You are on page 1of 33

ProTime Estimation

More Accurate Time Studies Video Time Studies Faster Time Studies Lean Work Analysis for Improvement Pre-Determined Motion Time Systems (PMTS) Local Support in the Philippines

Robin Owens
BSIE, MMM, MBA Asia Managing Director, Proplanner

Leaders in Process and Industrial Engineering

ProTime Estimation
Presentation Overview

Proplanner & ProTime Estimation Estimated Times & Time Studies

Lean Work Content Analysis


Motion Studies

Leaders in Process and Industrial Engineering

ProTime Estimation
Presentation Overview

Proplanner & ProTime Estimation Estimated Times & Time Studies

Lean Work Content Analysis


Motion Studies

Leaders in Process and Industrial Engineering

Proplanner
Background

Formed in 2002 in the USA


Iowa State University Research Park Branched off from EDS PLM Solutions Focus on engineering software solutions for manufacturing (versus a focus on product design).

President: Dr. Dave Sly,


BSIE, MSIE, PhD IE, MBA, Licensed PE Adjunct Professor Iowa State University

Process and Industrial Engineering software, created by 20-30 highly educated and experienced engineers and software developers.

Biggest competitor is MS Excel.


Map of Proplanner Customers

Leaders in Process and Industrial Engineering

Robin Owens
Background
Penn State University
BSIE, MMM, MBA

Industrial Engineer
American Express Empire Industries Boeing Commercial Airplane Group

IE Consultant

Engineering Animation Inc. Japan, Korea, Malaysia, USA Amkor Technology Philippines, Taiwan, China, USA

Manufacturing Manager
Amkor Philippines Intel Smiths Medical

Adjunct Professor
De La Salle University (prev. Mapua)

November 2011 Industrial Engineer Magazine Article

Leaders in Process and Industrial Engineering

ProTime Estimation
Value

Most everyone at your company understands the importance of accurate time standards.
(affects the costing and pricing of products, planning of work, determining production performance, etc.)

Leaders in Process and Industrial Engineering

ProTime Estimation
Value

Most everyone at your company understands the importance of accurate time standards.
(affects the costing and pricing of products, planning of work, determining production performance, etc.)

Therefore, it is easy to understand the value of using software increase the accuracy of time standards.
(versus inaccurate manual methods using paper, pencil, stopwatch, and then MS Excel)

Leaders in Process and Industrial Engineering

Time Standards
Current Issues
How are time studies frequently performed today?
Paper, pencil, stopwatch Transfer data to MS Excel Perform calculations and analysis in MS Excel

Current methods to determine time standards are lengthy and prone to human error.

Impossible to check the accuracy of a stopwatch study (cannot check an observed time or rating).
Without engineering software, time and work improvement studies are being performed today as best they can be.

Leaders in Process and Industrial Engineering

Time Standards
Current Issues Addressed
Use of software for time studies and work improvement is beneficial:
Enables video time study (less offensive to operators, much more accurate standards) Automatic calculation of the various parts of the study (faster studies & more accurate data) Easier justification of time standards (team review video of the work study) Automatic reporting (saves engineering time, better management presentation) Automated analysis of Value Added & Non-Value Added work content (for work improvement)

ProTime Estimation allows users to have & compare 3 different types of times for each time standard:
Estimated Times Observed Times (real-time or video time studies) Calculated Time (PMTS systems MTM (various), Basic MOST, MODAPTS)

Proplanners MS Excel-like data entry grids allow for easy insert, delete, cut, copy and paste functionality.
Leaders in Process and Industrial Engineering

ProTime Estimation
Presentation Overview

Proplanner & ProTime Estimation Estimated Times & Time Studies

Lean Work Content Analysis


Motion Studies

Leaders in Process and Industrial Engineering

Estimated Times & Time Studies


Estimated Times
Store Estimated Normal Times, Allowances, and Standard Times

Option to Perform Lean value Added Analysis

Leaders in Process and Industrial Engineering

Estimated Times & Time Studies


Time Studies

Adjustable Allowances

Observations Section, with automatic calculation of Observed Times and Normal Times

Work Elements / Tasks Section, with automatic calculation of Average Normal Times and Standard Times
Leaders in Process and Industrial Engineering

Estimated Times & Time Studies


Time Studies
Perform Stopwatch or Video Studies (video studies are highly recommended, studies are performed using the videos)

Multiple videos supported, Windows formats, .WMV video speeds can be adjusted for increased accuracy
Leaders in Process and Industrial Engineering

Estimated Times & Time Studies


Time Studies

Supports Multiple Operators with varying Speed Ratings

Leaders in Process and Industrial Engineering

Estimated Times & Time Studies


Time Studies

Compare Multiple Video Observations

Adjust Start and End Times for Each Observation (increased accuracy)

Leaders in Process and Industrial Engineering

Estimated Times & Time Studies


Time Studies
Automated Reporting of Observed Time Studies

Reports can be exported into 8 file formats and 7 picture formats


Leaders in Process and Industrial Engineering

Estimated Times & Time Studies


Time Studies
Automated Reporting of Observed Time Studies

Detailed Summary of Time Study Observations


Leaders in Process and Industrial Engineering

Estimated Times & Time Studies


Time Studies
Automated Man-Machine (Gantt) Charts

Christina, please update

Leaders in Process and Industrial Engineering

ProTime Estimation
Presentation Overview

Proplanner & ProTime Estimation Estimated Times & Time Studies

Lean Work Content Analysis


Motion Studies

Leaders in Process and Industrial Engineering

Lean Work Content Analysis


Customizable Lean Categories
Create custom, detailed Lean work categories (Value Added, Non Value Added, and Semi Value Added)

Leaders in Process and Industrial Engineering

Lean Work Content Analysis


Customizable Lean Categories

Distribute the Average Normal Time for Each Work Task into the Detailed Lean Categories

Leaders in Process and Industrial Engineering

Lean Work Content Analysis


Customizable Lean Categories
Distribute the Average Normal Time for Each Work Task into the Detailed Lean Categories

Leaders in Process and Industrial Engineering

Lean Work Content Analysis


Automated Lean Reporting
Automated Reporting of Lean Work Content for Analysis and Improvement

Leaders in Process and Industrial Engineering

Lean Work Content Analysis


Automated Lean Reporting
Automated Reporting of Lean Work Content (2nd Level Pareto and Pie Charts to Target Areas for Improvement)

Leaders in Process and Industrial Engineering

ProTime Estimation
Presentation Overview

Proplanner & ProTime Estimation Estimated Times & Time Studies

Lean Work Content Analysis


Motion Studies

Leaders in Process and Industrial Engineering

Motion Studies
Pre-determined Motion Time Systems (PMTS)

ProTime Estimation also allows users to perform faster and more accurate PMTS motion studies, which use pre-determined times, instead of observed times. ProTime Estimation comes with the codes for the following PMTS systems:
MTM-1 MTM-UAS MTM-B Basic MOST MODAPTS

Additionally, customers can create custom codes for these PMTS systems and use them along with the standard codes.
Leaders in Process and Industrial Engineering

Motion Studies
MTM-1 Editor
TMU calculations shown in header

User defined Table (defaults shown)

User defined Table Lists and Tabs

Supports Left and Right calculations, and properly calculates Simultaneous motion times.
Leaders in Process and Industrial Engineering

Motion Studies
MTM-UAS Editor
TMU calculations shown in header

User defined Table (defaults shown)

User defined Table Lists and Tabs


Leaders in Process and Industrial Engineering

Motion Studies
MTM-B Editor
TMU calculations shown in header

User types in MTM-B keywords and description of the processes.

MTM-B Code Lookup Form

Leaders in Process and Industrial Engineering

Motion Studies
Basic MOST Element Builder
Click in Cells to Auto-fill the MOST Code at the bottom of the interface

Supports General, Controlled, Crane, and Equipment Sequences

Supports Partial Frequencies and Ability to Ignore Codes


Leaders in Process and Industrial Engineering

Motion Studies
MODAPTS Editor
MOD calculations shown in header

Supports Left and Right Hand Moves, and properly accounts for Complex Simultaneous motions.
Leaders in Process and Industrial Engineering

ProTime Estimation
Presentation Overview

Proplanner & ProTime Estimation Estimated Times & Time Studies

Lean Work Content Analysis


Motion Studies

Leaders in Process and Industrial Engineering

Next Steps
Purchase Order
Determine Priority of Software Needs
Time & motion study (with Lean work content analysis) Centralized database of official assembly process data Assembly process planning Work instructions Line balancing Facility layout analysis Electronic kanban and kitting

Custom Development
Interfaces with PDM or ERP systems. Customized work instruction templates.

Training and Project Consulting Services Quotation to Customer - Software & Services

Leaders in Process and Industrial Engineering

You might also like