DAFTAR HARGA HAL 1

DAFTAR HARGA SATUAN UPAH TENAGA KERJA, PERALATAN DAN BAHAN Propinsi Kotamadya DAFTAR HARGA SATUAN UPAH TENAGA KERJA Upah Satuan No Tenaga Kerja Satuan Kode Tidak Terpajak 1 Mandor Org/hr 90,000 L - 101 Rp 2 Kapala Tukang Org/hr 100,000 L - 102 Rp 3 Tukang Batu Org/hr 85,000 L - 103 Rp 4 Tukang Kayu Org/hr 85,000 L - 104 Rp 5 Tukang Besi Org/hr 85,000 L - 105 Rp 6 Tukang Cat Org/hr 85,000 L - 106 Rp 7 Pekerja Org/hr 85,000 L - 107 Rp 8 Operator Org/hr 95,000 L - 108 Rp 9 Operator Pembantu Org/hr 35,000 L - 109 Rp 10 Makanik Org/hr 100,000 L - 110 Rp 11 Mekanik Pembantu Org/hr 37,500 L - 111 Rp 12 Sopir Org/hr 90,000 L - 112 Rp 13 Pembantu Sopir Org/hr L - 113 Rp 35,000

Upah Satuan Terpajak (PPn&PPh) 99,000.00 Rp 110,000.00 Rp 93,500.00 Rp 93,500.00 Rp 93,500.00 Rp 93,500.00 Rp 93,500.00 Rp 104,500.00 Rp 38,500.00 Rp 110,000.00 Rp 41,250.00 Rp 99,000.00 Rp Rp 38,500.00

DAFTAR HARGA SATUAN PERALATAN Upah Satuan Upah Satuan No Alat Satuan Kode Tidak Terpajak Terpajak (PPn&PPh) 1 Alat-alat kerja set 80,000 Rp 88,000.00 E - 001 Rp 2 Dump Truck 5 ton perjam 312,266 Rp 343,492.60 E - 002 Rp 3 Excavator Hidro. 1,0 m perjam 385,499 Rp 424,048.90 E - 003 Rp 4 Motor Grader 100 hp perjam 180,940 Rp 199,034.21 E - 004 Rp 5 Wheel Loader 115 hp perjam 93,831 Rp 103,214.03 E - 005 Rp 6 Hammer Breaker perjam 232,870 Rp 256,157.09 E - 006 Rp 7 Mesin Pompa Air ( Sewa ) Alat/hr 85,000 Rp 93,500.00 E - 007 Rp 8 Molem ( Sewa ) Alat/hr 175,000 Rp 192,500.00 E - 008 Rp 9 Vibrator ( Sewa ) Alat/hr 150,000 Rp 165,000.00 E - 009 Rp 10 Winch ( Sewa ) Alat/hr 125,000 Rp 137,500.00 E - 010 Rp 11 Mesin Gilas 3 roda 6-8 ton Alat/hr 57,146 Rp 62,860.57 E - 011 Rp 12 Asphalt finisher Alat/hr 145,000 Rp 159,500.00 E - 012 Rp 13 Roller 3 whelled Alat/hr E - 013 Rp 105,000 Rp 115,500.00

FEBRIANTO / D 111 04 095

DAFTAR HARGA HAL 2


DAFTAR HARGA SATUAN BAHAN Upah Satuan Satuan Kode Tidak Terpajak M M M M M M M Zak Zak Zak Zak Zak Zak Kg Drum Kg Ton M M Btg M M M M M M M Kg Kg Kg Kg Kg Dos Kg Kg Kg Btg Btg Btg Btg Btg Kg Btg Btg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 45,000 80,000 80,000 250 180,000 75,000 80,000 5,000 38,000 35,000 30,000 28,000 88,550 7,000 645,000 5,500 700,000 603,000 606,500 10,000 3,000,000 3,000,000 2,500,000 2,500,000 2,000,000 2,000,000 1,200,000 9,000 25,000 26,000 17,000 35,000 26,000 54,000 12,000 13,500 25,000 50,000 75,000 95,000 20,500 10,000 76,000 134,000 7,500 8,500 18,000 10,500 24,000 18,500 10,000 18,500 18,500 18,500

No A

Bahan

Upah Satuan Terpajak (PPn&PPh) Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 49,500.00 88,000.00 88,000.00 275.00 198,000.00 82,500.00 88,000.00 5,500.00 41,800.00 38,500.00 33,000.00 30,800.00 97,405.00 7,700.00 709,500.00 6,050.00 770,000.00 663,300.00 667,150.00 11,000.00 3,300,000.00 3,300,000.00 2,750,000.00 2,750,000.00 2,200,000.00 2,200,000.00 1,320,000.00 9,900.00 27,500.00 28,600.00 18,700.00 38,500.00 28,600.00 59,400.00 13,200.00 14,850.00 27,500.00 55,000.00 82,500.00 104,500.00 22,550.00 11,000.00 83,600.00 147,400.00 8,250.00 9,350.00 19,800.00 11,550.00 26,400.00 20,350.00 11,000.00 20,350.00 20,350.00 20,350.00

Bahan Dasar Tanah/Pasir Urug Batu Gunung Batu Kali Batu Bata/Merah Kerikil Beton Cipping Pasir Pasang/Pasir Beton Sirtu Kapur Pasang Semen @ 50 Kg Merk Tonasa Merk Bosowa Semen @ 40 Kg Merk Tonasa Merk Bosowa Semen Putih @ 50 Kg Semen Warna Aspal : Cair Aspal : Bitumen Aspal : Buton Campuran Laston ( AC ) Campuran Lataston ( HRS ) Bahan Kayu Bambu Kayu Kls I Balok Papan Kayu Kls II Balok Papan Kayu Kls III Balok Papan Kayu untuk Perancah Bahan Besi/Baja/Aluminium Paku Biasa Paku Seng Paku Genteng Paku Eternit Paku Ulir Paku Beton 5-7 cm Paku Keling Besi Tulangan Beton Besi Galvanisir Besi Siku 30.30.0,8 Besi Siku 40.40.3 Besi Siku 50.50.4 Besi Siku 60.60.4,5 Besi Strip Besi Moer,Baut,Angker Besi Holow 3 x 4 cm Madium C Besi Holow 4 x 6 cm Medium B Baja Tulangan Beton ( Polos ) Baja Tulangan Beton ( Ulir ) Baja Konstruksi Baja Teralis Baja Angker Plat ( Kolom Baja ) Baja IWF 250/346/500/198 Baja C 150 Baja I 300/250/6 Baja L 60.60.6 Baja C 125.25.20

FEBRIANTO / D 111 04 095

DAFTAR HARGA HAL 3


Baja Treak stang (Bracing) Kg Rp Baja Jarum Penyetel Kg Rp Baja Plat Bahul Kg Rp Baja Veer 40 cm Bh Rp Baja Moer,Baut,Angker Kg Rp Kawat Beton Kg Rp Kawat Bronjong Kg Rp Kawat Duri Roll Rp Kawat Licin Roll Rp Kawat Las Dos Rp Kawat Raam M Rp Kawat Harmonika Kg Rp Kawat Baja ( Bindrat ) Kg Rp Kawat Digalvano Roll Rp Pintu Rolling Door M Rp Pintu Aluminium M Rp Aluminium Swing 120 x 60 mm Btg Rp Pintu Harmonika M Rp Talang Aluminium Press 1,8 mm M Rp Lisplang Zincalume Clean Colorbond1 LbrT=24mm - P=3MRp Bracket Lisplang ( Plat Galvanis 0,8 mm) Bh Rp Lis Zicalume L 30 x 30 x 0,8 mm (Stringer) Lbr P =3 M Rp Panellux Colourbond Linear (Plafond Lbr Ekterior) Rp Sun Screen Panellux Colourbond (Loster Lbrangin) Rp Stringer 85x45 mm P=1m SL1 45 & Lbr SL2 20 Rp Stringer 85 C P = 6 M (Plafond Interior) Lbr Rp Bahan Lantai/Turap 0 Bahan Plafond/Partisi Eternit/Asbes 4 mm uk.100x100cm Lbr Rp Tripleks Biasa : 2 mm Lbr Rp 3 mm Lbr Rp 4 mm Lbr Rp 6 mm Lbr Rp Tripleks Jati Lbr Rp Tripleks Sungkai Lbr Rp Multipleks : 8mm Lbr Rp 18 mm Lbr Rp Teakwood / Polywood Lbr Rp Akustic Duragrid M Rp Gypsum Plat Merk Jaya Board 9mmLbr Rp Karpet plint Lbr Rp Vertikal Blind M Rp Wall Paper M Rp Sungkai Paper Roll Rp Akustik 30 x 60 x 9 mm Lbr Rp Kisi kisi / Lambrisering Lbr Rp Gamacca Lbr Rp List Profil Kayu ( Kls 1 ) M2 Rp List Profil Kayu ( Kls 1I ) M Rp List Profil Kayu Double Line M Rp List Plint Profile M Rp List Plint Sungkai Ukir M Rp List Profile Gypsum C Comice 16 M Rp Papan Blis M Rp Bahan Atap Sirap Ikat Rp Seng Gelombang BWG 34 (6 kaki) Lbr Rp Seng Superdek ( 6 kaki) Lbr Rp Seng Plastik (6 kaki) Lbr Rp Seng Plat BJLS (6 kaki) Lbr Rp 10,000 10,000 10,000 42,500 7,500 9,000 10,000 85,000 70,000 95,000 15,750 22,550 12,700 250,000 300,000 150,000 186,000 900,000 185,000 124,500 4,500 75,000 284,500 284,500 24,500 89,000 14,000 33,000 40,000 53,000 66,500 65,000 85,000 90,000 120,000 85,000 85,000 110,000 80,000 325,000 32,500 78,750 21,000 17,000 10,000 10,000 5,000 20,000 12,000 12,000 18,750 17,750 30,000 35,000 47,000 28,000 25,000 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 11,000.00 11,000.00 11,000.00 46,750.00 8,250.00 9,900.00 11,000.00 93,500.00 77,000.00 104,500.00 17,325.00 24,805.00 13,970.00 275,000.00 330,000.00 165,000.00 204,600.00 990,000.00 203,500.00 136,950.00 4,950.00 82,500.00 312,950.00 312,950.00 26,950.00 97,900.00 15,400.00 36,300.00 44,000.00 58,300.00 73,150.00 71,500.00 93,500.00 99,000.00 132,000.00 93,500.00 93,500.00 121,000.00 88,000.00 357,500.00 35,750.00 86,625.00 23,100.00 18,700.00 11,000.00 11,000.00 5,500.00 22,000.00 13,200.00 13,200.00 20,625.00 19,525.00 33,000.00 38,500.00 51,700.00 30,800.00 27,500.00

FEBRIANTO / D 111 04 095

DAFTAR HARGA HAL 4


Seng Licin BJLS (6 kaki) Lbr Seng Gelombang : 0,20 mm Lbr BJLS (6 kaki) 0,22 mm Lbr 0,29 mm Lbr 0,31 mm Lbr Seng Aluminium Licin 0,31 Lbr Seng Onduline Lbr Asbes Gelombang ( 6 kaki ) Lbr Spandek M Atap Galvanum/Boundec merah Maron M TLS M Karet Talang M Karet Alas Tetap M Genteng : Asbes Tylux Lbr Kodok Lbr Beton Lbr Keramik Lbr Metal Merk Sakura Roof Lbr Haplas Lbr Bubungan : Asbes Gelombang Lbr Spandek M Galvanum/Boundec WarnaM TLS M Genteng Asbes Tylux+Karet Lbr Genteng Kodok Lbr Genteng Beton Lbr Genteng Keramik Lbr Genteng Metal Sakura Roof Lbr T. Ratu Genteng Haplas Lbr Bahan Finishing Amplas Kertas Roll M Cat Tembok Merk Kuda Warna Krem Kg muda Cat Tembok Merk Kuda Warna Krem Kg tua Cat Mowilex VS 2801 Lakestone/setara Kg Cat Ultraproof UPR 960 White ( Eksterior) Kg Cat Dulux Emultion ( Eksterior ) merah Kg maron Cat Dulux Pentalite ( Interior ) Kg Cat Aquaproof Kg Sanding Sealer MSS 123/124 Kg Cat Tembok Merk Kimex Kg Mani Kayu/Besi Kg Residu Kg Plamur Wyber Plus Lem Kg Boral Plasterboard Kg Dempul Merk Auto Kg Lem Aibon Kg Lem Selicon Tb Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 40,000 34,000 45,000 50,000 57,000 210,000 62,500 60,000 150,000 175,000 45,500 6,500 12,000 16,500 3,000 5,000 28,500 26,550 35,000 22,000 85,500 135,000 22,500 18,500 2,500 3,500 5,500 24,000 35,500 8,500 7,750 7,750 32,000 42,500 49,000 42,500 35,000 37,500 16,000 16,850 3,220 7,700 8,000 26,800 24,100 17,500 Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp 44,000.00 37,400.00 49,500.00 55,000.00 62,700.00 231,000.00 68,750.00 66,000.00 165,000.00 192,500.00 50,050.00 7,150.00 13,200.00 18,150.00 3,300.00 5,500.00 31,350.00 29,205.00 38,500.00 24,200.00 94,050.00 148,500.00 24,750.00 20,350.00 2,750.00 3,850.00 6,050.00 26,400.00 39,050.00 9,350.00 8,525.00 8,525.00 35,200.00 46,750.00 53,900.00 46,750.00 38,500.00 41,250.00 17,600.00 18,535.00 3,542.00 8,470.00 8,800.00 29,480.00 26,510.00 19,250.00

FEBRIANTO / D 111 04 095

SPESIFIKASI PEKERJAAN
1. Spesifikasi Pembangunan Jalan Merupakan - pembangunan jalan baru dengan tipe perkerasan LASTON (AC) Drainase - ditalud dengan pasangan batu kali dengan ketebalan 15 cm Kemiringan memanjang drainase 5% ke arah Jalan A. Yani dari jalan Jend. Sudirman 2. Spesifikasi Pembangunan Checkpoint Pasangan batu bata diplaster di cat Lantai : beton rabat (tanpa tulangan) Struktur beton bertulang Pondasi : batu kali Pengecatan Tembok Baru = 1 lapis pamir, 1 lapis cat dasar, 2 lapis cat penutup 3. Spesifikasi Pembangunan Culvert Pelat : beton bertulang Pasangan batu kali Panjang Lahan Lebar Lahan Lebar jalan : : : 40 m 12 m 19 m

WORK BREAKDOWN STRUCTURE DURASI DURASI PEKERJAAN MENGIKUTI

NO I a b c II d e f g h i j

DESKRIPSI Pekerjaan Pesiapan Pek. Direksi Keet dan bangsal kerja Pengukuran dan pemasangan bouwplank Dokumentasi Perkerasan Jalan Penyiapan badan jalan Lapis pondasi bawah (aggregat kelas B) Lapis pondasi atas (aggregat kelas A) Lapis permukaan AC Bahu jalan Galian Drainase Pasangan batu kali Drainase

BOBOT

(HARI) (MINGGU) 7 7 30 5 4 4 7 5 5 27 1 1 4 1 1 1 1 1 1 4

0.48% 0.03% 0.08% 0.32% 0.04% 0.03% 0.05% 3.17% 0.02% 0.23%

III Checkpoint k l m n o p q r s t u v w x y z aa ab ac ad Galian tanah Pasangan Batu Kosong Pasangan Batu Kali Urugan tanah Urugan pasir Pembetonan Sloof Pembetonan Kolom Pembetonan plat, ringbalk, listplank Pembesian Sloof Pembesian Kolom Pembesian plat, ringbalk, listplank Lantai ( beton rabat ) Pasangan bata Plasteran Pengecatan Galian tanah Urugan tanah Pasangan batu kali Pembetonan Pembesian 0.08% 0.02% 0.26% 0.01% 0.03% 0.33% 0.39% 5.94% 0.31% 0.28% 84.00% 0.03% 0.34% 2.64% 0.12% 0.06% 0.04% 0.32% 0.29% 0.08% 100.00% 3 2 2 2 2 7 7 7 2 2 5 2 2 4 3 3 2 5 7 2 90 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 90

IV Culvert

Oleh Grace Bakara TPJJ-6A 1005131008

BAR CHART DURASI (MINGGU) 4 5 6 7 8 9 10 11 12

NO I a b c II d e f g h i j III k l m n o p q r s t u v w x y IV z aa

DESKRIPSI Pekerjaan Pesiapan Pek. Direksi Keet dan bangsal kerja Pengukuran dan pemasangan bouwplank Dokumentasi Perkerasan Jalan Penyiapan badan jalan Lapis pondasi bawah (aggregat kelas B) Lapis pondasi atas (aggregat kelas A) Lapis permukaan AC Bahu jalan Galian Drainase Pasangan batu kali Drainase Checkpoint Galian tanah Pasangan Batu Kosong Pasangan Batu Kali Urugan tanah Urugan pasir Pembetonan Sloof Pembetonan Kolom Pembetonan plat, ringbalk, listplank Pembesian Sloof Pembesian Kolom Pembesian plat, ringbalk, listplank Lantai ( beton rabat ) Pasangan bata Plasteran Pengecatan Culvert Galian tanah Urugan tanah

BOBOT

0.48% 0.03% 0.08% 0.32% 0.04% 0.03% 0.05% 3.17% 0.02% 0.23% 0.08% 0.02% 0.26% 0.01% 0.03% 0.33% 0.39% 5.94% 0.31% 0.28% 84.00% 0.03% 0.34% 2.64% 0.12% 0.06% 0.04% 0.32% 0.29% 0.08% 100.00%

ab Pasangan batu kali ac Pembetonan ad Pembesian

RENCANA ANGGARAN BIAYA PEMBANGUNAN PERUMAHAN KOTAMADYA MAKASSAR TAHUN ANGGARAN 2007
NO PEKERJAAN VOLUME HRG. SATUAN JUMLAH

A PEKERJAAN FISIK

1 Pekerjaan Pesiapan a. b. c. Pek. Direksi Keet dan bangsal kerja Pengukuran dan pemasangan bouwplank Dokumentasi Lsg Lsg Lsg Rp Rp Rp 3,000,000.00 220,000.00 500,000.00 Jumlah Rp Rp Rp Rp 3,000,000.00 220,000.00 500,000.00 3,720,000.00

Perkerasan Jalan
a. b. c. e. f. g. h. Penyiapan badan jalan Lapis pondasi bawah (aggregat kelas B) Lapis pondasi atas (aggregat kelas A) Lapis permukaan AC Bahu jalan Galian Drainase Pasangan batu kali Drainase 87.600 m 1.520 m 1.140 m 0.380 m 80.000 m 1.296 m 2.880 m Rp Rp Rp Rp Rp Rp Rp 23,324.74 156,567.29 156,567.29 786,068.03 248,967.29 86,995.26 502,727.50 Jumlah Rp Rp Rp Rp Rp Rp Rp Rp 2,043,247.12 237,982.28 178,486.71 298,705.85 19,917,383.07 112,745.86 1,447,855.20 24,236,406.08

Checkpoint
a. b. c. d. e. f. g. h. i. j. k. l.

Galian tanah Pasangan Batu Kosong Pasangan Batu Kali Urugan tanah Urugan pasir Pembetonan Sloof Pembetonan Kolom Pembetonan plat, ringbalk, listplank Pembesian Sloof Pembesian Kolom Pembesian plat, ringbalk, listplank Lantai ( beton rabat ) Plasteran Pengecatan

7.50 m 0.63 m 3.25 m 3.29 m 1.28 m 0.50 m 0.44 m 5.76 m 127.80 KG 112.46 KG ####### KG 1.44 m 28.70 m 58.00 m 58.00 m

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

64,575.50 247,896.00 502,727.50 19,833.00 128,040.00 4,128,654.20 5,567,375.00 6,484,775.00 15,424.20 15,424.20 15,424.20 116,550.50 75,469.90 286,412.50 12,617.00 Jumlah

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

484,316.25 154,935.00 1,633,864.38 65,300.15 163,251.00 2,064,327.10 2,449,645.00 37,340,955.64 1,971,135.64 1,734,599.36 528,199,291.67 168,269.78 2,166,080.47 16,611,925.00 731,786.00 595,939,682.44

m. Pasangan bata n. o.

Culvert
a. b. c. d. e.

Galian tanah Urugan tanah Pasangan batu kali Pembetonan Pembesian

5.650 m 13.668 m 3.963 m 0.279 m 30.681 KG

Rp Rp Rp Rp Rp

64,575.50 19,833.00 502,727.50 6,484,775.00 15,424.20 Jumlah

Rp Rp Rp Rp Rp Rp

364,864.49 271,073.28 1,992,211.05 1,810,711.30 473,228.04 4,912,088.16

Jumlah Biaya Fisik

Rp

628,808,176.69

PEKERJAAN NON FISIK 1 Biaya IMB 2 Jasa Konsultan Perencana 3 Jasa Konsultan Pengawas 480 m 3.0 % 2.0 % Rp Rp Rp 6,500.00 628,808,176.69 628,808,176.69 Rp Rp Rp 31,200.00 18,864,245.30 12,576,163.53

JUMLAH BIAYA NON FISIK

Rp

31,471,608.83

TOTAL BIAYA MEMBANGUN DIBULATKAN

Rp Rp

660,279,785.52 660,280,000.00

Terbilang : Delapan Ratus Sembilan Puluh Enam Juta Dua Ratus Dua Ribu Rupiah

FEBRIANTO Presdir

NO I. 1 2 3 II.1 2 3 4 5 6 7 III. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 IV. 1 2 3 4 5

DURASI BOBOT MINGGUAN I 0.48% Pek. Direksi Keet dan bangsal kerja 0.48% 1 0.03% Pengukuran dan pemasangan bouwplank 0.03% 1 0.02% Dokumentasi 0.08% 4 Penyiapan badan jalan 0.32% 1 Lapis pondasi bawah (aggregat kelas B) 0.04% 1 Lapis pondasi atas (aggregat kelas A) 0.03% 1 Lapis permukaan AC 0.05% 1 Bahu jalan 3.17% 3 Galian Drainase 0.02% 1 Pasangan batu kali Drainase 0.23% 4 Galian tanah 0.08% 1 Pasangan Batu Kosong 0.02% 1 Pasangan Batu Kali 0.26% 1 Urugan tanah 0.01% 1 Urugan pasir 0.03% 1 Pembetonan Sloof 0.33% 1 Pembetonan Kolom 0.39% 1 Pembetonan plat, ringbalk, listplank 5.94% 1 Pembesian Sloof 0.31% 1 Pembesian Kolom 0.28% 1 Pembesian plat, ringbalk, listplank 84.00% 1 Lantai ( beton rabat ) 0.03% 1 Pasangan bata 0.34% 1 Plasteran 2.64% 1 Pengecatan 0.12% 1 Galian tanah 0.06% 1 Urugan tanah 0.04% 1 Pasangan batu kali 0.32% 1 Pembetonan 0.29% 1 Pembesian 0.08% 1 RENCANA MINGGUAN 0.53% RENCANA KOMULATIF 0.53% DESKRIPSI

II

APRIL III

MEY IV I II III IV I II

JUNI III IV

0.02% 0.32% 0.04% 0.03%

0.02%

0.02%

0.05% 1.06% 0.02% 0.06% 0.08% 0.02% 0.26% 0.01% 0.03% 0.33% 0.39% 5.94% 0.31% 0.28% 84.00% 0.03% 0.34% 2.64% 0.12% 0.06% 0.04% 0.32% 0.29% 0.74% 1.27% 0.08% 0.11% 1.38% 0.99% 2.37% 1.01% 3.38% 91.03% 1.43% 3.74% 0.22% 0.06% 0.06% 94.41% 95.84% 99.59% 99.81% 99.86% 99.92% 0.08% 100% 0.06% 0.06% 0.06% 1.06% 1.06%

100%

75%

50%

25%

0%

VOLUME HAL 15

FORMULIR PEREKAMAN VOLUME PEKERJAAN


PROYEK PEKERJAAN UTAMA JENIS PEKERJAAN SATUAN KUANTITAS PERKIRAAN KUANTITAS ANALISA Luas jalan bagian kiri = lebar kiri jalan x 40 = 1.095 x 43.8 = M = lebar kanan jalan x 40 = 1.095 x 43.8 = M panjang jalan PENYIAPAN LAHAN TRANSPORTASI JALAN PEMBERSIHAN LAHAN M 87.6 M

SKETSA
Lebar Lahan

12 m

CULVERT

DRAINASE

Panjang Lahan

Luas jalan bagian kanan

panjang jalan
A

Luas Total Jalan yang dibersihkan = 43.8 + 43.8 87.6 M =


DRAINASE CHECKPOINT

JL. A. YANI

CULVERT

FEBRIANTO / D 111 04 095

40 m

JL. JEND. SUDIRMAN

VOLUME HAL 16

FORMULIR PEREKAMAN VOLUME PEKERJAAN


PROYEK PEKERJAAN UTAMA JENIS PEKERJAAN SATUAN KUANTITAS PERKIRAAN KUANTITAS ANALISA Volume lapisan podasi bawah = = = Volume lapisan pondasi atas = = = luas jalan x tebal perkerasan 0.19 40 0.2 x x 1.52 M luas jalan x tebal perkerasan 0.19 40 0.15 x x 1.14 M luas jalan x tebal perkerasan 0.19 40 0.05 x x 0.38 M PENYIAPAN LAHAN TRANSPORTASI PERKERASAN JALAN VOLUME PERKERASAN M 0 M

SKETSA

LAPISAN PERMUKAAN LASTON (AC) LAPISAN PEREKAT 5 15 20 cm 1.5 cm cm cm

LAPISAN PONDASI ATAS LAPISAN PONDASI BAWAH TADAH DASAR

Volume lapisan permukaan AC = = =

Tebal perkerasan didapat dengan Metode Analisa Komponen Berdasarkan referensi dari AASHTO'72 Volume lapisan perekat = = = luas jalan x tebal perkerasan 0.19 40 x x 0.015 0.114 M

FEBRIANTO / D 111 04 095

VOLUME HAL 17

FORMULIR PEREKAMAN VOLUME PEKERJAAN


PROYEK PEKERJAAN UTAMA JENIS PEKERJAAN SATUAN KUANTITAS PERKIRAAN KUANTITAS ANALISA PENYIAPAN LAHAN TRANSPORTASI DRAINASE GALIAN DAN PASANGAN BATU KALI M 0 M

SKETSA

0.12 m 0.15 m 0.15 m

GALIAN DRAINASE Volume galian = luas penampang x panjang drainase 40 = 0.032 m x 1.296 M =

0.12 m 0.15 m

PAS. BATU KALI DRAINASE Luas pasangan batu kali tinggi = 2 x 0.15 = 2 x x 0.036 M = x 0.12 lebar

Volume pasangan batu kali

= 2 x Luas pas batu x panjang drenase 40 = 2 x 0.036 x 2.88 M =

FEBRIANTO / D 111 04 095

0.12 m

VOLUME HAL 18

FORMULIR PEREKAMAN VOLUME PEKERJAAN


PROYEK PEKERJAAN UTAMA JENIS PEKERJAAN SATUAN KUANTITAS PERKIRAAN KUANTITAS ANALISA GALIAN PENDIRIAN CHECKPOINT PONDASI GALIAN DAN PONDASI M 0 M

SKETSA 0.2 m

0.1 m 0.55 m 0.05 m 0.15 m 0.25 m

Volume galian

PONDASI Pasangan batu kosong = luas penampang x panjang pas. batu kali 0.05 12.5 = x 0.625 M = = luas penampang x panjang pas. batu kali 0.26 12.5 = x 3.25 M = = 0.63 + 3.25 M = 3.875

Pasangan batu kali

Volume total pondasi

0.25 m

= luas penampang x 0.6 12.5 = x 7.5 M =

panjang galian 0.1 m 0.3 m 0.1 m

FEBRIANTO / D 111 04 095

VOLUME HAL 19

FORMULIR PEREKAMAN VOLUME PEKERJAAN


PROYEK PEKERJAAN UTAMA JENIS PEKERJAAN SATUAN KUANTITAS PERKIRAAN KUANTITAS ANALISA URUGAN PASIR Urugan pasir bawah pondasi = luas penampang x 12.5 = 0.025 x 0.3125 M = = = = panjang galian PENDIRIAN CHECKPOINT URUGAN URUGAN PASIR & URUGAN TANAH M 0 M

SKETSA

0.2 m

0.15 m 0.1 m 0.1 m 0.55 m 0.05 m 0.15 m 0.15 m 0.15 m 0.1 m 0.3 m 0.1 m

Urugan pasir bawah lantai

luas lantai x tebal lapisan lantai 9.625 0.1 x 0.9625 M

URUGAN TANAH Urugan tanah pondasi = Vol. galian - Vol. pondasi - Vol.pasir Vol. sloof 7.5 0.02 = - 3.875 - 0.3125 3.2925 M = = 1.28 + 3.29 M = 4.5675

Volume total urugan

FEBRIANTO / D 111 04 095

VOLUME HAL 20

FORMULIR PEREKAMAN VOLUME PEKERJAAN


PROYEK PEKERJAAN UTAMA JENIS PEKERJAAN SATUAN KUANTITAS PERKIRAAN KUANTITAS ANALISA PENDIRIAN CHECKPOINT LANTAI PENEMPELAN BETON PADA LANTAI M 1.44 M

SKETSA

Lantai ( beton rabat )

= = =

luas lantai x 9.625 x 0.15 1.44375 M

tebal lantai 0.15 m 0.1 m 0.1 m 0.55 m 0.05 m 0.15 m 0.15 m 0.15 m 0.1 m 0.3 m 0.1 m

0.2 m

FEBRIANTO / D 111 04 095

VOLUME HAL 21

FORMULIR PEREKAMAN VOLUME PEKERJAAN


PROYEK PEKERJAAN UTAMA JENIS PEKERJAAN SATUAN KUANTITAS PERKIRAAN KUANTITAS ANALISA SLOOF ( tul. Utama ) 12.5 panjang 1 buah = 4 jumlah = 0.89 berat per meter = berat total = panjang total SLOOF ( tul. Sengkang ) 1.08 panjang 1 buah = 125 jumlah = 0.617 berat per meter = berat total = panjang total KOLOM ( tul. Utama ) 11 panjang 1 buah = 4 jumlah = 0.89 berat per meter = berat total = panjang total KOLOM ( tul. Sengkang ) 1.08 panjang 1 buah = 110 jumlah = 0.617 berat per meter = berat total = panjang total meter buah KG/M x berat per meter = meter buah 125 KG/M x berat per meter =
PENDIRIAN CHECKPOINT PEMBESIAN TUL. UTAMA DAN TUL. SENGKANG PEMBESIAN SLOOF DAN KOLOM

SKETSA SLOOF 12 100 RINGBALK 12 100

20 cm

4 cm 20 cm KOLOM 12 44.5 KG 20 cm 14 4 cm 100

25 cm

KG KG

14

14

4 cm 20 cm

LISTPLANK 20 cm 4 cm 25 cm 14

83.295 KG 20 cm

meter buah KG/M x berat per meter = meter buah 110 KG/M x berat per meter =

39.16 KG 12 100

73.2996 KG

FEBRIANTO / D 111 04 095

VOLUME HAL 22

FORMULIR PEREKAMAN VOLUME PEKERJAAN


PENDIRIAN CHECKPOINT PROYEK PEKERJAAN UTAMA PEMBESIAN TULANGAN PEMBESIAN PLAT, LISTPLANK, DAN RINGBALK JENIS PEKERJAAN KG SATUAN KUANTITAS 0 KG PERKIRAAN KUANTITAS ANALISA PEMBESIAN TUL. UTAMA LISTPLANK 22.1 panjang 1 buah = 6 jumlah = 0.89 berat per meter = berat total = panjang total RINGBALK 12.5 panjang 1 buah = 6 jumlah = 0.89 berat per meter = berat total = panjang total PEMBESIAN TUL. SENGKANG LISTPLANK 0.64 panjang 1 buah = 221 jumlah = 0.617 berat per meter = berat total = panjang total RINGBALK 0.64 panjang 1 buah = 125 jumlah = 0.617 berat per meter = berat total = panjang total RINGBALK 12 100

25 cm

14

4 cm meter buah KG/M x berat per meter = meter buah KG/M x berat per meter = 20 cm 118.014 KG LISTPLANK 20 cm 66.75 KG 25 cm 4 cm 14

meter buah 221 KG/M x berat per meter = meter buah 125 KG/M x berat per meter =

87.26848 KG 12 100

49.36 KG

FEBRIANTO / D 111 04 095

VOLUME HAL 23

FORMULIR PEREKAMAN VOLUME PEKERJAAN

SKETSA YANG DICARI 20 100 370 350 100 20

ANALISA AKUMULASI BERAT PENULANGAN RINGBALK DAN LISTPLANK 116.11 205.28248 + = 321.39248 KG TUL. ARAH VERTIKAL 5.25 meter panjang 1 buah = 55 buah 55 jumlah = 288.75 meter panjang total = 0.845 KG/M berat per meter = berat total = panjang total x berat per meter = 13419.656 KG TUL. ARAH HORISONTAL 6 meter panjang 1 buah = 48 buah 47.5 jumlah = 288 meter panjang total = 0.845 KG/M berat per meter = berat total = panjang total x berat per meter = 295 275 20 Penampang listplank 11681.28 KG Penampang ringbalk = 20 25 = 20 25 100

100

PROYEK PENDIRIAN CHECKPOINT PEKERJAAN UTAMA PEMBESIAN TULANGAN 20 PEMBESIAN PLAT, LISTPLANK, DAN RINGBALK JENIS PEKERJAAN KG SATUAN KUANTITAS 0 KG PERKIRAAN KUANTITAS

FEBRIANTO / D 111 04 095

VOLUME HAL 24

FORMULIR PEREKAMAN VOLUME PEKERJAAN


PROYEK PEKERJAAN UTAMA JENIS PEKERJAAN SATUAN KUANTITAS PERKIRAAN KUANTITAS ANALISA TUL. ARAH VERTIKAL 5.55 meter panjang 1 buah = 19 buah 18.875 jumlah = 105.45 meter panjang total = 1.845 KG/M berat per meter = berat total = panjang total x berat per meter = 3696.5498 KG TUL. ARAH HORISONTAL 6.3 meter panjang 1 buah = 21 buah 20.75 jumlah = 132.3 meter panjang total = 1.845 KG/M berat per meter = berat total = panjang total x berat per meter = 5125.9635 KG PENDIRIAN CHECKPOINT PEMBESIAN TUL. PLAT PEMBESIAN TULANGAN KG #### KG

SKETSA YANG DICARI 20 20 100 100 370 350 100 20

20 Penampang listplank = = 20 20 25 25

BERAT TOTAL TULANGAN PLAT, LISTPLANK, RINGBALK tul. Plat = + tul. Listplank + tul. Ringbalk 205.28248 116.11 = 33923.4495 + + 34244.84 kg =

100
0

295 275 Penampang ringbalk

FEBRIANTO / D 111 04 095

VOLUME HAL 25

FORMULIR PEREKAMAN VOLUME PEKERJAAN


PROYEK PEKERJAAN UTAMA JENIS PEKERJAAN SATUAN KUANTITAS PERKIRAAN KUANTITAS ANALISA Volume sloof = luas penampang x 0.04 12.5 = x 0.5 M = panjang sloof

SKETSA

PENDIRIAN CHECKPOINT CHECKPOINT VOLUME PEMBETONAN SLOOF DAN KOLOM M 0 M

SLOOF 12 100

20 cm

14 4 cm 20 cm

KOLOM 12 100

Volume kolom

20 cm

= luas penampang x total tinggi kolom 0.04 11 = x 0.44 M =

14 4 cm 20 cm

FEBRIANTO / D 111 04 095

VOLUME HAL 26

FORMULIR PEREKAMAN VOLUME PEKERJAAN


PROYEK PEKERJAAN UTAMA JENIS PEKERJAAN SATUAN KUANTITAS PERKIRAAN KUANTITAS ANALISA Volume pelat = luas sisi dalam x 0.15 = 29.355 x 4.40325 M = tebal pelat PENDIRIAN CHECKPOINT CHECKPOINT VOLUME PLAT ( inc. RINGBALK ) M 5.76 M

SKETSA

20 20 100

100

370 350

100

20

Volume listplank

= keliling tengah x luas penampang 22.1 0.05 = x 1.105 M = = keliling tengah x luas penampang 12.5 0.02 = x 0.25 M = = 4.40325 + 5.75825 = 1.105 M + 0.25

Volume ringbalk

Volume total pelat

20 Penampang listplank Penampang ringbalk = = 20 20 25 25

100
0

295 275

FEBRIANTO / D 111 04 095

VOLUME HAL 27

FORMULIR PEREKAMAN VOLUME PEKERJAAN


PROYEK PEKERJAAN UTAMA JENIS PEKERJAAN SATUAN KUANTITAS PERKIRAAN KUANTITAS ANALISA Luas pasangan bata sisi kanan = luas sisi checkpoint - luas bukaan = 9.625 - 0.03063 M = 9.594375 Luas pasangan bata sisi kiri = luas sisi checkpoint - luas bukaan = 9.625 - 0.03063 M = 9.594375 = luas sisi checkpoint - luas bukaan 0 = 7.5625 7.5625 M = PENDIRIAN CHECKPOINT CHECKPOINT PASANGAN BATA M 28.7 M

SKETSA

5m 2.7

DINDING RINGBALK BUKAAN

1.75 m
0

Luas pasangan bata sisi belakang

TINGGI DINDING

2.75 m

SLOOF

Luas pasangan bata sisi depan = luas sisi checkpoint x luas bukaan = 7.5625 x 5.6125 1.95 M = Luas pasangan bata = 9.59 + 9.59 + 7.56 + 1.95 M = 28.70125

3.5

KOLOM

0.8

FEBRIANTO / D 111 04 095

VOLUME HAL 28

FORMULIR PEREKAMAN VOLUME PEKERJAAN


PROYEK PEKERJAAN UTAMA JENIS PEKERJAAN SATUAN KUANTITAS PERKIRAAN KUANTITAS ANALISA Luas pasangan bata sisi kanan = luas sisi checkpoint - luas bukaan = 9.625 - 0.03063 M = 9.594375 Luas pasangan bata sisi kiri = luas sisi checkpoint - luas bukaan = 9.625 - 0.03063 M = 9.594375 = luas sisi checkpoint - luas bukaan = 7.5625 - ####### 7.5625 M = PENYIAPAN LAHAN PERUMAHAN CHECKPOINT PLASTERAN M 58 M

SKETSA

5m 2.7

DINDING RINGBALK BUKAAN

1.75 m
0

Luas pasangan bata sisi belakang

TINGGI DINDING

2.75 m

SLOOF

Luas pasangan bata sisi depan = luas sisi checkpoint - luas bukaan = 7.5625 x 5.6125 1.95 M = Luas plasteran Approx = = = 2 x 9.59 + 9.59 + 7.56 + 1.95 57.4025 M 58 M

3.5

KOLOM

0.8

FEBRIANTO / D 111 04 095

VOLUME HAL 29

FORMULIR PEREKAMAN VOLUME PEKERJAAN


PROYEK PEKERJAAN UTAMA JENIS PEKERJAAN SATUAN KUANTITAS PERKIRAAN KUANTITAS ANALISA Luas pasangan bata sisi kanan = luas sisi checkpoint - luas bukaan = 9.625 - 0.03063 M = 9.594375 Luas pasangan bata sisi kiri = luas sisi checkpoint - luas bukaan = 9.625 - 0.03063 M = 9.594375 = luas sisi checkpoint - luas bukaan 0 = 7.5625 7.5625 M = PENYIAPAN LAHAN PERUMAHAN CHECKPOINT PENGECETAN M 58 M

SKETSA

5m 2.7

DINDING RINGBALK BUKAAN

1.75
0

Luas pasangan bata sisi belakang

TINGGI DINDING

2.75 m

SLOOF

Luas pasangan bata sisi depan = luas sisi checkpoint - luas bukaan = 7.5625 x 5.6125 1.95 M = Luas pengecetan Approx = = = 2 x 9.59 + 9.59 + 7.56 + 1.95 57.4025 M 58 M

3.5

KOLOM

0.8

FEBRIANTO / D 111 04 095

VOLUME HAL 30

FORMULIR PEREKAMAN VOLUME PEKERJAAN

SKETSA

30 cm

50 cm

85 cm

50 cm

PROYEK PEKERJAAN UTAMA JENIS PEKERJAAN SATUAN KUANTITAS PERKIRAAN KUANTITAS ANALISA luas galian culvert = = = = = = = = = vol. urukan tanah = = = 0.5 x 0.5 x 1.29 2 x 2 x 5.6502

PENYIAPAN CULVERT CULVERT GALIAN DAN URUKAN M 0 M

30 cm

####

5 cm

1.85 4.3 M

+ x

2.45 0.6

0.6

10 cm

55 cm

55 cm

55 cm

luas urukan tanah

luas galian - pasangan batu kali - luas daerah kosong daerah timbunan 1.29 - 1.8095 0.36 + 4

+
0

3.1205

M panjang

2 luas urukan tanah x x 2 3.1205 2.19 x x 13.66779 M

10 cm

vol. galian culvert

luas galian culvert x 1.29 2.19 x M

panjang

FEBRIANTO / D 111 04 095

50 cm

VOLUME HAL 31

FORMULIR PEREKAMAN VOLUME PEKERJAAN


PROYEK PEKERJAAN UTAMA JENIS PEKERJAAN SATUAN KUANTITAS PERKIRAAN KUANTITAS ANALISA Panjang culvert Luas total penampang Luas I = = = = = = = = = = = = = 2.19 M 2 x luas I + luas II - luas III 0.925 x 0.0925 0.1 M PENYIAPAN CULVERT BADAN CULVERT PASANGAN BATU KALI M 3.96 M

SKETSA

0.1 m 0.15 m 0.1 m


III

0m 0.15 m

0.02 m

II

0.1 m

Luas II

0.5 x 0.55 + 0.25 x 0.12 0.048 M 0.15 0.05 0.1 M + 0.05

0.55 m Luas III 0.1 m


0

0.55 m

0.55 m 0.1 m

Luas total

2 x 0.0925 + 0.048 2 x 0.1905 1.8095 M 2.19 3.962805 x M

Volume total

1.8095

FEBRIANTO / D 111 04 095

VOLUME HAL 32

FORMULIR PEREKAMAN VOLUME PEKERJAAN


PROYEK PEKERJAAN UTAMA JENIS PEKERJAAN SATUAN KUANTITAS PERKIRAAN KUANTITAS ANALISA Lebar pelat Panjang pelat Tebal pelat Volume pelat = = = = = 0.85 2.19 0.15 0.85 x 0.279225 M PENYIAPAN CULVERT BADAN CULVERT PEMBETONAN PELAT M 0.28 M

SKETSA

0.15 m M M 2.19 M x 0.15 0.15 m

0.55 m

0.15 m

FEBRIANTO / D 111 04 095

VOLUME HAL 33

FORMULIR PEREKAMAN VOLUME PEKERJAAN


PROYEK PEKERJAAN UTAMA JENIS PEKERJAAN SATUAN KUANTITAS PERKIRAAN KUANTITAS ANALISA Panjang 1 buah Jumlah Panjang total Berat per meter berat total Panjang 1 buah Jumlah Panjang total Berat per meter berat total Berat satu buah tulangan ( 1 & 2 ) = = = = =
(0,85 - 0,06) + (0,15 - 0,06)

SKETSA

PENYIAPAN CULVERT PLAT CULVERT PEMBESIAN PELAT KG 30.7 KG


14 - 200

2.19 m

= 0.88 m ( ( 775 - 6 ) / 20 ) + 1 = ####### 0.88 x ####### = 10.25 m = ####### 10.252 x 0.89 = 9.12 kg = = = = = 2.13 m 9.9 buah 21.09 m ####### 18.77 kg

0.85 m 14 - 200

14 - 200

2.19 0.06 = = 2 x ( (85 - 6 ) / 20 ) + 1 2.13 = x 9.9 buah = 0.89 = 21.087 x

0.85 m

0.15 m
0

= 9.12428 + 18.7674 = 27.89 kg 10 % = 2.79 kg

- - 200 14

Kaitan & overlapping, say 10 % barat = 27.89 kg x Berat total keseluruhan

= 27.89 kg + 2.79 kg = 30.68 kg Selimut beton = 0.03 m

FEBRIANTO / D 111 04 095

Data Awal Panjang Lahan Lebar Lahan Lebar Jalan Lapisan Permukaan Jalan Lebar Check point Panjang Chekpoint Tinggi Chekpoint Lebar Drainase Lebar Culvert Pasangan Batu Kali Pasangan Batu Bata Pasangan Batubata Beton Bertulang Tulangan Utama Tulangan Sengkang Tulangan Pelat Ketebalan saluran Kedalaman saluran Rencana dimensi sloof Rencana dimensi kolom Rencana dimensi ringbalk Rencana tebal pelat Rencana tebal drainase = = = = = = = = = = = = = = = = = = = = = = = f f f 40 m 12 m 19 cm LASTON (AC) 275 cm 350 cm 275 cm 12 cm 55 cm 1 1 1 1 : : : : 14 12 12 15 cm 23 cm 20 20 20 x x x 20 20 25 cm2 cm2 cm2 100 200 2 3 3 3 : 3

15 cm 15 cm

GAMBAR KERJA HAL 35

GAMBAR KERJA
SKETSA LAHAN PEKERJAAN 12 m

JL. JEND. SUDIRMAN

CULVERT

DRAINASE
275 cm

CHECKPOINT
350 cm

JL. A. YANI

FEBRIANTO / D 111 04 095

40 m

GAMBAR KERJA HAL 36

I.1. POTONGAN JALAN A-A

12 100 I.2. LAPISAN PERKERASAN

9.5

9.5

100

12

LAPISAN PERMUKAAN LASTON (AC) LAPISAN PEREKAT ( ASPAL ) 5 cm 1.5 cm 15 cm

20 cm

LAPISAN PONDASI ATAS LAPISAN PONDASI BAWAH TANAH DASAR I.3. DRAINASE

12 cm 15 cm 15 cm

I.4. POTONGAN DRAINASE

15 cm

12 cm

12 cm

FEBRIANTO / D 111 04 095

GAMBAR KERJA HAL 37

II.1. DENAH CHECKPOINT

A A

350 cm II.2. POTONGAN CHECKPOINT A-A


RINGBALK

TINGGI CHECKPOINT

275 cm
SLOOF BETON RABAT

POTONGAN A-A

275 cm

FEBRIANTO / D 111 04 095

GAMBAR KERJA HAL 38

II.3. DETAIL PONDASI 20 cm

10 cm 55 cm 5 cm 10 cm 10 cm 25 cm 30 cm 25 cm 15 cm II.4. GAMBAR TULANGAN A. SLOOF 12 100 20 cm 14 4 cm 20 cm B. KOLOM 12 100 20 cm 14 4 cm 20 cm C. RINGBALK 12 100 25 cm 14 4 cm 20 cm

FEBRIANTO / D 111 04 095

GAMBAR KERJA HAL 39

D. LIST PLANK

20 cm 4 cm 25 cm 14

12 E. PELAT
15 100 500 475

100

100

15

100

15

12

200

500

II.5. TAMPAK

15

100

475

m 0c 35

DINDING RINGBALK BUKAAN

125 cm

TINGGI DINDING

SLOOF

275 cm

KOLOM

## ##

FEBRIANTO / D 111 04 095

GAMBAR KERJA HAL 40

III.1. URUKAN TANAH 5 cm 10 cm

40 cm 10 cm 30 cm 10 cm 30 cm 10 cm 15 cm 15 cm 10 cm 30 cm 10 cm 30 cm 55 cm III.2. PEMBESIAN 85 m
14 - 200

15 cm 14 - 200

14 - 200

55 cm

15 cm
0

- - 200 14