You are on page 1of 31

REKAPITULASI URAIAN HARGA UPAH PEKERJA

Kegiatan
Lokasi
Volume
Tahun Anggaran

:
:
:
:

Pembangunan Rumah Bantuan Untuk Bidan Desa


Idi Cut
38 M2
2011

NO

URAIAN KEGIATAN

JUMLAH HARGA
(RP)
600,000.00

PEKERJAAN PERSIAPAN

II

PEKERJAAN TANAH & PONDASI

III

PEKERJAAN BETON BERTULANG

IV

PEKERJAAN PASANGAN DAN PLASTERAN

PEKERJAAN KUZEN PINTU DAN JENDELA

VI

PEKERJAAN ATAP DAN PLAFOND

4,762,451.00

VII

PEKERJAAN LANTAI DAN DINDING KERAMIK

3,004,210.50

VIII

PEKERJAAN PENGUNCI DAN PENGGANTUNG

425,000.00

IX

PEKERJAAN PENGECATAN

450,058.00

PEKERJAAN INSTALASI LISTRIK

1,262,500.00

XI

PEKERJAAN INSTALASI AIR

3,322,180.00

XII

PEKERJAAN AKHIR

1,250,000.00

1,022,631.40
746,344.00
3,015,519.50
139,300.00

a.

JUMLAH

Rp.

20,000,194.40

b.

DIBULATKAN

Rp.

20,000,000

Terbilang : Dua Puluh Lima Juta Tujuh Ratus Dua Belas Ribu Rupiah

DAFTAR URAIAN SATUAN HARGA UPAH PEKERJA

Kegiatan

: Pembangunan Rumah Bantuan Untuk Bidan Desa

Lokasi

: Idi Cut

Volume

: 38 M2

Tahun Anggaran

: 2011

No

URAIAN PEKERJAAN

VOLUME/SAT

SUMBER DATA

HARGA
SATUAN
( Rp )
5

JUMLAH
HARGA
( Rp )
6

PEKERJAAN PERSIAPAN
Pembersihan Lapangan
Pemasangan Bouwplank
Papan Nama Proyek
Administrasi & Dokumentasi
Sewa Direksi Keet

1.000 Ls
38.000 M'
1.000 Bh
1.000 Ls
1.000 Unit

Respondensi
Respondensi
Respondensi
Respondensi
Respondensi

100,000.00
5,000.00
100,000.00
10,000.00
200,000.00
Sub Jumlah

100,000.00
190,000.00
100,000.00
10,000.00
200,000.00
600,000.00

II
1
2
3
4
5
6

PEKERJAAN TANAH & PONDASI


Galian Tanah Pondasi
Urugan Kembali Tanah Pondasi
Lapisan pasir bawah pondasi
Lapisan Anstamping setebal 11 cm
Pasangan Pondasi Cyclopen
Beton Cor Alas Kerja Selasar Camp 1:2:3

10.134
2.534
1.763
1.235
3.216
0.302

M3
M3
M3
M3
M3
M3

Respondensi
Respondensi
Respondensi
Respondensi
Respondensi
Respondensi

23,000.00
15,000.00
18,800.00
75,500.00
185,000.00
100,000.00
Sub Jumlah

233,082.00
38,002.50
33,144.40
93,242.50
594,960.00
30,200.00
1,022,631.40

III
1
2
3
4
5
6

PEKERJAAN BETON BERTULANG


Sloof Beton 15/20 cm Camp. 1:2:3
Kolom Beton 15/15 Camp. 1:2:3
Kolom Beton 25/25 cm Camp. 1:2:3
Ring Balok 13/18 cm Camp. 1:2:3
Balok Top Gavel 13/18 cm Camp. 1:2:3
Kanopi Beton T = 13 cm Camp. 1:2:3

0.888
0.462
0.541
0.466
0.241
0.192

M3
M3
M'
M3
M3
M3

Respondensi
Respondensi
Respondensi
Respondensi
Respondensi
Respondensi

320,000.00
340,000.00
8,000.00
333,000.00
350,000.00
319,000.00
Sub Jumlah

284,160.00
157,080.00
4,328.00
155,178.00
84,350.00
61,248.00
746,344.00

IV
1
2
3
4

PEKERJAAN PASANGAN DAN PLASTERAN


Pasangan Pasangan Transraam Bata 1 Pc : 2 Ps
Plasteran Transraam Bata 1:2
Pasangan Dinding Bata 1:4
Plasteran Dinding Bata 1:4

34.353
45.276
42.342
48.352

M2
M2
M2
M2

Respondensi
Respondensi
Respondensi
Respondensi

16,000.00
15,500.00
22,250.00
17,000.00
Sub Jumlah

549,648.00
701,778.00
942,109.50
821,984.00
3,015,519.50

V
1
2
3

PEKERJAAN KUZEN PINTU DAN JENDELA


Pekerjaan Kuzen
Pekerjaan Pintu
Pekerjaan Jendela

0.524
0.243
0.233

M3
M3
M3

Respondensi
Respondensi
Respondensi

175,000.00
100,000.00
100,000.00
Sub Jumlah

91,700.00
24,300.00
23,300.00
139,300.00

1
2
3
4
5

1
VI
1
2
3
4
5

PEKERJAAN ATAP DAN PLAFOND


Pekerjaan Rangka Kuda - Kuda Baja Ringan
Lisplank Kayu 2/30 cm
Atap Seng BJLS. 0,20
Rabong Seng BJLS. 0,20
Plafond Asbes 1 x 1 m

6 List Plafond Kayu Profit

40.231
13.213
11.524
7.123
36.343

Ls
M2
M2
M2
M2

Respondensi
Respondensi
Respondensi
Respondensi
Respondensi

25.234

M2

Respondensi

80,000.00
40,000.00
35,000.00
60,000.00
3,000.00
3,000.00
Sub Jumlah

VII

3,218,480.00
528,520.00
403,340.00
427,380.00
109,029.00
75,702.00
4,762,451.00

PEKERJAAN LANTAI DAN DINDING KERAMIK

1 Timbunan Tanah Bawah Lantai

16.238

M3

Respondensi

11,000.00

178,618.00

2 Timbunan Pasir Bawah Lantai

13.048

M3

Respondensi

9,250.00

120,694.00

3 Rabat Beton Bawah Keramik

12.050

M3

Respondensi

20,000.00

241,000.00

4 Lantai Keramik 30 x 30

36.000

M2

Respondensi

60,000.00

2,160,000.00

5 Lantai Keramik 20/20 cm pada KM / WC

1.966

M2

Respondensi

40,000.00

78,640.00

6 Dinding Keramik 20/20 cm

4.981

M2

Respondensi

27,500.00

136,977.50

7 Pasangan Bon - Bon Keramik Ruangan

9.809

M'

Respondensi

9,000.00
Sub Jumlah

88,281.00
3,004,210.50

VIII
1
2
3

PEKERJAAN PENGUNCI DAN PENGGANTUNG


Peumelles Nilon
Kunci Tanam Union 2x Slaag 3.b
Engsel Pintu

15.000
3.000
20.000

Bh
Bh
Bh

Respondensi
Respondensi
Respondensi

20,000.00
15,000.00
4,000.00
Sub Jumlah

300,000.00
45,000.00
80,000.00
425,000.00

IX
1
2
3

PEKERJAAN PENGECATAN
Cat Dinding Tembok Luar Dalam
Cat Plafond dan List plafond
Cat Listplank

59.641
21.160
10.234

M2
M2
M2

Respondensi
Respondensi
Respondensi

5,000.00
5,000.00
4,500.00
Sub Jumlah

298,205.00
105,800.00
46,053.00
450,058.00

X
1
2
3
4
5
6
7

PEKERJAAN INSTALASI LISTRIK


Penyambungan Arus Listrik
Lampu SL 18 Watt
Lampu SL 26 Watt
Stop Kontak + Instalasi Titik termasuk Kabel
Box Zekering
Saklar Tunggal
Saklar Double

1.000
3.000
5.000
7.000
1.000
2.000
1.000

Ttk
Bh
Ttk
Ttk
Ttk
Bh
Bh

Respondensi
Respondensi
Respondensi
Respondensi
Respondensi
Respondensi
Respondensi

195,000.00
25,000.00
27,500.00
100,000.00
120,000.00
10,000.00
15,000.00
Sub Jumlah

195,000.00
75,000.00
137,500.00
700,000.00
120,000.00
20,000.00
15,000.00
1,262,500.00

XI PEKERJAAN INSTALASI AIR


1 Instalasi Air Kotor
2 Instalasi Air Bersih

5.381
10.209

Ls
Ls

Respondensi
Respondensi

200,000.00
220,000.00
Sub Jumlah

1,076,200.00
2,245,980.00
3,322,180.00

XII PEKERJAAN AKHIR


1 Pekerjaan Relif
2 Pemebersihan Lokasi

11.000
1.000

M'
Ls

Respondensi
Respondensi

100,000.00
150,000.00
Sub Jumlah

1,100,000.00
150,000.00
1,250,000.00

Bouwplank
Panjang
PANJANG+LEBAR

Panjang
22

Lebar
22

Lebar

12

12

Galian Tanah Pondasi Tapak


Pondasi Tapak

LxL
0.64
Tinggi
0.85
Tinggi x Lebar
0.544

Total Volume

Jml Kolom
7

Galian Tanah Pondasi Menerus


Pondasi menerus

Panjang Seluruhnya'
Horizontal
Vertikal

Lebar Atas
Total Volume

18
7

Lebar Bawah
1.2
0.8

18
7

18
7

:2
1.00

Tinggi
0.85

Galian Tanah Pondasi Lantai Kerja


Pondasi Selasar

Total Volume

Panjang Seluruhnya'
Horizontal
Vertikal

Lebar Atas
0.35
0.35

Total Volume ( Sloof Bantu )

9
10

Tinggi
0.4
0.15

9
1

2
10

P. Seluruhnya
45
14

Galian Tanah Pondasi Tangga


Lebar

Tinggi
1.2

0.4

P. Seluruhnya
0.4

Total Volume

0.384

TOTAL VOLUME GALIAN


Galian Tanah Pondasi Tapak
Galian Tanah Pondasi Menerus
Galian Tanah Pondasi Lantai Kerja
Galian Tanah Pondasi Tangga

0.384

3.808
68.85
6.3
0.384

79.342

Urugan Pasir Urug Bawah pondasi


Lebar

Tebal

Pasir urug Bawah Pondasi Tapak


Pasir urug Bawah Pondasi Cyclopen
Pasir urug Bawah Lantai Kerja
Pondasi Tangga
Pondasi Sekat Ruang BELAJAR

0.64
0.8
0.35
1.2
0.35

0.05
0.05
0.05
0.05
0.05

4.3055

Total Volume

Urugan Aanstamping
Bawah Pondasi Cyclopen

Lebar

Tebal
0.8

0.1

Pondasi Cyclopen
Pondasi Cyclopen

Lebar

Tinggi
0.45

0.7

Beton lantai Kerja 1 : 3 : 6


Lebar
Selasar
Pondasi Tapak
Tangga
Pondasi Sekat Ruang BELAJAR

Tinggi
0.35
0.64
1.2
0.3

0.1
0.1
0.1
0.1

2.131

Total Volume

Sloof Beton 20/15


Sloof

Lebar

Tinggi
0.2

0.15

Sloof Beton 15/20


Sloof

Lebar

Tinggi
0.15

0.2

Sloof Beton 11/15


Sloof

Lebar

Tinggi
0.11

0.15

Kolom Praktis
Kolom

Banyaknya
7

Kolom 18/20

Lebar
Kolom Utama
Kolom Selasar
Kolom Utama ( Di tengah )
Total Volume

Lebar

Tinggi

0.18
0.18
0.18

0.2
0.2
0.2

4.2
4.7
6.9

Balok Latai 13/15


Balok Latai

Lebar

Tinggi
0.11

0.15

Ring Balok15/20
Ring Balok 15/20

Lebar

Tinggi
0.15

0.13

Top Gavel 11/15


Ring Balok 15/20

Lebar

Tinggi
0.11

0.15

Pasangan Bata Trasram


Batu Bata
Bangunan Induk
Selasar dan sekat selasr sampng & blkg
Tangga
Bata pd Pondasi teras Depan
Bata pd Sekat Selaras Teras Depan

Tinggi

Panjang
0.4
0.688
0.7
0.17
0.2

Jumlah
57
45
1.2
18
6

22.8
30.96
1.68
3.06
1.2
59.7

Pasangan Bata 1 : 4
Batu Bata
Bangunan Induk
Tombak Layar

Tinggi

Panjang
3.7

57

11.7

11.7

Jumlah
210.9

axt/2

Jumlah Pasangan Bata

23.4
234.3

Dikurang luas pintu dan Jendela


Pintu
Tinggi

Lebar
2.25

Jendela

Banyaknya Jumlah
1
2

4.5

Tinggi

Lebar

Jumlah

10

20

1.32
25.82

Lubang Angin Tombak layar


Tinggi

Lebar
0.55

Dikurang Ring Balok dan Latei

Tinggi

Jumlah
0.6

Panjang

Jumlah

0.13
0.13
Dikurang Trassram
Dikurang Lubang Ventilasi

57
36

7.41
4.68

8.55
2.58

Total Volume Bata

197.35

Pasangan Dinding Keramik


DINDING KERAMIK

Lebar

Dikurang Lubang Ventilasi

Tinggi

0.1

Total Volume Keramik

Panjang
Jumlah
1.2
15.6
18.72

0.3

20

18.12

Pasangan Kuda - Kuda


Kuda - Kuda

Lebar

Panjang
6.55
6.15

Jumlah
20.4
20.4

Total Volume

133.62
125.46
259.08

Pasangan Listplank
Listplank

Lebar

Panjang
12.96
20

Total Volume

Kusen Allumunium

Jumlah
12.96
20

25.92
40
65.92

0.6

Allumunium

Vertikal
Horizontal

1
1.9

Banyak jendela

10
78

Total Volume

1
1.9

Plafond Eternit
Plafond
DALAM
DALAM
LUAR Depan
LUAR Depan ( Lebar 70 cm)
LUAR Belakang
LUAR Kanan
LUAR Kiri

Lebar

Panjang
7
7
2
0.7
1.1
1.1
1.1

Jumlah
9
9
20.4
20.4
20.4
7
7

Total Volume

63
63
40.8
14.28
22.44
7.7
7.7
218.92

Tanah Urug Bawah Lantai


Tanah
DALAM
DALAM
LUAR Depan
LUAR Belakang
LUAR Kanan
LUAR Kiri

Lebar

Panjang
7
7
2
1
1
1

Tinggi
9
9
20
20
7
7

Jumlah

0.34
0.34
0.3248
0.3248
0.32
0.32

21.42
21.42
12.992
6.496
2.24
2.24

Total Volume

66.808

Pasir Urug Bawah Lantai


Pasir
DALAM
DALAM
LUAR Depan
LUAR Belakang
LUAR Kanan
LUAR Kiri

Lebar

Panjang
7
7
2
1
1
1

Total Volume

Tinggi
9
9
20
20
7
7

Jumlah
0.08
0.08
0.08
0.08
0.08
0.08

5.04
5.04
3.2
1.6
0.56
0.56
16

Beton Tumbuk

Beton Tumbuk
DALAM
DALAM
LUAR Depan
LUAR Belakang
LUAR Kanan
LUAR Kiri

Lebar

Panjang
7
7
2
1
1
1

Tinggi
9
9
20
20
7
7

Jumlah
0.07
0.07
0.07
0.07
0.07
0.07

4.41
4.41
2.8
1.4
0.49
0.49

Total Volume

14.00

Cat Lisplank
Beton Tumbuk
DALAM
DALAM

Lebar

Panjang
0.2
0.2
0.2
0.2

Jumlah
12.8
12.8
20
20

2.56
2.56
4
4

Total Volume

13.12

PONDASI TAPAK
Lebar
PONDASI Tapak

Panjang
0.7

0.7

0.15

TINGGI BANGUNAN 3.70 METER


68

130

3.808

54
27

81
P. Seluruhnya
81

68.85

24
21
45

6.3
0 xxxxx

Panjang

Jumlah

6.3

7
81
45
0.45
14

Panjang

0.224
3.24
0.7875

0.054
0 xxxx

Jumlah

6.48

81

Panjang

Jumlah
81

Panjang

25.515

Jumlah
45
7
0.45
14

1.575
0.448
0.108
0 xxxx
18

Panjang

Jumlah

2.43

81

Panjang

Jumlah
24
93.5

Panjang

Jumlah

8.87
6.87
1.93

63

Tinggi

Jumlah
0.65

7.5

4.55

Banyak

Jumlah
15
7
2

Panjang

2.268
1.1844
0.4968
3.9492

4.7

Jumlah
36

Panjang

0.594

Jumlah
81

Panjang

1.5795

Jumlah
21.2

0.3498

0.6
0.85
0.8

23.4

Jumlah
1

4
3.8
7.8

0.5145

DAFTAR UPAH KERJA DAN HARGA BAHAN


Kegiatan
Lokasi
Volume
Tahun Anggaran

:
:
:
:

Pembangunan Rumah Bantuan Untuk Bidan Desa


Idi Cut
38 M2
2011

A. DAFTAR UPAH KERJA


NO

URAIAN PERSONIL

SATUAN

HARGA BAHAN

1
2
3
4

Pekerja
Kepala Tukang
Mandor
Tukang

1.00
1.00
1.00
1.00

Hari
Hari
Hari
Hari

Rp
Rp
Rp
Rp

60,000.00
110,000.00
82,000.00
82,000.00

B. DAFTAR HARGA BAHAN


NO

URAIAN BAHAN

SATUAN

HARGA BAHAN

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

Tanah timbun
Pasir urug
Pasir Pasangan ( beton )
Batu kerikil bersih
Batu kali / batu pecah
Batu Bata
Semen Andalas @ 40 Kg
Semen putih
Kapur pasang
Keramik 40 x 40 cm (Polished)
Keramik 40 x 40 cm (Unpolished)
Keramik 60 x 60 cm
Keramik 20 x 25 cm
Keramik 20 x 20 cm
Besi Beton polos
Kawat Beton
Paku kayu
Paku Seng
Paku eternit
Paku Sekrup
Atap Genteng Seng Metal t=0,30 mm (uk. 154 x 80) cm
Bumbungan / nok Metal t=0,30 mm (uk. 95 x 22) cm
Kuda - kuda bahan Zincalume Bluescope 90% ( C-100)
Kuda - kuda bahan Zincalume Bluescope 90% ( C-75)
Kayu Klas 1 ( Damar laut )
Kayu Klas II ( Meuranti )
Kayu Klas III ( Sembarang keras )

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

M
M3
M3
3
M
3
M
Buah
Zak
Zak
Kg
Buah
Buah
Buah
Buah
Buah
Kg
Kg
Kg
Kg
Kg
Kotak
Lembar
M'
M2
M2
M3
M3
M3

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

60,000.00
95,000.00
105,000.00
130,000.00
198,000.00
600.00
55,000.00
110,000.00
7,000.00
9,166.67
8,833.33
40,000.00
2,750.00
2,200.00
15,500.00
20,000.00
18,500.00
15,700.00
32,000.00
5,300.00
80,000.00
20,000.00
180,000.00
150,000.00
7,200,000.00
6,000,000.00
4,500,000.00

28

Kayu Bekisting / mal

1.00 M

29
30
31
32
33
34
35
36
37
38
39
40
41

Kayu Keras 3" ; 4 M'


Papan kayu klas II
Papan kayu klas III
Papan lisplank 2.5 x 30 cm
Plywood tebal 4 mm
Plywood tebal 6 mm
Plywood tebal 9 mm
List kayu pofil
Plafond Gipsum 9 mm + Rangka Furing lengkap terpasang
Plafond Calciboard 4 mm + Rangka Furing lengkap terpasang
Asbes Eternit
Cat menie kayu / besi
Cat minyak setara Avian

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

42

Cat tembok setara Nippon

43

Minyak Cat

44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75

Dempul kayu
Pelamur tembok
Cat kayu dasar
Kertas pasir / amplas
Residu ( Teer )
Engsel Pintu Kuningan 4"
Engsel Jendela Kuningan 3"
Kunci 2 Slaag Antik
Kunci 2 Slaag setara merek kodai 7605
Grendel / pacok jendela setara merk bunga
Kait / hak angin jendela
Tarikan jendela
Plat strip untuk penguat kuda-kuda 3 x 40 mm
Kaca bening tebal 5 mm
Kaca Rayben tebal 5 mm
Glass Block
Ornamen gypsum
Baut dan mur
Seng plat BJLS 0,30
Pipa PVC uk. 1/2"
Pipa PVC uk. 3"
Pipa PVC uk. 4"
Bak cuci piring logam 1 lubang
Kloset duduk keramik
Kloset jongkok keramik
Kran air
Floor drain
Tempat sabun keramik
Wastafel keramik
Armatur lampu baret Phillips TL ring 32 Watt
Armatur lampu Inbow + Acrilic Louvre TL 2 x 20 Watt
Armatur lampu Phillips SL 8 Watt

4
3

Rp

4,000,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

15,000.00
6,000,000.00
4,500,000.00
5,400,000.00
60,000.00
95,000.00
130,000.00
4,800.00
125,000.00
140,000.00
14,500.00
23,800.00
48,500.00

1.00 Kg

Rp

16,500.00

1.00 Liter

Rp

20,000.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

18,900.00
12,700.00
13,200.00
2,100.00
8,500.00
21,100.00
19,800.00
170,000.00
126,000.00
9,300.00
5,000.00
8,500.00
4,000.00
85,000.00
105,000.00
27,500.00
165,000.00
4,200.00
52,300.00
36,600.00
133,400.00
272,200.00
528,600.00
1,524,300.00
175,000.00
17,000.00
65,000.00
85,000.00
485,000.00
175,000.00
350,000.00
24,250.00

Batang
3

M
3
M
M'
Lembar
Lembar
Lembar
M'
M2
M2
Lembar
Kg
Kg

Kg
Kg
Kg
Lembar
Kg
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
M2
2
M
Buah
Buah
Buah
Lembar
Batang
Batang
Batang
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah
Buah

76

Armatur lampu Phillips SL 18 Watt

1.00 Buah

Rp

28,250.00

77
78
79
80

Armatur lampu Phillips SL 20 Watt


Armatur lampu Phillips TL 20 Watt
Armatur lampu Phillips TL 40 Watt
Instalasi titik penerangan, instalasi termasuk kabel NYA 2,5 mm
dalam pipa PVC Fitting lampu dan kelengkapan instalasi terpasang
Stop kontak + instalasi
Box Zekering kast lokal 2 group
Saklar tunggal 1 gang merk setara BROCO
Saklar multi 2 gang merk setara BROCO
Saklar multi 3 gang merk setara BROCO
Panel Listrik

1.00 Buah
1.00 Buah
1.00 Buah

Rp
Rp
Rp

31,250.00
75,100.00
96,300.00

1.00
1.00
1.00
1.00
1.00
1.00
1.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

120,000.00
120,000.00
145,000.00
16,800.00
20,000.00
22,000.00
2,430,000.00

81
82
83
84
85
86

Titik
Titik
Titik
Buah
Buah
Buah
Buah

DAFTAR ANALISA HARGA SATUAN


Kegiatan
Lokasi
Volume
Tahun Anggaran

:
:
:
:

Pembangunan Rumah Bantuan Untuk Bidan Desa


Idi Cut
38 M2
2011

SNI - 1 - 6 - 08
: 1 M2 Membersihkan Lapangan dan Meratakan
0.100
Org
Pekerja
0.050
Org
Mandor

@
@

Rp
Rp
Jumlah
Dibulatkan

60,000.00 Rp
82,000.00 Rp
Rp
Rp

6,000.00
4,100.00
10,100.00
10,100.00

SNI - 1 - 6 - 04
: 1 M' Pengukuran dan Pemasangan Bouwplank
M3
0.012
Kayu Kasau 5/7 klas III
M3
0.007
Papan papan klas III
0.020
Kg
Paku
0.100
Org
Pekerja
0.010
Org
Kepala Tukang
0.005
Org
Mandor
0.100
Org
Tukang

@
@
@
@
@
@
@

Rp
4,500,000.00 Rp
Rp
4,500,000.00 Rp
Rp
18,500.00 Rp
Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp

6,000.00
1,100.00
410.00
8,200.00
15,710.00
15,700.00

SNI - 2 - 6 - 01
: 1 M3 Galian Tanah Biasa sedalam 1 m
0.040
Org
Mandor
0.400
Org
Pekerja

@
@

Rp
Rp
Jumlah
Dibulatkan

82,000.00 Rp
60,000.00 Rp
Rp
Rp

3,280.00
24,000.00
27,280.00
27,300.00

SNI - 2 - 6 - 02
: 1 M3 Galian Tanah Biasa sedalam 2 m
0.052
Org
Mandor
0.526
Org
Pekerja

@
@

Rp
Rp
Jumlah
Dibulatkan

82,000.00 Rp
60,000.00 Rp
Rp
Rp

4,264.00
31,560.00
35,824.00
35,800.00

SNI - 2 - 6 - 09
: 1 M3 Urugan Tanah Kembali
0.019
Org
Mandor
0.192
Org
Pekerja

@
@

Rp
Rp
Jumlah
Dibulatkan

82,000.00 Rp
60,000.00 Rp
Rp
Rp

1,558.00
11,520.00
13,078.00
13,100.00

SNI - 2 - 6 - 11
: 1 M3 Timbunan Pasir
1.200
M3
0.010
Org
0.300
Org

Pasir Urug
Mandor
Pekerja

@
@
@

Rp
Rp
Rp
Jumlah
Dibulatkan

95,000.00 Rp
82,000.00 Rp
60,000.00 Rp
Rp
Rp

820.00
18,000.00
18,820.00
18,800.00

Analisa A. 18 a
: 1 M3 Tanah Timbun
M3
1.200
0.300
Org
0.010
Org

Tanah Timbun
Pekerja
Mandor

@
@
@

Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00 Rp
60,000.00 Rp
82,000.00 Rp
Rp
Rp

18,000.00
820.00
18,820.00
18,800.00

@
@
@
@
@

Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

SNI - 3 - 6 - 14
: 1 M3 Pasangan Batu Kosong tebal 20 cm
1.200
M3
Batu Belah
0.039
Org
Mandor
0.039
Org
Kepala tukang
0.390
Org
Tukang Batu
0.780
Org
Pekerja

Page 19 of 31

198,000.00
82,000.00
110,000.00
82,000.00
60,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,198.00
4,290.00
31,980.00
46,800.00
80,312.33
80,300.00

SNI - 3 - 6 - 15
: 1 M3 Pondasi Cyclopen 1 Pc : 3 Ps : 6 Kr
0.490
M3
Batu Kali
0.320
M3
Pasir Pasangan
5.0500
Zak
Semen
3.000
Org
Pekerja
0.085
Org
Kepala Tukang
0.150
Org
Mandor
0.850
Org
Tukang

@
@
@
@
@
@
@

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

198,000.00
105,000.00
55,000.00
60,000.00
110,000.00
82,000.00
82,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

SNI - 4 - 6 - 09
: 1 M2 Pas. Bata Merah Tebal 1/2 Bata, 1 Pc : 2 Ps
0.320
Org
Pekerja
0.010
Org
Kepala Tukang
0.015
Org
Mandor
0.100
Org
Tukang
70.000
Buah
Batu Bata
0.038
M3
Pasir Pasangan
0.474
zak
Semen

@
@
@
@
@
@
@

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
600.00
105,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

19,200.00
1,100.00
1,230.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
600.00
105,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

19,200.00
1,100.00

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
105,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

12,000.00
1,650.00

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
105,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

12,000.00
1,650.00

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
105,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

12,000.00
1,650.00

SNI - 4 - 6 - 11
: 1 M2 Pas. Bata Merah Tebal 1/2 Bata, 1 Pc : 4 Ps
0.320
Org
Pekerja
0.010
Org
Kepala Tukang
0.015
Org
Mandor
0.100
Org
Tukang
70.000
Buah
Batu Bata
0.043
M3
Pasir Pasangan
0.287
zak
Semen

SNI - 5 - 6 - 02
: 1 M2 Plasteran, 1 Pc : 2 Ps : Tebal 15 mm.
0.200
Org
Pekerja
0.015
Org
Kepala Tukang
0.010
Org
Mandor
0.150
Org
Tukang
0.017
M3
Pasir Pasangan
0.213
Zak
Semen

@
@
@
@
@
@
@

@
@
@
@
@
@

SNI - 5 - 6 - 03
: 1 M2 Plasteran, 1 Pc : 3 Ps : Tebal 15 mm.
0.200
Org
Pekerja
0.015
Org
Kepala Tukang
0.010
Org
Mandor
0.150
Org
Tukang
0.019
M3
Pasir Pasangan
0.162
Zak
Semen

@
@
@
@
@
@

SNI - 5 - 6 - 04
: 1 M2 Plasteran, 1 Pc : 4 Ps : Tebal 15 mm.
0.200
Org
Pekerja
0.015
Org
Kepala Tukang
0.010
Org
Mandor
0.150
Org
Tukang
0.020
M3
Pasir Pasangan
0.130
Zak
Semen

@
@
@
@
@
@

Page 20 of 31

180,000.00
9,350.00
12,300.00
69,700.00
234,567.00
234,600.00

21,530.00
21,500.00

8,200.00

28,500.00
28,500.00

12,300.00

23,567.49
23,600.00

12,300.00

25,950.00
26,000.00

12,300.00

25,950.00
26,000.00

SNI - 7 - 6 - 02
: 1 M3 Membuat beton tumbuk 1 Pc : 3 Ps : 6 Kr
1.650
Org
Pekerja
0.025
Org
Kepala Tukang
0.080
Org
Mandor
0.250
Org
Tukang batu
0.940
M3
Kerikil bersih
0.470
M3
Pasir Pasangan
4.925
Zak
Semen

@
@
@
@
@
@
@

SNI - 13 - 6 - 44
: 1 M2 Lantai Keramik 20 x 20 Cm
0.620
Org
Pekerja
0.035
Org
Kepala Tukang
0.030
Org
Mandor
0.350
Org
Tukang Batu
25.000
Buah
Keramik 20 x 20 cm
0.038
M3
Pasir Pasangan
1.500
Kg
Semen Berwarna
0.042
Zak
Semen Portland

@
@
@
@
@
@
@
@

SNI - 13 - 6 - 47
: 1 M2 Lantai Keramik 40 x 40 Cm polished
0.620
Org
Pekerja
0.035
Org
Kepala Tukang
0.030
Org
Mandor
0.350
Org
Tukang Batu
6.250
Buah
Keramik 40 x 40 cm polished
0.038
M3
Pasir Pasangan
1.500
Kg
Semen Berwarna
0.042
Zak
Semen Portland

SNI - 13 - 6 - 47a.
: 1 M2 Lantai Keramik 40 x 40 Cm Unpolished
0.620
Org
Pekerja
0.035
Org
Kepala Tukang
0.030
Org
Mandor
0.350
Org
Tukang Batu
6.250
Buah
Keramik 40 x 40 cm unpolished
0.038
M3
Pasir Pasangan
1.500
Kg
Semen Berwarna
0.042
Zak
Semen Portland

SNI - 13 - 6 - 68a.
: 1 M2 Dinding Keramik 20 x 25 Cm
0.600
Org
Pekerja
0.045
Org
Kepala Tukang
0.030
Org
Mandor
0.100
Org
Tukang Batu
20.000
Buah
Keramik 20 x 25 cm
0.233
M3
Pasir Pasangan
1.5000
Kg
Semen Berwarna
0.0180
Zak
Semen Portland

@
@
@
@
@
@
@
@

@
@
@
@
@
@
@
@

@
@
@
@
@
@
@
@

SNI - 13 - 6 - 74
: 1 M2 Dinding batu tempel
0.620
Org
Pekerja
0.035
Org
Kepala Tukang
0.030
Org
Mandor
0.350
Org
Tukang Batu
1.050
M2
Batu tempel
0.035
M3
Pasir Pasangan
0.2938
Zak
Semen Portland

@
@
@
@
@
@
@

Page 21 of 31

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
130,000.00
105,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
2,200.00
105,000.00
2,750.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
9,166.67
105,000.00
2,750.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
8,833.33
105,000.00
2,750.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
2,750.00
105,000.00
2,750.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
99,000.00
105,000.00
55,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

99,000.00
2,750.00
20,500.00

119,234.35
119,200.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

37,200.00
3,850.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

37,200.00
3,850.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

37,200.00
3,850.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

36,000.00
4,950.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

37,200.00
3,850.00

28,700.00

66,345.46
66,300.00

28,700.00

66,234.46
66,200.00

28,700.00

66,234.34
66,200.00

8,200.00

43,456.00
43,500.00

28,700.00

67,234.25
67,200.00

SNI - 7 - 6 - 38
: 1 M3 Membuat Pondasi Beton Bertulang ( 150 Kg Besi + Bekisting )
3.900
Org
Pekerja
0.245
Org
Kepala Tukang
0.165
Org
Mandor
0.350
Org
Tukang Batu
1.040
Org
Tukang Kayu
1.050
Org
Tukang Besi
0.200
M3
Kayu Bekisting
1.500
Kg
Paku Kayu 2" - 5"
0.400
Liter
Minyak Bekisting
145.000
Kg
Besi Beton Polos
2.250
Kg
Kawat Beton
8.075
Zak
Semen Portland
0.520
M3
Pasir Pasangan
0.780
M3
Kerikil / Koral Beton

SNI - 7 - 6 - 39
: 1 M3 Membuat Sloof Bertulang ( 180 Kg Besi + Bekisting )
4.850
Org
Pekerja
0.331
Org
Kepala Tukang
0.170
Org
Mandor
0.350
Org
Tukang Batu
1.560
Org
Tukang Kayu
1.400
Org
Tukang Besi
0.270
M3
Kayu Bekisting
2.000
Kg
Paku Kayu 2" - 5"
0.600
Liter
Minyak Bekisting
180.000
Kg
Besi Beton Polos
3.000
Kg
Kawat Beton
8.075
Zak
Semen Portland
0.520
M3
Pasir Pasangan
0.780
M3
Kerikil / Koral Beton

SNI - 7 - 6 - 39.a
: 1 M3 Membuat Sloof Bertulang ( 135 Kg Besi + Bekisting )
4.850
Org
Pekerja
0.331
Org
Kepala Tukang
0.170
Org
Mandor
0.350
Org
Tukang Batu
1.560
Org
Tukang Kayu
1.400
Org
Tukang Besi
0.270
M3
Kayu Bekisting
2.000
Kg
Paku Kayu 2" - 5"
0.600
Liter
Minyak Bekisting
135.000
Kg
Besi Beton Polos
3.000
Kg
Kawat Beton
8.075
Zak
Semen Portland
0.520
M3
Pasir Pasangan
0.780
M3
Kerikil / Koral Beton

Page 22 of 31

@
@
@
@
@
@
@
@
@
@
@
@
@
@

@
@
@
@
@
@
@
@
@
@
@
@
@
@

@
@
@
@
@
@
@
@
@
@
@
@
@
@

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
4,000,000.00 Rp
Rp
18,500.00 Rp
Rp
8,500.00 Rp
Rp
15,500.00 Rp
Rp
20,000.00 Rp
Rp
55,000.00 Rp
Rp
105,000.00 Rp
Rp
130,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp

234,000.00
26,950.00

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
4,000,000.00 Rp
Rp
18,500.00 Rp
Rp
8,500.00 Rp
Rp
15,500.00 Rp
Rp
20,000.00 Rp
Rp
55,000.00 Rp
Rp
105,000.00 Rp
Rp
130,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp

291,000.00
36,410.00

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
4,000,000.00 Rp
Rp
18,500.00 Rp
Rp
8,500.00 Rp
Rp
15,500.00 Rp
Rp
20,000.00 Rp
Rp
55,000.00 Rp
Rp
105,000.00 Rp
Rp
130,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp

291,000.00
36,410.00

28,700.00
85,280.00
86,100.00

432,234.23
432,200.00

28,700.00
127,920.00
114,800.00

566,345.47
566,300.00

28,700.00
127,920.00
114,800.00

558,345.24
558,300.00

SNI - 7 - 6 - 40
: 1 M3 Membuat Kolom Beton Bertulang ( 140 Kg Besi + Bekisting )
5.960
Org
Pekerja
0.455
Org
Kepala Tukang
0.208
Org
Mandor
0.350
Org
Tukang Batu
2.800
Org
Tukang Kayu
1.400
Org
Tukang Besi
0.320
M3
Kayu Bekisting
3.200
Kg
Paku Kayu 2" - 5"
1.600
Liter
Minyak Bekisting
0.140
M3
Kayu Balok Klas III
2.800
Lembar
Plywood 9 mm
16.000
Batang
Kayu Keras 3" ; 4 M'
140.000
Kg
Besi Beton Polos
3.000
Kg
Kawat Beton
8.075
Zak
Semen Portland
0.520
M3
Pasir Pasangan
0.780
M3
Kerikil / Kerikil Beton

SNI - 7 - 6 - 40.a
: 1 M3 Membuat Kolom Beton Bertulang ( 110 Kg Besi + Bekisting )
5.960
Org
Pekerja
0.455
Org
Kepala Tukang
0.208
Org
Mandor
0.350
Org
Tukang Batu
2.800
Org
Tukang Kayu
1.400
Org
Tukang Besi
0.320
M3
Kayu Bekisting
3.200
Kg
Paku Kayu 2" - 5"
1.600
Liter
Minyak Bekisting
0.140
M3
Kayu Balok Klas III
2.800
Lembar
Plywood 9 mm
16.000
Batang
Kayu Keras 3" ; 4 M'
110.000
Kg
Besi Beton Polos
3.000
Kg
Kawat Beton
8.075
Zak
Semen Portland
0.520
M3
Pasir Pasangan
0.780
M3
Kerikil / Kerikil Beton

SNI - 7 - 6 - 40.b
: 1 M3 Membuat Kolom Beton Bertulang ( 120 Kg Besi + Bekisting )
5.960
Org
Pekerja
0.455
Org
Kepala Tukang
0.208
Org
Mandor
0.350
Org
Tukang Batu
2.800
Org
Tukang Kayu
1.400
Org
Tukang Besi
0.320
M3
Kayu Bekisting
3.200
Kg
Paku Kayu 2" - 5"
1.600
Liter
Minyak Bekisting
0.140
M3
Kayu Balok Klas III
2.800
Lembar
Plywood 9 mm
16.000
Batang
Kayu Keras 3" ; 4 M'
120.000
Kg
Besi Beton Polos
3.000
Kg
Kawat Beton
8.075
Zak
Semen Portland
0.520
M3
Pasir Pasangan
0.780
M3
Kerikil / Kerikil Beton

Page 23 of 31

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
4,000,000.00 Rp
Rp
18,500.00 Rp
Rp
8,500.00 Rp
Rp
4,500,000.00 Rp
Rp
130,000.00 Rp
Rp
15,000.00 Rp
Rp
15,500.00 Rp
Rp
20,000.00 Rp
Rp
55,000.00 Rp
Rp
105,000.00 Rp
Rp
130,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp

357,600.00
50,050.00

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
4,000,000.00 Rp
Rp
18,500.00 Rp
Rp
8,500.00 Rp
Rp
4,500,000.00 Rp
Rp
130,000.00 Rp
Rp
15,000.00 Rp
Rp
15,500.00 Rp
Rp
20,000.00 Rp
Rp
55,000.00 Rp
Rp
105,000.00 Rp
Rp
130,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp

357,600.00
50,050.00

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
4,000,000.00 Rp
Rp
18,500.00 Rp
Rp
8,500.00 Rp
Rp
4,500,000.00 Rp
Rp
130,000.00 Rp
Rp
15,000.00 Rp
Rp
15,500.00 Rp
Rp
20,000.00 Rp
Rp
55,000.00 Rp
Rp
105,000.00 Rp
Rp
130,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp

357,600.00
50,050.00

28,700.00
229,600.00
114,800.00

624,356.24
624,400.00

28,700.00
229,600.00
114,800.00

723,456.37
723,500.00

28,700.00
229,600.00
114,800.00

723,456.37
723,500.00

SNI - 7 - 6 - 40.c
: 1 M3 Membuat Kolom Beton Bertulang ( 190 Kg Besi + Bekisting )
5.960
Org
Pekerja
0.455
Org
Kepala Tukang
0.208
Org
Mandor
0.350
Org
Tukang Batu
2.800
Org
Tukang Kayu
1.400
Org
Tukang Besi
0.320
M3
Kayu Bekisting
3.200
Kg
Paku Kayu 2" - 5"
1.600
Liter
Minyak Bekisting
0.140
M3
Kayu Balok Klas III
2.800
Lembar
Plywood 9 mm
16.000
Batang
Kayu Keras 3" ; 4 M'
190.000
Kg
Besi Beton Polos
3.000
Kg
Kawat Beton
8.075
Zak
Semen Portland
0.520
M3
Pasir Pasangan
0.780
M3
Kerikil / Kerikil Beton

SNI - 7 - 6 - 41
: 1 M3 Membuat Balok Beton Bertulang ( 135 Kg Besi + Bekisting )
5.800
Org
Pekerja
0.420
Org
Kepala Tukang
0.185
Org
Mandor
0.350
Org
Tukang Batu
2.800
Org
Tukang Kayu
1.050
Org
Tukang Besi
0.320
M3
Kayu Bekisting
3.200
Kg
Paku Kayu 2" - 5"
1.600
Liter
Minyak Bekisting
0.120
M3
Kayu Balok Klas III
2.800
Lembar
Plywood 9 mm
24.000
Batang
Kayu Keras 3" ; 4 M'
160.000
Kg
Besi Beton Polos
2.250
Kg
Kawat Beton
8.075
Zak
Semen Portland
0.520
M3
Pasir Pasangan
0.780
M3
Kerikil / Kerikil Beton

SNI - 7 - 6 - 41.a
: 1 M3 Membuat Balok Beton Bertulang ( 140 Kg Besi + Bekisting )
5.800
Org
Pekerja
0.420
Org
Kepala Tukang
0.185
Org
Mandor
0.350
Org
Tukang Batu
2.800
Org
Tukang Kayu
1.050
Org
Tukang Besi
0.320
M3
Kayu Bekisting
3.200
Kg
Paku Kayu 2" - 5"
1.600
Liter
Minyak Bekisting
0.120
M3
Kayu Balok Klas III
2.800
Lembar
Plywood 9 mm
24.000
Batang
Kayu Keras 3" ; 4 M'
140.000
Kg
Besi Beton Polos
2.250
Kg
Kawat Beton
8.075
Zak
Semen Portland
0.520
M3
Pasir Pasangan
0.780
M3
Kerikil / Kerikil Beton

Page 24 of 31

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
4,000,000.00 Rp
Rp
18,500.00 Rp
Rp
8,500.00 Rp
Rp
4,500,000.00 Rp
Rp
130,000.00 Rp
Rp
15,000.00 Rp
Rp
15,500.00 Rp
Rp
20,000.00 Rp
Rp
55,000.00 Rp
Rp
105,000.00 Rp
Rp
130,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp

357,600.00
50,050.00

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
4,000,000.00 Rp
Rp
18,500.00 Rp
Rp
8,500.00 Rp
Rp
4,500,000.00 Rp
Rp
130,000.00 Rp
Rp
15,000.00 Rp
Rp
15,500.00 Rp
Rp
20,000.00 Rp
Rp
55,000.00 Rp
Rp
105,000.00 Rp
Rp
130,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp

348,000.00
46,200.00

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
4,000,000.00 Rp
Rp
18,500.00 Rp
Rp
8,500.00 Rp
Rp
4,500,000.00 Rp
Rp
130,000.00 Rp
Rp
15,000.00 Rp
Rp
15,500.00 Rp
Rp
20,000.00 Rp
Rp
55,000.00 Rp
Rp
105,000.00 Rp
Rp
130,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp

348,000.00
46,200.00

28,700.00
229,600.00
114,800.00

723,456.37
723,500.00

28,700.00
229,600.00
86,100.00

623,245.35
623,200.00

28,700.00
229,600.00
86,100.00

723,456.37
723,500.00

SNI - 7 - 6 - 41.b
: 1 M3 Membuat Balok Beton Bertulang ( 165 Kg Besi + Bekisting )
5.800
Org
Pekerja
0.420
Org
Kepala Tukang
0.185
Org
Mandor
0.350
Org
Tukang Batu
2.800
Org
Tukang Kayu
1.050
Org
Tukang Besi
0.320
M3
Kayu Bekisting
3.200
Kg
Paku Kayu 2" - 5"
1.600
Liter
Minyak Bekisting
0.120
M3
Kayu Balok Klas III
2.800
Lembar
Plywood 9 mm
24.000
Batang
Kayu Keras 3" ; 4 M'
165.000
Kg
Besi Beton Polos
2.250
Kg
Kawat Beton
8.075
Zak
Semen Portland
0.520
M3
Pasir Pasangan
0.780
M3
Kerikil / Kerikil Beton

SNI - 7 - 6 - 41.c
: 1 M3 Membuat Balok Beton Bertulang ( 170 Kg Besi + Bekisting )
5.800
Org
Pekerja
0.420
Org
Kepala Tukang
0.185
Org
Mandor
0.350
Org
Tukang Batu
2.800
Org
Tukang Kayu
1.050
Org
Tukang Besi
0.320
M3
Kayu Bekisting
3.200
Kg
Paku Kayu 2" - 5"
1.600
Liter
Minyak Bekisting
0.120
M3
Kayu Balok Klas III
2.800
Lembar
Plywood 9 mm
24.000
Batang
Kayu Keras 3" ; 4 M'
170.000
Kg
Besi Beton Polos
2.250
Kg
Kawat Beton
8.075
Zak
Semen Portland
0.520
M3
Pasir Pasangan
0.780
M3
Kerikil / Kerikil Beton

SNI - 7 - 6 - 41.d
: 1 M3 Membuat Balok Beton Bertulang ( 180 Kg Besi + Bekisting )
5.800
Org
Pekerja
0.420
Org
Kepala Tukang
0.185
Org
Mandor
0.350
Org
Tukang Batu
2.800
Org
Tukang Kayu
1.050
Org
Tukang Besi
0.320
M3
Kayu Bekisting
3.200
Kg
Paku Kayu 2" - 5"
1.600
Liter
Minyak Bekisting
0.120
M3
Kayu Balok Klas III
2.800
Lembar
Plywood 9 mm
24.000
Batang
Kayu Keras 3" ; 4 M'
180.000
Kg
Besi Beton Polos
2.250
Kg
Kawat Beton
8.075
Zak
Semen Portland
0.520
M3
Pasir Pasangan
0.780
M3
Kerikil / Kerikil Beton

Page 25 of 31

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
4,000,000.00 Rp
Rp
18,500.00 Rp
Rp
8,500.00 Rp
Rp
4,500,000.00 Rp
Rp
130,000.00 Rp
Rp
15,000.00 Rp
Rp
15,500.00 Rp
Rp
20,000.00 Rp
Rp
55,000.00 Rp
Rp
105,000.00 Rp
Rp
130,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp

348,000.00
46,200.00

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
4,000,000.00 Rp
Rp
18,500.00 Rp
Rp
8,500.00 Rp
Rp
4,500,000.00 Rp
Rp
130,000.00 Rp
Rp
15,000.00 Rp
Rp
15,500.00 Rp
Rp
20,000.00 Rp
Rp
55,000.00 Rp
Rp
105,000.00 Rp
Rp
130,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp

348,000.00
46,200.00

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
4,000,000.00 Rp
Rp
18,500.00 Rp
Rp
8,500.00 Rp
Rp
4,500,000.00 Rp
Rp
130,000.00 Rp
Rp
15,000.00 Rp
Rp
15,500.00 Rp
Rp
20,000.00 Rp
Rp
55,000.00 Rp
Rp
105,000.00 Rp
Rp
130,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp

348,000.00
46,200.00

28,700.00
229,600.00
86,100.00

623,245.35
623,200.00

28,700.00
229,600.00
86,100.00

623,245.35
623,200.00

28,700.00
229,600.00
86,100.00

634,245.24
634,200.00

SNI - 7 - 6 - 44
: 1 M3 Membuat Plat Lantai Beton Bertulang ( 105 Kg Besi + Bekisting )
5.600
Org
Pekerja
0.400
Org
Kepala Tukang
0.193
Org
Mandor
0.350
Org
Tukang Batu
2.640
Org
Tukang Kayu
1.050
Org
Tukang Besi
0.240
M3
Kayu Bekisting
0.160
M3
Kayu Balok Klas III
2.800
Lembar
Plywood 9 mm
24.000
Batang
Kayu Keras 3" ; 4 M'
3.200
Kg
Paku Kayu 2" - 5"
1.600
Liter
Minyak Bekisting
105.000
Kg
Besi Beton Polos
2.250
Kg
Kawat Beton
8.075
Zak
Semen Portland
0.520
M3
Pasir Pasangan
0.780
M3
Kerikil / Koral Beton

SNI - 7 - 6 - 45
: 1 M' Membuat Kolom Penguat / Praktis Beton Bertulang ( 13 x 13 ) cm
0.060
Org
Pekerja
0.006
Org
Kepala Tukang
0.003
Org
Mandor
0.020
Org
Tukang Batu
0.020
Org
Tukang Kayu
0.020
Org
Tukang Besi
0.002
M3
Kayu Bekisting
0.010
Kg
Paku Kayu 2" - 5"
3.000
Kg
Besi Beton Polos
0.450
Kg
Kawat Beton
0.100
Zak
Semen Portland
0.006
M3
Pasir Pasangan
0.009
M3
Kerikil / Koral Beton

SNI - 6 - 6 - 01
: Mengerjakan 1 M3 Kayu untuk Kosen Jendela / Pintu
6.000
Org
Pekerja
2.000
Org
Kepala Tukang
0.300
Org
Mandor
18.000
Org
Tukang
1.100
M3
Kayu Kosen Klas I

SNI - 6 - 6 - 52
: Mengerjakan 1 M' papan lisplank 3 x 30 cm
0.100
Org
Pekerja
0.010
Org
Kepala Tukang
0.050
Org
Mandor
0.100
Org
Tukang
0.0086
M'
Papan lisplank Klas II di Ridder
0.060
Kg
Paku

SNI - 6 - 6 - 60
: 1 M' Pasang list plafond
0.021
Org
0.002
Org
0.001
Org
0.021
Org
1.050
M'
0.050
Kg

Pekerja
Kepala Tukang
Mandor
Tukang kayu
Kayu profil
Paku

@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@
@

@
@
@
@
@
@
@
@
@
@
@
@
@

@
@
@
@
@

@
@
@
@
@
@

@
@
@
@
@
@

Page 26 of 31

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
4,000,000.00 Rp
Rp
4,500,000.00 Rp
Rp
130,000.00 Rp
Rp
15,000.00 Rp
Rp
18,500.00 Rp
Rp
8,500.00 Rp
Rp
15,500.00 Rp
Rp
20,000.00 Rp
Rp
55,000.00 Rp
Rp
105,000.00 Rp
Rp
130,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp

336,000.00
44,000.00

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
4,000,000.00 Rp
Rp
18,500.00 Rp
Rp
15,500.00 Rp
Rp
20,000.00 Rp
Rp
55,000.00 Rp
Rp
105,000.00 Rp
Rp
130,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp

3,600.00
660.00

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
7,200,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp

360,000.00
220,000.00

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
5,400,000.00 Rp
Rp
18,500.00 Rp
Jumlah
Rp
Dibulatkan
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
4,800.00
18,500.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

28,700.00
216,480.00
86,100.00

612,343.13
612,300.00

1,640.00
1,640.00
1,640.00

9,180.00
9,200.00

1,476,000.00
1,065,356.35
1,065,400.00

6,000.00
1,100.00
8,200.00

15,300.00
15,300.00

1,260.00
220.00
1,722.00

3,202.00
3,200.00

SNI - 8 - 6 - 32
: Mengerjakan 1 M2 Atap Genteng Seng Metal
0.200
Org
Pekerja
0.010
Org
Kepala Tukang
0.001
Org
Mandor
0.100
Org
Tukang
1.020
Lembar
Genteng Seng Metal
0.200
Kg
Paku Biasa 2" - 5"

@
@
@
@
@
@

SNI - 8 - 6 - 36
: Menutup 1 M' Pasang Nok Genteng.
0.250
Org
Pekerja
0.015
Org
Kepala Tukang
0.150
Org
Tukang
0.013
Org
Mandor
1.100
M3
Nok Genteng Seng Metal
0.200
Zak
Paku Biasa 1/2" - 1"

SNI - 11 - 6 - 19
: 1 M' Pasang talang miring, seng BJLS 28
0.040
Org
Pekerja
0.025
Org
Kepala Tukang
0.001
Org
Mandor
0.400
Org
Tukang kayu
0.500
Lbr
Seng plat 3' x 6' BJLS 28
0.015
Kg
Paku biasa 1/2" - 1"
0.019
M3
Kayu klas II
0.300
Kg
Flincote / menie besi

@
@
@
@
@
@

@
@
@
@
@
@
@
@

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
80,000.00
15,700.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

12,000.00
1,100.00

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
20,000.00
15,700.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

15,000.00
1,650.00
12,300.00

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
52,300.00 Rp
Rp
18,500.00 Rp
Rp
6,000,000.00 Rp
Rp
23,800.00 Rp
Jumlah
Rp
Dibulatkan
Rp

2,400.00
2,750.00

SNI - 6 - 6 - 57
: Mengerjakan 1 M2 Pasang dinding pemisah Calciboard 4 mm rangkap, rangka kayu
0.200
Org
Pekerja
@
Rp
60,000.00 Rp
0.060
Org
Kepala Tukang
@
Rp
110,000.00 Rp
0.010
Org
Mandor
@
Rp
82,000.00 Rp
0.600
Org
Tukang kayu
@
Rp
82,000.00 Rp
0.0195
M3
Kayu klas II balok
@
Rp
6,000,000.00 Rp
0.007
M3
Kayu klas II papan
@
Rp
4,500,000.00 Rp
1.000
Lbr
Calciboard 4 mm
@
Rp
140,000.00 Rp
0.560
Ltr
Lem kayu
@
Rp
5,000.00 Rp
0.100
Kg
Paku
@
Rp
32,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp
SNI - 6 - 6 - 09
: Mengerjakan 1 M2 Pintu atau jendela panel kaca
0.800
Org
Pekerja
0.200
Org
Kepala Tukang
0.040
Org
Mandor
2.000
Org
Tukang
0.900
M2
Kaca 5 mm
0.035
M3
Kayu klas I

SNI - 6 - 6 - 08
: Mengerjakan 1 M2 Pintu panel kayu klas II
1.000
Org
Pekerja
0.250
Org
Kepala Tukang
0.050
Org
Mandor
2.500
Org
Tukang
0.040
M3
Kayu, Papan klas II

@
@
@
@
@
@

@
@
@
@
@

Page 27 of 31

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
85,000.00 Rp
Rp
7,200,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
6,000,000.00 Rp
Jumlah
Rp
Dibulatkan
Rp

8,200.00

21,300.00
21,300.00

28,950.00
29,000.00

32,800.00

37,950.00
38,000.00

12,000.00
6,600.00
49,200.00

67,800.00
67,800.00

48,000.00
22,000.00
164,000.00

198,456.37
198,500.00

60,000.00
27,500.00
205,000.00
258,245.29
258,200.00

E.13
: Mengerjakan 1 M' Memancang Kayu
0.180
Org
Pekerja
0.004
Org
Kepala Tukang
0.043
Org
Mandor
0.040
Org
Tukang
1.200
M'
Kayu Dolken

@
@
@
@
@

SNI - 9 - 6 - 20
: Mengerjakan 1 M2 Langit-langit asbes (1 x 1) m, rangka kayu klas III
0.180
Org
Pekerja
0.032
Org
Kepala Tukang
0.009
Org
Mandor
0.320
Org
Tukang
0.012
m3
Kayu Klas III
0.060
Kg
Paku biasa 1/2" - 1"
1.100
Lbr
Asbes 1 x 1 M

SNI - 10 - 6 - 01
: Memasang I buah kloset duduk / monoblok
3.300
Org
Pekerja
0.001
Org
Kepala Tukang
0.160
Org
Mandor
1.100
Org
Tukang
1.000
Buah
Kloset duduk / monoblok
0.060
Perlengkapan 6% harga kloset

SNI - 10 - 6 - 02
: Memasang I buah kloset jongkok keramik
1.000
Org
Pekerja
1.500
Org
Kepala Tukang
0.160
Org
Mandor
1.500
Org
Tukang
1.000
Buah
Kloset jongkok keramik
0.150
Zak
Semen Portland
0.010
M3
Pasir Pasangan

@
@
@
@
@
@
@

@
@
@
@
@
@

@
@
@
@
@
@
@

SNI - 10 - 6 - 25
: Memasang I M Pipa PVC diameter 1/2"
0.036
Org
Pekerja
0.006
Org
Kepala Tukang
0.002
Org
Mandor
0.060
Org
Tukang batu
1.200
M'
Pipa PVC dia. 1/2"
1.000
Perlengkapan 35% harga pipa

SNI - 10 - 6 - 31
: Memasang I M Pipa PVC diameter 3"
0.081
Org
Pekerja
0.014
Org
Kepala Tukang
0.004
Org
Mandor
0.135
Org
Tukang batu
1.200
M'
Pipa PVC dia. 3"
1.000
Perlengkapan 35% harga pipa

Page 28 of 31

@
@
@
@
@
@

@
@
@
@
@
@

Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
3,750.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

10,800.00
440.00

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
4,500,000.00 Rp
Rp
18,500.00 Rp
Rp
14,500.00 Rp
Jumlah
Rp
Dibulatkan
Rp

10,800.00
3,520.00
738.00

Rp
60,000.00 Rp
Rp
110,000.00 Rp
Rp
82,000.00 Rp
Rp
82,000.00 Rp
Rp
1,524,300.00 Rp
Rp
0.00 Rp
Jumlah
Rp
Dibulatkan
Rp

198,000.00
110.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
175,000.00
55,000.00
105,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

60,000.00
165,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
6,100.00
2,135.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,160.00
660.00

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
22,233.33
7,781.67

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,860.00
1,540.00

3,280.00
14,520.00
14,500.00

15,058.00
15,100.00

90,200.00

213,243.24
213,200.00

123,000.00

299,354.23
299,400.00

4,920.00

7,740.00
7,700.00

11,070.00

17,470.00
17,500.00

SNI - 10 - 6 - 32
: Memasang I M Pipa PVC diameter 4"
0.081
Org
Pekerja
0.014
Org
Kepala Tukang
0.004
Org
Mandor
0.135
Org
Tukang batu
1.200
M'
Pipa PVC dia. 4"
1.000
Perlengkapan 35% harga pipa

SNI - 10 - 6 - 35
: Memasang I buah kran diameter 3/4" atau 1/2"
0.010
Org
Pekerja
0.010
Org
Kepala Tukang
0.005
Org
Mandor
0.100
Org
Tukang batu
1.000
Buah
Kran air
0.025
Buah
Seal tape

@
@
@
@
@
@

@
@
@
@
@
@

SNI - 10 - 6 - 36
: Memasang I buah floor drain
0.010
Org
Pekerja
0.010
Org
Kepala Tukang
0.005
Org
Mandor
0.100
Org
Tukang batu
1.000
Buah
Floor drain

@
@
@
@
@

SNI - 10 - 6 - 05
: Memasang I buah wastafel
1.100
Org
Pekerja
0.150
Org
Kepala Tukang
0.100
Org
Mandor
1.450
Org
Tukang batu
0.010
M3
Pasir Pasangan
0.150
Zak
Semen Portland
1.000
Buah
Wastefel
1.000
Perlengkapan 35% harga pipa

SNI - 14 - 6 - 14
: 1 M2 Mengecat Tembok / Dinding Baru ( 3x )
0.020
Org
Pekerja
0.0063
Org
Kepala Tukang
0.063
Org
Tukang
0.0025
Org
Mandor
0.100
Kg
Plamur
0.100
Kg
Cat Dasar
0.260
Kg
Cat Penutup

@
@
@
@
@
@
@
@

@
@
@
@
@
@
@

SNI - 14 - 6 - 08
: 1 M2 Pengecatan Bidang Kayu Baru
0.070
Org
Pekerja
0.006
Org
Kepala Tukang
0.0025
Org
Mandor
0.009
Org
Tukang
0.200
Kg
Cat Menie
0.150
Kg
Plamur
0.170
Kg
Cat Dasar
0.260
Kg
Cat Penutup

@
@
@
@
@
@
@
@

Page 29 of 31

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
45,366.67
15,878.33

Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
17,000.00
4,000.00

Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
65,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
105,000.00
55,000.00
485,000.00
169,750.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
12,700.00
13,200.00
16,500.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
23,800.00
12,700.00
13,200.00
48,500.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,860.00
1,540.00
11,070.00

17,470.00
17,500.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

600.00
1,100.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

600.00
1,100.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

66,000.00
16,500.00

8,200.00

9,900.00
9,900.00

8,200.00
9,900.00
9,900.00

118,900.00

176,245.24
176,200.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,200.00
693.00
5,166.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,200.00
660.00

7,059.00
7,100.00

738.00

5,598.00
5,600.00

SNI - 12 - 6 - 01
: 1 Buah pasang kunci tanam antik
0.060
Org
Pekerja
0.060
Org
Kepala Tukang
0.003
Org
Mandor
0.600
Org
Tukang Kayu
1.000
Buah
Kunci tanam antik

@
@
@
@
@

SNI - 12 - 6 - 02
: 1 Buah pasang kunci tanam biasa
0.010
Org
Pekerja
0.010
Org
Kepala Tukang
0.005
Org
Mandor
0.500
Org
Tukang Kayu
1.000
Buah
Kunci tanam biasa

@
@
@
@
@

SNI - 12 - 6 - 05
: 1 Buah pasang engsel pintu
0.015
Org
Pekerja
0.015
Org
Kepala Tukang
0.001
Org
Mandor
0.150
Org
Tukang Kayu
1.000
Buah
Engsel pintu

@
@
@
@
@

SNI - 12 - 6 - 06
: 1 Buah pasang engsel jendela kupu-kupu
0.010
Org
Pekerja
0.010
Org
Kepala Tukang
0.001
Org
Mandor
0.100
Org
Tukang Kayu
1.000
Buah
Engsel jendela

@
@
@
@
@

SNI - 12 - 6 - 09
: 1 Buah pasang kait angin
0.015
Org
Pekerja
0.015
Org
Kepala Tukang
0.001
Org
Mandor
0.150
Org
Tukang Kayu
1.000
Buah
Kait angin

@
@
@
@
@

SNI - 12 - 6 - 11
: 1 Buah pasang kunci selot / grendel
0.020
Org
Pekerja
0.020
Org
Kepala Tukang
0.001
Org
Mandor
0.200
Org
Tukang Kayu
1.000
Buah
Kunci selot

@
@
@
@
@

Page 30 of 31

Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
170,000.00

Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
126,000.00

Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
21,100.00

Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
19,800.00

Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
5,000.00

Rp
Rp
Rp
Rp
Rp
Jumlah
Dibulatkan

60,000.00
110,000.00
82,000.00
82,000.00
9,300.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,600.00
6,600.00
49,200.00
55,224.24
55,200.00

600.00
1,100.00
41,000.00
42,700.00
42,700.00

900.00
1,650.00
12,300.00
14,850.00
14,900.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

600.00
1,100.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

900.00
1,650.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

8,200.00
9,900.00
9,900.00

12,300.00
14,850.00
14,900.00

1,200.00
2,200.00
16,400.00
19,800.00
19,800.00

REKAPITULASI RENCANA ANGGARAN BIAYA


Kegiatan
Lokasi
Volume
Tahun Anggaran

:
:
:
:

Pembangunan Rumah Dinas Sementara Militer


Bataliyon Tualang Cut
40 M2
2011 / 2012

NO

URAIAN KEGIATAN

JUMLAH HARGA
(RP)
600,000.00

PEKERJAAN PERSIAPAN

II

PEKERJAAN TANAH & PONDASI

III

PEKERJAAN BETON BERTULANG

IV

PEKERJAAN PASANGAN DAN PLASTERAN

PEKERJAAN KUZEN PINTU DAN JENDELA

VI

PEKERJAAN ATAP DAN PLAFOND

4,762,451.00

VII

PEKERJAAN LANTAI DAN DINDING KERAMIK

3,004,210.50

VIII

PEKERJAAN PENGUNCI DAN PENGGANTUNG

425,000.00

IX

PEKERJAAN PENGECATAN

450,058.00

PEKERJAAN INSTALASI LISTRIK

1,262,500.00

XI

PEKERJAAN INSTALASI AIR

3,322,180.00

XII

PEKERJAAN AKHIR

1,250,000.00

a.

JUMLAH

20,000,194.40

b.

PPN 10%

2,000,019.44

c.

JUMLAH ( a + b )

22,000,213.84

d.

DIBULATKAN

22,000,000.00

1,022,631.40
746,344.00
3,015,519.50
139,300.00

Terbilang : Dua Ratus Lima Puluh Satu Juta Delapan Ratus Tujuh Puluh Tiga Ribu Rupiah