HABILITADO Y ARMADO - VIGA UND KG METRADO

90,000.00

ACTIVIDAD 01

CU 0

PARCIAL 0

ANALISIS DE COSTO UNITARIO RECURSOS OPERARIO OFICIAL SOLDADOR MATERIAL 1 MATERIAL 2 HH HH HH M2 KG UND CUAD 1 1 0 CANT. UNIT. 0.01 0.01 PRECIO UNITARIO

CM

# CUADRILLAS TOTAL X CUADRILLA

5 2

SOLDEO - VIGA UND KG METRADO


90,000.00

ACTIVIDAD 01

CU 0

PARCIAL 0

ANALISIS DE COSTO UNITARIO RECURSOS OPERARIO OFICIAL SOLDADOR MATERIAL 1 MATERIAL 2 HH HH HH M2 KG UND CUAD 0 0 1 CANT. UNIT. 0.02 PRECIO UNITARIO

CM

# CUADRILLAS TOTAL X CUADRILLA

9 1

LIMPIEZA MECANICA - VIGA

ACTIVIDAD 01

UND KG

METRADO
90,000.00

CU 0

PARCIAL 0

ANALISIS DE COSTO UNITARIO RECURSOS OPERARIO OFICIAL SOLDADOR MATERIAL 1 MATERIAL 2 HH HH HH M2 KG UND CUAD 0 1 0 CANT. UNIT. 0.0101 PRECIO UNITARIO

CM

# CUADRILLAS TOTAL X CUADRILLA

6 1

DUR 17.63

REND/DIA 1,021.26

JORNADA 8

REND/HH 63.8

PRECIO PARCIAL 0 0 0

METRADO 90000 90000 90000

CANTIDAD TOTAL 705.0 705.0 0 0 1,410.0

COSTO TOTAL 0 0 0 0 0 0

DUR 18.88

REND/DIA 529.54

JORNADA 8

REND/HH 66.2

PRECIO PARCIAL 0 0 0

METRADO 90000 90000 90000

CANTIDAD TOTAL 1,359.7 0 0 1,359.7

COSTO TOTAL 0 0 0 0 0 0

DUR 18.88

REND/DIA 794.31

JORNADA 8

REND/HH 99.3

PRECIO PARCIAL 0 0 0

METRADO 90000 90000 90000

CANTIDAD TOTAL 906.4 0 0 906.4

COSTO TOTAL 0 0 0 0 0 0