ENSAYO DE CORTE DIRECTO PROYECTO UBICACIN FECHA CALICATA PROF SECTOR : : : : : :

REH. CAMINO VECINAL ILLIMO - SAN JUAN - COMPUERTA MARCELO - SAN PEDRO. DIST. ILLIMO - PROV. LAMBAYEQUE - REG. LAMBAYEQUE 8/24/2009 C 1 - PUENTE 01 KM: 0+000

1.50m 1 - ILLIMO - SAN JUAN - COMPUERTA

N DE ESPECIMEN

PESO VOLUMETRICO SECO

ESFUERZO NORMAL

PROPORCION DE ESFUERZOS

HUMEDAD NATURAL

ESFUERZO DE CORTE

1 2 3

(gr/cm3) 1.880 1.886 1.892

(kg/cm2) 0.50 1.00 1.50

(t/s) 0.578 0.558 0.551

(%) 4.12 4.23 4.63

(kg/cm2) 0.289 0.558 0.827

RESULTADO : COHESION (kg/cm2) ANGULO DE FRICCION INTERNA ()

: :

0.02 28.3

PROFUNDIDAD EN METROS

CAPACIDAD ADMISIBLE DEL 2 TERRENO EN kg/cm

1.5

ESFUERZO DE CORTE

0.5 28.3

0.50

1.00

ESFUERZO NORMAL (kg/cm2)

KM: 0+000

ESFUERZO DE CORTE

HUMEDAD SATURADA

(kg/cm2) 0.289 0.558 0.827

(%) 14.36 15.69 15.89

NORMAL CORTE 0.50 0.289 1.00 0.558 1.50 0.827

1.50

NORMAL (kg/cm2)