Professional Documents
Culture Documents
PEKERJAAN
KEGIATAN
KONSULTAN
TAHUN ANGGARAN
No
I
A
URAIAN PEKERJAAN
1
1
1
1
1
TENAGA PENDUKUNG
1 juru Bor
2 Asisten Juru Bor
3 Juru Hitung
4 Surveyor
5 Draftman
6 Tenaga Administrasi & Keuangan
7 Pengolah Data/Operator Komputer/Typist
MM
MM
MM
MM
MM
MM
MM
1
2
1
2
1
1
1
Unit/Bln
Bln
Bln
2
1
1
B
B1
JUMLAH
MM
MM
MM
MM
MM
A2
SATUAN
II
A1
Peralatan
1 Sewa Komputer + printer
2 Telpon
3 Sewa kendaraan roda empat
Bahan (ATK)
1 Kertas HVS A4
2 Disket
3 Kertas Kalkir/gambar
4 Disk Cleaner
5 Tinta Printer Black
6 Tinta printer Warna
Rim
Box
Ls
Buah
Buah
Buah
4
1
2
1
3
1
OH
OH
OH
OH
1
1
1
1
B2
B3
C
C1
5 Ahli Terowongan
6 Juru Hitung
7 Draftman
8 Surveyor
OH
OH
OH
OH
1
1
1
2
Survey Topografi
1 Longitudinal profile survey
2 Cross section survey
M
M
200
200
Investigasi Geologi
1 Pemboran Inti
2 SPT
3 Permeability Test
4 Test Pit
5 Mobilisasi dan Demobilisasi
6 Laboratorium Test
- Unconfined Compressive Strength Test
- Poisson Ratio Test
- Sieve Analisys
- Modulus Elastisity Test
- Compaction Test
- Specific gravity and absorption test
- Natural Water Content Test
- Permeability Test
- Unit Weihgt Test
- atterberg Limit Test
- Triaxtial Test
- Direct Shear Test
- Consolidation Test
- Ultra Sonic Test
M
kali
kali
titik
ls
100
10
10
3
1
ls
Sample
Sample
Sample
Sample
Sample
Sample
Sample
Sample
Sample
Sample
Sample
Sample
Sample
5
5
5
5
5
5
5
5
5
5
5
5
5
5
PENGADAAN LAPORAN
Dokumentasi Teknis
1 Laporan Pendahuluan
2 Laporan Bulanan
3 Draft Laporan Akhir Rancangan
4 Laporan Akhir & Gambar
5 Dokumentasi Album
eks
eks
eks
eks
Album
5
15
10
10
1
Rencana Kemajuan
Realisasi Kemajuan
Deviasi
JUMLAH TOTAL
PPN (10%)
JUMLAH TOTAL
JUMLAH TOTAL
Perminggu
Kumulatif
Perminggu
Kumulatif
K MEKANIK
AN PEMULIHAN LINGKUNGAN BIDANG PERTAMBANGAN
WAKTU
LAYANAN
HARGA
SAT (Rp)
TOTAL
(Rp)
BOBT
%
Juli
26-31
6
3.0
2.5
2.5
2.5
2.5
5,500,000.00
4,400,000.00
4,400,000.00
4,400,000.00
4,400,000.00
16,500,000.00
11,000,000.00
11,000,000.00
11,000,000.00
11,000,000.00
10.638
7.092
7.092
7.092
7.092
0.709
2.5
2.5
2.5
2.5
2.5
3.0
3.0
1,450,000.00
1,450,000.00
1,450,000.00
1,450,000.00
1,200,000.00
950,000.00
850,000.00
3,625,000.00
7,250,000.00
3,625,000.00
7,250,000.00
3,000,000.00
2,850,000.00
2,550,000.00
2.337
4.674
2.337
4.674
1.934
1.837
1.644
0.379
3.0
3.0
3.0
475,000.00
225,000.00
1,950,000.00
2,850,000.00
675,000.00
5,850,000.00
1.837
0.435
3.772
0.122
0.029
0.251
45,000.00
45,000.00
190,000.00
25,000.00
300,000.00
325,000.00
180,000.00
45,000.00
380,000.00
25,000.00
900,000.00
325,000.00
0.116
0.029
0.245
0.016
0.580
0.210
0.008
0.002
0.016
0.001
0.039
0.014
30.0
25.0
20.0
20.0
50,000.00
40,000.00
40,000.00
40,000.00
1,500,000.00
1,000,000.00
800,000.00
800,000.00
0.967
0.645
0.516
0.516
0.122
0.110
23.0
20.0
20.0
21.0
40,000.00
40,000.00
40,000.00
40,000.00
920,000.00
800,000.00
800,000.00
1,680,000.00
0.593
0.516
0.516
1.083
7,500.00
7,500.00
1,500,000.00
1,500,000.00
0.967
0.967
200,000.00
185,000.00
150,000.00
185,000.00
7,200,000.00
20,000,000.00
1,850,000.00
1,500,000.00
555,000.00
7,200,000.00
12.894
1.193
0.967
0.358
4.642
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
120,000.00
250,000.00
600,000.00
600,000.00
600,000.00
600,000.00
600,000.00
600,000.00
600,000.00
600,000.00
600,000.00
600,000.00
600,000.00
600,000.00
600,000.00
1,250,000.00
0.387
0.387
0.387
0.387
0.387
0.387
0.387
0.387
0.387
0.387
0.387
0.387
0.387
0.806
25,000.00
20,000.00
55,000.00
65,000.00
145,000.00
125,000.00
300,000.00
550,000.00
650,000.00
145,000.00
0.081
0.193
0.355
0.419
0.093
155,105,000.00
15,510,500.00
170,615,500.00
170,615,000.00
100.000
JUMLAH TOTAL
PPN (10%)
JUMLAH TOTAL
JUMLAH TOTAL
Perminggu
Kumulatif
Perminggu
Kumulatif
1.8
I
Agustus
1-7
8-16
Agusus
26-31
17-25
JADWAL PELAKSANAAN
II
September
1-7
8-16
17-24
0.827
0.645
0.552
0.645
0.645
1.064
0.829
0.829
0.829
0.829
1.064
0.829
0.829
0.829
0.829
0.709
0.553
0.553
0.553
0.553
0.827
0.645
0.645
0.645
0.645
1.064
0.829
0.829
0.829
0.829
0.946
0.737
0.737
0.737
0.737
0.212
0.425
0.212
0.442
0.143
0.128
0.273
0.546
0.273
0.568
0.226
0.184
0.164
0.273
0.546
0.273
0.568
0.226
0.184
0.164
0.182
0.364
0.182
0.379
0.151
0.122
0.110
0.212
0.425
0.212
0.442
0.176
0.143
0.128
0.273
0.546
0.273
0.568
0.226
0.184
0.164
0.243
0.486
0.243
0.505
0.201
0.163
0.146
0.143
0.034
0.293
0.184
0.044
0.377
0.018
0.004
0.377
0.122
0.029
0.251
0.143
0.034
0.293
0.184
0.044
0.377
0.163
0.039
0.335
0.009
0.002
0.019
0.001
0.045
0.016
0.012
0.003
0.024
0.002
0.058
0.021
0.012
0.003
0.024
0.002
0.058
0.021
0.008
0.002
0.016
0.001
0.039
0.014
0.009
0.002
0.019
0.001
0.045
0.016
0.012
0.003
0.024
0.002
0.058
0.021
0.010
0.003
0.022
0.001
0.052
0.019
0.281
0.281
0.187
0.218
0.193
0.193
0.129
0.141
0.164
0.211
0.406
0.406
0.271
0.363
0.363
0.363
0.363
0.242
0.242
2.149
0.199
0.161
0.060
0.774
2.507
0.232
0.188
0.070
0.903
3.224
0.298
0.242
0.089
1.161
2.865
0.265
0.215
0.080
1.032
0.193
5.44
8.94
0.064
0.064
0.031
0.031
8.836
9.446
10.183
12.563
11.076
III
September
25-30
Oktober
8-16
1-7
7
0.709
0.553
0.553
0.553
0.553
9
0.827
0.645
0.645
0.645
0.645
Komu
Latif
17-23
7
1.064
0.829
0.829
0.829
0.829
Kete
Rangan
100
0.827
90
0.182
0.364
0.182
0.379
0.151
0.122
0.110
0.212
0.425
0.212
0.442
0.176
0.143
0.128
0.273
0.546
0.273
0.226
0.184
0.164
0.176
0.143
0.128
80
0.122
0.029
0.251
0.143
0.034
0.293
0.184
0.044
0.377
0.143
0.034
0.293
0.008
0.002
0.016
0.001
0.039
0.014
0.009
0.002
0.019
0.001
0.045
0.016
0.012
0.003
0.024
0.002
0.058
0.021
0.009
0.002
0.019
0.001
0.045
0.016
0.176
0.205
0.264
70
60
50
0.162
0.141
0.141
0.189
0.164
0.164
0.243
0.211
0.211
40
2.149
0.199
0.161
0.060
0.774
30
0.179
0.179
0.179
0.179
0.179
0.179
0.179
0.179
0.179
0.179
0.179
0.179
0.179
0.372
0.208
0.208
0.208
0.208
0.208
0.208
0.208
0.208
0.208
0.208
0.208
0.208
0.208
0.434
20
10
0.064
0.355
0.419
0.031
11.547
9.572
8.053
2.352