4
28 547101462188 HJ ELVA HARTANT SP 3500 22521,94 23922,25 1400,31
29 547101462196 Pastor Saut ,MH 4400 11083,14 11536,83 453,69
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



45
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


30 547101463873 Adiwarsita Adinegoro 1300 8823,01 8936,79 113,78
31 547400062465 R.ARLANGGA H MMT M 1300 1822,62 1928,75 106,13
32 547103845066 LUKAS KARL DEGE 3500 9855,07 10544,58 689,51
33 547101463865 Drg H Tonny A Msc 3500 8475,52 8660,43 184,91
34 547101463795 NYA BAY , SE MM 3500 20423,24 22092,53 1669,29
35 547101463808 DR YUSRON HZA LLM 3500 7843,76 8229,01 385,25
36 547101463787 R HAMZAH SANGADJH 3500 12017 12628,78 611,78
37 547101463816 H NUR SYAMS N SH 3500 11169,66 11665,9 496,24
38 547101463824 Hasnuddin Murad SH 3500 20662,46 20972,86 310,4
39 547101463840 DRS H RSWAN TONY DK 3500 10717,88 10992,5 274,62
40 547101463832 M AZS SYAMSUDN 3500 7996,14 8330,98 334,84
41 547102975896 Komp DPR R / MATV 22 450 104,2 109,28 5,08
42 547101463434 r Hendarso H MBA 3500 2536,33 2765,21 228,88
43 547101463505 Nurson Wahid 3500 16298,58 17060,46 761,88
44 547101463491 DRA TRULYANT HABB 3500 6903,27 7284,63 381,36
45 547101463426 H ANWAR FATTA 3500 4659,32 5005,35 346,03
46 547101463418 MAX MOE MA MBA 3500 23646,07 23875,43 229,36
47 547101463442 Syamsul Bachri , Msc 3500 14223,22 14802,55 579,33
48 547101463513 ZANUDN AMAL SE 3500 9702,51 10323,49 620,98
49 547102975900 Komp DPR R / MTv 23 450 383,75 392,09 8,34
50 547101463658 Drs Made Urip 3500 15587,99 16629,47 1041,48
51 547101463674 Ni Gustui Ayu Sumade 3500 32328,65 33634,21 1305,56
52 547101463666 Drs agustinus Clarus 3500 13689,69 14300,06 610,37
53 547101463633 L Soepomo SW 3500 8172,07 8525,5 353,43
54 547101463641 Dr r Wayan Koster,M 3500 13131,73 13602,56 470,83
55 547101463617 DRS H MARJONO MM 3500 11454,26 12028,98 574,72
56 547101463625 Gusti Agung Rai ,SE 3500 9722,29 10245,32 523,03
57 547101463609 Drs H DJOEMAD T W MB 3500 12750,09 13209,25 459,16
58 547101941719 Lapangan Tenis 16500 1460,76 1490,4 29,64
59 547101463562 r M Nazaruddin 3500 27720,57 28897,35 1176,78
60 547101463554 TR MEDYA P,SH 3500 15093,17 15486,15 392,98
61 547101463547 Dudhie Makmun M ,MBA 3500 17275,71 18168,21 892,5
62 547101463539 r Emir Moeis Msc 3500 7898,23 8237,35 339,12
63 547101463521 DRS HM RSYAD SUDRO 3500 13677,12 14306,14 629,02
64 547101463588 Suparlan SH 3500 9781,13 10127,55 346,42
65 547101463596 M Taufiq Kiemas 3500 5930,5 6184,24 253,74
66 547101463570
RUFNUS SANTUR SH
MH
3500 5286,4 5470,31 183,91
67 547101464756 DEP WEL SET NEG 16500 54180,34 57354,93 3174,59
68 547101461958 DRS MOH ALY YAHYA 3500 3108,11 3264,83 156,72
69 547101461966 DRS EKA SANTOSA 3500 7644,25 8093,76 449,51
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



46
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


70 547101461838 Theo Syafei 3500 26763,09 28257,71 1494,62
71 547101461820 R PENDY LAMADJDO 3500 4617,17 4774,7 157,53
72 547101461812 Ferdiansyah ,SE,MM 3500 20056,37 21013,38 957,01
73 547101461804 M Yahya Zaini ,Sh 4400 11098,32 11120,92 22,6
74 547102975792 Komp DPR R/MATV 12 450 111,52 116,91 5,39
75 547101461791 Drs Agun Gunandjar S 3500 17435,93 17880,51 444,58
76 547101461783 R. ACHMAD HAFZ.Z MS 3500 6761,35 7382,05 620,7
77 547101461775 DRA MARDANA 3500 10987,97 11704,28 716,31
78 547101461613 R SOEHARSOJO 3500 20535,13 21969,84 1434,71
79 547101461647 Apbab Parpoeka,SH 3500 15603,22 15771,36 168,14
80 547101461621 H SYAK SALEH 3500 8987,92 9543,16 555,24
81 547101461639 DRS H RJAL JALL MM 3500 5312,45 5613,08 300,63
82 547101461654 H MUDAHR 11000 13236,23 14531,28 1295,05
83 547101463779 MURDAYA POO 3500 6392,2 6799,7 407,5
84 547101463753 DRA ELVANA MS 3500 14070,66 14832,12 761,46
85 547101463761 PANDA NABABAN 3500 9396,46 10011,32 614,86
86 547102975918 KOMP DPR R /MATV 24 450 187,23 193,14 5,91
87 547101463704 R AZHAR ROML MS 3500 17808,86 17839,18 30,32
88 547101463720 NADHAR ZHAR SH 3500 17530,22 19226,01 1695,79
89 547101463746 R ABDUL HAD DJAMAL 3500 15761,89 16700,77 938,88
90 547101463738 DRS FERRY MURSYDAN 3500 7517,72 7944,76 427,04
91 547101463712 MUHAMMAD SOPHAN 5500 8131,15 8389,19 258,04
92 547102975862 Komp DPRR1 / MATV 19 450 122,57 128,44 5,87
93 547101463292 r Nizar Dahlan ,MSi 3500 5636,69 6003,26 366,57
94 547101463306 DRS AL MOCHTAR N MS 3500 19729,76 20611,31 881,55
95 547101463276 Muhamad Fauzi,SE 3500 1136,65 1901,32 764,67
96 547101463250 Jamaludin Karim ,SH 3500 8933,65 9235,69 302,04
97 547101463284 Muhammad Tonas 3500 11365,32 11925,36 560,04
98 547101463131 WLLEM MAXMLAN T.SH 3500 3265,36 3965,36 700
99 547101463149 DRS PRYONO BUD S 3500 8112,4 8529,54 417,14
100 547101463115 DRS. H. SUMARYOTO 3500 6532,36 7231,32 698,96
101 547101463107 Hj CHYPRANUS 3500 7965,32 8365,23 399,91
102 547101463156 DR HAPPY BONE Z MS 4400 3659,36 4536,63 877,27
103 547101463123 ST SOEPAM 5500 25007,68 26050,52 1042,84
104 547101463164 DA BAGUS N SH 3500 9146,86 9557,83 410,97
105 547101463180 Drs Agus Condro P 3500 9818,58 10225,4 406,82
106 547101463172 HM Said Abdullah 3500 9433,85 9904,5 470,65
107 547101463198 Nursuhud 3500 14126,63 14750,7 624,07
108 547101463002 DRS. TUKDJO,MM 3500 11087,69 11518,11 430,42
109 547101463028 DRS. H DARMONO K.LMS 3500 7412,66 7696,1 283,44
110 547101463010 DRS.W EKO WALUYO 3500 10054,86 10454,04 399,18
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



47
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


111 547101463036 SURYANA 3500 7931,15 8181,97 250,82
112 547101463389 TAUPAN TAMPUBOLON 3500 7654,05 8203,93 549,88
113 547101463400 Drs Simon Patrice M 3500 18145,06 19093,33 948,27
114 547101463397 Dr DHAM SH, Mkn 3500 3265,69 4456,12 1190,43
115 547400057683 R HERMAN W SE MS 3500 9958,14 10274,65 316,51
116 547101463243 Ramson. S,MBA 3500 8468,2 8793,05 324,85
117 547101463690 JAKA ARYA DBA 3500 3302,19 3608,11 305,92
118 547101463682 CHEPY TRPRAKOSO W 3500 19915,39 20505,32 589,93
119 547102975888 Komp DPR R / MATV 21 450 126,11 132,28 6,17
120 547101463227 Agung Sasongko 3500 17796,68 18848,81 1052,13
121 547101463201 DRS H SURATAL HW 3500 11166,15 11846,33 680,18
122 547101463219 Prof Dr sudigdo ,Dr,S 3500 16231,2 16872,14 640,94
123 547101463475 Dr H Yuddy C, Me 3500 5632,32 6002,12 369,8
124 547101463467 Yorris TH Raweyae 3500 32421,18 33654,96 1233,78
125 547101463459 Dr Marwah Daud 3500 16356,23 16756,32 400,09
126 547101463483 Drs Slamet Efendi Y 4400 1532,32 2312,33 780,01
127 547101463371 P Rudianto Tjen 3500 5968,18 6264,24 296,06
128 547101463363 A Darodjat 3500 12268,1 12588,69 320,59
129 547101463322 KH Anwar Saleh 3500 2356,32 3123,32 767
130 547101463314 Hilman ndra ,SE,MBA 3500 5915,16 6165 249,84
131 547101463330 Anton A Mashur ,SE 3500 11566,32 12013,23 446,91
132 547101463355 DRS DEALSMAN DACH 3500 3266,32 3965,32 699
133 547101463348 KH M Zainul Madji ,MA 4400 3903,65 4563,36 659,71
134 547101627242 PJU SETNEG DPR R 85500 10325,65 11235,32 909,67
135 547101462075 ASMAN ABDUR SE, MS. 3500 3586,39 3714,26 127,87
136 547101462034 Dede Yusuf 3500 11391,98 11868,85 476,87
137 547101462042 DR R DRADJAD H ,W, M 3500 9725,76 10292,94 567,18
138 547101462067 DRS ENGGARTASTO L 3500 11126,33 11818,68 692,35
139 547101462059 H MAM SYUJA SE 3500 11529,66 11864,33 334,67
140 547101462026 DRS MUH NURLF 4400 32301,65 33839,16 1537,51
141 547102975805 KOMP DPR R /MATV 13 450 7201,32 7956,36 755,04
142 547101461974 H WOWO BRAHM 3500 8001,32 8956,36 955,04
143 547101461982 GUST SKANDAR SUKMA 3500 20571,84 21519,39 947,55
144 547101462018 ZULKFL HASAN SE MM 3500 19411,81 19713,99 302,18
145 547101462000 R DANEL BUD S MM 3500 5079,41 5342,08 262,67
146 547101461990
AR AK MALDN NOOR
MBA
3500 9096,25 9600,24 503,99
147 547101461941 Hj Azlainin Agus ,SH,M 3500 8922,15 9540,06 617,91
148 547101461933 DRS SDARTO DS SH 3500 163,75 163,75 0
149 547101461925
M MOKO SANTOSO
S,SOS
3500 9313,14 9673,86 360,72
150 547101461895 Zaenal Arifin 3500 8803,6 9206,33 402,73
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



48
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


151 547101461917 Soekardjo H Soewirjo 3500 7137,41 7453,73 316,32
152 547101461909 DRS PASKAH SUZETA 3500 13784,19 14701,75 917,56
153 547101461887 Drs Joko Purwongembo 3500 8965,32 9563,32 598
154 547103827495
AULA AMANRACHMAN
SH
3500 9457,6 9999,37 541,77
155 547101461861 Djoko Edhi Sucipto 3500 2972,86 3111,37 138,51
156 547101461853 SABAM SRAT 4400 5935,49 6532,25 596,76
157 547101461846 Maruarar Sirait ,SP 5500 20018,01 20992,16 974,15
158 547101461767 Abdillah Toha,SE 3500 6160,29 6409,82 249,53
159 547101461759 Djumanhuri Spd 3500 6003,36 6523,24 519,88
160 547101461742 Tuti ndarsih LS 3500 8756,36 9563,23 806,87
161 547101461726 H.SABR SAMAN 3500 12369,36 13253,54 884,18
162 547101461718 r Taufik Kurniawan 3500 7985,81 8097,72 111,91
163 547101461734 R SAYUT ASYATHR 3500 25091,26 26618,45 1527,19
TOTAL PEMAKAAN BULAN DESEMBER (kWH) 93766,09

Di rak TR juga terdapat CT untuk pengukuran kwh meter pembanding di
gardu yang menunjukkan nilai sebagai berikut:
Tot al kWh J ur usan Tot al kWh Pel anggan Losses ( kWh) Losses ( %)
112. 843, 20 93. 766, 09 19. 077, 11 16, 91%

Data catatan meter di bulan januari 2008 adalah sebagai berikut:
NO
DPEL Nama Pelanggan Daya
STAND
AWAL
STAND
AKHR
STAND
AKHR
1 547102975821 KOMP DPR R /MATV 15 450 133,94 139,87 5,93
2 547102975870 Komp DPRR/ MTV 20 450 135,39 141,43 6,04
3 547101462091 Hayani sman Soetojo 3500 4032,36 5342,08 1309,72
4 547101462154 Tiurlan B Hutagaol ,S 3500 10717,88 10992,5 274,62
5 547101462139 RK Sembiring M 3500 7412,66 7696,1 283,44
6 547101462113 Ruth Nina M Kedang 3500 5968,18 6264,24 296,06
7 547101462105 ST DRS JANSEN H,SE,M 3500 5312,45 5613,08 300,63
8 547103836674 NUAH TORANG 3500 2536,33 2765,21 228,88
9 547101462083 rmadi Lubis 3500 19411,81 19713,99 302,18
10 547101462147 Aria Bima 7700 3302,19 3608,11 305,92
11 547101462266 H ASEP RUCHMAT S 3500 4659,32 5005,35 346,03
12 547101462258 Drs Ade Komarudin 3500 20662,46 20972,86 310,4
13 547101462241 Drs HM rsyad Djuwae 3500 7137,41 7453,73 316,32
14 547101462312 John M Toisuta 3500 9958,14 10274,65 316,51
15 547101462338 DR AHMAD FARHAN H,MS 3500 12268,1 12588,69 320,59
16 547101462346 DRS HM SARP 3500 8468,2 8793,05 324,85
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



49
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


HUTAHURU
17 547101462320 CAROL D KADANG SE M 3500 11529,66 11864,33 334,67
18 547101462274 r chwan shak, Msi 3500 7996,14 8330,98 334,84
19 547101462304 Narsril Bahar 3500 10345,09 10683,66 338,57
20 547101462282 Prof Dr Didik J Rach 3500 7898,23 8237,35 339,12
21 547101462290 r Hj A Yuliani P,MS 3500 4804,79 4899,63 94,84
22 547101462162 Constant MP,SH 3500 2376,37 2481,63 105,26
23 547101462233 RETNA ROSMANTA S 3500 1822,62 1928,75 106,13
24 547101462170 HM MALKAN AMN 3500 7985,81 8097,72 111,91
25 547101462225 R APR HANANTO 3500 8823,01 8936,79 113,78
26 547101462217 WALWAN S ,S,H, MM, MBA 3500 3586,39 3714,26 127,87
27 547101462209 Drs Hasurungan S 3500 2103,32 3111,37 1008,05
28 547101462188 HJ ELVA HARTANT SP 3500 3108,11 3264,83 156,72
29 547101462196 Pastor Saut ,MH 4400 4617,17 4774,7 157,53
30 547101463873 Adiwarsita Adinegoro 1300 8936,79 8937,12 0,33
31 547400062465 R.ARLANGGA H MMT M 1300 1928,75 1962,6 33,85
32 547103845066 LUKAS KARL DEGE 3500 5603,32 6532,23 928,91
33 547101463865 Drg H Tonny A Msc 3500 8660,43 9008,95 348,52
34 547101463795 NYA BAY , SE MM 3500 22092,53 23791,02 1698,49
35 547101463808 DR YUSRON HZA LLM 3500 8229,01 8653,33 424,32
36 547101463787 R HAMZAH SANGADJH 3500 12628,78 13354,22 725,44
37 547101463816 H NUR SYAMS N SH 3500 11665,9 12182,42 516,52
38 547101463824 Hasnuddin Murad SH 3500 20972,86 21218,62 245,76
39 547101463840 DRS H RSWAN TONY DK 3500 10992,5 11345,09 352,59
40 547101463832 M AZS SYAMSUDN 3500 8330,98 8806,28 475,3
41 547102975896 Komp DPR R / MATV 22 450 109,28 114,2 4,92
42 547101463434 r Hendarso H MBA 3500 2931,36 3232,32 300,96
43 547101463505 Nurson Wahid 3500 9032,3 9563,12 530,82
44 547101463491 DRA TRULYANT HABB 3500 8963,32 9565,32 602
45 547101463426 H ANWAR FATTA 3500 7956,32 8965,33 1009,01
46 547101463418 MAX MOE MA MBA 3500 23875,43 24148,67 273,24
47 547101463442 Syamsul Bachri , Msc 3500 14802,55 15278,48 475,93
48 547101463513 ZANUDN AMAL SE 3500 10323,49 11014,46 690,97
49 547102975900 Komp DPR R / MTv 23 450 392,09 399,4 7,31
50 547101463658 Drs Made Urip 3500 16629,47 17326,75 697,28
51 547101463674 Ni Gustui Ayu Sumade 3500 17796,68 18848,81 1052,13
52 547101463666 Drs agustinus Clarus 3500 27720,57 28897,35 1176,78
53 547101463633 L Soepomo SW 3500 7201,32 7956,36 755,04
54 547101463641 Dr r Wayan Koster,M 3500 8001,32 8956,36 955,04
55 547101463617 DRS H MARJONO MM 3500 27201,12 28382,57 1181,45
56 547101463625 Gusti Agung Rai ,SE 3500 22176,81 23370,61 1193,8
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



50
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


57 547101463609 Drs H DJOEMAD T W MB 3500 32421,18 33654,96 1233,78
58 547101941719 Lapangan Tenis 16500 22794,3 24069,28 1274,98
59 547101463562 r M Nazaruddin 3500 13236,23 14531,28 1295,05
60 547101463554 TR MEDYA P,SH 3500 32328,65 33634,21 1305,56
61 547101463547 Dudhie Makmun M ,MBA 3500 22521,94 23922,25 1400,31
62 547101463539 r Emir Moeis Msc 3500 20535,13 21969,84 1434,71
63 547101463521 DRS HM RSYAD SUDRO 3500 26763,09 28257,71 1494,62
64 547101463588 Suparlan SH 3500 26401,07 27925,24 1524,17
65 547101463596 M Taufiq Kiemas 3500 8965,32 9563,32 598
66 547101463570
RUFNUS SANTUR SH
MH
3500 25091,26 26618,45 1527,19
67 547101464756 DEP WEL SET NEG 16500 32301,65 33839,16 1537,51
68 547101461958 DRS MOH ALY YAHYA 3500 5935,49 6532,25 596,76
69 547101461966 DRS EKA SANTOSA 3500 20423,24 22092,53 1669,29
70 547101461838 Theo Syafei 3500 17530,22 19226,01 1695,79
71 547101461820 R PENDY LAMADJDO 3500 6003,36 6523,24 519,88
72 547101461812 Ferdiansyah ,SE,MM 3500 8756,36 9563,23 806,87
73 547101461804 M Yahya Zaini ,Sh 4400 12369,36 13253,54 884,18
74 547102975792 Komp DPR R/MATV 12 450 5632,36 6562,5 930,14
75 547101461791 Drs Agun Gunandjar S 3500 56369,65 57354,93 985,28
76 547101461783 R. ACHMAD HAFZ.Z MS 3500 7382,05 8033,47 651,42
77 547101461775 DRA MARDANA 3500 11704,28 12433,25 728,97
78 547101461613 R SOEHARSOJO 3500 21969,84 23382,79 1412,95
79 547101461647 Apbab Parpoeka,SH 3500 15771,36 15926,4 155,04
80 547101461621 H SYAK SALEH 3500 9543,16 10022,43 479,27
81 547101461639 DRS H RJAL JALL MM 3500 5613,08 5900,98 287,9
82 547101461654 H MUDAHR 11000 14531,28 16052,6 1521,32
83 547101463779 MURDAYA POO 3500 6799,7 7250,7 451
84 547101463753 DRA ELVANA MS 3500 14832,12 15642,98 810,86
85 547101463761 PANDA NABABAN 3500 10011,32 10657,05 645,73
86 547102975918 KOMP DPR R /MATV 24 450 193,14 199 5,86
87 547101463704 R AZHAR ROML MS 3500 17839,18 17851,17 11,99
88 547101463720 NADHAR ZHAR SH 3500 19226,01 20903,17 1677,16
89 547101463746 R ABDUL HAD DJAMAL 3500 16700,77 17697,2 996,43
90 547101463738 DRS FERRY MURSYDAN 3500 7944,76 8595,6 650,84
91 547101463712 MUHAMMAD SOPHAN 5500 8389,19 8834,97 445,78
92 547102975862 Komp DPRR1 / MATV 19 450 128,44 134,27 5,83
93 547101463292 r Nizar Dahlan ,MSi 3500 3265,69 4456,12 1190,43
94 547101463306 DRS AL MOCHTAR N MS 3500 21685,9 22439,52 753,62
95 547101463276 Muhamad Fauzi,SE 3500 10653,32 12458,95 1805,63
96 547101463250 Jamaludin Karim ,SH 3500 14070,66 14832,12 761,46
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



51
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


97 547101463284 Muhammad Tonas 3500 16298,58 17060,46 761,88
98 547101463131 WLLEM MAXMLAN T.SH 3500 18579,21 19442,57 863,36
99 547101463149 DRS PRYONO BUD S 3500 19729,76 20611,31 881,55
100 547101463115 DRS. H. SUMARYOTO 3500 17275,71 18168,21 892,5
101 547101463107 Hj CHYPRANUS 3500 13784,19 14701,75 917,56
102 547101463156 DR HAPPY BONE Z MS 4400 5632,32 6002,12 369,8
103 547101463123 ST SOEPAM 5500 15761,89 16700,77 938,88
104 547101463164 DA BAGUS N SH 3500 9557,83 10002,34 444,51
105 547101463180 Drs Agus Condro P 3500 10225,4 10742,39 516,99
106 547101463172 HM Said Abdullah 3500 9904,5 10471,81 567,31
107 547101463198 Nursuhud 3500 14750,7 15387,89 637,19
108 547101463002 DRS. TUKDJO,MM 3500 11518,11 12065,95 547,84
109 547101463028 DRS. H DARMONO K.LMS 3500 7696,1 8000,42 304,32
110 547101463010 DRS.W EKO WALUYO 3500 1136,65 1901,32 764,67
111 547101463036 SURYANA 3500 8933,65 9235,69 302,04
112 547101463389 TAUPAN TAMPUBOLON 3500 11365,32 11925,36 560,04
113 547101463400 Drs Simon Patrice M 3500 3265,36 3965,36 700
114 547101463397 Dr DHAM SH, Mkn 3500 9396,46 10011,32 614,86
115 547400057683 R HERMAN W SE MS 3500 6532,36 7231,32 698,96
116 547101463243 Ramson. S,MBA 3500 8793,05 9116,66 323,61
117 547101463690 JAKA ARYA DBA 3500 3608,11 3891,23 283,12
118 547101463682 CHEPY TRPRAKOSO W 3500 20505,32 21219,54 714,22
119 547102975888 Komp DPR R / MATV 21 450 132,28 138,48 6,2
120 547101463227 Agung Sasongko 3500 19635,32 19853,31 217,99
121 547101463201 DRS H SURATAL HW 3500 11846,33 12704,92 858,59
122 547101463219 Prof Dr sudigdo ,Dr,S 3500 16872,14 17858,32 986,18
123 547101463475 Dr H Yuddy C, Me 3500 10987,97 11704,28 716,31
124 547101463467 Yorris TH Raweyae 3500 4032,32 4456,12 423,8
125 547101463459 Dr Marwah Daud 3500 21685,9 22439,52 753,62
126 547101463483 Drs Slamet Efendi Y 4400 11705,03 12458,95 753,92
127 547101463371 P Rudianto Tjen 3500 14070,66 14832,12 761,46
128 547101463363 A Darodjat 3500 12588,69 12986,71 398,02
129 547101463322 KH Anwar Saleh 3500 11365,32 11925,36 560,04
130 547101463314 Hilman ndra ,SE,MBA 3500 3265,36 3965,36 700
131 547101463330 Anton A Mashur ,SE 3500 9396,46 10011,32 614,86
132 547101463355 DRS DEALSMAN DACH 3500 6532,36 7231,32 698,96
133 547101463348 KH M Zainul Madji ,MA 4400 3265,69 4456,12 1190,43
134 547101627242 PJU SETNEG DPR R 85500 21685,9 22439,52 753,62
135 547101462075 ASMAN ABDUR SE, MS. 3500 11705,03 12458,95 753,92
136 547101462034 Dede Yusuf 3500 14070,66 14832,12 761,46
137 547101462042 DR R DRADJAD H ,W, M 3500 16298,58 17060,46 761,88
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



52
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


138 547101462067 DRS ENGGARTASTO L 3500 18579,21 19442,57 863,36
139 547101462059 H MAM SYUJA SE 3500 11864,33 11915,52 51,19
140 547101462026 DRS MUH NURLF 4400 33839,16 35481,36 1642,2
141 547102975805 KOMP DPR R /MATV 13 450 5632,32 6562,5 930,18
142 547101461974 H WOWO BRAHM 3500 56653,23 57354,93 701,7
143 547101461982 GUST SKANDAR SUKMA 3500 22301,32 22603,51 302,19
144 547101462018 ZULKFL HASAN SE MM 3500 19713,99 20103,75 389,76
145 547101462000 R DANEL BUD S MM 3500 5342,08 5623,54 281,46
146 547101461990
AR AK MALDN NOOR
MBA
3500 9600,24 10119,57 519,33
147 547101461941 Hj Azlainin Agus ,SH,M 3500 9540,06 10212,15 672,09
148 547101461933 DRS SDARTO DS SH 3500 163,75 163,75 0
149 547101461925 M MOKO SANTOSO S,SOS 3500 9673,86 9891,19 217,33
150 547101461895 Zaenal Arifin 3500 3586,39 3714,26 127,87
151 547101461917 Soekardjo H Soewirjo 3500 2972,86 3111,37 138,51
152 547101461909 DRS PASKAH SUZETA 3500 3108,11 3264,83 156,72
153 547101461887 Drs Joko Purwongembo 3500 4617,17 4774,7 157,53
154 547103827495
AULA AMANRACHMAN
SH
3500 15603,22 15771,36 168,14
155 547101461861 Djoko Edhi Sucipto 3500 8601,23 8777,7 176,47
156 547101461853 SABAM SRAT 4400 5286,4 5470,31 183,91
157 547101461846 Maruarar Sirait ,SP 5500 21832,32 22052,95 220,63
158 547101461767 Abdillah Toha,SE 3500 6409,82 6686,56 276,74
159 547101461759 Djumanhuri Spd 3500 6032,32 6953,32 921
160 547101461742 Tuti ndarsih LS 3500 14181,66 14780,83 599,17
161 547101461726 H.SABR SAMAN 3500 14161,8 14788,33 626,53
162 547101461718 r Taufik Kurniawan 3500 8097,72 8203,63 105,91
163 547101461734 R SAYUT ASYATHR 3500 27965,32 28350,15 384,83
TOTAL PEMAKAAN BULAN JANUAR(kWH) 98772,46

Data kwh pembanding adalah sebagai berikut:
Total kWh Jurusan Total kWh Pelanggan Losses (kWh) Losses (%)
118.651,20 98.772,46 19.878,74 16,75%

Sehingga penekanan losses yang didapat adalah sebesar:
% 16 , 0
75 . 16 91 . 16 Losses

Nilai rupiah penekanan losses didapat dari selisih losses dikalikan dengan
total kwh jurusan di bulan januari, sehingga didapat nilai sebesar:
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



53
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007


kWH
kwh Losses
84 . 189
100
16 , 0
20 , 118651 ) (

Dirupiahkan menjadi:
123.397,25
650 * 84 . 189 Rp

PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



54
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007



BAB V
PENUTUP


5.1. KESIMPULAN
Dari kegiatan pemerataan beban ini dapat diambil beberapa kesimpulan:
1. Ketidak seimbangan beban menyebabkan arus mengalir pada hantaran
netral. Arus ini menjadi losses yang harus ditanggung PT PLN karena
sepanjang hantaran netral terdapat resistansi.
2. Pemerataan beban dilakukan dengan jalan rewiring sambungan rumah
pelanggan dari phase yang berat ke phase yang berbeban ringan.
3. Dengan program pemerataan beban di gardu E 311P ini, didapat hasil
penekanan losses di hantaran netral sebesar 0,76%, dan di hantaran phase
sebesar 0,75%.

5.2. SARAN
1. Untuk memudahkan pemeliharaan atau perbaikan jaringan, sebaiknya data
teknik jaringan Mister 2000 tetap dijaga kevalidannya.
2. Penyambungan pelanggan baru sebaiknya terorganisir dengan baik, dengan
melihat data beban jaringan, sehingga tidak terjadi ketimpangan beban antar
phase.
3. Pada jaringan tegangan rendah, sebaiknya dilengkapi dengan tanda
identifikasi kabel. Identifikasi terdiri dari asal gardu, jurusan dan phase
suatu kabel JTR.
4. Perlunya dibuat suatu prosedur kerja (SOP) yang bertujuan
mempertahankan keseimbangan beban, seperti terlampir dalam lampiran.
5. Untuk memudahkan pekerjaan pemerataan beban, sebaiknya PT PLN
membuat suatu alat untuk mengetahui phase(detektor phase) suatu
sambungan rumah, ataupun kabel JTR.
6. Untuk mendapatkan data losses yang real, di setiap gardu distribusi
sebaiknya dilengkapi dengan kwh meter pembanding di gardu.
PT PLN(PERSERO)
DISTRIBUSI JAKARTA RAYA DAN TANGERANG
AREA JARINGAN KRAMATJATI



54
PRASETYA ULAH SAKT B/ED/00481
SSWA OJT ANGKATAN V Thn 2007



BAB V
PENUTUP


5.1. KESIMPULAN
Dari kegiatan pemerataan beban ini dapat diambil beberapa kesimpulan:
1. Ketidak seimbangan beban menyebabkan arus mengalir pada hantaran
netral. Arus ini menjadi losses yang harus ditanggung PT PLN karena
sepanjang hantaran netral terdapat resistansi.
2. Pemerataan beban dilakukan dengan jalan rewiring sambungan rumah
pelanggan dari phase yang berat ke phase yang berbeban ringan.
3. Dengan program pemerataan beban di gardu E 311P ini, didapat hasil
penekanan losses di hantaran netral sebesar 0,76%, dan di hantaran phase
sebesar 0,75%.

5.2. SARAN
1. Untuk memudahkan pemeliharaan atau perbaikan jaringan, sebaiknya data
teknik jaringan Mister 2000 tetap dijaga kevalidannya.
2. Penyambungan pelanggan baru sebaiknya terorganisir dengan baik, dengan
melihat data beban jaringan, sehingga tidak terjadi ketimpangan beban antar
phase.
3. Pada jaringan tegangan rendah, sebaiknya dilengkapi dengan tanda
identifikasi kabel. Identifikasi terdiri dari asal gardu, jurusan dan phase
suatu kabel JTR.
4. Perlunya dibuat suatu prosedur kerja (SOP) yang bertujuan
mempertahankan keseimbangan beban, seperti terlampir dalam lampiran.
5. Untuk memudahkan pekerjaan pemerataan beban, sebaiknya PT PLN
membuat suatu alat untuk mengetahui phase(detektor phase) suatu
sambungan rumah, ataupun kabel JTR.
6. Untuk mendapatkan data losses yang real, di setiap gardu distribusi
sebaiknya dilengkapi dengan kwh meter pembanding di gardu.
ID PEL NAMA DAYA I
MAX
NO TIANG TARIF FASE KET
547102592838 H NTONG 900 4 CDT-10049 R1 R
547104035538 MUHAMAD YUSUF 1300 6 CDT-10049 R1 R
547101313407 MRHASAN 450 2 CDT-10049 R1 S
547102690189 AL ANWAR B H LABAY 450 2 CDT-10049 R1 T
547103829147 TUKMO 1300 6 CDT-10049 R1 T
547103947115 SUMD SHAK 1300 6 CDT-10049 R1 T
547101087497 MT DJUR 1300 6 CDT-10049 R1 T
547103848716 YAMN 1300 6 CDT-10050 R1 S
547100847594 MAMAN R 900 4 CDT-10050 R1 T
547101309763 MASDONG B 900 4 CDT-10050 R1 T
547103317040 KARNO 450 2 CDT-10052 R1 R
547103514420 DJMINO 450 2 CDT-10052 R1 R MISTER 2000= R
547103804856 DAN S 450 2 CDT-10052 R1 R
547101057553 LAOREN A L 2200 10 CDT-10052 R1 R MISTER 2000= R
547102858927 MATSEAN 450 2 CDT-10052 R1 S
547103509584 YAMN 450 2 CDT-10052 R1 S
547103896375 DJEMNO 900 4 CDT-10052 R1 S
547103055494 DJMNO 450 2 CDT-10052 R1 T
547103895692 BEDJO 1300 6 CDT-10052 R1 T
547101098360 SUPRAD 450 2 CDT-10052 R1 T
547102721792 SONA 3500 16 CDT-10054 R1 R
547103801004 YYS D N ABPRAYA 4400 20 CDT-10054 B2 R
547100249439 DRD SUDRO 1300 6 CDT-10054 R1 R
547102871753 SUKART H S 2200 20 CDT-10054 B1 R
547102001089 SOETEDJ GK 1300 6 CDT-10054 B1 S
547101139565 RASM BR SNULNGGA 1300 6 CDT-10054 B1 S
547100239700 DRS HAPSORO 2200 20 CDT-10055 R1 S
547100189599 EDR PRHARTO 2200 20 CDT-10056 R1 R
547100256153 JOKO SUPONO S 1300 6 CDT-10056 R1 S
547100569008 R NOOR HANDONO 2200 20 CDT-10056 R1 S
547100597745 SUDGDO 900 4 CDT-10057 R1 R
547100255128 O NAPTUPULU 3500 16 CDT-10057 R1 R
547100270140 NYOMAN S 2200 10 CDT-10057 R1 R
547103776320 KOESWANTO M 900 4 CDT-10058 R1 T
547103875566 MADE SUNANDA 2200 10 CDT-10058 R1 T
547100900411 LETKOL UTDJ GK 900 4 CDT-10058 R1 T
547102521349 R SUSYNTO 2200 10 CDT-10058 R1 T
547102377405 EFEND SABAM 1300 6 CDT-10059 R1 R
547100266568 MUCHLS 1300 6 CDT-10059 R1 T
547100857352 NYOMAN SEMADH 3500 16 CDT-10059 R1 T
547100185300 A NASUTON 2200 10 CDT-10060 R1 R
547100182153 MUSNGAT 4400 20 CDT-10060 R2 R
547102120663 HAD SOEHAWO 900 4 CDT-10060 R1 T
547100182146 H SOEDARWO 1300 6 CDT-10060 R1 T
547102746249 HARLYAN D 4400 20 CDT-10061 R1 S
TABEL 1
DATA PELANGGAN JURUSAN B GARDU E 311P
ID PEL NAMA DAYA I
MAX
NO TIANG TARIF FASE KET
547100190858 W SMANJUNTAK 900 4 CDT-10061 R1 S
547100243244 ZULKPL 1300 6 CDT-10061 R1 S
547104020018 R HERLAN DEWABRATA 2200 10 CDT-10061 R1 S
547102839515 N MADE PUSPA ARN 2200 10 CDT-10062 R1 R
547101913517 DRS NYOMN SUTSNA 3500 16 CDT-10062 R1 S
547103271225 GDR JPA 3500 16 CDT-10063 R1 R
547102490101 T RSHMAAT 1300 6 CDT-10064 R1 R
547100578651 SOLECHAN EFFEND 1300 6 CDT-10064 R1 T
547103966488 RYONA FRANCNE P 2200 10 CDT-10064 R1 T
547101000112 ADOLF A CH KAPOYOS 3500 16 CDT-10064 R2 T
547101734076 MARMN 2200 10 CDT-10065 R1 R
547103869810 R NG CHALL A 2200 10 CDT-10065 R1 R
547100329965 MUSH BATUL HUDA 2200 10 CDT-10065 S2 R
547100971595 ENDANG SR NURHAYAT 2200 10 CDT-10065 R1 R
547102546929 H ASAH A 450 2 CDT-10065 R1 T
547102546911 H ASYAH B 450 2 CDT-10065 R1 T
547103104375 ACEP RWANTO 450 2 CDT-10065 R1 T
547100193473 YUL ASTUT TR H 7700 35 CDT-10065 R2 T
547100911185 H ENTONG 1300 6 CDT-10065 R1 T
547103444678 NTAN TGAN BA 2200 10 CDT-10066 R1 S
547101234720 YULASTUT 3500 16 CDT-10066 R1 S
547101320347 D SETAAN 1300 6 CDT-10066 R1 S
547100193503 MAT NUR 900 4 CDT-10079 R1 T
547100242267 RMUNG 1300 6 CDT-10079 R1 T
547100287991 ENNY RH 2200 10 CDT-10079 R1 T
547101098768 SR AWAN 3500 16 CDT-10079 R2 T
547101532578 MANAH 450 2 CDT-10079 R1 T
547100185773 SURATMAN 900 4 CDT-10085 R1 S
547100867178 HKAP U 900 4 CDT-10085 R1 S
547103900528 DJAMAL AZS 16 CDT-10085 R3 R
547103900528 DJAMAL AZS 16 CDT-10085 R3 S
547103900528 DJAMAL AZS 16 CDT-10085 R3 T
547101670232 NY HERNAH 450 2 CDT-10086 R1 R
547101370342 NAD AGUS TAMPLK 1300 6 CDT-10086 R1 T
547101699272 PANH 450 2 CDT-10087 R1 R
547102113102 ALH BN JEL 450 2 CDT-10087 R1 R
547103764774 H HARTN 450 2 CDT-10087 R1 R
547103165881 PARTO 450 2 CDT-10087 R1 R
547103171243 BARKAH 900 4 CDT-10087 R1 R
547103373002 NNNG SUSAPT 900 4 CDT-10087 R1 R
547103423772 SUWAND 450 2 CDT-10087 R1 R
547103871965 SUBANDRO 1300 6 CDT-10087 R1 R
547103914430 SULASTR 1300 6 CDT-10087 R1 R
547101481097 MANSUR 450 2 CDT-10088 R1 S
547101832921 MUSTAN 450 2 CDT-10088 R1 S
547103938850 DRS PN S 1300 6 CDT-10088 R1 S
547100172154 SUMANTA PETRUS 1300 6 CDT-10088 R1 S
547101805891 YANAH 1300 6 CDT-10088 R1 T
######
ID PEL NAMA DAYA I
MAX
NO TIANG TARIF FASE KET
547103372897 ANNA S 1300 6 CDT-10088 R1 T
547102775563 SADAH 900 4 CDT-10088 R1 T
547100879409 DRS PN SUPEND 1300 6 CDT-10088 R1 T
547101680775 BURHAN 1300 6 CDT-10089 R1 R
547101844759 YASR ARAPAT 450 2 CDT-10089 R1 R
547102253944 ABU BAKAR 1300 6 CDT-10089 R1 R
547102662768 ANNA SENTYORN 1300 6 CDT-10089 R1 R
547103586331 HERLNA MASTUR 900 4 CDT-10089 R1 R
547103754820 SIDIK PAMBUKO 1300 6 CDT-10090 R1 R MISTER 2000= T
547103984035 LUKMAN ALATAS 1300 6 CDT-10090 R1 R MISTER 2000= T
547104012652 MUCHSN ALATTAS 2200 10 CDT-10090 R1 R
547100672195 LL SUMARNO 900 4 CDT-10090 R1 S
547101847756 ATJM 1300 6 CDT-10090 R1 T
547103777600 TJE ROHMAN 2200 10 CDT-10090 R1 T
547103374126 TJE ROHMAH 900 4 CDT-10091 R1 R
547102748132 MOH RUSDI 1300 6 CDT-10091 R1 R MISTER 2000= T
547103374134 TJE ROHMAH 900 4 CDT-10091 R1 R
547103374142 TJE ROHMAH 450 2 CDT-10091 R1 R
547103900337 HARSONO HARJADINATA 900 4 CDT-10091 R1 R MISTER 2000= S
547100467758 WARSONO HARJADINATA1300 6 CDT-10091 R1 R MISTER 2000= S
547100185716 IDUP SUMANTRI 1300 6 CDT-10091 R1 R MISTER 2000= T
547101898322 M SYAFRN 900 4 CDT-10091 R1 S
547103900329 WARSONO HARJA DINARTA900 4 CDT-10091 R1 S MISTER 2000= T
547103967728 DUP SUMANTR (B) 900 4 CDT-10091 R1 S
547103967736 IDUP SUMANTRI 900 4 CDT-10091 R1 S MISTER 2000= S
547100698872 RMAN MASTAM 900 4 CDT-10091 R1 S
547101029812 KUSRIYAH 900 4 CDT-10091 R1 S MISTER 2000= S
547101390842 SUMANTA PETRUS 2200 10 CDT-10091 R1 T
547101525861 MAR 450 2 CDT-10092 R1 R
547104035699 SUWARNO 1300 6 CDT-10092 R1 R
547101498595 MOCHAMAD ANWAR 900 4 CDT-10092 R1 S
547101514774 SUMYAT 1300 6 CDT-10092 R1 S
547101023800 EFFEND 450 2 CDT-10092 R1 S
547101680369 MARDYAH 900 4 CDT-10092 R1 S
547100704689 KOSASH 900 4 CDT-10092 R1 T
547103870252 MARDAN 1300 6 CDT-10092 R1 T
547104012660 DJOKO HATMAD 4400 20 CDT-10093 R2 R
547103306757 MSNAD 1300 6 CDT-10093 R1 S
547100172147 GONDO SUTDJO 1300 6 CDT-10093 R1 S
547100176585 DRUS MANSYUR 900 4 CDT-10093 R1 S
547100665717 SUKDJO 900 4 CDT-10093 R1 S
547101732972 MAT NUR 900 4 CDT-10093 R1 T
547103415553 SUTRAH 900 4 CDT-10093 R1 T
547103992134 ACHMAD ALAYDRUS 2200 10 CDT-10093 R1 T
547102183225 BUM BNA AL 450 2 CDT-10094 R1 R
547100586208 MAT SALEH 1300 6 CDT-10094 R1 R
547100183729 TATANG 3500 16 CDT-10094 R1 R MISTER 2000= R
547104006375 ABU BAKAR SE MM 2200 10 CDT-10094 R1 R
547104035396 FAHM 1300 6 CDT-10094 R1 R
547103695351 TATAMG 1300 6 CDT-10094 R1 S MISTER 2000= R
547103442657 AL B OPONG 450 2 CDT-10094 R1 T
547104000978 H ZAHARA 2200 10 CDT-10094 R1 T
ID PEL NAMA DAYA I
MAX
NO TIANG TARIF FASE KET
547100882564 DURAHM 450 2 CDT-10095 R1 R
547100578333 DAL S 1300 6 CDT-10095 R1 R
547101695187 SUKIRMAN 1300 6 CDT-10095 R1 S MISTER 2000= S
547100672146 R SURANTO 1300 6 CDT-10095 R1 S MISTER 2000= R
547103989201 JULANTA STNJAK 1300 6 CDT-10095 R1 T
547100263275 NY SUWARSH SURATMA 900 4 CDT-10095 R1 T
547100494177 SOEKDJO 2200 10 CDT-10095 R1 T
547101096842 T GNTNG SUKA 1300 6 CDT-10095 R1 T
547100181924 HERMAN S 900 4 CDT-10096 R1 R
547103872614 ROOSAH Y 2200 10 CDT-10096 R1 R
547100418174 MARNUS ADY 900 4 CDT-10096 R1 R
547100638653 MULYO KUNTORO 1300 6 CDT-10096 R1 T
547100317939 BUD RAHADJA 900 4 CDT-10096 R1 T
547103997894 YOHAN 1300 6 CDT-10096 R1 T
PETA REAL
547103959167 4 10800 10 3,11 1,83 0,1976 1,9174
547103939177 5 13500 10 3,11 1,83 0,2471 2,3968
547103791774 4,5 12150 20 6,23 1,83 0,2223 8,6285
547103827582 1 2700 20 6,23 1,83 0,0494 1,9174
547103898466 1,5 4050 16 4,98 1,83 0,0741 1,8407
547103766504 2,5 6750 10 3,11 1,83 0,1235 1,1984
547103791741 3 8100 20 6,23 1,83 0,1482 5,7523
547103791733 3,5 9450 25 7,79 1,83 0,1729 10,4860
547103791766 3,4 9180 10 3,11 1,83 0,1680 1,6298
547103766512 2,9 7830 10 3,11 1,83 0,1433 1,3901
547103766490 2,4 6480 10 3,11 1,83 0,1186 1,1505
547103766482 1,7 4590 20 6,23 1,83 0,0840 3,2597
547104053797 1,2 3240 2 0,62 1,91 0,0619 0,0240
Kabel Obstig 500 57 0,193 0,0010 3,1353
TOTAL 183 41,5918
PETA REAL
547103959167 4 10800 10 0,71 1,83 0,1976 0,0997
547103939177 5 13500 10 0,71 1,83 0,2471 0,1247
547103791774 4,5 12150 20 0,71 1,83 0,2223 0,4488
547103827582 1 2700 20 0,71 1,83 0,0494 0,0997
547103898466 1,5 4050 16 0,71 1,83 0,0741 0,0957
547103766504 2,5 6750 10 0,71 1,83 0,1235 0,0623
547103791741 3 8100 20 0,71 1,83 0,1482 0,2992
547103791733 3,5 9450 25 0,71 1,83 0,1729 0,5454
547103791766 3,4 9180 10 0,71 1,83 0,1680 0,0848
547103766512 2,9 7830 10 0,71 1,83 0,1433 0,0723
547103766490 2,4 6480 10 0,71 1,83 0,1186 0,0598
547103766482 1,7 4590 20 0,71 1,83 0,0840 0,1696
547104053797 1,2 3240 2 0,71 1,91 0,0619 0,0012
Kabel Obstig 500 13,00 0,193 0,0010 0,1631
TOTAL 183 2,1634
IN
TABEL 8
Losses Pada Hantaran Netral Sebel um Pemerataan Beban Jurusan C
TABEL 9
Losses Pada Hantaran Netral Sesudah Pemerataan Beban Jurusan C
Losses
(Watt)
Ohm/Km R (ohm)
Losses
(Watt)
ID PEL
PANJANG JTR(cm)
I
NMAX
I
N
Ohm/km R (ohm)
ID PEL
PANJANG JTR(cm)
I