Professional Documents
Culture Documents
Tegangan Lentur = ?
Tegangan Geser = ?
Penyelesaian:
Data E19
Fb = 44 MPa (Kuat lentur).
Fv = 5,6 MPa (Kuat geser).
Koreksi:
Lentur b = 0,85.
Geser v = 0,75.
Layan = 0,80.
Fb = . b . Fb = 0,80 . 0,85 . 44 = 29,92 MPa.
Fv = . v . Fv = 0,80 . 0,75 . 5,6 = 3,36 MPa.
Asumsi: SF = 1,2 maka:
Beban merata menjadi 1,2 0,64 kN/m = 0,768 kN/m.
Akibat qDL
Akibat P
Cek Lendutan:
Lendutan akibat beban merata (qDL = 0,768 kN/m):
I = (1/12) . b . h3.
I = (1/12) (80 mm) (100 mm)3 = 6.666.666,667 mm4.
E = 18.000.
= (5/384) (qDL . L4) / (EI)
= (5/384) {(0,768 kN/m . (3.400 mm)4) / (18.000 6.666.666,667 mm4)}
= 11,136 mm.
Total Lendutan:
total = merata + terpusat
total = 11,136 mm + 50,5 mm = 61,636 mm.
total = 61,636 mm > Syarat Lendutan = 3.400 mm/250 = 13,6 mm Tidak
OKE!
Ditanya: Besarnya:
-
Mmaks = ?
P=?
Penyelesaian:
Data E23
Fb = 56 MPa (Kuat lentur).
Ft = 53 MPa (Kuat tarik sejajar serat).
Koreksi:
Lentur b = 0,85.
Tarik sejajar serat t = 0,80.
Layan = 0,80.
Fb = . b . Fb = 0,80 . 0,85 . 56 = 38,08 MPa.
Ft = . t . Ft = 0,80 . 0,80 . 53 = 33,92 MPa.
Akibat qDL
Akibat P
Cara lain:
Akibat qDL
Akibat P1
Akibat P2
Besar P:
Mmax = 2,816475 kN.m + (1,4 m . P) kN.m.
Mmax = 2.816.475 N.mm + (1.400 mm . P) N.mm.
Wx = (1/6) . b . h2 = (1/6) . (100 mm) . (150 mm)2 = 375.000 mm3.
P = 3 kN = 3.000 N.
A = (10 15) cm2.
A = (100 150) mm2.
A = 15.000 mm2.
P/A = 3.000 N / 15.000 mm2.
P/A = 0,2 N/mm2.
1 = Ft / Fb
1 = 33,92 MPa / 38,08 MPa = 0,890756302 0,891.
1 = 0,890756302 0,891.
Ftotal = 0,891 . (M/W) + (P/A) Ftotal Ft = 33,92 MPa, Ftotal Fb = 38,08 MPa.
38,08 MPa = 0,891 . {(2.816.475 N.mm + (1.400 mm . P) N.mm) / 375.000 mm3}
+ 0,2 N/mm2.
Dari persamaan di atas, diperoleh P = 9.375,918531 N 9,375 kN.
Ditanya: Besarnya:
-
Penyelesaian:
Data E18
Fb = 42 MPa (Kuat lentur).
Ft = 39 MPa (Kuat tarik sejajar serat).
Fc = 35 MPa (Kuat tekan sejajar serat).
Koreksi:
Lentur b = 0,85.
Tarik sejajar serat t = 0,80.
Tekan sejajar serat c = 0,90.
Layan = 0,80.
= Lk / i
= 3.602 mm / 28,86751346 mm.
= 124,77694 125 < 175 OKE!
= 125 = 5,00.
Fc = . (P1/A)
Fc = 5,00 . (P1/15.000 mm2).
25,2 MPa = 5,00 . (P1/15.000 mm2).
25,2 N/mm2 = 5,00 . (P1/15.000 mm2).
P1 = (25,2 N/mm2 15.000 mm2) / 5,00.
P1 = 75.600 N = 75,6 kN.
-
tr// = P2 / Anetto
Ftr// = tr// = 50.400 N / 15.000 mm2.
Ftr// = tr// = 3,36 N/mm2 < Ftr// = 24,96 MPa OKE!
INDONESIA