Building Information - Forest Hills Local SD (47340) - Nagel Middle School (135830)

Program Type: Setting: Assessment Name: Assessment Date: Cost Set: Building Name: Building Address: Building City: Building Zipcode: Building Phone: Acreage: Current Grades: Teaching Stations: Number of Floors: Student Capacity: Current Enrollment: Enrollment Date:

Assessment Only Suburban 135830-Nagel Middle-FINAL 2004-07-12 2004 Nagel Middle School 1500 Nagel Road Cincinnati 45255 513-474-5407 35 7-8 72 2 1184 1209 2003-10-01

Enrollment Date is the date in which the current enrollment was taken. Number of Classrooms: Historical Register Buildings Principal: Building Type: Current Elementary Enrollment: Current Middle Enrollment: Current High Enrollment: Current Career Technical Enrollment: Next Page 64 NO Dona Gardner Middle 0 1209 0 0

Building Information - Forest Hills Local SD (47340) - Nagel Middle School (135830)

Page 1

Report Generated at 3 May 2005 06:46

Building Pictures - Forest Hills Local SD(47340) - Nagel Middle School(135830)

North elevation photo:

East elevation photo:

South elevation photo:

West elevation photo:

GENERAL DESCRIPTION 166,900 Total Existing Square Footage 1999 Building Dates 7-8 Grades 1,209 Current Enrollment 72 Teaching Stations 35 Site Acreage Nagel Middle School, which is not on the National Register of Historic Buildings, is a 1999, two story, 168,346 square foot brick and stone school building located in a suburban residential setting. The existing facility does not use modular buildings. The exterior wall construction of the facility is load-bearing masonry insulated cavity walls or steel frame with masonry insulated cavity wall infill. Interior walls are of load-bearing concrete masonry unit type wall construction or non-load-bearing metal stud and gypsum board partitions. The floor system consists of concrete slab on grade lower floors and concrete on metal form deck on steel beams for the second floor framing. The roof structure is a combination of steel trusses and steel joists. The roofing system of the facility is approximately 80% standing seam metal and 20% adhered membrane, installed in 1999. The ventilation system of the building is inadequate to meet the needs of the users. The classrooms are undersized in terms of the current standards established by the State of Ohio. Physical Education and Student Dining spaces consist of 8,950 SF Primary Gymnasium with 3,890 SF Auxiliary Gymnasium and separate Student Dining that is built in a cafetorium style. The electrical system for the facility is adequate. The facility is equipped with a compliant security system. The building has a compliant automatic fire alarm system. The facility is equipped with a compliant automated fire suppression system. The building does not contain asbestos or other hazardous materials. The overall building is compliant with ADA accessibility requirements. The school is located on a 35 acre site adjacent to residential properties. The property and athletic facilities are not fenced for security. Access onto the site is unrestricted. Site circulation is fair. There is dedicated space for school buses to load and unload on the site. Parking for staff, visitors and community events is adequate in quantity but somewhat remote from the building.

Building Pictures - Forest Hills Local SD(47340) - Nagel Middle School(135830)

Page 2

Report Generated at 3 May 2005 06:46

Previous Page Next Page

Building Pictures - Forest Hills Local SD(47340) - Nagel Middle School(135830)

Page 3

Report Generated at 3 May 2005 06:46

Building Information - Forest Hills Local SD (47340) - Nagel Middle School (135830)

Program Type: Setting: Assessment Name: Assessment Date: Cost Set: Building Name: Building Address: Building City: Building Zipcode: Building Phone: Acreage: Current Grades: Teaching Stations: Number of Floors: Student Capacity: Current Enrollment: Enrollment Date:

Assessment Only Suburban 135830-Nagel Middle-FINAL 2004-07-12 2004 Nagel Middle School 1500 Nagel Road Cincinnati 45255 513-474-5407 35 7-8 72 2 1184 1209 2003-10-01

Enrollment Date is the date in which the current enrollment was taken. Number of Classrooms: Historical Register Buildings Principal: Building Type: Current Elementary Enrollment: Current Middle Enrollment: Current High Enrollment: Current Career Technical Enrollment: Next Page 64 NO Dona Gardner Middle 0 1209 0 0

Building Information - Forest Hills Local SD (47340) - Nagel Middle School (135830)

Page 4

Report Generated at 3 May 2005 06:46

Building Construction Information - Forest Hills Local SD (47340) - Nagel Middle School (135830)

Name

Year Handicapped Access Floors Square Feet 2 166,900

Original Building 1999 yes Previous Page Next Page

Building Construction Information - Forest Hills Local SD (47340) - Nagel Middle School (135830)

Page 5

Report Generated at 3 May 2005 06:46

Building Component Information - Forest Hills Local SD (47340) - Nagel Middle School (135830)

Addition Original Building (1999)

Auditorium Corridors 30808

Agricultural Media Vocational Student Gymnasium Kitchen Natatorium Education Lab Center Space Dining 12840 Previous Page Next Page 4496 8950 3670

Building Component Information - Forest Hills Local SD (47340) - Nagel Middle School (135830)

Page 6

Report Generated at 3 May 2005 06:46

Career Technical Information - Forest Hills Local SD (47340) - Nagel Middle School (135830) No Career Technical Programs Present Previous Page Next Page

Career Technical Information - Forest Hills Local SD (47340) - Nagel Middle School (135830)

Page 7

Report Generated at 3 May 2005 06:46

Main Assessment Menu - Forest Hills Local SD (47340) - Nagel Middle School (135830)

Building Summary - Nagel Middle School (135830)


District: Name: Forest Hills Local SD Nagel Middle School Cincinnati,OH 45255 Bldg. IRN: 135830 Current Grades Proposed Grades Current Enrollment Projected Enrollment Addition Original Building Total *HA *Rating = Handicapped Access =1 Satisfactory =2 Needs Repair =3 Needs Replacement *Const P/S = Present/Scheduled Construction FACILITY ASSESSMENT Cost Set: 2004 A. Heating System B. Roofing C. Ventilation / Air Conditioning D. Electrical Systems E. Plumbing and Fixtures F. Windows G. Structure: Foundation H. Structure: Walls and Chimneys I. Structure: Floors and Roofs J. General Finishes K. Interior Lighting L. Security Systems M. Emergency/Egress Lighting N. Fire Alarm O. Handicapped Access P. Site Condition Q. Sewage System R. Water Supply S. Exterior Doors T. Hazardous Material U. Life Safety V. Loose Furnishings W. Technology X. Construction Contingency / Non-Construction Cost Rating 1 1 2 2 2 2 1 1 1 2 2 1 1 1 2 2 1 1 3 1 1 2 3 Date HA 1999 yes 7-8 N/A 1209 N/A Number of Floors 2 Acreage: Teaching Stations: Classrooms: County: Contact: Phone: Hamilton Dona Gardner 513-474-5407 By: By: Tony Zircher Bill Mentges Area: Cincinnati (1)

Address: 1500 Nagel Road

Date Prepared: 2004-07-12 Date Revised: 2005-04-22 35 CEFPI Appraisal Summary 72 64 Cover Sheet Section

Points Possible Points Earned Percentage Rating Category 100 200 100 200 200 200 1000 95 192 87 195 168 186 923 95% 96% 87% 98% 84% 93% 92% Excellent Excellent Satisfactory Excellent Satisfactory Excellent Satisfactory

Current Square Feet 1.0 The School Site 166,900 2.0 Structural and Mechanical Features 166,900 3.0 Plant Maintainability 4.0 Building Safety and Security 5.0 Educational Adequacy 6.0 Environment for Education Commentary Total Dollar C=Under Contract Assessment C $0.00 - Renovation Cost Factor $0.00 - Cost to Renovate (Cost Factor applied)

100.44% $2,374,075.30

$112,356.00 - The Replacement Cost Per SF and the Renovate/Replace ratio are only provided when this summary is $7,600.00 - requested from a Master Plan. $24,000.00 $8,690.00 $0.00 $0.00 $0.00 $375,680.00 $25,680.00 $0.00 $0.00 $0.00 $7,500.00 $200,000.00 $0.00 $0.00 $9,650.00 $0.00 $0.00 $166,900.00 $963,013.00 $462,606.13 $2,363,675.13 Previous Page

Total

Main Assessment Menu - Forest Hills Local SD (47340) - Nagel Middle School (135830)

Page 8

Report Generated at 3 May 2005 06:46

Main Assessment Menu - Forest Hills Local SD (47340) - Nagel Middle School (135830)

Original Building (1999) Summary


District: Name: Forest Hills Local SD Nagel Middle School Cincinnati,OH 45255 Bldg. IRN: 135830 Current Grades Proposed Grades Current Enrollment Projected Enrollment Addition Date HA 7-8 N/A 1209 N/A Acreage: Teaching Stations: Classrooms: County: Contact: Phone: Hamilton Dona Gardner 513-474-5407 By: By: Tony Zircher Bill Mentges Area: Cincinnati (1)

Address: 1500 Nagel Road

Date Prepared: 2004-07-12 Date Revised: 2005-04-22 35 CEFPI Appraisal Summary 72 64 Cover Sheet Section

Points Possible Points Earned Percentage Rating Category 100 200 100 200 200 200 1000 95 192 87 195 168 186 923 95% 96% 87% 98% 84% 93% 92% Excellent Excellent Satisfactory Excellent Satisfactory Excellent Satisfactory

Number of Floors Current Square Feet 1.0 The School Site Original Building 1999 yes 2 166,900 2.0 Structural and Mechanical Features Total 166,900 3.0 Plant Maintainability *HA *Rating = Handicapped Access =1 Satisfactory =2 Needs Repair =3 Needs Replacement *Const P/S = Present/Scheduled Construction FACILITY ASSESSMENT Cost Set: 2004 A. Heating System B. Roofing C. Ventilation / Air Conditioning D. Electrical Systems E. Plumbing and Fixtures F. Windows G. Structure: Foundation H. Structure: Walls and Chimneys I. Structure: Floors and Roofs J. General Finishes K. Interior Lighting L. Security Systems M. Emergency/Egress Lighting N. Fire Alarm O. Handicapped Access P. Site Condition Q. Sewage System R. Water Supply S. Exterior Doors T. Hazardous Material U. Life Safety V. Loose Furnishings W. Technology X. Construction Contingency / Non-Construction Cost Rating 1 1 2 2 2 2 1 1 1 2 2 1 1 1 2 2 1 1 3 1 1 2 3 4.0 Building Safety and Security 5.0 Educational Adequacy 6.0 Environment for Education Commentary Total Dollar C=Under Contract Assessment C $0.00 - Renovation Cost Factor $0.00 - Cost to Renovate (Cost Factor applied)

100.44% $2,374,075.30

$112,356.00 - The Replacement Cost Per SF and the Renovate/Replace ratio are only provided when this summary is $7,600.00 - requested from a Master Plan. $24,000.00 $8,690.00 $0.00 $0.00 $0.00 $375,680.00 $25,680.00 $0.00 $0.00 $0.00 $7,500.00 $200,000.00 $0.00 $0.00 $9,650.00 $0.00 $0.00 $166,900.00 $963,013.00 $462,606.13 $2,363,675.13

Total

Main Assessment Menu - Forest Hills Local SD (47340) - Nagel Middle School (135830)

Page 9

Report Generated at 3 May 2005 06:46

Facility Assessment

A. Heating System
Description:
The existing system for the facility is a natural gas hot water system, installed in 1999, and is in fair condition. The two hot water boilers, manufactured by Well McLain, were installed in 1999 and are in fair condition. Heating water is distributed to terminal units consisting of air handlers and VAV boxes. The terminal equipment was installed in 1999 and is in fair condition. The kitchen and locker rooms are equipped with heating only ceiling mounted cabinet heaters in fair condition. The teacher dining area is equipped with a heating and cooling unit ventilator in fair condition. The system complies with the 15 CFM per person fresh air requirements of the Ohio Building Code mechanical code and Ohio School Design Manual. The Johnson electric system temperature controls were installed in 1999 and are in good condition. The system features individual temperature controls in all spaces required by the OSDM. Louvered interior doors are a violation of the Ohio Building Code, and interior doors in this facility are not louvered to facilitate corridor utilization as return air plenums. The existing system is ducted. The overall heating system is evaluated as being in safe and efficient working order, and long term life expectancy of the existing system is anticipated. The majority of the structure is equipped with air conditioning. The kitchen and locker rooms do not have air conditioning. The site does not contain underground fuel tanks. 1 Satisfactory Existing conditions require no renovation or replacement at the present time.

Rating: Recommendations:

Item CostUnitWhole BuildingOriginal Building (1999)SumComments 166,900 ft Sum: $0.00 $0.00

Boilers Back to Assessment Summary

Air Handling Unit

Facility Assessment

Page 10

Report Generated at 3 May 2005 06:46

Facility Assessment

B. Roofing
Description:
The roof over approximately 80% of the facility is a standing seam metal system that was installed in 1999, and is in good condition. The roof over the remaining 20% (kitchen, auxillary gym, and connecting corridor) is a Carlisle adhered membrane roofing system that was installed in 1999, and is in fair condition. There are no District reports of current leaking. No signs of past leaking were observed during the physical assessment. Access to the roof was gained by a ladder and walk out door from the mechanical mezzanine that is in good condition. There were no observations of standing water on the roof. Metal flashings are in good condition. The gutters and downspouts are properly located, and in good condition. Roof drains are adequate in number, properly located, and in good condition. 1 Satisfactory Existing conditions require no renovation or replacement at the present time.

Rating: Recommendations:

Item CostUnitWhole BuildingOriginal Building (1999)SumComments 166,900 ft Sum: $0.00 $0.00

Membrane Roofing Back to Assessment Summary

Various Roof Levels

Facility Assessment

Page 11

Report Generated at 3 May 2005 06:46

Facility Assessment

C. Ventilation / Air Conditioning


Description:
The majority of the facility is equipped with a central air conditioning system in fair condition. The kitchen and the locker rooms are equipped with heating only ceiling mounted cabinet heaters. Cooling is provided by a Marley NC Series cooling tower which feeds 2 carrier chillers. Cooling water is distributed to terminal units consisting of air handlers, with VAV boxes providing reheat for temperature control. A window unit is provided in the dieticians office. The ventilation system consists of air handlers, installed in 1999 and in fair condition, providing fresh air to classrooms and other miscellaneous spaces such as Gymnasiums, Student Dining, Media Center, etc. Interior doors are not louvered to facilitate corridor utilization as return air plenums. The ventilation system meets the Ohio Building Code 15 CFM per occupant fresh air requirement. The overall system is compliant with Ohio Building Code and Ohio School Design Manual requirements. Dust collection system is not required in this facility. Exhaust systems for Restrooms, Kitchen, Gymnasium, and Storage Rooms are adequate. 2 Needs Repair Provide an air conditioning system to meet Ohio Building Code and the Ohio School Design Manual in the Kitchen and Locker Room areas.

Rating: Recommendations:
Item

Whole BuildingOriginal Building (1999)Sum Comments 166,900 ft Other: Air Conditioning System$12.00sq.ft. (Qty) 9,363 Required $112,356.00(AC for kitchen and locker rooms) Sum: $112,356.00 $112,356.00

Cost

Unit

Cooling Tower Back to Assessment Summary

Chillers

Facility Assessment

Page 12

Report Generated at 3 May 2005 06:46

Facility Assessment

D. Electrical Systems
Description:
The electrical system provided to the facility is a 480 / 277 volt, 3000 amp, 3 phase 4 wire system installed in 1999, and is in good condition. Power is provided to the school by a district owned, pad-mounted transformer located in the rear of the school, and in good condition. The panel system, installed in 1999, is in good condition, and can be expanded to add additional capacity. The classrooms are equipped with adequate electrical outlets. The typical classroom contains 9 general purpose outlets and one dedicated outlet for each classroom television, as well as dedicated outlets for student and teacher computers. There are not any spaces that have no electrical outlets. The corridors are equipped with adequate electrical outlets for servicing. There are adequate GFI protected exterior outlets located around the perimeter of the building. Electrical connections for added air conditioning systems in the Kitchen and Locker Room areas will be required. The overall electrical system meets Ohio School Design Manual requirements in supporting the current needs of the school, and will be adequate to meet the facility?s future needs. 2 Needs Repair Provide additional disconnect switches, circuits, and power feeds to Kitchen and Locker Room area air conditioning equipment added under Item C. Cost Unit

Rating: Recommendations:

Item

Whole BuildingOriginal Building (1999)Sum Comments 166,900 ft Other: Additional Costs for Air Conditioning Electrical Connections$7,600.00allowance Required $7,600.00(disconnect switches, circuits, wiring) Sum: $7,600.00 $7,600.00

Main Service Back to Assessment Summary

Step Down Transformer

Facility Assessment

Page 13

Report Generated at 3 May 2005 06:46

Facility Assessment

E. Plumbing and Fixtures


Description:
The service entrance is equipped with a reduced pressure backflow preventer in good condition. A water treatment system is provided for the kitchen area and is in fair condition. The domestic water supply piping in the overall facility is copper in good condition. The waste piping in the overall facility is cast iron in good condition. The facility is equipped with a 120-gallon gas water heater in good condition that serves the kitchen. The remainder of the facility has a hot water heater with 500-gallon storage tank in good condition. The school contains 4 restrooms for boys, 1 locker room / restroom for boys, 4 restrooms for girls, 1 locker room / restroom for girls, 8 individual restrooms, and 2 coaches locker / restrooms. Boys? restrooms contain 5 ADA and 8 non-ADA wall mounted auto flush toilets, 5 ADA and 7 non-ADA wall mounted auto flush urinals, and 13 ADA and no non-ADA wall mounted lavatories. Girls? restrooms contain 5 ADA and 15 non-ADA wall mounted auto flush toilets, as well as 13 ADA and no non-ADA wall mounted lavatories. Individual restrooms contain 8 ADA and no non-ADA wall mounted auto flush toilets, no urinals, and 8 ADA and no non-ADA wall mounted lavatories. Staff locker restrooms contain 2 ADA and 1 non-ADA wall mounted auto flush toilets, 1 ADA and no non-ADA wall mounted urinals, and 2 ADA and no non-ADA wall mounted lavatories. Student locker shower areas are equipped with 8 standard and one ADA shower each. Staff locker rooms are equipped with one ADA shower each. The facility is equipped with 6 ADA and 4 non-ADA electric water coolers, in good condition. The school meets the OBC requirements for toilet fixtures, but not for number of water coolers based on the current enrollment. ADA requirements are met for fixtures and drinking fountains. Project Laboratories are equipped with required gas and safety shower / eyewash in good condition. Compressed air is not provided in project laboratories. Adequate exterior wall hydrants are provided. 2 Needs Repair Provide compressed air in project laboratories to meet OSDM requirements. Provide three additional water coolers to meet OBC requirements. Water coolers to be ADA accessible. Cost Unit

Rating: Recommendations:

Item

Whole BuildingOriginal Building (1999)Sum Comments 166,900 ft Electric water cooler: $3,000.00unit 3 Required $9,000.00(double ADA) HIGH BAY/INDUSTRIAL SPACE - LAB TYPES 5,6,7 - Compressed Air Connections$15,000.00per system 1 Required $15,000.00 Sum: $24,000.00 $24,000.00

Shower/Eyewash

ADA Compliant Restroom Back to Assessment Summary

Facility Assessment

Page 14

Report Generated at 3 May 2005 06:46

Facility Assessment

F. Windows
Description:
The facility is equipped with thermally broken aluminum frame windows with double pane insulated glazing type window system, which was installed in 1999, and is in good condition. The entrance doors are equipped with thermally broken aluminum frame sidelights and transoms with double pane insulated glazing in good condition. The exterior doors are equipped with hollow metal frame sidelights and transoms with single glazing, in fair condition. The school contains an aluminum frame double pane skylight in good condition. 2 Needs Repair Replace transoms and sidelights in exterior doors as described in item S.

Rating: Recommendations:
Item

Whole BuildingOriginal Building (1999)Sum Comments 166,900 ft Curtain Wall/Storefront System:$55.00sq.ft. (Qty) 158 Required $8,690.00 Sum: $8,690.00 $8,690.00

Cost

Unit

Skylight Back to Assessment Summary

Typical Windows

Facility Assessment

Page 15

Report Generated at 3 May 2005 06:46

Facility Assessment

G. Structure: Foundation
Description: Rating: Recommendations:
The facility is equipped with a combination of concrete and concrete masonry unit foundation walls on concrete footings. Foundations displayed no locations of major settlement, cracking, or leaking, and are in fair condition. The District reports that there has been no past leaking. 1 Satisfactory Existing conditions require no renovation or replacement at the present time.

Item CostUnitWhole BuildingOriginal Building (1999)SumComments 166,900 ft Sum: $0.00 $0.00

CMU Foundation Back to Assessment Summary

Concrete Foundations

Facility Assessment

Page 16

Report Generated at 3 May 2005 06:46

Facility Assessment

H. Structure: Walls and Chimneys


Description:
The majority of the facility has a brick veneer on a masonry bearing wall system, which displayed no locations of deterioration, and is in good condition. Portions of the facility such as the gymnasiums have a steel frame system that supports the roof loads with brick veneer on a non-bearing masonry exterior wall system. The exterior masonry appears to have appropriately spaced and adequately caulked control joints in good condition. The exterior masonry has not yet needed to be cleaned and sealed, showing no evidence of mortar deterioration. Interior walls are primarily concrete masonry units with metal stud partitions with gypsum board in the administration area. Interior walls are in good condition with only minor cracking noted. Interior masonry appears to have adequately spaced and caulked control joints in good condition. The windowsills in the front of the facility are stone, while the windowsills in the rear of the facility are brick. Windowsills are in good condition. The exterior lintels are in good condition. The school has sufficient expansion joints, and they are in good condition. 1 Satisfactory Existing conditions require no renovation or replacement at the present time.

Rating: Recommendations:

Item CostUnitWhole BuildingOriginal Building (1999)SumComments 166,900 ft Sum: $0.00 $0.00

Exterior Masonry Back to Assessment Summary

Exterior Masonry

Facility Assessment

Page 17

Report Generated at 3 May 2005 06:46

Facility Assessment

I. Structure: Floors and Roofs


Description:
The floor construction of the base floor of the facility is concrete slab on grade type construction, and is in good condition. There is no crawl space. The floor construction of the second floor is metal form deck on steel beams with concrete topping type construction, and is in good condition. The roof construction at the flat roof areas is metal deck on steel joist. The roof construction at the sloped roof areas is steel trusses supporting steel purlins with batt insulation draped over the purlins and standing seam metal roofing. The roof structure is in good condition. 1 Satisfactory Existing conditions require no renovation or replacement at the present time.

Rating: Recommendations:

Item CostUnitWhole BuildingOriginal Building (1999)SumComments 166,900 ft Sum: $0.00 $0.00

Roof Framing Back to Assessment Summary

Roof Framing

Facility Assessment

Page 18

Report Generated at 3 May 2005 06:46

Facility Assessment

J. General Finishes
Description:
The facility has classrooms with vinyl composition tile (VCT) type flooring, lay in acoustic ceiling tile (ACT) type ceilings, and painted concrete masonry unit (CMU) type wall finishes, and they are in fair condition. The majority of the facility has corridors with VCT type flooring, ACT type ceilings, and CMU type wall finishes, and they are in fair condition. The floor in the main entry corridor has various types of tile that are laid in a pattern. The facility has restrooms with ceramic tile type flooring, gypsum board ceilings, and CMU type wall finishes, and they are in fair condition. The Gymnasium spaces have wood flooring, exposed structure type ceilings, and CMU type wall finishes, and they are in fair condition. Gymnasium telescoping stands are in good condition. Student Dining has VCT type flooring, exposed structure ceiling, and CMU type wall finishes with acoustic panels, and they are in fair condition. Classroom casework is plastic laminate type construction with plastic laminate tops, and in fair condition. The amount of casework and chalkboards in smaller classrooms or classrooms equipped with folding partitions is less than OSDM recommendations. The size and layout of the room does not allow for additional casework and boards to be added. Other teaching stations are not provided adequate chalkboards, markerboards, and tackboards. Existing board condition is good. The lockers are adequately provided, and in good condition. The facility is equipped with wood non-louvered interior doors in good condition. The toilet partitions are metal type construction, and are in fair condition. The existing kitchen is full service. The existing Kitchen equipment is in good condition with the exception of the floor mixer that is in poor condition. 2 Needs Repair Provide painting of the entire facility. Replace existing floor mixer. Provide allowance for marker and tackboards to be added to existing to comply with OSDM where possible. Cost

Rating: Recommendations:

Item

Unit Whole BuildingOriginal Building (1999)Sum Comments 166,900 ft Paint: $2.00sq.ft. Required $333,800.00(partial finish - floor area/prep and installation) Floor Mixer $8,500.00unit 1 Required $8,500.00 Other: Additional Marker / Tackboards $0.20sq.ft. Required $33,380.00Upgrade to OSDM where possible Sum: $375,680.00 $375,680.00

Media Center Back to Assessment Summary

Cafetorium

Facility Assessment

Page 19

Report Generated at 3 May 2005 06:46

Facility Assessment

K. Interior Lighting
Description:
The typical Classrooms are equipped with T-8 2x4 lay-in fluorescent fixtures with single level switching. Classroom fixtures are in good condition and provide an average illumination of 80FC, thus complying with the 50 FC recommended by the OSDM. The typical Corridors are equipped with T-8 2x4 lay-in fluorescent fixtures with single level switching. Corridor fixtures are in good condition and provide an average illumination of 30 FC, thus complying with the 20 FC recommended by the OSDM. The Primary and Auxillary Gymnasium spaces are equipped with pendant mounted metal halide type lighting, in fair condition, and providing an average illumination of 20 FC, which is less than the 50 FC recommended by the OSDM. The Media Center is equipped with a combination of 2x4 lay-in and 1x4 indirect suspended T8 fluorescent fixture type lighting in good condition, and providing an average illumination of 89 FC, thus complying with the 50 FC recommended by the OSDM. The Student Dining spaces are equipped with pendant mounted metal halide type lighting in good condition, and providing an average illumination of 32 FC, which is less than the 50 FC recommended by the OSDM. The service areas are equipped with 1x4 suspended T8 fluorescent fixture type lighting in fair condition. The typical Administrative spaces are equipped with 2x4 lay-in T8 fluorescent fixture type lighting in good condition, and providing adequate illumination based on OSDM requirements. The overall lighting systems of the facility are not fully compliant with Ohio School Design Manual requirements due to inadequate lighting levels. 2 Needs Repair Upgrade the lighting in the gymnasiums and the student dining area the meet the OSDM lighting level requirements.

Rating: Recommendations:
Item

Whole BuildingOriginal Building (1999)Sum Comments 166,900 ft Other: Additional lighting for gymnasium$2.00sq.ft. (Qty) 12,840 Required $25,680.00Upgrade to OSDM light levels Sum: $25,680.00 $25,680.00

Cost Unit

Cafetorium Lighting Back to Assessment Summary

Corridor Lighting

Facility Assessment

Page 20

Report Generated at 3 May 2005 06:46

Facility Assessment

L. Security Systems
Description:
The facility contains a security system in good condition. Motion detectors are adequately provided in offices, corridors, and spaces where 6 or more computers are located. Exterior doors are equipped with door contacts. An automatic visitor control system is provided. CCTV cameras are provided at main entry areas, parking lots, central gathering areas, and main corridors. CCTV is monitored in Administrative Area with the use of TV, VCR, and multiplexer. The security system is adequately provided throughout, and the system is compliant with Ohio School Design Manual guidelines. The exterior site lighting system is equipped with surface mounted metal halide entry lights in good condition. Pedestrian walkways are illuminated with metal halide fixtures in good condition. Parking and bus pick-up / drop off areas are illuminated by pole mounted metal halide fixtures in good condition. The exterior site lighting system generally provides adequate coverage. The district reported that lighting over by the football field is limited. 1 Satisfactory Existing conditions require no renovation or replacement at the present time.

Rating: Recommendations:

Item CostUnitWhole BuildingOriginal Building (1999)SumComments 166,900 ft Sum: $0.00 $0.00

Security Monitor Back to Assessment Summary

Security Panel

Facility Assessment

Page 21

Report Generated at 3 May 2005 06:46

Facility Assessment

M. Emergency/Egress Lighting
Description:
The facility is equipped with an emergency egress lighting system consisting of illuminated exit signs, emergency floodlighting, and recessed fluorescent lighting. The system is in good condition, and is provided with appropriate backup powered by two Kohler natural gas fired emergency generators. The system is adequately provided throughout, and meets Ohio School Design Manual requirements. 1 Satisfactory Existing conditions require no renovation or replacement at the present time.

Rating: Recommendations:

Item CostUnitWhole BuildingOriginal Building (1999)SumComments 166,900 ft Sum: $0.00 $0.00

Natural Gas Generators Back to Assessment Summary

Exit Light

Facility Assessment

Page 22

Report Generated at 3 May 2005 06:46

Facility Assessment

N. Fire Alarm
Description:
The facility is equipped with a fire alarm system in good condition, consisting of manual pull stations, horn, and strobe indicating devices. The system is automatic and is monitored by a third party. The system is equipped with sufficient flow switches, tamper switches, smoke detectors, and heat sensors. The system is adequately provided throughout, and has additional zone capabilities. The system is compliant with Ohio Building Code, NFPA, and Ohio School Design Manual requirements. 1 Satisfactory Existing conditions require no renovation or replacement at the present time.

Rating: Recommendations:

Item CostUnitWhole BuildingOriginal Building (1999)SumComments 166,900 ft Sum: $0.00 $0.00

Fire Alarm Panel Back to Assessment Summary

Horn Strobe Device

Facility Assessment

Page 23

Report Generated at 3 May 2005 06:46

Facility Assessment

O. Handicapped Access
Description:
The exterior entrances are ADA accessible. Access from the parking / drop-off area to the building entries is not compromised by steps or steep ramps. Adequate handicap parking is provided. Exterior doors are equipped with ADA hardware. The main entry is not equipped with an ADA power assist door. This multistory building has a compliant elevator that accesses every floor. Access to the stage is facilitated by a ramp. Some interior doors are recessed with adequate clearances. All doors are provided with ADA-compliant hardware. 16 ADA-compliant toilets are required, and 16 are currently provided. 16 ADA-compliant lavatories are required, and 36 are currently provided. 6 ADA-compliant urinals are required, and 6 are currently provided. 7 ADA-compliant electric water coolers are required, and 6 are currently provided. Toilet partitions are metal, and provide appropriate ADA clearances. ADA-compliant accessories are adequately provided and mounted. Mirrors meet ADA requirements for mounting heights. ADA signage is provided on the building. 2 Needs Repair Provide ADA assist opener on main exterior door. Provide an additional ADA accessible water cooler. Cost is covered under Item E.

Rating: Recommendations:
Item

UnitWhole BuildingOriginal Building (1999)Sum Comments 166,900 ft ADA Assist Door & Frame:$7,500.00unit 1 Required $7,500.00(openers, electrical, patching, etc) Sum: $7,500.00 $7,500.00

Cost

Compliant Electric Water Cooler Back to Assessment Summary

Two Story Elevator

Facility Assessment

Page 24

Report Generated at 3 May 2005 06:46

Facility Assessment

P. Site Condition
Description:
The 35 acre sloped site is located in a suburban residential setting with moderate tree, shrub, and floral type landscaping. There are no apparent problems with erosion or ponding. A CMU concession / restroom building exists on the north side of the site near the athletic fields. The site is accessed by a moderately traveled city street. A single entrance onto the site separates into the main parking lot, the bus loop, and the overflow parking lot. No vehicular traffic is allowed into the bus loop during loading periods, but the lot is set up to be used as additional parking during special events. Proper separation of bus and other vehicular traffic is accomplished, and one way bus traffic is provided. Four separate parking areas plus the auxiliary bus loop parking area facilitate staff and visitor parking. The main parking lot has 108 spaces plus 4 ADA spaces. The south lot has 32 spaces. The service lot has 10 spaces. The athletic lot has 139 spaces plus 4 ADA spaces. The total parking count is 289 spaces plus 8 ADA spaces. The bus loop has 25 bus loading spaces or 102 vehicular spaces plus 4 ADA spaces. All parking lots are asphalt construction in good condition. The lots provide adequate parking for staff members, visitors, and the disabled. The parking lot drainage design, consisting of proper slopes and catch basins, provides adequate evacuation of storm water, and no problems with parking lot ponding were observed. Concrete curbs in good condition are appropriately placed. Concrete sidewalks are properly sloped, are located to provide a logical flow of pedestrian traffic, and are in good condition. Site fencing is not provided. The athletic facilities are comprised of a track, football, softball, and baseball field, and are in good condition. 2 Needs Repair Existing conditions require no renovation or replacement at the present time. Provide sitework allowances for unforseen circumstances per OSDM requirements. Cost Unit Whole Building

Rating: Recommendations:

Item

Original Building Sum Comments (1999) 166,900 ft Base Sitework Allowance for Unforeseen $50,000.00allowance Required $50,000.00Include this and one of the next two. (Applies for whole Circumstances building, so only one addition should have this item) Sitework Allowance for Unforeseen Circumstances $150,000.00allowance Required $150,000.00Include this one or the previous. (Applies for whole building, for buildings 100,000 SF or larger so only one addition should have this item) Sum: $200,000.00 $200,000.00

Main Parking Lot Back to Assessment Summary

Access from Auxillary Parking

Facility Assessment

Page 25

Report Generated at 3 May 2005 06:46

Facility Assessment

Q. Sewage System
Description: Rating: Recommendations:
The sanitary sewer system is tied in to the municipal system in good condition. No significant system deficiencies were reported by the school district or noted during the physical assessment. 1 Satisfactory Existing conditions require no renovation or replacement at the present time.

Item CostUnitWhole BuildingOriginal Building (1999)SumComments 166,900 ft Sum: $0.00 $0.00

Sanitary Clean Out Back to Assessment Summary

Sanitary Manhole

Facility Assessment

Page 26

Report Generated at 3 May 2005 06:46

Facility Assessment

R. Water Supply
Description:
The domestic water supply system is tied in to the municipal system, features 4 inch service, and is in good condition. The facility is equipped with an automated fire suppression system, for which the existing water supply provides adequate support. The domestic water service is not equipped with a water booster pump, and none is required. The system provides adequate pressure and capacity for the future needs of the school. 1 Satisfactory Existing conditions require no renovation or replacement at the present time.

Rating: Recommendations:

Item CostUnitWhole BuildingOriginal Building (1999)SumComments 166,900 ft Sum: $0.00 $0.00

Backflow Preventer Back to Assessment Summary

Sprinkler Service

Facility Assessment

Page 27

Report Generated at 3 May 2005 06:46

Facility Assessment

S. Exterior Doors
Description:
Entrance doors in the facility are aluminum type construction, mounted on aluminum frames, and in good condition. Entrance doors feature thermally broken tempered glass vision panels. Exterior doors in the facility are hollow metal type construction, mounted on hollow metal frames, and in fair condition. Most of the exterior doors do not have vision panels. Two exterior door assemblies feature single pane tempered glass vision panels with single pane sidelights and transoms. There are no overhead doors in the facility. 3 Needs Replacement Replace the two exterior door assemblies that have single pane glazing. Sidelights and transom costs are covered under Item F. Paint the exterior doors that have paint chipping off. Cost Unit

Rating: Recommendations:

Item

Whole BuildingOriginal Building (1999)Sum Comments 166,900 ft Door Leaf/Frame and Hardware:$2,000.00per leaf 4 Required $8,000.00(includes removal of existing) Other: Paint doors $150.00leaf 11 Required $1,650.00Paint door & frame Sum: $9,650.00 $9,650.00

Main Entry Back to Assessment Summary

Aluminum Entrance Doors

Facility Assessment

Page 28

Report Generated at 3 May 2005 06:46

Facility Assessment

T. Hazardous Material
Description: Rating: Recommendations:
This facility was constructed in 1999 and is asbestos free. There are no underground storage tanks on the site. Due to the construction date, there is not a potential for lead based paint. 1 Satisfactory Existing conditions require no renovation or replacement at the present time.

Item CostUnitWhole BuildingOriginal Building (1999)SumComments 166,900 ft Sum: $0.00 $0.00

Back to Assessment Summary

Facility Assessment

Page 29

Report Generated at 3 May 2005 06:46

Facility Assessment

U. Life Safety
Description:
The facility is equipped with an automated fire suppression system in good condition. Exit corridors are situated such that dead-end corridors are not present. Egress stair towers are protected by a two hour fire enclosure. One monumental stair tower exists without rated enclosure. Guardrails are constructed as required by the Ohio Building Code. The kitchen hood is equipped with a fire suppression system. There is an adequate number of fire extinguishers that are adequately spaced. The existing water supply is provided by a tie-in to the municipal system, and is sufficient to meet the future fire suppression needs of the school. Rooms with capacity greater than 50 are equipped with adequate egress. 1 Satisfactory Existing conditions require no renovation or replacement at the present time.

Rating: Recommendations:

Item CostUnitWhole BuildingOriginal Building (1999)SumComments 166,900 ft Sum: $0.00 $0.00

Sprinkler Head Back to Assessment Summary

Monumental Stair

Facility Assessment

Page 30

Report Generated at 3 May 2005 06:46

Facility Assessment

V. Loose Furnishings
Description:
The typical classroom furniture is of consistent design, and in generally good condition, consisting of student desks & chairs, teacher desk & chair, computer workstation, and wastebasket. The facilitys furniture and loose equipment was evaluated in item 6.17 in the CEFPI section of this report, and on a scale of 1 to 10 the facility received a rating of 8 due to observed conditions, and due to the fact that it lacks some of the Design Manual required elements. 2 Needs Repair Provide for replacement of outdated or inadequate furniture.

Rating: Recommendations:
Item

Cost Unit Whole BuildingOriginal Building (1999)Sum Comments 166,900 ft CEFPI Rating 8$1.00sq.ft. Required $166,900.00 Sum: $166,900.00 $166,900.00

Science Furnishings Back to Assessment Summary

Classroom Furniture

Facility Assessment

Page 31

Report Generated at 3 May 2005 06:46

Facility Assessment

W. Technology
Description:
The typical classroom is not equipped with the required four technology data ports for student use, one data port for teacher use, one voice port, one cable port and monitor, and a 2-way PA system that can be initiated by either party to meet Ohio School Design Manual requirements. The facility does contain a media distribution center, and provides computer labs for use by students. The facility is not equipped with a digitally based phone system. 3 Needs Replacement Provide complete replacement of technology systems to meet Ohio School Design Manual requirements.

Rating: Recommendations:
Item

Cost Unit Whole BuildingOriginal Building (1999)Sum Comments 166,900 ft Non-OSDM Compliant:$5.77sq.ft. Required $963,013.00 Sum: $963,013.00 $963,013.00

Typical Technology Port Back to Assessment Summary

Main Technology Rack

Facility Assessment

Page 32

Report Generated at 3 May 2005 06:46

Facility Assessment

X. Construction Contingency / Non-Construction Cost


Renovation Costs (A-W) 7.00% Subtotal 16.20% Non-Construction Costs Construction Contingency $1,901,069.00 $133,074.83 $2,034,143.83 $329,531.30 $2,363,675.13

Total Project

Construction Contingency Non-Construction Costs Total for X.

$133,074.83 $329,531.30 $462,606.13

Non-Construction Costs Breakdown Soil Borings Agency Approval Fees Construction Testing Printing Advertising Builders Risk Design Professional Compensation CM Compensation Non-Construction Contingency (includes partnering and mediation services) Total Non-Construction Costs Back to Assessment Summary 0.03% 0.20% 0.15% 0.30% 0.05% 0.20% 7.50% 6.00% 1.77% 16.20% $610.24 $4,068.29 $3,051.22 $6,102.43 $1,017.07 $4,068.29 $152,560.79 $122,048.63 $36,004.35 $329,531.30

Facility Assessment

Page 33

Report Generated at 3 May 2005 06:46

School Facility Appraisal

Name of Appraiser Building Name Street Address City/Town, State, Zip Code Telephone Number(s) School District

Bill Mentges Nagel Middle School 1500 Nagel Road Cincinnati, OH 45255 513-474-5407 Forest Hills Local SD

Date of Appraisal

2004-07-12

Setting: Site-Acreage Grades Housed Number of Teaching Stations Student Enrollment Dates of Construction Energy Sources: Air Conditioning: Heating:

Suburban 35 7-8 72 1209 1999 Fuel Oil Roof Top Central Hot Water Gas Windows Units Roof Top Steam Floor Construction Wood Joists Steel Joists Slab on grade Structural slab Electric Central Individual Unit Solar Room Units Forced Air Building Square Footage Student Capacity Number of Floors 166,900 1,184 2

Type of Construction Load bearing masonry Steel frame Concrete frame Wood Steel Joists

Exterior Surfacing Brick Stucco Metal Wood Stone

Back to Assessment Summary

School Facility Appraisal

Page 34

Report Generated at 3 May 2005 06:46

CEFPI Ratings Sheet

1.0 The School Site


School Facility Appraisal

Points Allocated

Points

1.1

Site is large enough to meet educational needs as defined by state and local requirements The 35 acre site exceeds the OSDM recommendation.

25

25

1.2

Site is easily accessible and conveniently located for the present and future population The site is centered within the population it serves and allows for many walking students.

20

19

1.3

Location is removed from undesirable business, industry, traffic, and natural hazards The site has residential surroundings.

10

1.4

Site is well landscaped and developed to meet educational needs The landscaping is small and well placed.

10

1.5

ES MS HS

Well equipped playgrounds are separated from streets and parking areas Well equipped athletic and intermural areas are separated from streets and parking Well equipped athletic areas are adequate with sufficient solid-surface parking

10

10

The site is equipped with football/track and softball fields which are in good condition and separated from streets and parking.

1.6

Topography is varied enough to provide desirable appearance and without steep inclines Sloping site provides desirable appearance, but steep inclines cause a portion of the site to be unusable.

1.7

Site has stable, well drained soil free of erosion Soil is free from erosion and appears to be stable.

1.8

Site is suitable for special instructional needs, e.g., outdoor learning A courtyard exists for outdoor learning.

1.9

Pedestrian services include adequate sidewalk with designated crosswalks, curb cuts, and correct slopes Correctly sloped sidewalks, crosswalks, and curb cuts exist.

1.10

ES/MS HS

Sufficient on-site, solid surface parking for faculty and staff is provided Sufficient on-site, solid surface parking is provided for faculty, students, staff and community

Sufficient solid surface parking exists and is in good condition. Some parking is separated from building by a stream.

TOTAL - The School Site Back to Assessment Summary

100

95

CEFPI Ratings Sheet

Page 35

Report Generated at 3 May 2005 06:46

CEFPI Ratings Sheet

2.0 Structural and Mechanical Features


School Facility Appraisal

Structural

Points Allocated

Points

2.1

Structure meets all barrier-free requirements both externally and internally Structure meets ADA requirements and is barrier free.

15

15

2.2

Roofs appear sound, have positive drainage, and are weather tight Low sloped roofing provides positive drainage. The District did not report any roof leaks.

15

15

2.3

Foundations are strong and stable with no observable cracks Minor cracking was observed in the foundations.

10

2.4

Exterior and interior walls have sufficient expansion joints and are free of deterioration The facility is equipped with sufficient expansion joints and walls are in good condition.

10

10

2.5

Entrances and exits are located so as to permit efficient student traffic flow Building entrances are properly located for the efficient flow of traffic.

10

10

2.6

Building envelope generally provides for energy conservation (see criteria) Composite masonry walls, insulated roof, and thermally broken double pane windows provide an adequate building envelope.

10

10

2.7

Structure is free of friable asbestos and toxic materials The structure is free from hazardous materials.

10

10

2.8

Interior walls permit sufficient flexibility for a variety of class sizes Folding partitions are available for varying class sizes.

10

10

Mechanical/Electrical

Points Allocated

Points

2.9

Adequate light sources are well maintained, and properly placed and are not subject to overheating

15

13

Light fixtures appeared to be well maintained. Dark spots were not observed. Cafetorium and gym light levels are lower than recommended.

2.10

Internal water supply is adequate with sufficient pressure to meet health and safety requirements Water supply is from a municipal system, has a backflow preventer and has adequate pressure.

15

15

2.11

Each teaching/learning area has adequate convenient wall outlets, phone and computer cabling for technology applications

15

13

A typical classroom is equipped with 11 electrical outlets, 0 phone, and 4 computer outlets. The facility does not meet the OSDM technolgy requirements.

2.12

Electrical controls are safely protected with disconnect switches easily accessible

10

10

CEFPI Ratings Sheet

Page 36

Report Generated at 3 May 2005 06:46

Electrical panels are not located in student occupied areas. Disconnect switches are accessible.

2.13

Drinking fountains are adequate in number and placement, and are properly maintained including provisions for the disabled

10

The O.B.C. requires one drinking fountain per 100 students. The building capacity requires 13 drinking fountains. The existing facility has 10 drinking fountains. ADA requires that 50 percent of drinking fountains be accessible. 6 of the drinking fountains are accessible.

2.14

Number and size of restrooms meet requirements

10

10

The O.B.C. requires that restrooms be located on every floor and that the maximum travel distance shall not exceed 500 feet. The facility meets the requirement.

2.15

Drainage systems are properly maintained and meet requirements The waste piping is cast iron. The District reported that no problems existed with the drainage system.

10

10

2.16

Fire alarms, smoke detectors, and sprinkler systems are properly maintained and meet requirements The fire alarm system meets current code requirements. Detection devices are provided. There is a sprinkler system.

10

10

2.17

Intercommunication system consists of a central unit that allows dependable two-way communication between the office and instructional areas The PA system provides two way communication that can be initiated from either party.

10

10

2.18

Exterior water supply is sufficient and available for normal usage Hose bibbs are located near areas where water is needed.

TOTAL - Structural and Mechanical Features Back to Assessment Summary

200

192

CEFPI Ratings Sheet

Page 37

Report Generated at 3 May 2005 06:46

CEFPI Ratings Sheet

3.0 Plant Maintainability


School Facility Appraisal

Points Allocated

Points

3.1

Windows, doors, and walls are of material and finish requiring minimum maintenance Aluminum windows, aluminum and wood doors, and CMU walls require moderate maintenance.

15

14

3.2

Floor surfaces throughout the building require minimum care

15

14

Typical classrooms have vinyl composition tile flooring. Typical corridors have vinyl composition tile flooring. Typical restrooms have ceramic tile flooring.

3.3

Ceilings and walls throughout the building, including service areas, are easily cleaned and resistant to stain The lay-in acoustic ceiling panels are not resistant to stain and must be replaced when damaged. Painted wall surfaces are cleaned easily.

10

3.4

Built-in equipment is designed and constructed for ease of maintenance Built-in equipment is constructed of plastic laminate and wood which requires some maintenance.

10

3.5

Finishes and hardware, with compatible keying system, are of durable quality The hardware has a quality finish and is ADA accessible. Keying system is hard to operate.

10

3.6

Restroom fixtures are wall mounted and of quality finish

10

10

Toilets are wall mounted flush valve. Urinals are wall mounted flush valve. Lavatories are wall mounted. ADA requirements are met. The fixtures are in good condition.

3.7

Adequate custodial storage space with water and drain is accessible throughout the building Custodial closets with mop sink are available throughout the building. Storage is limited.

10

3.8

Adequate electrical outlets and power, to permit routine cleaning, are available in every area Electrical outlets are located as required for cleaning.

10

10

3.9

Outdoor light fixtures, electrical outlets, equipment, and other fixtures are accessible for repair and replacement

10

10

Outdoor light fixtures provide adequate light levels in all areas. Electrical outlets are conveniently located. Outdoor mechanical equipment is easily accessible.

TOTAL - Plant Maintainability Back to Assessment Summary

100

87

CEFPI Ratings Sheet

Page 38

Report Generated at 3 May 2005 06:46

CEFPI Ratings Sheet

4.0 Building Safety and Security


School Facility Appraisal

Site Safety

Points Allocated

Points

4.1

Student loading areas are segregated from other vehicular traffic and pedestrian walkways The facility is equipped with a separate bus loop. The bus loop doubles as a parking area when busses are not present.

15

15

4.2

Walkways, both on and offsite, are available for safety of pedestrians Correctly sloped sidewalks, with crosswalks and curb cuts exist.

10

10

4.3

Access streets have sufficient signals and signs to permit safe entrance to and exit from school area School signs are provided to permit safe site access.

4.4

Vehicular entrances and exits permit safe traffic flow A single entrance separates into the main parking, bus loop, and auxillary parking.

4.5

ES MS HS

Playground equipment is free from hazard Location and types of intramural equipment are free from hazard Athletic field equipment is properly located and is free from hazard

The site is equipped with softball, baseball, football fields, and track which are free from hazard.

Building Safety

Points Allocated

Points

4.6

The heating unit(s) is located away from student occupied areas The mechanical room is located away from student areas. Heat distribution is away from student interaction.

20

20

4.7

Multi-story buildings have at least two stairways for student egress O.B.C. compliant fire rated stairways exist in the quantity and location required by code.

15

15

4.8

Exterior doors open outward and are equipped with panic hardware Exterior doors open outward per O.B.C. requirements and have panic hardware.

10

10

4.9

Emergency lighting is provided throughout the entire building with exit signs on separate electrical circuits The exit lighting is powered by an emergency generator. The system meets current building code standards.

10

10

4.10

Classroom doors are recessed and open outward

10

10

Some classroom doors are flush with the corridor wall. Some classroom doors are recessed with allowable ADA clearances. Doors open outward.

4.11

Building security systems are provided to assure uninterrupted operation of the educational program The facility is equipped with a security system with motion detectors, door contacts and CCTV.

10

CEFPI Ratings Sheet

Page 39

Report Generated at 3 May 2005 06:46

4.12

Flooring (including ramps and stairways) is maintained in a non-slip condition Slippery areas were identified in the site visit.

4.13

Stair risers (interior and exterior) do not exceed 6 1/2 inches and range in number from 3 - 16 The stair risers are 7 and typically fall into the acceptable range.

4.14

Glass is properly located and protected with wire or safety material to prevent accidental student injury All glass appeared to be properly protected as required by code.

4.15

Fixed Projections in the traffic areas do not extend more than eight inches from the corridor wall No items were found to be extending beyond the allowable dimension.

4.16

Traffic areas terminate at an exit or a stairway leading to an egress There are no dead end corridors in the facility.

Emergency Safety

Points Allocated

Points

4.17

Adequate fire safety equipment is properly located

15

15

The number of fire extinguishers appears to meet the requirements. The kitchen hood is equipped with a fire suppression system.

4.18

There are at least two independent exits from any point in the building Rooms with capacity greater than fifty persons are equipped with two exits. There are no dead end corridors in the facility.

15

15

4.19

Fire-resistant materials are used throughout the structure The entire building structure is constructed with non-combustible materials.

15

15

4.20

Automatic and manual emergency alarm system with a distinctive sound and flashing light is provided A code compliant emergency alarm system exists.

15

15

TOTAL - Building Safety and Security Back to Assessment Summary

200

195

CEFPI Ratings Sheet

Page 40

Report Generated at 3 May 2005 06:46

CEFPI Ratings Sheet

5.0 Educational Adequacy


School Facility Appraisal

Academic Learning Space

Points Allocated

Points

5.1

Size of academic learning areas meets desirable standards The average size of classrooms is 745 s.f. compared to 900 s.f. recommended by the OSDM.

25

15

5.2

Classroom space permits arrangements for small group activity The classrooms are too small to allow for small groups to work affectively.

15

5.3

Location of academic learning areas is near related educational activities and away from disruptive noise

10

10

The location of the gym, music, cafeteria, and classrooms is adequately separated. Academic functions are grouped together. No disruptive noise was evident.

5.4

Personal space in the classroom away from group instruction allows privacy time for individual students Designated personal space is present.

10

10

5.5

Storage for student materials is adequate Quantity and size of lockers is small for student capacity and grade level served. Condition is good.

10

5.6

Storage for teacher materials is adequate Adequate casework is provided for teacher material storage. Condition is good.

10

10

Special Learning Space

Points Allocated

Points

5.7

Size of special learning area(s) meets standards The average size of special education areas is less than that recommended by the OSDM.

15

10

5.8

Design of specialized learning area(s) is compatible with instructional need

10

10

Handicap provisions are made in special education areas. Special education areas are equipped with casework and loose equipment specific to instructional need.

5.9

Library/Resource/Media Center provides appropriate and attractive space Large media center with windows opening to courtyard is attractive and dynamic space.

10

10

5.10

Gymnasium (or covered P.E. area) adequately serves physical education instruction The main gym is 8,950 s.f. compared to 8,500 s.f. recommended by the OSDM.

5.11

ES MS/HS

Pre-kindergarten and kindergarten space is appropriate for age of students and nature of instruction Science program is provided sufficient space and equipment

10

The size of the science classrooms is less than the OSDM recommendation. The science equipment is in good condition.

CEFPI Ratings Sheet

Page 41

Report Generated at 3 May 2005 06:46

5.12

Music Program is provided adequate sound treated space

The size of the general music room is less than the OSDM recommendation. Sound treatment is good. Additional music spaces for band, strings, and chorus provided.

5.13

Space for art is appropriate for special instruction, supplies, and equipment The size of the art room is less than the OSDM recommendation. Equipment is in fair condition.

School Facility Appraisal

Points Allocated

Points

5.14

Space for technology education permits use of state-of-the-art equipment Computer labs are appropriately sized for instruction need and well equipped.

5.15

Space for small groups and remedial instruction is provided adjacent to classrooms Small project rooms are located near classrooms.

5.16

Storage for student and teacher material is adequate

Quantity and size of lockers is small for student capacity and grade level served. Condition is good. Adequate casework is provided for teacher material storage. Condition is good.

Support Space

Points Allocated

Points

5.17

Teachers lounge and work areas reflect teachers as professionals Teachers lounge is appropriately furnished and finishes are adequate.

10

10

5.18

Cafeteria/Kitchen is attractive with sufficient space for seating/dining, delivery, storage, and food preparation

10

The kitchen is smaller than OSDM standards, but serves adequately. The cafeteria is a cafetorium design. The size is more than the size recommended by the OSDM. The finishes are good.

5.19

Administrative offices provided are consistent in appearance and function with the maturity of the students served The office layout is appropriate for the required function. The appearance is attractive and professional.

5.20

Counselors office insures privacy and sufficient storage Counselor has private office with adequate storage space.

5.21

Clinic is near administrative offices and is equipped to meet requirements Clnic is equipped with toilet, sink, and 3 cots. Location is near offices.

5.22

Suitable reception space is available for students, teachers, and visitors Reception space is large enough to perform its intended function.

5.23

Administrative personnel are provided sufficient work space and privacy Administrative area is equipped with secretarial area, offices, conference room, mail room, work room, copy room, and storage space.

TOTAL - Educational Adequacy

200

168

CEFPI Ratings Sheet

Page 42

Report Generated at 3 May 2005 06:46

Back to Assessment Summary

CEFPI Ratings Sheet

Page 43

Report Generated at 3 May 2005 06:46

CEFPI Ratings Sheet

6.0 Environment for Education


School Facility Appraisal

Exterior Environment

Points Allocated

Points

6.1

Overall design is aesthetically pleasing to age of students Very attractive building with good use of color and texture.

15

15

6.2

Site and building are well landscaped The landscaping is small and well placed.

10

6.3

Exterior noise and poor environment do not disrupt learning The surrounding neighborhood is a residential type.

10

6.4

Entrances and walkways are sheltered from sun and inclement weather The main entrance is sheltered, but the secondary entrances are not.

10

6.5

Building materials provide attractive color and texture Brick and colored block provide good texture and attractive finish.

Interior Environment

Points Allocated

Points

6.6

Color schemes, building materials, and decor provide an impetus to learning Color schemes are well thought out and of quality finish.

20

20

6.7

Year around comfortable temperature and humidity are provided throughout the building The facility has heating and cooling systems which provide a year round comfortable environment.

15

15

6.8

Ventilating system provides adequate quiet circulation of clean air and meets 15cfm VBC requirement The existing ventilation system provides the code required amount of fresh air.

15

15

6.9

Lighting system provides proper intensity, diffusion, and distribution of illumination

15

11

Light fixtures appeared to be well maintained. Dark spots were not observed. Light levels were lower than recommended in cafetorium and gym.

6.10

Drinking fountains and restroom facilities are conveniently located

15

12

The O.B.C. requires one drinking fountain per 100 students. The building capacity requires 13 drinking fountains. The existing facility has 10 drinking fountains. ADA requires that 50 percent of drinking fountains be accessible. 6 of the drinking fountains are accessible. The O.B.C. requires that restrooms be located on every floor and that the maximum travel distance shall not exceed 500 feet. The facility meets the requirement.

6.11

Communication among students is enhanced by commons area(s) for socialization The cafetorium/commons exists in the building and a courtyard exists where students can socialize.

10

10

CEFPI Ratings Sheet

Page 44

Report Generated at 3 May 2005 06:46

6.12

Traffic flow is aided by appropriate foyers and corridors Corridors meet the OSDM recommended width.

10

10

6.13

Areas for students to interact are suitable to the age group Cafetorium, courtyard, gymnasium, and media center provide a suitable interaction space.

10

10

6.14

Large group areas are designed for effective management of students Large group areas are provided with a sound system. There are no blind spots where supervision is limited.

10

10

6.15

Acoustical treatment of ceilings, walls, and floors provides effective sound control

10

Lay-in acoustic ceilings, masonry walls, and vinyl tile floor provide fair acoustics. Tectum sound panels provide good acoustics in music rooms.

6.16

Window design contributes to a pleasant environment Nicely sized, well placed, well maintained windows contribute to a pleasant environment.

10

10

6.17

Furniture and equipment provide a pleasing atmosphere The equipment appeared clean and well maintained.

10

TOTAL - Environment for Education Back to Assessment Summary

200

186

CEFPI Ratings Sheet

Page 45

Report Generated at 3 May 2005 06:46

Justification for Allocation of Points

Building Name and Level:

Nagel Middle School 7-8

Building features that clearly exceed criteria: 1. 2. 3. 4. 5. 6. Building features that are non-existent or very inadequate: 1. 2. 3. 4. 5. 6. Back to Assessment Summary Low light levels in gyms. 35 acre site. Main and auxiliary gymnasium.

Justification for Allocation of Points

Page 46

Report Generated at 3 May 2005 06:46

Main Assessment Menu - Forest Hills Local SD (47340) - Nagel Middle School (135830)

Building Summary - Nagel Middle School (135830)


District: Name: Forest Hills Local SD Nagel Middle School Cincinnati,OH 45255 Bldg. IRN: 135830 Current Grades Proposed Grades Current Enrollment Projected Enrollment Addition Original Building Total *HA *Rating = Handicapped Access =1 Satisfactory =2 Needs Repair =3 Needs Replacement *Const P/S = Present/Scheduled Construction FACILITY ASSESSMENT Cost Set: 2004 A. Heating System B. Roofing C. Ventilation / Air Conditioning D. Electrical Systems E. Plumbing and Fixtures F. Windows G. Structure: Foundation H. Structure: Walls and Chimneys I. Structure: Floors and Roofs J. General Finishes K. Interior Lighting L. Security Systems M. Emergency/Egress Lighting N. Fire Alarm O. Handicapped Access P. Site Condition Q. Sewage System R. Water Supply S. Exterior Doors T. Hazardous Material U. Life Safety V. Loose Furnishings W. Technology X. Construction Contingency / Non-Construction Cost Rating 1 1 2 2 2 2 1 1 1 2 2 1 1 1 2 2 1 1 3 1 1 2 3 Date HA 1999 yes 7-8 N/A 1209 N/A Number of Floors 2 Acreage: Teaching Stations: Classrooms: County: Contact: Phone: Hamilton Dona Gardner 513-474-5407 By: By: Tony Zircher Bill Mentges Area: Cincinnati (1)

Address: 1500 Nagel Road

Date Prepared: 2004-07-12 Date Revised: 2005-04-22 35 CEFPI Appraisal Summary 72 64 Cover Sheet Section

Points Possible Points Earned Percentage Rating Category 100 200 100 200 200 200 1000 95 192 87 195 168 186 923 95% 96% 87% 98% 84% 93% 92% Excellent Excellent Satisfactory Excellent Satisfactory Excellent Satisfactory

Current Square Feet 1.0 The School Site 166,900 2.0 Structural and Mechanical Features 166,900 3.0 Plant Maintainability 4.0 Building Safety and Security 5.0 Educational Adequacy 6.0 Environment for Education Commentary Total Dollar C=Under Contract Assessment C $0.00 - Renovation Cost Factor $0.00 - Cost to Renovate (Cost Factor applied)

100.44% $2,374,075.30

$112,356.00 - The Replacement Cost Per SF and the Renovate/Replace ratio are only provided when this summary is $7,600.00 - requested from a Master Plan. $24,000.00 $8,690.00 $0.00 $0.00 $0.00 $375,680.00 $25,680.00 $0.00 $0.00 $0.00 $7,500.00 $200,000.00 $0.00 $0.00 $9,650.00 $0.00 $0.00 $166,900.00 $963,013.00 $462,606.13 $2,363,675.13 Previous Page

Total

Main Assessment Menu - Forest Hills Local SD (47340) - Nagel Middle School (135830)

Page 47

Report Generated at 3 May 2005 06:46