Your company has bagged a lucrative contract to construct a housing colony for an Industrial Group to be located in Western Maharashtra on coastal belt. You as a Project Manager have been asked by the company to evolve Organisation Structure with following conditions. Organisation should be as lean and thin as possible with bare minimum of personnel on company roll upto Junior Engineer Level All supervisors to down below will be temporary for project duration only to be recruited locally from 100 Km radius. Suggest and discuss an organisation structure denoting responsibility, authority, communication control for all facets of construction work and management functions as visualised by you. Housing colony consists of 10 Bungalows for senior executives, 20 Apartments in five buildings, 100 dwellings for white collar workers and 300 dwellings for blue coloured workers. Colony will have market and entertainment complex.

NICMAR-SODE/PGPM

Page 1

ABSTRACT

Management in Organisation 2012

This assignment is about Management in an Organisation for a Residential Housi ng Project. A Housing colony generally compromises of building blocks which are categorized based on grade of personnel working in the firm. This grade varies from senior executive to blue collared workers.

The rational of organizational management is to facilitate the application of knowledge, skills, tools and techniques to project activities to meet project requirements in terms of Scope, Cost, Time, Quality, Participant satisfaction. In organizational management, the important steps include:

1. Choosing the right people 2. Setting up the right organization 3. Using the right system

The concept of how to choose the right people for the task and how to set up the right organization was also discussed in this study. There are many organizational structures and each one of them has its own application, advantages and drawbacks. Selecting the appropriate structure for an organization will therefore be dependent on the task, the size of the firm, the subordinates, the managers and the environment. Managers, in choosing the right organizing structure, need to study its vision, mission and its strategic intent and then strive to pick strategies and structures that are congruent. In choosing the right people for the team, managers need to define what kinds of skills are required, what kinds of individuals required in what time frames and then select the right people

INTRODUCTION

Management of materials and information flows are key strategic priorities for construction firms. Sound performance in these two areas can provide them with significant benefits and allow the adding of value for clients.

NICMAR-SODE/PGPM

Page 2

The introduction of supply chain management in construction is intended to integrate processes, manage interfaces between companies in projects, reduce uncertainties and weed out inefficiency as much as possible. The elimination of waste and inefficiency from the supply chain builds in value in the process.

Management in Organisation 2012

Similarly, Sir John Egan reaffirmed the aforementioned recommendations in his report title Rethinking Construction (Egan, 1998: 16). The report identified five key drivers of change, namely:

Committed leadership Focus on the client Integrated processes and teams Quality driven agenda, and Commitment to people.

The present assignment paper is done by keeping in mind the above factors for attaining the best and profitable output.

PROJECT- SCOPE OF WORK

The project is about construction of a housing colony for an industrial group in Western Maharashtra in a coastal belt. There are three main aspects to be studied in the course of project namely man power, materials and expectation of the client.

1.

The colony may be divided into three blocks tabulated as,

Block A

Area (Sqm) 120/Block

Personal Senior Executives

Nos. 90

B C

100 80

White Collared Workers Blue Collared Workers

100 300

Remarks 10 Bungalows comprising of Two Apartments Each Individual House Individual House

NICMAR-SODE/PGPM

Page 3

Management in Organisation 2012 2. Apart from the housing it is also proposed to build an entertainment complex and a market. 3. Entertainment complex comprises of a theatre and a multi-purpose hall and a small park at the entrance. Considering on the economical basis the market can be also kept inside the complex as a shopping mall.

Considering the fact that the local labours can be engaged in the field of work due to the following facts; a. No permanent accommodation is required for local workers. b. Only travel arrangements can be made on demand as the people are around 100KM radius from the work site and c. The number of labours can be altered in the work load.

Apart from these as all the materials and are purchased from the nearby market and availability of materials can be made on demand and there will be an assured supply of materials.

NICMAR-SODE/PGPM

Page 4

SITE ORGANISATION STRUCTURE

Management in Organisation 2012

Project Manager
Manager (Contracts)
Assistant Manager (Scheduler) Qunatity Surveyor MEP Qunatity Surveyor Document Controllers

Manager (Engineering and Design)


Assistant Manager (Design) Assistant Manager (Quality Control) Project Engineer (Safety)

Manager (Construction)
Construction Manager (Civil & Structure) Assistant Project Manager (Civil) Manager Services (MEP) Site Engineers

Manager (Procurement)
Assistant Manager (Logistics) Assistant Manager (Accounts & Administration) Assistant Manager (Supply Chain Management)

NICMAR-SODE/PGPM

Page 5

The above organization chart is prepared keeping in mind Basic Design and Engineering is provided by Client-Architect. We have not considered the Client Organisation requirement in above Structure. This Structure is applicable for Contractor Organisation deployed at site only. The top most position in any project is the project manager. The orders are executed by the junior engineers through their senior engineer who is guided by the construction manager. The functions of the personnel are discussed briefly below

Management in Organisation 2012

PROJECT MANAGER The project manager is a leader of the team. The project manager will have clear idea about all the process that takes place in the project. He should be influencing the team to follow in the achievement of a common goal. He should be able to identify the delay if it is occurred and should be able to rectify it. He is answerable to the top level management of the firm and to the clients. MANAGER (Contracts Administration) The function of a Manager (Contracts) is to regularise the work flow in the project. He forms a planning department under which all the essentials of the project are been maintained and recorded. The Manager (Contracts) being the head of the planning department has to keep up the above mentioned functions. He is assisted by:

Assistant Manager (SCHEDULERS): Prepares the work flow for a project. Assistant Manager (QUANTITY SURVEYS-Civil): Preparing and checking Bills of Quantity related to all the civil and structure work on site. Assistant Manager (QUANTITY SURVEY- Services): Preparing and checking Bills of Quantity related to all the Service work i.e. MEP on site. Assistant Manager (DOCUMENT CONTROLLERS): Maintains all the records of the project

MANAGER (ENGINEERING & DESIGN) The Manager (E &D) makes the plan and does the design of every single member of a structure that has to come in the project.
Page 6

NICMAR-SODE/PGPM

As for the residential project, he does prepare the layout of the entire colony with specification of the every single apartment and bungalow allocated as per the specification proposed by the clients. He prepares the drawings which provide all the essentials for the structure.

Management in Organisation 2012

Assistant Manager (Design): He will take care and assist Manager for design related calculation and drawing preparations. Assistant Manager (QC INSPECTOR): He takes care in examining the quality of the all the products from reinforcement, concrete to a completed building. Project Engineer (SAFETY): He assures the safe working condition prevails in the site to all the people working in the site. Thus he assures that the risk factors in the site are minimized and a safe working environment is provided.

4. MANAGER (Construction- Civil & Structure) He is the head of the execution department. The main function of the execution department is to execute the orders received from the planning department. The most active post in the organisation is the construction manager since he decides upon the plans proposed on assumed working conditions and executes them under the actual working conditions. He has a team consisting of engineers ad his sub-ordinates for various works in the field.

Construction Manager (Civil): He is the head of civil work over site, report to Manager (Construction- Civil& Structure) and responsible for all construction related issues accept the structure as that part is headed by his hierarchy boss.

Assistant Manager (Structure): He will be responsible for allocating duties to supervisory staff as well as idle labour for works related to Structure.

Manager- Service (MEP): He will be responsible for all Service related work on site.

Site Engineers: They are responsible for looking after site execution work under the guidance of their respective managers.
NICMAR-SODE/PGPM Page 7

5. MANAGER (Procurement)

Management in Organisation 2012

The commercial Manager looks after finance, administration and HR related work Banking and managing cash flow Site Legal matters General books of account maintenance Subsidiary records Financial reports Payment of invoices Billing Personnel records Payrolls and records Wage and personnel reports to public agency

Assistant Manager (Logistics): He will be responsible for logistical and delivery of material to site. He will provide the status of material in transit.

Assistant Manager (Accounts and Administration): He will be responsible for all accounts and administration work for company and supporting hand for Manager (Procurement)

Assistant Manager (Supply Chain Management & HR): He will be responsible for material and manpower supply flow to site and checks for idle labour on site. He will also look after HR work for Manager (Procurement)

NICMAR-SODE/PGPM

Page 8

NOS OF PERSONNEL IN ORGANISATION STRUCTURE


S.No 1 2 Positions Project Manager

Management in Organisation 2012 Nos. 1 1

5 6 7

8 9 10

Qualification and Experience Min. BE (Civil) with 20-25 years of Experience in Civil Industry Manager (Contracts) Min. BE (Civil) with 15-18 years of Experience in Civil Industry and almost 5 years of experience in handling contracts Manager (Engineering Min. M.Tech (Strcuture) with 15-18 years of & Design) Experience in Structure Design of Residential Complex Manager (ConstructionMin. B.Tech (Civil) with 15-20 years of Civil & Structure) Experience in Residential Complex construction related work Manager (Procurement) Min. 10-12 years of exp in the field of HR, Materials, Logistics, Accounting Construction Manager Min. 10-12 years of exp in the Civil and structure work Quantity Suveryors Min. 7-8 Years of experience in Estimation surveying in respective field of Civil and MEP Assistant Manger Min 5-8 years of experience in Construction (Civil) Industry Assistant Manager Min 5-8 years of of exp in handling complex (Accounts and Admin.) Civil projects Project Engineer Min 2-5 years exp in Construction Projects :6 : 12

1 1 2

6 2 2

The number of Professional Personnel The numbers of junior manager The number of skilled labours The number of unskilled labours

: 20 (This may vary on demand) : 80 (This may vary on demand)

Hence total Senior executive and labours required Total= 118 persons min.

INFORMATION FLOW AMONG SITE FUNCTIONS

As discussed above the breakdown in an organisation can be categorized four departments namely, 1. Planning Department, 2. Commercial department,
NICMAR-SODE/PGPM Page 9

3. Engineering and Design Department and 4. Execution department.

Management in Organisation 2012

Planning Department The Planning team would work on the Project schedule, sequence material and activities, initial site mobilisation activities planning, Site Layout, Town Planning and Connectivity. The Planning team would ensure that the basic infrastructure like Water and Electricity is made available to the units. The intention to club these two divisions is based on logical interpretation of the basic tenets on which the two teams work. A coordinative effort between these two divisions will ensure that that the product is ready for the execution team to deliver.

Commercial Department The team will work around the year to ensure that the required cash flows are maintained and also to ensure that the work doesnt get affected due to the inherent issues of managing the project. Booking to ensure that all the required books are to do the book keeping and also execute the plans Store, Purchase and logistics management at site

Engineering and Design department The Quality Team will have a structure as follows: Quality Control plays a very vital role in a project. Hence, it would be critical to have a Quality team member involved in every critical aspect of the project. A team member would be involved in the Engineering Drawing and Interface with Engineering Consultants, one team member in Architecture and one in Execution.

Execution department The primary thing that has to be realized is that execution is a very critical team for the success of the organization. This team has to be closely monitored and should also be given enough flexibility to allow intelligent deviations from the plan and also should be flexible enough to incorporate the changing conditions in the environment.

NICMAR-SODE/PGPM

Page 10

Information and Material flow chart as shown in the flow chart below among construction site, Consultants and Clients;

Management in Organisation 2012

Design and Studies

Consultant

Client
Use

Need

Contractor
Management

Site Execution and Handing Over after QC Approval

Fabrication Part Production Material Production

Sub-Contractor

Information Flow i.e. Orders, Programs, Estimates, Procedure etc. Resource Flow i.e. Supplies, Finished Products, Equipments etc

Thus it is very clear from the flow chart that in the field of construction there is no unidirectional flow of orders or communication it is a must that a for an efficient project there is a must that all should be knowing the happenings around them so as that the problems can be discussed and hurdles are overcome.

So as a result the client is pleased and at the same times the work progress is also maintained at the same ratio. As a result for the company time efficiency is gained which at the days end earns a lot of profit and fame for the concern.
NICMAR-SODE/PGPM Page 11

RECOMENDATION

Management in Organisation 2012

Construction is a labour-intensive industry, which places heavy reliance upon the skills of its workforce; In the construction sector, a very fast employment growth is expected. Additionally, excellent job opportunities will exist as number of job opening exceeds the numbers of qualified applicants. Thus, the retention of good people is very crucial. Good manpower planning is necessary. Storage of workforce results in delays leading to a cost escalation. Availability of workforce differs from region to region. Even the cost of man hours is different in different places. This it is necessary to keep these factors in mind before processing with project. Pre-planning for the manpower should be done with a proper estimation of required personnel. This will be great help to avoid labour related uncertainties. The structure of site organisation should be such that is able to focus on its core activities and outsourcing is cost effective. Communication is very important aspect. It is recommended to use the e-mail and communication tool effectively.

BIBLIOGRAPHY
Hinks, J., Aouad, G., Cooper, R., Sheath, D., Kagioglou, M. and Sexton, M. (1997) IT and The Design and Construction Process: A Conceptual Model of Co-Maturation. Towers, David. "Human Resource Management essays". Retrieved 2007-10-17. The international journal of construction IT, July Construct IT report. (1995) Occasional Paper No. 1: A Process-Based Study of an IT Research Work Plan, University of Salford. Jonathan E. DeGraff (21 February 2010). "The Changing Environment of Professional HR Associations". Cornell HR Review. Retrieved 21 December 2011. Wright, Patrick. "The 2011 CHRO Challenge: Building Organizational, Functional, and Personal Talent". Cornell Center for Advanced Human Resource Studies (CAHRS). Retrieved 3 September 2011. Conaty, Bill, and Ram Charan (2011). The Talent Masters: Why Smart Leaders Put People Before Numbers. Crown Publishing Group. ISBN 978-0-307-46026-4. "Human Resources, Training, and Labor Relations Managers and Specialists". U.S Bureau of Labor Statistics. 2011.