You are on page 1of 24

01 - 2004 rev 0

EURA E ed SE

FUNCTIONING CHECK AND FAULTS FINDING CHARTS The following check must be executed with the help of the Instructions Manual

REMARK: The lasting check must be executed with a tester on the flow of the , after disconnecting the boiler and after disconnecting the connector relevant to the component or circuit to be tested. For the tests on the electrical components check the connections and the contacts of the connections even if not indicated ABBREVIATIONS: PCB/M = Modulation PCB - PCB/I = Flame check PCB Give the electrical supply to the boiler with the botton O/I Does the green led flash?
YES
NO NO

Check the connection and insert the external switch Are there 230v between L.N. of M11 of the PCB/M?
NO

Is the boiler electrically supplied?

YES

Check the supplying cables and the connections Replace the fuse and the PCB/M

YES

Is the yellow led off?

NO

The positioning of the Mixing valve is disabled (parameter 9 on 1) The antifrost system is on

YES WAIT 80 SECONDS FOR THE POSITIONING OF THE MIXING VALVE YES The display shows the error code. If the led is constantly on it is possible to reset with the relevant button, if it is flashing read the following instructions E01 Block of the ignition board Reset with the button RESET E02 Block for lack of burner ignition Reset with the button RESET E05 Damaged flow sensor Replace the sensor Is the red led off? E12 Damaged Micro-storage sensor Replace the sensor NO E18 Water filling in action (led off) Wait 4 minutes E19 Water filling not completed within 4 minutes Reset the el. network E21 Lack of water. 3 tempts of filling already done Reset the el. network E22 EPROM errors. Demand for programming Reset the el. network E 29 Modulator coil in short circuit Replace the coil E31 Eventual not compatible remote control Replace the eventual remote E 68 Eventual not programmed remote Program it YES Move the boiler on Summer Replace the Does the green led switch NO PCB/M on? YES NO Regulate the DHW at Is the contact of Controllare il buon funzionamento del galleggiante maximum and open an DHW micro switch o sostituire il micro del flussostato hot water tap. NO closed ? Does the boiler switch Replace the PCB/M after checking that the wires of on? ( continuity between the micro are connected and entire YES 26 and 29 of M5 of PCB/M YES NO Is the pump on? Are there 230v Replace the PCB/M between the clamps NO of the pump? YES Replace the pump YES With boiler off is the NO Replace the pressure switch Are there NO contact between C Does the fan turn? 230v on the and NC of the Flue Switch on the boiler. If ( only SE models) clamps of press. switch closed? YES NO there are not 230v between the fan? 41 and 48 of M4 replace the PCB/I. If not, replace the YES Replace the fan PCB/I YES

Does the sparkle appear on the burner?

NO

Are the ignition electrode and its cable dirty or damaged?

NO

Replace the PCB/I

YES

Clean or replace electrodes and cable Have the safety thermostat and the flue therm. (E model) the contact closed?

For the SE models: check that the contact between C and NO of the flue press.switch is closed, that the pipes are connected and that the press.switch is efficient Replace the damaged one REMARK: for the flue therm. As first check the draught Replace the damaged one Replace the PCB/I

YES

Does the burner switch on?


NO

During the ignition, are there 230 v between the coils of the gas valve? (reset if the boiler goes in block Has the power of slow ignition been properly regulated? (see Manual)

NO

NO

YES YES

Replace the valve if gas arrives from the network (IN plug) Check the regulation of power of slow ign. And of minimum power of gas valve ( see the Manual ) Is the modulator interrupted or in short circuit ? Does the flame remain at minimum or at slow power? Is the ionization electrode dirty, wrong regulated or damaged?
NO YES

YES
NO

Does the flame remain in slow ignition for 8 secs? NO

YES

Replace the PCB/M Replace the modulator Regulate the maximum power of the gas valve as indicated in the Manual. Replace the Iono board Clean, regulate or replace the ionization elec.

YES
NO YES

After 8 seconds does the flame move to the maximum power?

NO

Does the boiler goes in block after 10 secs?


YES

NO

YES

YES

The water draw Does the water flow Clean the DHW YES Does the water at the tap off is superior to NO remain low? exchanger with specific NO that allowed by get warm? products the boiler? ( see the Manual YES Reduce the water draw off at the tap YES Reduce the draw off at the Check the resistance of 0C = 33 k tap at 5 l/min NO the NTC sensor and 20C = 12,5 k Does the flame modulate replace it if necessary 60C = 2,5 k after some seconds? 80C = 1,3 k YES END OF THE DHW TEST CHECK OF THE HEATING Move the selector on WINTER with the NO regulation at maximum Does the boiler switch on? YES Does the pump start NO working?
YES Do the radiators get warm? YES END OF THE TEST

Does the Room Therm. ask for heat?

NO

Regulate the room thermostat Create a jumper between 5 and 7 of M10 of the PCB/M, if the boiler doesnt switch on replace the PCB/M Regulate the parameter Replace the PCB/M

YES NO Is the parameter 5 regulated on the YES value 0?

NO

Check that the taps or thermostatic valves are open

You might also like