You are on page 1of 3

Doc No:

EVI-EP-02 30/01/2012 00 As Needed Page 1 of 3

Environmental Management System


Waste Management Plan
Preparation: EMR Authority: Director Issuing Dept: ISO

Initial Issue Date Revision Date: Revision No. Next Revision Date: Page:

PT. ENVITECH PERKASA Environmental Instruction

Prepared by:

Reviewed by:

Approved by:

SSU

SSU

MSJ

Doc No:

EVI-EP-02 30/01/2012 00 As Needed Page 2 of 3

Environmental Management System


Waste Management Plan
Preparation: EMR Authority: Director Issuing Dept: ISO

Initial Issue Date Revision Date: Revision No. Next Revision Date: Page:

Date: 30/01/12 Issued

Revision: SSU

Made by:

Doc No:

EVI-EP-02 30/01/2012 00 As Needed Page 3 of 3

Environmental Management System


Waste Management Plan
Preparation: EMR Authority: Director Issuing Dept: ISO

Initial Issue Date Revision Date: Revision No. Next Revision Date: Page:

1. Purpose
This instruction describes how to prepare and implement an Management Plan (WMP) for individual construction project as required. enhanced Waste

2. Scope
This instruction applies to construction project that a WMP is required by contract or as required by the Companys initiative and commitment to waste reduction.

3. Procedure
3.1. If a WMP with specified format is required by the client, EP shall prepare the WMP according to the contract requirements and relevant documents supplied by client. 3.2. If there is no specified format for the WMP from the client, EP shall prepare the WMP according to the company guidelines as shown in Appendix 1 of this Instruction, which is provided for the purpose of reference. Project Manager shall determine the most suitable contents for the WMP based on the company guidelines and contractual requirements, whereas the stricter requirement shall be followed.

4. Monitoring and Checking


Project Manager shall responsible for the adequacy and suitability of the WMP and update it as necessary. Project Environmental Officer/Engineer shall maintain and follow the requirements of WMP to perform environmental performance inspection or other monitoring programmes.

5. Record
Record Description Waste Management (WMP) Plan Record Location/ Retention Project Manager Minimum Retention 3 years after the date of completion of project

6. Appendix
Appendix 1 : Waste Management Plan