Professional Documents
Culture Documents
NO
URAIAN
SATUAN
A
1
2
3
4
UPAH
Tukang
Kepala Tukang
Pekerja
Mandor
B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
BAHAN/MATERIAL
Pasir Pasang
Pasir Urug
Pasir Beton
Semen Batu Raja (50 Kg)
Semen Batu Raja
Batu Kali
Batu Bata Lubang
Batu Pecah 3-5 Cm
Batu Pecah 2-3 Cm
Batu Pecah 1-2 Cm
Koral Beton 2/3
Besi Siku/Plat Strip
Besi Beton Polos
Kawat Beton
Kawat Duri
Paku Biasa 2" - 5"
1
Paku Biasa /2" - 1"
Kayu Kelas II Persegi
Kayu Kelas II Papan
Kayu Kelas III Persegi
Kayu Kelas III Papan
Kayu Kelas IV Persegi
Kayu Kelas IV Papan
Kayu Gelam dia. 8/12 Cm - 14 Cm
Seng Gelombang BJLS 20 6 kk
Plywood tebal 3 mm
Plywood tebal 5 mm
Cat Tembok
Plamir Tembok
Amplas Biasa
Besi Plat 1,2 x 2,4 M tebal 10 mm
Pipa PVC Dia. 4"
C
1
2
3
4
5
6
C
1
2
3
4
5
Hari
Hari
Hari
Hari
HRG SATUAN
(RUPIAH)
4
40,000.00
45,000.00
25,000.00
40,000.00
55,000.00
50,000.00
60,000.00
40,000.00
800.00
180,000.00
350.00
200,000.00
215,000.00
230,000.00
215,000.00
12,000.00
11,000.00
12,825.00
1,500.00
10,000.00
12,000.00
2,200,000.00
2,300,000.00
1,400,000.00
1,500,000.00
750,000.00
750,000.00
5,500.00
25,000.00
45,000.00
66,000.00
8,000.00
7,000.00
2,500.00
20,500.00
15,500.00
BAHAN BAKAR
Minyak Solar
Minyak Premium
Minyak SAE 30
Minyak Hidrolik
Minyak Rem
Minyak Gemuk
Ltr
Ltr
Ltr
Ltr
Btl
Kg
4,300.00
4,500.00
35,000.00
40,000.00
26,000.00
52,000.00
PERALATAN BERAT
Wheel Loader 80 HP
Buldozer 110 HP
Alat Penggetar beton 4 HP
Excavator 80 - 140 HP
Track Loader 75 - 100 HP
Unit
Unit
Unit
Unit
Unit
700,000,000.00
1,000,000,000.00
10,000,000.00
1,100,000,000.00
850,000,000.00
m
m3
3
m
Zak
kg
3
m
buah
M3
M3
M3
m3
Kg
kg
kg
M'
kg
kg
m3
m3
3
m
3
m
m3
m3
Btg
lbr
Kpg
Kpg
kg
kg
lembar
m'
m'
NO.
URAIAN
Harga
Satuan
(Rp)
3
SATUAN HARGA
Jumlah Harga
Jumlah
Bahan
Tenaga
(Rp)
(Rp)
4
5
Jumlah
Bahan+Tenaga
(Rp)
6
PEKERJAAN PERSIAPAN
1 1 M' Pengukuran dan Pemasangan Bouwplank
a. Bahan
0.012 M3 Kayu 5/7
0.020 Kg Paku Biasa 2" - 5"
0.007 M3 Kayu Papan 3/20
750,000.00
10,000.00
750,000.00
b. Tenaga
0.100 Oh Tukang Kayu
0.100 Oh Pekerja
0.005 Oh Mandor
9,000.00
200.00
5,250.00
14,450.00
40,000.00
25,000.00
40,000.00
Jumlah
14,450.00
9,000.00
200.00
5,250.00
14,450.00
4,000.00
2,500.00
200.00
6,700.00
4,000.00
2,500.00
200.00
6,700.00
6,700.00
21,150.00
2 1 M Pembuatan Direksikeet
a. Bahan
1.250 Btg Kayu gelam 10-12 cm
0.180 M3 Kayu kls. IV Persegi
0.850 Kg Paku Biasa
1.500 Lbr Seng gelombang BJLS 20 6kk
2.000 Bh Jendela Nako
0.150 Bh Kunci tanam biasa 1 slaag
5,500.00
750,000.00
10,000.00
25,000.00
1,500.00
55,000.00
b. Tenaga
2.000 Oh Tukang Kayu
2.000 Oh Pekerja
0.050 Oh Mandor
40,000.00
25,000.00
40,000.00
Jumlah
199,125.00
5,500.00
750,000.00
10,000.00
25,000.00
b. Tenaga
1.500 Oh Tukang Kayu
1.000 Oh Pekerja
0.050 Oh Mandor
6,875.00
135,000.00
8,500.00
37,500.00
3,000.00
8,250.00
199,125.00
186,375.00
25,000.00
40,000.00
Jumlah
II PEKERJAAN TANAH
1 1 M3 Galian Tanah Biasa Sedalam 2 Meter
a. Tenaga
0.526 Oh Pekerja
- - Tukang Gali
- - Kepala Tukang
0.052 Oh Mandor
25,000.00
40,000.00
Jumlah
80,000.00
50,000.00
2,000.00
132,000.00
80,000.00
50,000.00
2,000.00
132,000.00
132,000.00
331,125.00
6,875.00
135,000.00
7,000.00
37,500.00
186,375.00
40,000.00
25,000.00
40,000.00
Jumlah
6,875.00
135,000.00
8,500.00
37,500.00
3,000.00
8,250.00
199,125.00
6,875.00
135,000.00
7,000.00
37,500.00
186,375.00
60,000.00
25,000.00
2,000.00
87,000.00
60,000.00
25,000.00
2,000.00
87,000.00
87,000.00
273,375.00
2,500.00
2,000.00
4,500.00
2,500.00
2,000.00
4,500.00
4,500.00
4,500.00
13,150.00
2,080.00
15,230.00
13,150.00
2,080.00
15,230.00
15,230.00
15,230.00
NO.
1
Harga
Satuan
(Rp)
3
URAIAN
2
2 1 M3 Galian Tanah Lumpur Sedalam 1 Meter
a. Tenaga
0.823 Oh Pekerja
- - Tukang Gali
- - Kepala Tukang
0.083 Oh Mandor
SATUAN HARGA
Jumlah Harga
Jumlah
Bahan
Tenaga
(Rp)
(Rp)
4
5
25,000.00
40,000.00
Jumlah
Jumlah
Bahan+Tenaga
(Rp)
6
20,575.00
3,320.00
23,895.00
20,575.00
3,320.00
23,895.00
23,895.00
23,895.00
4,800.00
760.00
5,560.00
4,800.00
760.00
5,560.00
5,560.00
5,560.00
12,500.00
2,000.00
14,500.00
12,500.00
2,000.00
14,500.00
14,500.00
14,500.00
3 1 M Urugan Kembali
a. Tenaga
0.192 Oh Pekerja
- - Tukang Gali
- - Kepala Tukang
0.019 Oh Mandor
25,000.00
40,000.00
Jumlah
4 1 M Pemadatan Tanah
a. Tenaga
0.500 Oh Pekerja
- - Tukang Gali
- - Kepala Tukang
0.050 Oh Mandor
25,000.00
40,000.00
Jumlah
5 1 M Urugan Pasir
a. Bahan
1.200 M3 Pasir Urug
50,000.00
b. Tenaga
0.200 Oh Pekerja
0.025 Oh Mandor
25,000.00
40,000.00
Jumlah
60,000.00
60,000.00
60,000.00
60,000.00
60,000.00
5,000.00
1,000.00
6,000.00
5,000.00
1,000.00
6,000.00
6,000.00
66,000.00
5,500.00
b. Tenaga
0.100 Oh Pekerja
0.010 Oh Tukang kayu
0.005 Oh Mandor
25,000.00
40,000.00
40,000.00
Jumlah
Oh
Oh
Oh
Oh
2,750.00
180,000.00
800.00
55,000.00
Pekerja
Tukang Batu
Kepala Tukang
Mandor
2,750.00
2,750.00
2,500.00
400.00
200.00
3,100.00
2,500.00
400.00
200.00
3,100.00
3,100.00
5,850.00
198,000.00
130,400.00
28,600.00
357,000.00
25,000.00
40,000.00
45,000.00
40,000.00
Jumlah
2,750.00
2,750.00
357,000.00
198,000.00
130,400.00
28,600.00
357,000.00
37,500.00
24,000.00
2,700.00
3,000.00
67,200.00
37,500.00
24,000.00
2,700.00
3,000.00
67,200.00
67,200.00
424,200.00
NO.
Harga
Satuan
(Rp)
3
URAIAN
1
2
IV PEKERJAAN DINDING
1 1 M2 Pasang Batu - Bata Bolong , 1Pc : 4Ps
a. Bahan
45.000 Bh Batu Bata Bolong
22.000 Kg Semen Portland
0.093 M3 Pasir Pasang
b. Tenaga
0.650
0.200
0.020
0.0300
Oh
Oh
Oh
Oh
350.00
800.00
55,000.00
Pekerja
Tukang Batu
Kepala Tukang
Mandor
15,750.00
17,600.00
5,115.00
38,465.00
25,000.00
40,000.00
45,000.00
40,000.00
Jumlah
SATUAN HARGA
Jumlah Harga
Jumlah
Bahan
Tenaga
(Rp)
(Rp)
4
5
38,465.00
Jumlah
Bahan+Tenaga
(Rp)
6
15,750.00
17,600.00
5,115.00
38,465.00
16,250.00
8,000.00
900.00
1,200.00
26,350.00
16,250.00
8,000.00
900.00
1,200.00
26,350.00
26,350.00
64,815.00
PEKERJAAN PLESTERAN
1 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm
a. Bahan
10.800 Kg Semen Portland
0.026 M3 Pasir Pasang
b. Tenaga
0.250
0.100
0.020
0.0125
Oh
Oh
Oh
Oh
800.00
55,000.00
Pekerja
Tukang Batu
Kepala Tukang
Mandor
25,000.00
40,000.00
45,000.00
40,000.00
Jumlah
Oh
Oh
Oh
Oh
8,640.00
1,430.00
10,070.00
10,070.00
800.00
55,000.00
Pekerja
Tukang Batu
Kepala Tukang
Mandor
6,250.00
4,000.00
900.00
500.00
11,650.00
6,250.00
4,000.00
900.00
500.00
11,650.00
11,650.00
21,720.00
6,944.00
1,540.00
8,484.00
25,000.00
40,000.00
45,000.00
40,000.00
Jumlah
8,640.00
1,430.00
10,070.00
8,484.00
6,944.00
1,540.00
8,484.00
6,250.00
4,000.00
900.00
500.00
11,650.00
6,250.00
4,000.00
900.00
500.00
11,650.00
11,650.00
20,134.00
750,000.00
10,000.00
4,300.00
11,000.00
12,825.00
800.00
60,000.00
215,000.00
150,000.00
15,000.00
1,720.00
1,375,000.00
28,856.25
258,400.00
31,200.00
167,700.00
2,027,876.25
150,000.00
15,000.00
1,720.00
1,375,000.00
28,856.25
258,400.00
31,200.00
167,700.00
2,027,876.25
NO.
URAIAN
b. Tenaga
3.900
0.350
1.040
1.050
0.245
0.165
Oh
Oh
Oh
Oh
Oh
Oh
Harga
Satuan
(Rp)
3
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
25,000.00
40,000.00
40,000.00
40,000.00
45,000.00
40,000.00
Jumlah
Oh
Oh
Oh
Oh
Oh
Oh
SATUAN HARGA
Jumlah Harga
Jumlah
Bahan
Tenaga
(Rp)
(Rp)
4
5
2,027,876.25
750,000.00
10,000.00
4,300.00
11,000.00
12,825.00
800.00
60,000.00
215,000.00
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
97,500.00
14,000.00
41,600.00
42,000.00
11,025.00
6,600.00
212,725.00
97,500.00
14,000.00
41,600.00
42,000.00
11,025.00
6,600.00
212,725.00
212,725.00
2,240,601.25
202,500.00
20,000.00
2,580.00
1,375,000.00
38,475.00
258,400.00
31,200.00
167,700.00
2,095,855.00
25,000.00
40,000.00
40,000.00
40,000.00
45,000.00
40,000.00
2,095,855.00
Jumlah
Bahan+Tenaga
(Rp)
6
202,500.00
20,000.00
2,580.00
1,375,000.00
38,475.00
258,400.00
31,200.00
167,700.00
2,095,855.00
121,250.00
14,000.00
62,400.00
56,000.00
14,895.00
6,800.00
275,345.00
121,250.00
14,000.00
62,400.00
56,000.00
14,895.00
6,800.00
275,345.00
275,345.00
2,371,200.00
Oh
Oh
Oh
Oh
Oh
Oh
750,000.00
10,000.00
4,300.00
11,000.00
12,825.00
800.00
60,000.00
215,000.00
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
25,000.00
40,000.00
40,000.00
40,000.00
45,000.00
40,000.00
Jumlah
300,000.00
40,000.00
8,600.00
1,375,000.00
57,712.50
258,400.00
31,200.00
167,700.00
2,238,612.50
2,238,612.50
750,000.00
10,000.00
4,300.00
11,000.00
12,825.00
800.00
60,000.00
215,000.00
300,000.00
40,000.00
8,600.00
1,210,000.00
57,712.50
258,400.00
31,200.00
167,700.00
2,073,612.50
300,000.00
40,000.00
8,600.00
1,375,000.00
57,712.50
258,400.00
31,200.00
167,700.00
2,238,612.50
121,250.00
14,000.00
62,400.00
56,000.00
14,895.00
6,800.00
275,345.00
121,250.00
14,000.00
62,400.00
56,000.00
14,895.00
6,800.00
275,345.00
275,345.00
2,513,957.50
300,000.00
40,000.00
8,600.00
1,210,000.00
57,712.50
258,400.00
31,200.00
167,700.00
2,073,612.50
NO.
Harga
Satuan
(Rp)
3
URAIAN
2
b. Tenaga
4.850
0.350
1.560
1.400
0.331
0.170
Oh
Oh
Oh
Oh
Oh
Oh
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
25,000.00
40,000.00
40,000.00
40,000.00
45,000.00
40,000.00
Jumlah
SATUAN HARGA
Jumlah Harga
Jumlah
Bahan
Tenaga
(Rp)
(Rp)
4
5
2,073,612.50
Jumlah
Bahan+Tenaga
(Rp)
6
121,250.00
14,000.00
62,400.00
56,000.00
14,895.00
6,800.00
275,345.00
121,250.00
14,000.00
62,400.00
56,000.00
14,895.00
6,800.00
275,345.00
275,345.00
2,348,957.50
b. Tenaga
0.081
0.135
0.0135
0.0041
Oh
Oh
Oh
Oh
15,500.00
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Oh
Oh
Oh
Oh
450,000.00
18,600.00
450,000.00
12,000.00
12,000.00
Tukang Las
Pekerja
Kepala Tukang
Mandor
2,025.00
5,400.00
607.50
164.00
8,196.50
8,196.50
26,796.50
450,000.00
450,000.00
60,000.00
26,250.00
4,725.00
208.00
91,183.00
60,000.00
26,250.00
4,725.00
208.00
91,183.00
91,183.00
541,183.00
42,000.00
180,000.00
222,000.00
40,000.00
25,000.00
45,000.00
40,000.00
Jumlah
2,025.00
5,400.00
607.50
164.00
8,196.50
450,000.00
450,000.00
40,000.00
25,000.00
45,000.00
40,000.00
Oh
Oh
Oh
Oh
18,600.00
18,600.00
Jumlah
b. Tenaga
0.350
0.350
0.035
0.00175
18,600.00
25,000.00
40,000.00
45,000.00
40,000.00
Jumlah
b. Tenaga
1.500
1.050
0.105
0.005
18,600.00
222,000.00
42,000.00
180,000.00
222,000.00
14,000.00
8,750.00
1,575.00
70.00
24,395.00
14,000.00
8,750.00
1,575.00
70.00
24,395.00
24,395.00
246,395.00
8,000.00
7,000.00
2,500.00
28,000.00
14,000.00
5,000.00
47,000.00
28,000.00
14,000.00
5,000.00
47,000.00
NO.
Harga
Satuan
(Rp)
3
URAIAN
2
b. Tenaga
2.000
0.200
1.500
0.075
Oh
Oh
Oh
Oh
Tukang Cat
Kepala Tukang
Pekerja
Mandor
40,000.00
45,000.00
25,000.00
40,000.00
Jumlah
Jumlah
Untuk 1 M2
27 10 m2 Pengecatan Tembok 2 x ( Pemeliharaan )
a. Bahan
2.330 Kg Cat Tembok
1.000 Lbr Amplas Biasa
b. Tenaga
1.330
0.133
1.000
0.050
Untuk 1 M2
Oh
Oh
Oh
Oh
SATUAN HARGA
Jumlah Harga
Jumlah
Bahan
Tenaga
(Rp)
(Rp)
4
5
47,000.00
4,700.00
8,000.00
2,500.00
Tukang Cat
Kepala Tukang
Pekerja
Mandor
Jumlah
Jumlah
80,000.00
9,000.00
37,500.00
3,000.00
129,500.00
80,000.00
9,000.00
37,500.00
3,000.00
129,500.00
129,500.00
12,950.00
176,500.00
17,650.00
18,640.00
2,500.00
21,140.00
40,000.00
45,000.00
25,000.00
40,000.00
21,140.00
2,114.00
Jumlah
Bahan+Tenaga
(Rp)
6
18,640.00
2,500.00
21,140.00
53,200.00
5,985.00
25,000.00
2,000.00
86,185.00
53,200.00
5,985.00
25,000.00
2,000.00
86,185.00
86,185.00
8,618.50
107,325.00
10,732.50
B PAGAR
I
II
4.59
1.53
1.31
M
M
M
12,500.00
5,560.00
45,000.00
57,421.88
8,513.75
59,062.50
124,998.13
0.25
31,249.53
156,247.66
1,877,751.00
0.25
469,437.75
2,347,188.75
1,302,126.14
0.25
325,531.53
1,627,657.67
562,291.20
0.25
140,572.80
702,864.00
1,008,861.14
0.25
252,215.28
1,261,076.42
1,203,685.00
0.25
300,921.25
1,504,606.25
6.84
1.71
M
2,872.80
4.10
18.13
22,500.00
11,000.00
175,000.00
45,000.00
38,500.00
466,363.64
188,100.00
239,400.00
46,170.00
362,092.50
Btg
Btg
M
M
Zak
22,500.00
14,000.00
175,000.00
45,000.00
38,500.00
270,000.00
113,400.00
66,124.80
12,752.64
100,013.76
Btg
Btg
M
M
Zak
22,500.00
11,000.00
175,000.00
45,000.00
38,500.00
466,363.64
153,900.00
143,640.00
27,702.00
217,255.50
M
722.50
1.73
5.78
0.30
Btg
Btg
M
M
Zak
M
20.73
13.99
0.82
0.62
5.64
57.80
1,005,480.00
174,420.00
697,851.00
M
12.00
8.10
0.38
0.28
2.60
1.03
350.00
42,500.00
38,500.00
M
20.73
17.10
1.37
1.03
9.41
0.47
Bh
M
Zak
Bh
M
Zak
1,250.00
45,000.00
38,500.00
903,125.00
78,030.00
222,530.00
M
4.00
0.24
Btg
M
22,500.00
1,250.00
90,000.00
300.00
4 Pasir
5 Semen
0.18
1.65
22.80
45,000.00
38,500.00
8,100.00
63,525.00
161,925.00
0.25
40,481.25
202,406.25
116,508.00
0.50
58,254.00
174,762.00
2,716,250.00
0.10
271,625.00
2,987,875.00
M
0.64
2.28
9.85
2.00
M
Zak
M
Zak
M
Unit
45,000.00
38,500.00
225,000.00
250,000.00
28728
87780
2,216,250.00
500,000.00
Jumlah Bahan
Jumlah Upah
Jumlah Bahan + Upah
Rp
Rp
Rp
8,957,887.60
Rp
Rp
Rp
47,281,997.77
Rp
1,832,034.40
10,964,684.00
9,908,430.51
57,190,428.28
28,595,214.14
A RUMAH TYPE 36 / 70 M
I
PEKERJAAN PERSIAPAN
1 Pek Pembersihan Lokasi
2 Pek Pengukuran dan Pasangan Bouflank
Panjang Lebar
Tinggi Banyak jumlah
14
20
2
Bahan
Hek 2/7
Kasau 5/5
Paku 2"
Benang
Banyak jumlah
1
1.95
Ls
68
Sat
M'
Total
6.00
6.00
1
1
Total
10.2375
3.413
Btg
Btg
Kg
Rol
Sat
M
M
Total
8.64
Sat
M
Total
3.6
Sat
M
Total
6.5
Sat
M
2730
3.9
17.225
Total
1.95
23.64
19.50
1.56
1.17
Bh
M
Zak
Sat
M
Btg
Btg
M
M
Semen
10.73
Banyak jumlah
1
Total
1.008
25.45
17.18
0.81
0.60
5.54
Total
1.62
32.73
22.09
1.30
0.97
8.91
Total
170
2,125.00
5.10
17.00
Total
0.786
0.64
0.50
3.14
Zak
Sat
M
Btg
Btg
M
M
Zak
Sat
M
Btg
Btg
M
M
Zak
Sat
M
Bh
M
Zak
Sat
M
M
M
Zak
Pasir
Semen
Panjang
4.75
Bahan
Bata
Pasir
Semen
0.06
0.56
2 Pek Pas Batu bata dinding Seftictank
Lebar
Tinggi Banyak jumlah
0.12
1.12
1
Total
0.638
M
Zak
Sat
M
271.32
0.38
2.30
Bh
M
Zak
1.00
0.50
10.00
Bh
M
Kg
3 Rembesan
Bahan
Koral
Pasir
Ijuk
20
10
30
16
lbg
daun
Bh
Bh
Banyak jumlah
Total
Sat
4
108.8
105.28 M
2
3.52
50 Btg
12
16
3
3
3
1
Kp
Bh
Kg
Kg
Kg
Rol
105.28
106
14
5
M
Kp
Kp
Kg
2 Pek Atap
3 Pek Plapond
Kayu Rangka 5x5x400
107 M
142 Btg
Plafond Triplek 3 mm
Lis Profil Kayu
Paku Plafond
VI
37.00 Kp
61 Btg
2 Kg
3
30
14
20
12
8
14
1
Rol
Btg
Bh
Bh
Bh
Bh
Bh
Ls
2 Instalasi Plumbing
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
Pipa 1/2"
Elbow 1/2"
Pipa 2"
Elbow 2"
Pipa 4"
Elbow 4"
Lem Pipa
Amplas
Kran 1/2"
Sok Drat dalam 1/2"
Pipa Penguras bak
Ploor Drain
Closed Jongkok
Pipa T Seftictank
Penyambunag inst Air
Banyak jumlah
1
4
4
2
2
2
4
4
2
4
4
2
2
2
2
2
Btg
Bh
Btg
Bh
Btg
Bh
Bh
Lbr
Bh
Bh
Bh
Bh
Bh
Bh
Ttk
133.28
8.00
3.73
Sat
M
Zak
M
10
20
6
4
Bh
Bh
Unit
Unit
Total
B PAGAR
I
Banyak jumlah
1
1.71
Total
4.59375
1.531
Sat
M
M
Total
1.3125
Sat
M
Total
6.84
Sat
M
2872.8
4.104
18.126
Total
1.71
20.73
17.10
1.37
1.03
9.41
Bh
M
Zak
Sat
M
Btg
Btg
M
M
Zak
Panjang Lebar
57
0.12
Bahan
Besi 10
Besi 6
Koral
Pasir
Semen
Tinggi
0.15
Banyak jumlah
1
1.026
Total
1.026
20.73
13.99
0.82
0.62
5.64
Banyak jumlah
1
29.6
1
28.2
Bahan
Bataco
Pasir
Semen
Total
57.8
722.50
1.73
5.78
Sat
M
Btg
Btg
M
M
Zak
Sat
M
Bh
M
Zak
Panjang
57
Lebar
Tinggi
0.4
Banyak jumlah
1
Total
Sat
22.8
M
0.6384
M
2.28
Zak
Banyak jumlah
2
0.3
Total
0.3
4 Pasir
5 Semen
5 Pek Beton Plat Pintu Pagar
Panjang
1.5
Lebar
1
1
3
4
5
Tinggi
0.1
Besi 10
Koral
Pasir
Semen
Sat
M
4
0.24
0.18
1.65
Btg
M
M
Zak