REKAPITULASI RENCANA ANGGARAN BIAYA PERPIPAAN + BANGUNAN PELENGKAP

Kegiatan
Pekerjaan
Volume

: Program P2TPD Dinas Kesehatan Kab. Bulukumba


: Pembangunan Jaringan Perpipaan + Bangunan Pelengkap
: 5,500 m

Lokasi
Tahun Anggaran
Kabupaten

NO

URAIAN PEKERJAAN

VOLUME

I
II

PEK. PENDAHULUAN
PEKERJAAN UTAMA
Pengadaan Pipa
Pengadaan Accessories
Pemasangan Pipa
Pemasangan Accessories
PEKERJAAN BANGUNAN PELENGKAP
Pek. Hidrant Umum
Pek. Rangka Struktur Turbine
Pek. Pengadaan dan Pemasangan Turbin Angin
Pengadaan Dan Instalasi Listrik
Pekerjaan Pengeboran

III

IV

JUMLAH
HARGA SATUAN (Rp)

4
12,324,167.40
277,796,740.00
15,768,700.00
72,565,305.48
6,552,316.49

25

7,370,984.14
127,105,012.80
2,917,800,000.00
10,739,421.69
141,992,126.09

Jumlah (A)
DIBULATKAN (B)
PPn 10% (tidak dipungut)(10% x B = C)
Jumlah (B + C)
DIBULATKAN
Terbilang :

Tiga Milyar Sembilan Ratus Delapan Juta Sembilan Ratus Sepuluh Ribu Rupiah

Pimpinan Kegiatan
Program P2TPD Dinas Kesehatan
Kab. Bulukumba

Hasanuddin, SKM. M.Kes


Nip: 196212110 198303 1 021

Bulukumba,
Februari 2010
Mengetahui / Menyetujui
Kepala Dinas Kesehatan Kab. Bulukumba

Dr. Hj. Rusni Sufran. M.Kes


Pangkat : Pembina Tk.I
Nip ; 19530103 198011 2 001

AN PELENGKAP
: Kel. Mariorennu
: 2010
: Bulukumba
JUMLAH (Rp)
5
12,324,167.40
277,796,740.00
15,768,700.00
72,565,305.48
6,552,316.49
184,274,603.40
127,105,012.80
2,917,800,000.00
10,739,421.69
283,984,252.18

3,908,910,519.44
3,908,910,000.00
390,891,000.00
4,299,801,000.00
4,299,801,000.00

piah

a,
Februari 2010
/ Menyetujui

tan Kab. Bulukumba

Sufran. M.Kes
embina Tk.I
198011 2 001

Kegiatan :
Pekerjaan :
Volume :

RENCANA ANGGARAN BIAYA


Program P2TPD Dinas Kesehatan Kab. Bulukumba
Lokasi
Pembangunan Jaringan Perpipaan + Bangunan Pelengkap
Tahun Anggaran
5,500 m
Kabupaten

NO

URAIAN PEKERJAAN

A.

B.

VOL. /
SAT.
3

HARGA
SATUAN
4

PEK. PENDAHULUAN
1. 1 Pengukuran Jalur Pipa dan Pematokan
2 Papan Nama Proyek
3 Administrasi dan Dokumentasi
4 Back Up Data dan As Built Drawing
5 Direksikeet 3 x 3 meter
6 Mobilisasi Peralatan dan Tenaga Kerja

5,500.00
1.00
1.00
1.00
9.00
1.00

m1
ls
ls
ls
m2
ls

926.95
350,000.00
1,000,000.00
750,000.00
458,435.55
1,000,000.00
J U M L A H A

PEKERJAAN UTAMA
1. Pengadaan Pipa
Pipa PVC, Tekanan Nominal 10 kg/cm2
Termasuk Pengangkutan Ke Lokasi Pekerjaan
1 Pipa PVC Paralon std S - 12,5 RRJ 3"
2 Pipa PVC Paralon std S - 12,5 RRJ 2"
3 Pipa GIP 4" (pelintas)
4 Pipa GIP 1" (pelintas)

4,580.00
920.00
30.00
8.00

m1
m1
m1
m

54,571.00
27,588.00
79,300.00
12,700.00
JUMLAH

6.00
4.00
2.00
3.00
2.00
2.00
25.00
3.00
6.00
25.00
25.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

133,300.00
116,700.00
74,600.00
50,000.00
65,000.00
425,000.00
24,400.00
36,800.00
500,000.00
350,000.00
30,100.00
JUMLAH

4,580.00
920.00
30.00
8.00

m1
m1
m1
m

13,452.57
11,139.44
18,533.33
18,533.33
JUMLAH

6.00
4.00
2.00
3.00
2.00
2.00
25.00
3.00
6.00
25.00
25.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

72,072.04
66,811.88
79,878.06
76,660.08
76,660.08
61,200.00
61,200.00
76,660.08
61,200.00
61,200.00
61,200.00
JUMLAH
J U M L A H B

2. Pengadaan Accessories
1 Long Bend 3" (raubber ring)
- 3" 90o
- 3" 45o
2 Bell Reducer 3" x 2" (raubber ring)
3 TS TEE 3" (raubber ring)
4 TS TEE 3" - 2"(raubber ring)
5 Ventil Udara 13 mm
6 Clamp Sadlle 2" x 0,5"
7 DOP
8 Stop Kran 3" (Flange)
9 WaterMeter 3/4
10 Stop Kran 3/4 "
3. Pemasangan Pipa
1 Pipa PVC Paralon std S - 12,5 RRJ 3"
2 Pipa PVC Paralon std S - 12,5 RRJ 2"
3 Pipa GIP 4" (pelintas)
4 Pipa GIP 1" (pelintas)
4. Pemasangan Accessories
1 Bell Bend 3"
- 3" 90o
- 3" 45o
2 Bell Reducer 3" x 2" (raubber ring)
3 TS TEE 3" (raubber ring)
4 TS TEE 3" - 2"(raubber ring)
5 Ventil Udara 13 mm
6 Clamp Sadlle 2" x 0,5"
7 DOP
8 Stop Kran 3" (Flange)
9 WaterMeter 3/4
10 Stop Kran 3/4 "

NO

URAIAN PEKERJAAN

C.

PEKERJAAN BANGUNAN PELENGKAP


1 Pek. Hidrant Umum
1 Galian Tanah
2 Urugan Tanah
3 Urugan Sirtu Bawah Lantai
4 Pasangan Batu Kosong
5 Pasangan Pondasi Batu Kali 1 : 4
Pekerjaan Rabat Beton 1 : 3 : 5 Lantai
6
Dudukan
Pekerjaan Rabat Beton 1 : 3 : 5 Tempat
7
Cuci
8 Pekerjaan Plesteran Camp. 1 : 4
9 Pekerjaan Acian dengan Semen
Pekerjaan Pasangan Bak Penampungan 2
10 3
m
11 Pas.Pipa PVC 3/4" aw
12 Kran Air 1/2" inc. install
13 Plampung 3/4" inc. install

VOL. /
SAT.
3

HARGA
SATUAN
4

1.22
0.61
2.10
1.43
2.78

m3
m3
m3
m3
m3

13,900.00
161,687.50
209,275.00
313,942.50
528,470.90

0.70

m3

624,977.00

0.70

m3

624,977.00

6.16
6.16

m2
m2

26,724.90
5,557.50

1.00

unit

3,219,300.00

12.00
6.00
1.00

m'
Bh
unit

5,458.75
73,000.00
101,200.00
JUMLAH C

2 Pek. Rangka Struktur Turbin


A Pondasi Rangka Struktur Turbin
1 Galian Tanah
2
3
4
B
1
2
3
4
6
5

Urugan Tanah kembali


Lantai kerja (rabat Beton 1:3;5)
Beton Bertulang (1:2:3)
Fabrikasi Rangka Struktur
Pipa GIP Medium A 3"
Pipa GIP Medium A 1,5"
Plat Sepatu uk 30x30cm tebal 8mm
Angkur 15mm
Pengecatan Rangka
Biaya Fabrikasi dan instal rangka

3 Pengadaan dan Instalsi Turbin Angin


1 Wind Turbine dia 1m (200 watt)
2 Charge Controller
3 Inverter 5KW
4 Battery 100aH
5 Frame ukuran 3625x5790 (alum, t 2")

36.36

m3

13,900.00

25.14
3.30
11.22

m
m3
m3

6,662.50
624,977.00
2,623,207.50

209.00
666.00
22.00
88.00
135.58
875.00

m
m
unit
Bh
m2
m

145,200.00
60,550.00
64,616.26
75,000.00
11,760.75
16,740.68
JUMLAH

140.00
140.00
6.00
20.00
10.00

unit
Bh
Bh
Bh
unit

18,200,000.00
1,350,000.00
19,800,000.00
1,850,000.00
2,500,000.00
JUMLAH D

4 Pengadaan Dan Instalasi Listrik


1 Pas. Kabel NFA2X 2x10mm
2 Tiang penyangga Gip 1,5" 6 m inc
dudukan beton 20x20x60cm

1,500.00

3,755.00

30.00

btg

170,230.72
JUMLAH D

: Kel. Mariorennu
: 2010
: Bulukumba
JUMLAH
HARGA
5

5,098,247.45
350,000.00
1,000,000.00
750,000.00
4,125,919.95
1,000,000.00
12,324,167.40

249,935,180.00
25,380,960.00
2,379,000.00
101,600.00
277,796,740.00

799,800.00
466,800.00
149,200.00
150,000.00
130,000.00
850,000.00
610,000.00
110,400.00
3,000,000.00
8,750,000.00
752,500.00
15,768,700.00
61,612,750.56
10,248,288.25
556,000.00
148,266.67
72,565,305.48

432,432.21
267,247.51
159,756.12
229,980.24
153,320.16
122,400.00
1,530,000.00
229,980.24
367,200.00
1,530,000.00
1,530,000.00
6,552,316.49
372,683,061.97

JUMLAH
HARGA
5

16,958.00
98,629.38
439,477.50
448,937.78
1,469,149.10
437,483.90
437,483.90
164,625.38
34,234.20
3,219,300.00
65,505.00
438,000.00
101,200.00
7,370,984.14

505,404.00
167,495.25
2,062,424.10
29,432,388.15
30,346,800.00
40,326,300.00
1,421,557.78
6,600,000.00
1,594,550.71
14,648,092.81
127,105,012.80
2,548,000,000.00
189,000,000.00
118,800,000.00
37,000,000.00
25,000,000.00
2,917,800,000.00
5,632,500.00
5,106,921.69
10,739,421.69

ANALISA HARGA LUMSUM


ITEM PEKERJAAN PENGADAAN TURBIN ANGIN DAN INSTALASI
No

Uraian

Volume Satuan

Harga Barang ( C )
Harga Barang ( C )
Insurance ( I ) (2%)
Ongkos kirim ( F ) 20%

1.00 ea
$ 1000
ea
2.00%
20.00%

Harga Satuan
$ 1000
Rp
11,000.00
Rp 11,000,000.00
Rp 11,000,000.00

Total CIF (A)


Bea Masuk MFN (Most Favourable Nations)
CIT * (10%)
PPN = (CIF + bea masuk) * 10%
PPh = (CIF + bea masuk) * 7.5%

10.00%

Rp 13,420,000.00

10.00%
7.50%

Rp 14,762,000.00
Rp 14,762,000.00

Jumlah Tagihan Pajak (B)


Biaya kirim dari Jakarta ke Bulukumba / kg
Biaya Instalasi (turbin ke rumah panel ,
diambil jarak rata rata
Biaya Komisioning (pengetesan 48 Jam

10.00

kg

15,465.00

1.00

LS

350,000.00

1.00

LS

350,000.00

Jumlah Pekerjaan Lokal (C)


Jumlah Material On Site dan Instalasi = A + B + C

Note : $1 = Rp 11,000,-

TALASI

Total Harga
Rp
Rp
Rp

11,000,000.00
220,000.00
2,200,000.00

Rp

13,420,000.00

Rp

1,342,000.00

Rp
Rp

1,476,200.00
1,107,150.00

Rp

3,925,350.00

Rp

154,650.00

Rp

350,000.00

Rp

350,000.00

Rp

854,650.00

Rp

18,200,000.00

DAFTAR ANALISA HARGA SATUAN PERPIPAAN


A.

PEKERJAAN PATOK
Patok dibuat dari kayu 5/7 pjg : 50 cm dgn ujung diruncingkan :
1. 1 m2 Pengecatan : Dinding / kayu / Besi
0.2600 kg
Cat Kayu / Besi
@ Rp.
0.0025 oh
Mandor
@ Rp.
0.0700 oh
Pekerja
@ Rp.

2. Biaya Pembuatan 100 Patok :


3
0.0250 m
Kayu Kaso Kls. II
0.6500
0.1000
1.0000
1.0000
1.0000
1.0000

m
oh
oh
oh
ls
ls

Pengecatan
Mandor
Tukang Kayu
Pekerja
Biaya Pemasangan
Biaya Pengukuran

36,700.00 =
47,500.00 =
30,000.00 =

Rp.
Rp.
Rp.
Rp.

Rp.

3,145,000.00 =

Rp.

@
@
@
@
@
@

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

11,760.75
47,500.00
45,000.00
30,000.00
100,000.00
100,000.00

=
=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

@
@
@
@

Rp.
Rp.
Rp.
Rp.

47,500.00
30,000.00
1,452.46
250,000.00

=
=
=
=

Rp.
Rp.
Rp.
Rp.

Biaya Pembuatan 1 Patok :


3. Biaya Pengukuran 500 m Uiset Jalur Pipa :
1.0000 oh
Mandor
5.0000 oh
Pekerja
11.0000 bh
Patok
1.0000 ls
Alat Bantu
1

Biaya Pengukuran dan Pematokan Per Meter ( m ) :


B.

PEKERJAAN PEMASANGAN PIPA


1. Pemasangan Per Batang Pipa PVC Dia. 3":
3
1.2600 m
Galian Tanah Biasa
3
0.3150 m
3
1.0395 m
1.0000 Btg

Rp.

Rp.

13,900.00 =

Rp.

Urugan Pasir

Rp.

145,915.00 =

Rp.

Urugan Tanah dan Pemadatan


Penurunan dan Penyetelan Pipa

@
@

Rp.
Rp.

6,662.50 =
10,312.50 =

Rp.
Rp.

Biaya Pemas. Per meter Pipa PVC Dia. 3" :


2. Pemasangan Per Batang Pipa PVC Dia. 2" :
3
0.9000 m
Galian Tanah Biasa
3

0.2700 m
3
0.6930 m
1.0000 Btg

Rp.

Rp.

13,900.00 =

Rp.

Urugan Pasir

Rp.

145,915.00 =

Rp.

Urugan Tanah dan Pemadatan


Penurunan dan Penyetelan Pipa

@
@

Rp.
Rp.

6,662.50 =
10,312.50 =

Rp.
Rp.

Biaya Pemas. Per meter Pipa PVC Dia. 2" :


C.

PEMASANGAN TEE / DOP


1. Pemasangan Tee / Dop pada Pipa Dia. 100 mm dan < 100 mm :
1.0000 bh
Penyetelan
@ Rp.
3
0.0048 m
Blok Beton
@ Rp.
0.0400 m

D.

Rp.

Bekisting Biasa

Rp.

PEMASANGAN REDUCER
1. Pemasangan Reducer pada Pipa Dia. 100 mm dan < 100 mm :
1.0000 bh
Penyetelan
@ Rp.
3
0.0100 m
Blok Beton
@ Rp.
2
0.0400 m

Bekisting Biasa

Rp.

61,200.00 =

Rp.

618,842.00 =

Rp.

312,241.00 =

Rp.

61,200.00 =

Rp.

618,842.00 =

Rp.

312,241.00 =

Rp.

DAFTAR ANALISA HARGA SATUAN PERPIPAAN


F.

PEMASANGAN BEND 90o


o
1. Pemasangan Bend 90 pada Pipa Dia. 100 mm dan < 100 mm :
1.0000 bh
Penyetelan
@ Rp.
3
0.0100 m
Blok Beton
@ Rp.

0.0150 m

G.

Bekisting

Rp.

PEMASANGAN BEND 45o ,22,5o , & 11./14o


1. Pemasangan Bend pada Pipa Dia. 100 mm dan < 100 mm :
1.0000 bh
Penyetelan
@ Rp.
3
0.0015 m
Blok Beton
@ Rp.
2
m
0.0150
Bekisting
@ Rp.

PEKERJAAN PEMASANGAN, PENURUNAN DAN PENYETELAN PIPA


1. 1 BATANG ( 6 METER ) PIPA PVC
Pipa Dia. 100 mm dan < Dia. 100 mm
0.0150 oh
Mandor
@ Rp.
0.0800 oh
Tukang Pipa
@ Rp.
0.1500 oh
Pekerja
@ Rp.
1.0000 oh
Peralatan
@ Rp.

Rp.

618,842.00 =

Rp.

312,241.00 =

Rp.

61,200.00 =

Rp.

618,842.00 =

Rp.

312,241.00 =

Rp.

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

Sehingga pekerjaan penyetelan Pipa PVC uk < dia 100 mm untuk 1 Meter =
Biaya Pemasangan Pipa PVC dia 3/4"
1.1000 m'
Pipa 3/4
@ Rp.
3,400.00 =
1.0000
Biaya penyetelan
@ Rp.
1,718.75 =

Rp.
Rp.

PEKERJAAN PENURUNAN DAN PENYETELAN PIPA


2. 1 BATANG ( 6 METER ) PIPA GIP
Pipa Dia. 4''mm dan < Dia. 4"
0.0200 oh
Mandor
0.7500 oh
Tukang Pipa
2.5000 oh
Pekerja
1.0000 oh
Peralatan

61,200.00 =

@
@
@
@

Rp.
Rp.
Rp.
Rp.

47,500.00
45,000.00
30,000.00
1,500.00

47,500.00
45,000.00
30,000.00
1,500.00

=
=
=
=
=

Rp.
Rp.
Rp.
Rp.
Rp.

Sehingga pekerjaanPenyetelan Pipa GIP uk < dia 100 mm untuk 1 Meter =


PEK. PENURUNAN / PENYAMBUNGAN FITTING (BEND/TEE/REDUCER/FLANGE SOCKET/FLANGET SPIGOT/
GIL BOULT JOINT) DAN SEJENISNYA :
1. Pipa Dia. 100 mm dan < Dia. 100 mm
0.1200 oh
Mandor
@ Rp.
47,500.00 = Rp.
0.4000 oh
Tukang Pipa
@ Rp.
45,000.00 = Rp.
1.2000 oh
Pekerja
@ Rp.
30,000.00 = Rp.
1.0000 oh
Peralatan
@ Rp.
1,500.00 = Rp.
= Rp.
PEK. PENURUNAN / PENYAMBUNGAN FITTING (GATE VALVE /CHECK VALVE/WATER METER/BUTTERFLY VALVE)
DAN SEJENISNYA
1. Pipa Dia. 100 mm dan < Dia. 100 mm
0.1200 oh
Mandor
@ Rp.
47,500.00 = Rp.
0.4000 oh
Tukang Pipa
@ Rp.
45,000.00 = Rp.
1.2000 oh
Pekerja
@ Rp.
30,000.00 = Rp.
1.0000 ls
Peralatan
@ Rp.
1,500.00 = Rp.
= Rp.

DAFTAR ANALISA HARGA SATUAN PERPIPAAN

9,542.00
118.75
2,100.00
11,760.75

78,625.00
7,644.49
4,750.00
45,000.00
30,000.00
100,000.00
100,000.00
366,019.49
1,452.46

47,500.00
150,000.00
15,977.04
250,000.00
463,477.04
926.95

17,514.00
45,963.23
6,925.67
10,312.50
80,715.39
13,452.57

12,510.00
39,397.05
4,617.11
10,312.50
66,836.66
11,139.44

61,200.00
2,970.44
12,489.64
76,660.08

61,200.00
6,188.42
12,489.64
79,878.06

61,200.00
6,188.42
4,683.62
72,072.04

61,200.00
928.26
4,683.62
66,811.88

712.50
3,600.00
4,500.00
1,500.00
10,312.50
1,718.75
3,740.00
1,718.75
5,458.75

950.00
33,750.00
75,000.00
1,500.00
111,200.00
18,533.33
SOCKET/FLANGET SPIGOT/

5,700.00
18,000.00
36,000.00
1,500.00
61,200.00

ATER METER/BUTTERFLY VALVE)

5,700.00
18,000.00
36,000.00
1,500.00
61,200.00

JENIS PEKERJAAN
ITEM PEKERJAAN

Fabrikasi Rangka struktur


: Plat Sepatu uk 30x30cm tebal 8mm

Kode Analisa
-

Uraian

Harga Satuan
(Rp.)

Jumlah Harga
(Rp.)

Bahan

-. Elektroda Baja
-. Plat Besi T 8 mm 120 x 240 cm
-. Welding Set

0.0350
0.0381
0.1500

kg
cm
hr

110,000.00
1,378,500.00
30,312.75
Jumlah (A)

3,850.00
52,520.85
4,546.91
60,917.76

Tenaga

-. Pekerja Terampil
-. Tukang Las
-. Mandor

0.0250
0.0600
0.0026

Oh
Oh
Oh

35,000.00
45,000.00
47,500.00
Jumlah (B)

875.00
2,700.00
123.50
3,698.50

Jumlah (A + B)

64,616.26

JENIS PEKERJAAN
ITEM PEKERJAAN

: Pemasangan Kabel Listrik


: 1 m1

Kode Analisa
ap

Koofisien
Analisa

Bahan

Uraian
-. Kabel NFA2X 2x10mm

Koofisien
Analisa
1.0000

Harga Satuan
(Rp.)
M

3,410.00

Jumlah (A)
ap. Sup Tenaga

-. Pekerja
-. Tukang Listrik

0.0100
0.0010

Oh
Oh

30,000.00
45,000.00

Jumlah (B)

Jumlah (A + B)

Jumlah Harga
(Rp.)
3,410.00

3,410.00
300.00
45.00

345.00

3,755.00

DAFTAR HARGA BAHAN TAHUN 2010


NO.

JENIS BAHAN

SAT.

BAHAN DASAR
1 Batu Kali :
- Batu Kali Utuh (Besar)
- Batu Kali (Kecil Disaring)
- Batu Split 3 - 5 cm
- Batu Split 2 - 3 cm
2 Batu Gunung (Royalty)
- Batu Gunung (Royalti)
3 Tanah
- Timbunan / Urug
- Urugan Pilihan
4 Pasir :
- Timbunan / Urug
- Pasangan
- Beton
5 Kerikil
- Kerikil Sungai Tersaring
- Sirtu
- Sirtu Tersaring
8 Semen (PC)
- Tonasa 50 Kg
- Tonasa 40 Kg
9 Batu Merah
10 Bambu
11 Ijuk
12 Flux Oil / Modifier
13 Kerosine / Minyak Tanah
14 Alat - alat Kerja (3 alat)
15 Minyak Diesel / Solar
16 Premium / Bensin
17 Minyak Pelumas / Oli
18 P r e m I x
19 Minyak Bekisting

HARGA
STANDARD
(Rp)
4

M
M
M
M

185,300.00
192,400.00
221,500.00
263,900.00

124,500.00

M
M

121,900.00
127,500.00

M
M
M

113,700.00
156,100.00
209,500.00

M
M
M

252,500.00
166,500.00
216,500.00

Zak
Zak
Bh
Bh
Ikat
Ltr
Ltr
Set
Ltr
Ltr
Ltr
Ltr
ltr

59,250.00
47,400.00
700.00
11,000.00
4,300.00
9,500.00
103,000.00
6,000.00
6,000.00
27,000.00
7,500.00
11,300.00

1
BAHAN KAYU
1 Kayu Kls. II
- Balok
- Papan
BAHAN BESI
1 Besi Beton
2 Paku
- Paku Biasa
3 Kawat
- Beton
4 Besi Plat

- 10 mm = 120 x 240 mm
5 Besi Strep
- 30,3 mm
- 35,4 mm
- 46,4 mm
- 40,6 mm
- 50,6 mm
6 Besi Siku
- 30.30.3
- 40.40.3
- 40.40.4
- 50.50.4
- 50.50.5
- 60.60.6
- 70.70.7
7 Besi CNP
- 100 x 6 mtr
- 125 x 6 mtr
- 150 x 6 mtr
8 Besi UNP
- 50 x 6 mtr
- 65 x 6 mtr
- 80 x 6 mtr
- 120 x 6 mtr
- 150 x 6 mtr
8 Besi IWF
9 Rangka Aluminium
10 Stainles Stell
11 Plat Mur, Plong, Baut / Begel U
12 Baja
- Gulungan Uk. Ringan / Tralis
- Anyaman Bronjong
- Anyaman Bronjong Galpanis
- Baut - baut
- Baja Galvanisasi
- Baja Struktur
- paku - paku Jembatan
BAHAN PIPA
1 Pipa Besi GIP
- 1" - 6 m
- 1,5" - 6 m
- 3" - 6 m
- 4" - 6 m

M
M

3,145,000.00
3,531,400.00

Kg

14,500.00

Kg

15,200.00

Kg

13,400.00

Lbr

1,378,500.00

Btg
Btg
Btg
Btg
Btg
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
Kg
Btg
m'
Set
Kg
Kg
Kg
Kg
Kg
Kg
Kg

m'
m'
m'
m'

12,700.00
18,100.00
51,800.00
79,300.00

2 Pipa Besi GIP Medium A


- 1,5" - 6 m
- 2" - 6 m
- 3" - 6 m
3 Jenis Pipa Standar SNI (P = 6.00 meter)
Pipa PVC Pralon Std. S - 12,5 RRJ 2"
Pipa PVC Pralon Std. S - 12,5 RRJ 3"
Pipa PVC Pralon Std. S - 12,5 RRJ 4"
Pipa PVC Diameter 6 "
Pipa PVC Diameter 8"
Pipa PVC Diameter 10 "
4 Lem Pipa
5 Isolasi Pipa
6 Sealed Pipe
7 Sealed Pipe / Gasket (Washtafel)
8 Sambungan Pipa PVC
9 Sambungan Pipa Galvanis
10 Long Bend 3" (raubber ring)
a - 3" 90o
b - 3" 45o
11 Bell Reducer 3" x 2" (raubber ring)
12 TS TEE 3" (raubber ring)
13 TS TEE 3" - 2"(raubber ring)
14 TS TEE 3" - 3/4" (raubber ring)
15 TS TEE 2" - 3/4" (raubber ring)
16 Ventil Udara 13 mm
17 DOP
18 Stop Kran 3" (Flange)
19 WaterMeter 3/4
20 Stop Kran 3/4 "
21 Kran Air 1/2"
22 Clamp sadle
23 Plampung 3/4"
24 Bak Fiber 2M2
MATERIAL SUMUR BOR
1 Bentonite
2 STTIP
3 Pipa GIP A dia. 4 "
4 Pipa Paralon PVC dia. 6 "
5 Low Carbon Screen dia. 6"
6 Pipa GIP A dia. 1.5 "
7 Botton Plug dia. 6"
8 Pengadaan & pemas. Patok tanda
9 Pengadaan & pemas. Tutup sumur
10 Alat Bantu( ayakan, botol, ember)
11 Pompa Submersible 1 Phase
12 Pipa PVC dia.10 "
13 Tali Selling
14 Acceasories pompa dan box control
15 Panel, kabel, acceasories, Tiang
16 Elektroda Baja
1 Dolken Kayu Galam 8 - 10 / 4 m
2 Multipleks 9 mm
3 Cat Kayu

m'
m'
m'

60,550.00
74,300.00
145,200.00

m'
m'
m'
m'
m'
m'
Klg
Bh
set
set
bh
bh

27,588.00
54,571.00
66,000.00
139,200.00
213,900.00
333,100.00
33,200.00
1,700.00
3,600.00
153,100.00
3,600.00
39,100.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

133,300.00
116,700.00
74,600.00
50,000.00
65,000.00
228,100.00
47,400.00
425,000.00
36,800.00
500,000.00
350,000.00
30,100.00
73,000.00
24,400.00
101,200.00
3,219,300.00

Zak
Kg
Meter
Meter
Meter
Meter
Buah
Buah
Buah
Set /m
Buah
Meter
Mtr
Set
Set
kg

500,000.00
300,000.00
79,300.00
139,200.00
139,200.00
60,550.00
500,000.00
50,000.00
350,000.00
50,000.00
25,000,000.00
333,100.00
36,000.00
1,500,000.00
3,500,000.00
110,000.00

Lbr
Lbr
Kg

18,000.00
223,100.00
36,700.00

BAHAN INSTALASI LISTRIK


1
Type NYFGBY
- 2 x 10 mm

m'

3,410.00

DAFTAR UPAH KERJA TAHUN 2010


NO.

UPAH KERJA

SAT.

HRG. STANDARD
(Rp.)
4

1 Pekerja Tak Terlatih


Pekerja Kurang Terlatih
Pekerja Terlatih

Org / Hr
Org / Hr
Org / Hr

30,000.00
32,500.00
35,000.00

2 Tukang Kayu
Tukang Batu
Tukang Cat
Tukang Listrik
Tukang Pipa
Tukang Besi

Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr

45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00

3 Kepala Tukang Kayu


Kepala Tukang Batu
Kepala Tukang Cat
Kepala Tukang Listrik
Kepala Tukang Pipa
Kepala Tukang Besi
4 Mandor
5 Mekanik
6 Pembantu Mekanik
7 Operator - Terampil
8 Operator - Semi Terampil
9 Pembantu Operator
10 Sopir Truk
11 Sopir Personil
12 Pembantu Sopir
Geologist
Hidrogeologist
Asisten Geologist/ hidrogiologist
Ahli Pumping
Driller
Welder
Asisten Driller

Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr
Org / Hr

50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
47,500.00
55,000.00
45,000.00
55,000.00
45,000.00
40,000.00
50,000.00
50,000.00
45,000.00
100,000.00
75,000.00
75,000.00
50,000.00
50,000.00
45,000.00
45,000.00

2010
KETERANGAN
5

uk 30X30 +siku 15x15


= Rp 64.617,19
Cek Teknik Sipil
Untuk Besi Strep
Per kg

KET.
5

INDEKS DAFTAR HARGA BAHAN PIPA TAHUN 2010


(Sumber : Hasil Survey Harga pipa standard SNI dari Mks ke Blk)

No.

JENIS BAHAN

KODE

SAT.

HARGA
DASAR
(Rp.)

ONGKOS
ANGKUT
(Rp.)

TAMBANG
GALIAN C
(20%)

SUB
JUMLAH
(Rp.)

Pipa PVC Pralon Std. S - 10 SCJ 1/2"

btg

16,800.00

5,000.00

21,800.00

3,270.00

501.40

25,571.40

25,500.00

Pipa PVC Pralon Std. S - 10 SCJ 3/4"

btg

25,200.00

5,000.00

30,200.00

4,530.00

694.60

35,424.60

35,000.00

Pipa PVC Pralon Std. S - 10 SCJ 1"

btg

41,400.00

5,000.00

46,400.00

6,960.00

1,067.20

54,427.20

54,000.00

Pipa PVC Pralon Std. S - 10 SCJ 1 1/4"

btg

60,300.00

5,000.00

65,300.00

9,795.00

1,501.90

76,596.90

76,500.00

Pipa PVC Pralon Std. S - 10 SCJ 1 1/2"

btg

95,400.00

5,000.00

100,400.00

15,060.00

2,309.20

117,769.20

117,700.00

Pipa PVC Pralon Std. S - 12,5 SCJ 2"

btg

121,200.00

5,000.00

126,200.00

18,930.00

2,902.60

148,032.60

148,000.00

Pipa PVC Pralon Std. S - 12,5 SCJ 2 1/2"

btg

171,600.00

5,000.00

176,600.00

26,490.00

4,061.80

207,151.80

207,000.00

Pipa PVC Pralon Std. S - 12,5 SCJ 3"

btg

248,100.00

5,000.00

253,100.00

37,965.00

5,821.30

296,886.30

296,800.00

Pipa PVC Pralon Std. S - 12,5 SCJ 4"

btg

364,500.00

5,000.00

369,500.00

55,425.00

8,498.50

433,423.50

433,000.00

Pipa PVC Pralon Std. S - 12,5 RRJ 2"

btg

125,700.00

5,000.00

130,700.00

19,605.00

3,006.10

153,311.10

153,000.00

Pipa PVC Pralon Std. S - 12,5 RRJ 2 1/2"

btg

178,200.00

5,000.00

183,200.00

27,480.00

4,213.60

214,893.60

214,800.00

Pipa PVC Pralon Std. S - 12,5 RRJ 3"

btg

257,700.00

5,000.00

262,700.00

39,405.00

6,042.10

308,147.10

308,000.00

Pipa PVC Pralon Std. S - 12,5 RRJ 4"

btg

378,300.00

5,000.00

383,300.00

57,495.00

8,815.90

449,610.90

449,600.00

Pipa GI Std. SIO Merk Bakrie 1/2"

btg

74,200.00

5,000.00

79,200.00

11,880.00

1,821.60

92,901.60

92,900.00

Pipa GI Std. SIO Merk Bakrie 1/2"

btg

224,900.00

5,000.00

229,900.00

34,485.00

5,287.70

269,672.70

269,600.00

Pipa GI Std. SIO Merk Bakrie 1/2"

btg

475,700.00

5,000.00

480,700.00

72,105.00

11,056.10

563,861.10

563,800.00

OVER
PPH
HEAD
(15% - 20%) 1,5% (8 + 9)
9

10

JUMLAH

PEMBULATAN

(Rp.)

(Rp.)

11

12

Bulukumba,
Pemimpin Kegiatan
Kasi Bangunan,

Team Perencana,
Kasubdin Cipta karya

H. H A M J A. S, ST
Nip. : 580 017 567

DRS. BAMBANG HERU. P, M. Si


Pangkat : Pembina
Nip. : 580 016 635

Mengetahui :
KEPALA DINAS

KEPALA DINAS
PEKERJAAN UMUM KAB. BULUKUMBA

..
Pangkat : Pembina Tk. I
Nip. :

IR. BAHARUDDIN, MM
Pangkat : Pembina Tk. I
Nip. : 010 202 342
Mengetahui / Menyetujui :
BUPATI BULUKUMBA,

H. ANDI PATABAI PABOKORI

Februari 2005

DAFTAR HARGA BAHAN TAHUN 2010


NO.
1

8
9
10
11
12
13
14
15
16
17
18
19
20

21
22
23

24

25

26

27
28
29
30
31
32
33
a
b
c
34
35

36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

JENIS BAHAN
2

Batu Kali :
- Batu Kali Utuh (Besar)
- Batu Kali (Kecil Disaring)
- Batu Split 3 - 5 cm
- Batu Split 2 - 3 cm
- Batu Gunung (Royalti)
Tanah
- Timbunan / Urug
- Urugan Pilihan
Pasir :
- Timbunan / Urug
- Pasangan
- Beton
Kerikil
- Kerikil Sungai Tersaring
- Sirtu
- Sirtu Tersaring
Semen Pc 50 Kg
Batu Merah
Keramik 20 x 20
Bambu
Flux Oil / Modifier
Kerosine / Minyak Tanah
Alat - alat Kerja (3 alat)
Minyak Diesel / Solar
Premium / Bensin
Minyak Pelumas / Oli
PremIx
Minyak Bekisting
Kayu Kls. II
- Balok
- Papan
Besi Beton
Paku Biasa
Besi
- Beton
- Plat 8 mm = 120 x 240 mm
- Angkur 15 mm
Pipa Besi GIP
- 1" - 6 m
- 1,5" - 6 m
- 3" - 6 m
- 4" - 6 m
Pipa Besi GIP Medium A
- 1,5" - 6 m
- 2" - 6 m
- 3" - 6 m
Jenis Pipa Standar SNI (P = 6.00 meter)
Pipa PVC Pralon Std. S - 12,5 RRJ 2"
Pipa PVC Pralon Std. S - 12,5 RRJ 3"
Pipa PVC Pralon Std. S - 12,5 RRJ 4"
Pipa PVC Diameter 3/4 "
Pipa PVC Diameter 6 "
Pipa PVC Diameter 8"
Pipa PVC Diameter 10 "
Lem Pipa
Isolasi Pipa
Sealed Pipe
Sealed Pipe / Gasket (Washtafel)
Sambungan Pipa PVC
Sambungan Pipa Galvanis
Long Bend 3" (raubber ring)
- 3" 90o
- 3" 45o
- 2" 90o
Bell Reducer 3" x 2" (raubber ring)
TS TEE 3" (raubber ring)
TS TEE 3" - 2"(raubber ring)
TS TEE 3" - 3/4" (raubber ring)
TS TEE 2" - 3/4" (raubber ring)
Ventil Udara 13 mm
DOP
a. Stop Kran 3" (Flange)
b. Stop Kran 2" (Flange)
WaterMeter 3/4
Stop Kran 3/4 "
Kran Air 1/2" inc. install
Clamp sadle
Plampung 3/4" inc. install
Bak Fiber 2M2
Wind Turbine dia 1m (200 watt) inc install
Charge Controller inc install
Inverter 5KW inc install
Battery 100aH inc install
Seng Gelombang BWG 33" BJLS 0.22 mm
Pintu PVC inc. Install

SAT.
3

HARGA STANDARD (Rp)


4

M
M
M
M
M

185,300.00
192,400.00
221,500.00
263,900.00
124,500.00

M
M

121,900.00
127,500.00

M
M
M

113,700.00
156,100.00
209,500.00

M
M
M
Zak
Bh
bh
Bh
Ltr
Ltr
Set
Ltr
Ltr
Ltr
Ltr
ltr

252,500.00
166,500.00
216,500.00
59,250.00
700.00
2,000.00
11,000.00
4,300.00
9,500.00
103,000.00
6,000.00
6,000.00
27,000.00
7,500.00
11,300.00

M
M
Kg
Kg

3,145,000.00
3,531,400.00
14,500.00
15,200.00

Kg
Lbr
bh

13,400.00
1,378,500.00
75000

m'
m'
m'
m'

12,700.00
18,100.00
51,800.00
79,300.00

m'
m'
m'

60,550.00
74,300.00
145,200.00

m'
m'
m'
m'
m'
m'
m'
Klg
Bh
set
set
bh
bh

27,588.00
54,571.00
66,000.00
3,400.00
139,200.00
213,900.00
333,100.00
33,200.00
1,700.00
3,600.00
153,100.00
3,600.00
39,100.00

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
Feet
SET

133,300.00
116,700.00
116,700.00
74,600.00
50,000.00
65,000.00
228,100.00
47,400.00
425,000.00
36,800.00
500,000.00
450,000.00
350,000.00
30,100.00
73,000.00
24,400.00
101,200.00
3,219,300.00
18,200,000.00
1,350,000.00
19,800,000.00
1,850,000.00
8,000.00
300,000.00

1
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73

2
Frame ukuran 3625x5790 (alum, t 2")
Bentonite
STTIP
Pipa GIP A dia. 4 "
Pipa Paralon PVC dia. 6 "
Low Carbon Screen dia. 6"
Pipa GIP A dia. 1.5 "
Botton Plug dia. 6"
Pengadaan & pemas. Patok tanda
Pengadaan & pemas. Tutup sumur
Alat Bantu( ayakan, botol, ember)
Pompa Submersible 1 Phase
Pompa Submersible 3 Phase
Pipa PVC dia.10 "
Tali Selling
Acceasories pompa Box Control inc install
Kabel dan tiang Tiang inc install
Elektroda Baja
Dolken Kayu Galam 8 - 10 / 4 m
Multipleks 9 mm
Cat Kayu
Kabel NFA2X
- 2 x 10 mm

3
ea
Zak
Kg
Meter
Meter
Meter
Meter
Buah
Buah
Buah
Set /m
Buah
Buah
Meter
Mtr
Set
Set
kg
Lbr
Lbr
Kg
m'

2,500,000.00
500,000.00
300,000.00
79,300.00
139,200.00
139,200.00
60,550.00
500,000.00
50,000.00
350,000.00
50,000.00
25,000,000.00
27,000,000.00
333,100.00
36,000.00
1,500,000.00
1,000,000.00
110,000.00
18,000.00
223,100.00
36,700.00
3,410.00

DAFTAR UPAH KERJA TAHUN 2010


NO.

UPAH KERJA

SAT.

Pekerja Tak Terlatih


Pekerja Kurang Terlatih
Pekerja Terlatih

Org / Hr
Org / Hr
Org / Hr

Tukang Kayu
Tukang Batu
Tukang Cat
Tukang Listrik
Tukang Pipa
Tukang Besi
Kepala Tukang Kayu
Kepala Tukang Batu
Kepala Tukang Cat
Kepala Tukang Listrik
Kepala Tukang Pipa
Kepala Tukang Besi
Mandor
Mekanik
Pembantu Mekanik
Operator - Terampil
Operator - Semi Terampil
Pembantu Operator
Sopir Truk
Sopir Personil
Pembantu Sopir
Geologist
Hidrogeologist
Asisten Geologist/ hidrogiologist
Ahli Pumping
Driller
Welder
Asisten Driller

Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org
Org

4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/
/

Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

HRG. STANDARD
(Rp.)
4
30,000.00
32,500.00
35,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
45,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
50,000.00
47,500.00
55,000.00
45,000.00
55,000.00
45,000.00
40,000.00
50,000.00
50,000.00
45,000.00
100,000.00
75,000.00
75,000.00
50,000.00
50,000.00
45,000.00
45,000.00
Bupati Kabupaten Bulukumba

A.M Sukri Sappewali

REKAPITULASI RENCANA ANGGARAN BIAYA PERPIPAAN + BANGUNAN PELENGKAP


Kegiatan
Pekerjaan
Volume

: Program P2TPD Dinas Kesehatan Kab. Bulukumba


: Pembangunan Jaringan Perpipaan + Bangunan Pelengkap
: 7150 M

Lokasi
Tahun Anggaran
Kabupaten

NO

URAIAN PEKERJAAN

VOLUME

I
II

III
IV

PEK. PENDAHULUAN
PEKERJAAN UTAMA
Pengadaan Pipa
Pengadaan Accessories
Pemasangan Pipa
Pemasangan Accessories
PEKERJAAN BANGUNAN PELENGKAP
Pek. Hidrant Umum
Pekerjaan Pengeboran
Pekerjaan Reservoir (Tower)

JUMLAH
HARGA SATUAN (Rp)

4
13,853,641.64
259,405,850.00
14,501,600.00
86,291,151.41
6,879,272.63

33
2
1

6,544,681.82
200,105,838.63
43,882,321.04

Jumlah
DIBULATKAN (B)
PPn 10% (tidak dipungut)(10% x B = C)
Jumlah (B + C)
DIBULATKAN
Terbilang :

Satu Milyar Empat Puluh Satu Juta Rupiah


Pimpinan Kegiatan
Program P2TPD Dinas Kesehatan
Kab. Bulukumba

Hasanuddin, SKM. M.Kes


Nip: 196212110 198303 1 021

Bulukumba,
Februari 2010
Kepala Dinas Kesehatan Kab. Bulukumba

Dr. Hj. Rusni Sufran. M.Kes


Pangkat : Pembina Tk.I
Nip : 19530103 198011 2 001

UNAN PELENGKAP
: Desa Caramming
: 2010
: Bulukumba
JUMLAH (Rp)
5
13,853,641.64
259,405,850.00
14,501,600.00
86,291,151.41
6,879,272.63
215,974,499.90
400,211,677.26
43,882,321.04
1,041,000,013.87
1,041,000,000.00
104,100,000.00
1,145,100,000.00
1,145,100,000.00

kumba,
Februari 2010
esehatan Kab. Bulukumba

usni Sufran. M.Kes


at : Pembina Tk.I
30103 198011 2 001

Kegiatan :
Pekerjaan :
Volume :

RENCANA ANGGARAN BIAYA


Program P2TPD Dinas Kesehatan Kab. Bulukumba
Lokasi
Pembangunan Jaringan Perpipaan + Bangunan Pelengkap
Tahun Anggaran
7150 m
Kabupaten

NO

URAIAN PEKERJAAN

A.

B.

VOL. /
SAT.
3

HARGA
SATUAN
4

PEK. PENDAHULUAN
1. 1 Pengukuran Jalur Pipa dan Pematokan
2 Papan Nama Proyek
3 Administrasi dan Dokumentasi
4 Back Up Data dan As Built Drawing
5 Direksikeet 3 x 3 meter
6 Mobilisasi Peralatan dan Tenaga Kerja

7,150.00
1.00
1.00
1.00
9.00
1.00

m1
ls
ls
ls
m2
ls

926.95
350,000.00
1,000,000.00
750,000.00
458,435.55
1,000,000.00
J U M L A H A

PEKERJAAN UTAMA
1. Pengadaan Pipa
Pipa PVC, Tekanan Nominal 10 kg/cm2
Termasuk Pengangkutan Ke Lokasi Pekerjaan
1 Pipa PVC Paralon std S - 12,5 RRJ 3"
2 Pipa PVC Paralon std S - 12,5 RRJ 2"

2,150.00
5,150.00

m1
m1

54,571.00
27,588.00
JUMLAH

1.00
2.00
2.00
1.00
1.00
33.00
4.00
33.00
33.00

bh
bh
bh
bh
bh
bh
bh
bh
bh

133,300.00
116,700.00
74,600.00
65,000.00
425,000.00
24,400.00
36,800.00
350,000.00
30,100.00
JUMLAH

2,150.00
5,150.00

m1
m1

13,452.57
11,139.44
JUMLAH

1.00
2.00
2.00
1.00
1.00
33.00
4.00
33.00
33.00

bh
bh
bh
bh
bh
bh
bh
bh
bh

72,072.04
72,072.04
79,878.06
76,660.08
61,200.00
61,200.00
76,660.08
61,200.00
61,200.00
JUMLAH
J U M L A H B

2. Pengadaan Accessories
1 Long Bend 3" (raubber ring)
- 3" 90o
- 2" 90o
2 Bell Reducer 3" x 2" (raubber ring)
3 TS TEE 3" - 2"(raubber ring)
4 Ventil Udara 13 mm
5 Clamp Sadlle 2" x 0,5"
6 DOP
7 WaterMeter 3/4
8 Stop Kran 3/4 "
3. Pemasangan Pipa
1 Pipa PVC Paralon std S - 12,5 RRJ 3"
2 Pipa PVC Paralon std S - 12,5 RRJ 2"
4. Pemasangan Accessories
1 Bell Bend "
- 3" 90o
- 2" 90o
2 Bell Reducer 3" x 2" (raubber ring)
3 TS TEE 3" - 2"(raubber ring)
4 Ventil Udara 13 mm
5 Clamp Sadlle 2" x 0,5"
6 DOP
7 WaterMeter 3/4
8 Stop Kran 3/4 "

NO

URAIAN PEKERJAAN

C.

VOL. /
SAT.
3

HARGA
SATUAN
4

PEKERJAAN BANGUNAN PELENGKAP


1 Pek. Hidrant Umum
1 Galian Tanah
2 Urugan Tanah
3 Urugan Sirtu Bawah Lantai
4 Pasangan Batu Kosong
5 Pasangan Pondasi Batu Kali 1 : 4
Pekerjaan Rabat Beton 1 : 3 : 5 Lantai
6
Dudukan
Pekerjaan Rabat Beton 1 : 3 : 5 Tempat
7
Cuci
8 Pekerjaan Plesteran Camp. 1 : 4
9 Pekerjaan Acian dengan Semen
Pekerjaan Pasangan Bak Penampungan 2
10 3
m
11 Pas.Pipa PVC 3/4" aw
12 Kran Air 1/2" inc. install
13 Plampung 3/4" inc. install
PEKERJAAN RESERVOIR (TOWER)
I Pekerjaan Tanah
1 Galian Tanah Pondasi
2 Urugan Tanah kembali
3 Urugan Sirtu Bawah Lantai
4 Urugan Pasir Bawah Lantai dan Pondasi

13.20
0.54
3.40
0.54

m3
m3
m3
m3

13,900.00
6,662.50
209,275.00
145,915.00
JUMLAH I

II
1
2
3
4
5
7
8
9
10

2.82
6.79
15.78
12.12
0.5
27.24
27.24
14.00
5.00

m3
m3
m2
m3
m3
m2
m2
m2
m2

313,942.50
528,470.90
84,652.30
2,623,207.50
624,977.00
26,724.90
5,557.50
107,827.20
110,101.70
JUMLAH II

Pekerjaan Batu dan Beton


Pasangan Batu Kosong
Pasangan Batu Kali 1:4
Pek. Dinding Batu Bata 1:4
Pekerjaan Beton
Rabat Beton Lantai R. Panel
Plasteran 1:4
Acian Semen
Pek. Lantai Keramik 20X20
Pek Dinding Keramik 20x20

1.03
0.52
1.95
0.99
1.90

m3
m3
m3
m3
m3

13,900.00
161,687.50
209,275.00
313,942.50
528,470.90

0.60

m3

624,977.00

0.56

m3

624,977.00

5.40
5.40

m2
m2

26,724.90
5,557.50

1.00

unit

3,219,300.00

12.00
6.00
1.00

m'
Bh
unit

5,458.75
73,000.00
101,200.00
JUMLAH C

III Pek. Pintu, dan tangga


1 Tangga Besi
a. Pipa GIP Medium A 1,5"
b. Biaya Fabrikasi dan Install
7 Pintu PVC inc. Install

18.50
18.50
1.00

IV Pekerjaan Pengecatan
1 Pengecatan Dinding

27.24 m2

m
m
set

60,550.00
16,740.68
300,000.00
JUMLAH III
11,760.75
JUMLAH IV
JUMLAH D

RENCANA ANGGARAN BIAYA


: Desa Caramming
: 2010
: Bulukumba
JUMLAH
HARGA
5

6,627,721.69
350,000.00
1,000,000.00
750,000.00
4,125,919.95
1,000,000.00
13,853,641.64

117,327,650.00
142,078,200.00
259,405,850.00

133,300.00
233,400.00
149,200.00
65,000.00
425,000.00
805,200.00
147,200.00
11,550,000.00
993,300.00
14,501,600.00
28,923,016.09
57,368,135.31
86,291,151.41

72,072.04
144,144.07
159,756.12
76,660.08
61,200.00
2,019,600.00
306,640.33
2,019,600.00
2,019,600.00
6,879,272.63
367,077,874.04

JUMLAH
HARGA
5

14,317.00
84,077.50
408,086.25
310,803.08
1,004,094.71
374,986.20
349,987.12
144,314.46
30,010.50
3,219,300.00
65,505.00
438,000.00
101,200.00
6,544,681.82

183,480.00
3,597.75
711,535.00
78,794.10
977,406.85
885,317.85
3,588,317.41
1,335,813.29
31,793,274.90
312,488.50
727,986.28
151,386.30
1,509,580.80
550,508.50
40,854,673.83
1,120,175.00
309,702.53
300,000.00
1,729,877.53
320,362.83
320,362.83
43,882,321.04

ANALISA HARGA SATUAN BIAYA PEKERJAAN


ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
12 JENIS PEKERJAAN
ITEM PEKERJAAN
INSTANSI
KABUPATEN
TAHUN ANGGARAN
Kode Analisa
6.4.1

Bahan

: PEKERJAAN PLESTERAN
: 1 m Plesteran Batu Bata 1 : 4 (Tebal 15 mm)
: DINAS PEKERJAAN UMUM
: BULUKUMBA
#REF!
Koofisien
Uraian
Analisa
-. Semen Portland (PC 50 Kg) 0.1040
-. Pasir Pasang
0.0200

Zak
M

Harga Satuan
(Rp.)
59,250.00
156,100.00

Jumlah (A)
6.4.2

Tenaga

-. Pekerja
-. Tukang Batu
-. Kepala Tukang
-. Mandor

0.2000
0.1500
0.0150
0.0100

Oh
Oh
Oh
Oh

30,000.00
45,000.00
50,000.00
47,500.00
Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAAN


ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
13 JENIS PEKERJAAN
ITEM PEKERJAAN
INSTANSI
KABUPATEN
TAHUN ANGGARAN
Kode Analisa
6.47.1

Bahan

: PEKERJAAN LANTAI
: 1 m Pasangan Lantai Keramik Ukuran 30 x 30 cm
: DINAS PEKERJAAN UMUM
: BULUKUMBA
#REF!
Koofisien
Harga Satuan
Uraian
Analisa
(Rp.)
-. Ubin Keramik 30 x 30 cm (Putih)
11.1111
-. Semen Portlan (PC 50 Kg) 0.2276
-. Pasir Pasang
0.0420
-. Semen Warna (PC 40 Kg)
0.0375

Bh
Zak
M
Zak

59,250.00
156,100.00
47,400.00
Jumlah (A)

6.47.2

Tenaga

-. Pekerja
-. Tukang Batu
-. Kepala Tukang
-. Mandor

0.2500
0.1200
0.0120
0.0125

Oh
Oh
Oh
Oh

30,000.00
45,000.00
50,000.00
47,500.00
Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAAN


ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
14 JENIS PEKERJAAN
ITEM PEKERJAAN
INSTANSI
KABUPATEN
TAHUN ANGGARAN
Kode Analisa
6.44.1

Bahan

: PEKERJAAN LANTAI
: 1 m Pasangan Lantai Keramik Ukuran 20 x 20 cm
: DINAS PEKERJAAN UMUM
: BULUKUMBA
#REF!
Koofisien
Harga Satuan
Uraian
Analisa
(Rp.)
-. Ubin Keramik 20 x 20 cm (Putih)
25.0000
-. Semen Portlan (PC 50 Kg) 0.2276
-. Pasir Pasang
0.0420
-. Semen Warna (PC 40 Kg)
0.0375

Bh
Zak
M
Zak

59,250.00
156,100.00
47,400.00
Jumlah (A)

6.44.2

Tenaga

-. Pekerja
-. Tukang Batu
-. Kepala Tukang
-. Mandor

0.6200
0.3500
0.0350
0.0300

Oh
Oh
Oh
Oh

30,000.00
45,000.00
50,000.00
47,500.00
Jumlah (B)

Jumlah (A + B)
ANALISA HARGA SATUAN BIAYA PEKERJAAN
ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
15 JENIS PEKERJAAN
ITEM PEKERJAAN
INSTANSI
KABUPATEN
TAHUN ANGGARAN
Kode Analisa
6.44.1

Bahan

: PEKERJAAN LANTAI
: 1 m Pasangan Dinding Keramik Ukuran 20 x 25 cm
: DINAS PEKERJAAN UMUM
: BULUKUMBA
#REF!
Koofisien
Harga Satuan
Uraian
Analisa
(Rp.)
-. Keramik 20 x 25 cm (Warna)
20.0000
-. Semen Portlan (PC 50 Kg) 0.1860
-. Pasir Pasang
0.0180
-. Semen Warna (PC 40 Kg)
0.0375

Bh
Zak
M
Zak

#REF!
59,250.00
156,100.00
47,400.00
Jumlah (A)

6.44.2

Tenaga

-. Pekerja
-. Tukang Batu
-. Kepala Tukang
-. Mandor

0.6200
0.3500
0.0350
0.0300

Oh
Oh
Oh
Oh

30,000.00
45,000.00
50,000.00
47,500.00
Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAAN


ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
16 JENIS PEKERJAAN
ITEM PEKERJAAN
INSTANSI
KABUPATEN
TAHUN ANGGARAN
Kode Analisa
6.1.1

Bahan

: PEKERJAAN KAYU
: 1 m Pas. Kusen Pintu dan Jendela Kls. I (Jati / Bayam)
: DINAS PEKERJAAN UMUM
: BULUKUMBA
#REF!
Koofisien
Harga Satuan
Uraian
Analisa
(Rp.)
-. Balok Kls. I (Jati / Bayam)

1.1000

Jumlah (A)
6.1.2

Tenaga

-. Pekerja
-. Tukang Kayu
-. Kepala Tukang
-. Mandor

6.0000
20.0000
2.0000
0.3000

Oh
Oh
Oh
Oh

30,000.00
45,000.00
50,000.00
47,500.00
Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAAN


ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
17 JENIS PEKERJAAN
ITEM PEKERJAAN
INSTANSI
KABUPATEN
TAHUN ANGGARAN
Kode Analisa
6.7.1

Bahan

: PEKERJAAN KAYU
: 1 m Pas. Pintu Panil Kls. I (Jati / Bayam)
: DINAS PEKERJAAN UMUM
: BULUKUMBA
#REF!
Koofisien
Uraian
Analisa
-. Papan Kls. I (Jati / Bayam) 0.0400

Harga Satuan
(Rp.)

Jumlah (A)
6.7.2

Tenaga

-. Pekerja
-. Tukang Kayu
-. Kepala Tukang
-. Mandor

1.0000
2.5000
0.2500
0.0500

Oh
Oh
Oh
Oh

30,000.00
45,000.00
50,000.00
47,500.00
Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAAN


ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN

BERDASARKAN SNI - 2001 (EDISI REVISI)


18 JENIS PEKERJAAN
ITEM PEKERJAAN
INSTANSI
KABUPATEN
TAHUN ANGGARAN
Kode Analisa

: PEKERJAAN KAYU + KACA


: 1 m Pas. Pintu dan Jendela Kaca Kls. II (Kamper / Meranti)
: DINAS PEKERJAAN UMUM
: BULUKUMBA
#REF!
Koofisien
Harga Satuan
Uraian
Analisa
(Rp.)

BINGKAI KACA (I)


6.10.1

Bahan

-. Papan Kls. II (Kamper / Meranti)


0.0350

3,531,400.00

Jumlah (A)
6.10.2

Tenaga

-. Pekerja
-. Tukang Kayu
-. Kepala Tukang
-. Mandor

0.8000
2.0000
0.2000
0.0400

Oh
Oh
Oh
Oh

1.1000

30,000.00
45,000.00
50,000.00
47,500.00
Jumlah (B)

KACA BENING 5 MM (II)


6.17.1

Bahan

-. Kaca Bening 5 mm

Jumlah (A)
6.17.2

Tenaga

-. Pekerja
-. Tukang Kayu
-. Kepala Tukang
-. Mandor

0.0150
0.1500
0.0150
0.0008

Oh
Oh
Oh
Oh

30,000.00
45,000.00
50,000.00
47,500.00
Jumlah (B)

Jumlah (I + II)

ANALISA HARGA SATUAN BIAYA PEKERJAAN


ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
19 JENIS PEKERJAAN
ITEM PEKERJAAN
INSTANSI
KABUPATEN
TAHUN ANGGARAN
Kode Analisa
6.12.1

Bahan

: PEKERJAAN KAYU
: 1 m Pas. Pintu dan Jendela Jalusi Kls. I (Jati / Bayam)
: DINAS PEKERJAAN UMUM
: BULUKUMBA
#REF!
Koofisien
Harga Satuan
Uraian
Analisa
(Rp.)
-. Papan Kls. I (Jati / Bayam) 0.0640

Jumlah (A)

6.12.2

Tenaga

-. Pekerja
-. Tukang Kayu
-. Kepala Tukang
-. Mandor

1.0000
3.0000
0.3000
0.3000

Oh
Oh
Oh
Oh

30,000.00
45,000.00
50,000.00
47,500.00
Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAAN


ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
20 JENIS PEKERJAAN
ITEM PEKERJAAN
INSTANSI
KABUPATEN
TAHUN ANGGARAN
Kode Analisa
6.27.1

Bahan

: PEKERJAAN KAYU
: 1 m Pas. Konstruksi Kuda - Kuda Kls. I (Jati / Bayam)
: DINAS PEKERJAAN UMUM
: BULUKUMBA
#REF!
Koofisien
Harga Satuan
Uraian
Analisa
(Rp.)
-. Balok Kls. I (Jati / Bayam) 1.1000
-. Besi Strip
15.0000
-. Paku Biasa 2" - 5"
0.8000

M
Kg
Kg

15,200.00

Jumlah (A)
6.27.2

Tenaga

-. Pekerja
-. Tukang Kayu
-. Kepala Tukang
-. Mandor

4.0000
12.0000
1.2000
0.2000

Oh
Oh
Oh
Oh

30,000.00
45,000.00
50,000.00
47,500.00
Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAAN


ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
21 JENIS PEKERJAAN
ITEM PEKERJAAN
INSTANSI
KABUPATEN
TAHUN ANGGARAN
Kode Analisa
6.28.1

Bahan

: PEKERJAAN KAYU
: 1 m Pas. Konstruksi Kuda - Kuda / Gording Kls. II (Kamper / Meranti)
: DINAS PEKERJAAN UMUM
: BULUKUMBA
#REF!
Koofisien
Harga Satuan
Uraian
Analisa
(Rp.)
-. Balok Kls. II (Kamper / Meranti)
1.1000
-. Besi Strip
15.0000
-. Paku Biasa 2" - 5"
0.8000

M
Kg
Kg

3,145,000.00
15,200.00

Jumlah (A)

6.28.2

Tenaga

-. Pekerja
-. Tukang Kayu
-. Kepala Tukang
-. Mandor

4.0000
12.0000
1.2000
0.2000

Oh
Oh
Oh
Oh

30,000.00
45,000.00
50,000.00
47,500.00
Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAAN


ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
22 JENIS PEKERJAAN
ITEM PEKERJAAN
INSTANSI
KABUPATEN
TAHUN ANGGARAN
Kode Analisa
6.39.1

Bahan

: PEKERJAAN KAYU
: 1 m Pas. Rangka Langit - Langit 100 x 100 cm Kls. II (Kamper / Meranti)
: DINAS PEKERJAAN UMUM
: BULUKUMBA
#REF!
Koofisien
Harga Satuan
Uraian
Analisa
(Rp.)
-. Balok Kls. II (Kamper / Meranti)
0.0120
-. Paku Biasa 2" - 5"
0.1000

M
Kg

3,145,000.00
15,200.00

Jumlah (A)
6.39.2

Tenaga

-. Pekerja
-. Tukang Kayu
-. Kepala Tukang
-. Mandor

0.1500
0.2500
0.0250
0.0750

Oh
Oh
Oh
Oh

30,000.00
45,000.00
50,000.00
47,500.00
Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAAN


ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
23 JENIS PEKERJAAN
ITEM PEKERJAAN
INSTANSI
KABUPATEN
TAHUN ANGGARAN
Kode Analisa
6.1.1

Bahan

: PEKERJAAN LANGIT - LANGIT


: 1 m Langit - Langit Eternit 100 x 100 cm (Tebal = 6 mm)
: DINAS PEKERJAAN UMUM
: BULUKUMBA
#REF!
Koofisien
Harga Satuan
Uraian
Analisa
(Rp.)
-. Eternit 100 x 100 cm
-. Paku

1.1000
0.0100

Lbr
Kg

15,200.00

Jumlah (A)

6.1.2

Tenaga

-. Pekerja
-. Tukang Kayu
-. Kepala Tukang
-. Mandor

0.0300
0.0700
0.0070
0.0015

Oh
Oh
Oh
Oh

30,000.00
45,000.00
50,000.00
47,500.00
Jumlah (B)

Jumlah (A + B)
ANALISA HARGA SATUAN BIAYA PEKERJAAN
ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
24 JENIS PEKERJAAN
ITEM PEKERJAAN
INSTANSI
KABUPATEN
TAHUN ANGGARAN
Kode Analisa
6.39.1

Bahan

: PEKERJAAN KAYU
: 1 m' Pas. Listplank Uk. 2/30 cm Kls. I (Jati / Bayam)
: DINAS PEKERJAAN UMUM
: BULUKUMBA
#REF!
Koofisien
Harga Satuan
Uraian
Analisa
(Rp.)
-. Papan Kls. I (Jati / Bayam) 0.0060
-. Paku Biasa 2" - 5"
0.0500

M
Kg

15,200.00

Jumlah (A)
6.39.2

Tenaga

-. Pekerja
-. Tukang Kayu
-. Kepala Tukang
-. Mandor

0.1000
0.2000
0.0250
0.0050

Oh
Oh
Oh
Oh

30,000.00
45,000.00
50,000.00
47,500.00
Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAAN


ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
25 JENIS PEKERJAAN
ITEM PEKERJAAN
INSTANSI
KABUPATEN
TAHUN ANGGARAN
Kode Analisa
6.60.1

Bahan

: PEKERJAAN KAYU
: 1 m' Pas. List Plafound Kayu Profil
: DINAS PEKERJAAN UMUM
: BULUKUMBA
#REF!
Koofisien
Uraian
Analisa
-. Kayu Profil

1.0500

M'

Harga Satuan
(Rp.)
#REF!

Jumlah (A)
6.60.2

Tenaga

-. Pekerja

0.0210

Oh

30,000.00

-. Tukang Kayu
-. Kepala Tukang
-. Mandor

0.0210
0.0020
0.0010

Oh
Oh
Oh

45,000.00
50,000.00
47,500.00
Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAAN


ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
26 JENIS PEKERJAAN
ITEM PEKERJAAN
INSTANSI
KABUPATEN
TAHUN ANGGARAN
Kode Analisa
6.38.1

Bahan

: PEKERJAAN ATAP
: 1 m Pas. Atap Seng Gelombang
: DINAS PEKERJAAN UMUM
: BULUKUMBA
#REF!
Koofisien
Uraian
Analisa
-. Seng Gelombang BWG 33" BJLS
6.0000
0.22 mm Ft
-. Paku Seng (Payung) RRT
0.0200
Kg

Harga Satuan
(Rp.)
#REF!
#REF!

Jumlah (A)
6.38.2

Tenaga

-. Pekerja
-. Tukang Kayu
-. Kepala Tukang
-. Mandor

0.0210
0.0210
0.0020
0.0010

Oh
Oh
Oh
Oh

30,000.00
45,000.00
50,000.00
47,500.00
Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAAN


ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
27 JENIS PEKERJAAN
ITEM PEKERJAAN
INSTANSI
KABUPATEN
TAHUN ANGGARAN

: PEKERJAAN ATAP
: 1 m Pas. Atap Nok Seng
: DINAS PEKERJAAN UMUM
: BULUKUMBA
#REF!

Kode Analisa
6.39.1

Bahan

Uraian
-. Seng Plat BJLS 0.28 mm
-. Paku Seng (Payung) RRT

Koofisien
Analisa
0.3000
0.0200

Lbr
Kg

Harga Satuan
(Rp.)
#REF!
#REF!

Jumlah (A)
6.39.2

Tenaga

-. Pekerja

0.0210

Oh

30,000.00

-. Tukang Kayu
-. Kepala Tukang
-. Mandor

0.0210
0.0020
0.0010

Oh
Oh
Oh

45,000.00
50,000.00
47,500.00
Jumlah (B)

Jumlah (A + B)

ANALISA HARGA SATUAN BIAYA PEKERJAAN


ANALISA BIAYA KONSTRUKSI BANGUNAN GEDUNG DAN PERUMAHAN
BERDASARKAN SNI - 2001 (EDISI REVISI)
28 JENIS PEKERJAAN

: PEKERJAAN PENGECETAN

AAN
AN PERUMAHAN
SI)

Jumlah Harga
(Rp.)
6,162.00
3,122.00

9,284.00
6,000.00
6,750.00
750.00
475.00
13,975.00

23,259.00

AAN
AN PERUMAHAN
SI)

Jumlah Harga
(Rp.)
13,485.30
6,556.20
1,777.50
21,819.00
7,500.00
5,400.00
600.00
593.75
14,093.75

35,912.75

AAN
AN PERUMAHAN
SI)

Jumlah Harga
(Rp.)
13,485.30
6,556.20
1,777.50
21,819.00
18,600.00
15,750.00
1,750.00
1,425.00
37,525.00

59,344.00

AAN
AN PERUMAHAN
SI)

Jumlah Harga
(Rp.)
#REF!
11,020.50
2,809.80
1,777.50
#REF!
18,600.00
15,750.00
1,750.00
1,425.00
37,525.00

#REF!

AAN
AN PERUMAHAN
SI)

Jumlah Harga
(Rp.)
-

180,000.00
900,000.00
100,000.00
14,250.00
1,194,250.00

1,194,250.00

AAN
AN PERUMAHAN
SI)

Jumlah Harga
(Rp.)
-

30,000.00
112,500.00
12,500.00
2,375.00
157,375.00

157,375.00

AAN
AN PERUMAHAN

SI)

Jumlah Harga
(Rp.)
249,499.00
123,599.00

123,599.00
24,000.00
90,000.00
10,000.00
1,900.00
125,900.00
7,985.63
-

450.00
6,750.00
750.00
35.63
7,985.63

257,484.63

AAN
AN PERUMAHAN
SI)

Jumlah Harga
(Rp.)
-

30,000.00
135,000.00
15,000.00
14,250.00
194,250.00

194,250.00

AAN
AN PERUMAHAN
SI)

Jumlah Harga
(Rp.)
12,160.00

12,160.00
120,000.00
540,000.00
60,000.00
9,500.00
729,500.00

741,660.00

AAN
AN PERUMAHAN
SI)

mper / Meranti)

Jumlah Harga
(Rp.)
3,459,500.00
12,160.00

3,471,660.00

120,000.00
540,000.00
60,000.00
9,500.00
729,500.00

4,201,160.00

AAN
AN PERUMAHAN
SI)

amper / Meranti)

Jumlah Harga
(Rp.)
37,740.00
1,520.00

39,260.00
4,500.00
11,250.00
1,250.00
3,562.50
20,562.50

59,822.50

AAN
AN PERUMAHAN
SI)

Jumlah Harga
(Rp.)
152.00

152.00

900.00
3,150.00
350.00
71.25
4,471.25

4,623.25

AAN
AN PERUMAHAN
SI)

Jumlah Harga
(Rp.)
760.00

760.00
3,000.00
9,000.00
1,250.00
237.50
13,487.50

14,247.50

AAN
AN PERUMAHAN
SI)

Jumlah Harga
(Rp.)
#REF!

#REF!
630.00

945.00
100.00
47.50
1,722.50

#REF!

AAN
AN PERUMAHAN
SI)

Jumlah Harga
(Rp.)
#REF!
#REF!

#REF!
630.00
945.00
100.00
47.50
1,722.50

#REF!

AAN
AN PERUMAHAN
SI)

Jumlah Harga
(Rp.)
#REF!
#REF!

#REF!
630.00

945.00
100.00
47.50
1,722.50

#REF!

AAN
AN PERUMAHAN
SI)

You might also like