Dewatering System Excavation & Levelling Pile head cut off & treatment

sub-struct ure (pile caps & foundation )

Formation level compacting & blinding

Blinding between Pile Caps

Waterproofing & protection of Pile head & PCC Shutter for Raft Concreting of Pile Cap & Raft Slab

Rebar of Pile Cap & Raft Slab

Installation of Slip Form System

Core Walls (1)

Core Walls (2)

super -structure
Slab (1) Verticals (1) Slab(2) Verticals (2)

Staircase (1)

Staircase (2)

External Plaster

External finishes
External Paint

1st fix

final fix -Installation of Glass/Shutter

windows & curtain walls

-Installation of Frames

balconies envelope

Plaster

Waterpro ofing

Floor Tile

Paint Prime

Paint 1st Coat

Aluminium Cladding Works

other finishes

Granite Cladding Works

Perforated Metal Works

Finishes to Crane area after removal

final finishes

Finishes to Hoist area after removal

Block & plaster

Block Work

Internal Plaster

Staircase

Staircase Finishes

sanitaryware , vanity & toilet accessories

Installation of Bath Tubs

Vanity Unit

Sanitary Ware & Toilet Accessories

Sink Tops & Accessories

Metal Doors Metal Work

Structural Steel Canopy

tiling work

Wall Tile in Wet Area

Wet Area Waterproofing

Floor Tile in Wet Area

Floor Tile in Room

interior finishes

Wall Tile in Corridor / Lift Lobby

Marble Floor Lift Lobby

Kitchen Cabinet carpentry & joinery Door Subframes Door Frames & Architrives Door Shutter & Ironmogery

Wardrobes

painting & decoration work

Preparation ,Primer & Stucco

1st Coat Paint -

Final Coat Paint

suspended ceiling

Ceiling Grid Works (Corridor/Rooms)

Ceiling Paster Board & Access Panels

Ceiling Grid Works (Wet Area)

Ceiling Tile Installation (wet area)

Traffic deck coating

Traffic deck coating (2nd BS to 3rd Fl.)

1st

2nd

Final Duct Connection of FCU

final

Buy SmartDraw!- purchased copies print this document without a watermark . Visit www.smartdraw.com or call 1-800-768-3729.

HVAC system

Installtion & Insulation of Ducts

FCU FCU Installation CHW Pipe Connection of FCU Grills & Diffusers

1st Install & Insulate Chilled Water Pipes

2nd

final

mechanic al

ChW Pipe Testing

Water Supply Pipe Installation piping system Fire Fighting Pipes Installation

Installation &Connection of Water Heater

Installation of Sprinkler Heads

Drain Pipes Installation

1st fix LV & ELV System electrical Install floor LV / ELV Conduits Install Walls LV / ELV Conduits

2nd Wiring & Cabling

final Switches / Sockets Light Fitting Installation

AHU Installation - 4th Fl HVAC system mech plant room

mechanical plant rooms

Installation of Heat / ChW Pump-Roof FL

Install ChW Risers Insulation of ChW Risers

Install Drainage Risers Mechanical Riser

Install HVAC Risers

Install Fire Risers

Install water supply Risers

Installation of Supports for Busbar Risers Risers Busbar Risers Installation of Busbar

Installation of ELV System Riser

emergency low voltage system

Fire & Voice Alarm Cables IT cables ELV System Riser BMS Cables

Building management system

Security cables

Lift 1st fix (Supports & Guide rails)

Lift builders work LIFTS Installation & Commisioning of Lift (PS)

Installation of Garbage Chute System-all levels OTHER SYSTEMS

Fcade cleaning system (PS)

Roof water proofing works-4th FL

Top Roof Water proofing-TRF Roof works Planter Box Works-4th FL

Roof lanscaping works-4th FL

Testing& Commisionin g

Testing& Commisioning of MEP Services

External Pavement Works external work External Lanscaping Works

snagging

snagging & handing over

Final Cleaning & Handing Over

Final Cleaning & Handing Over