List Dokumen Metode Kerja

Metode Kerja Pekerjaan Jembatan


No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 Metode Kerja Erection Box Girder Launching Gantry Instalation Bored Pile Pier, Pier head sheet Pile, pile cap Tiang Pancang Pipe roofing sheet pile stressing stressing box girder parapet beton Erection Box Girder Status

34

Total

12

List Dokumen Metode Kerja


Metode Kerja Pekerjaan Jalan
No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 Metode Kerja Box Culvert CTRB Geotekstile & Urugan Pasir Metode Kerja AC-BC Metode Kerja AC-WC Metode Kerja Agregate Kelas A Metode Kerja Agregate Kelas B Metode Kerja Galian Biasa Metode Kerja Pas Bata dengan Mortar Metode Kerja Pas. Kansteen Metode kerja Pas. Paving Block Metode Kerja Rigid Pavement Metode kerja Timbunan Pilihan Prime Coat Reinforced Concrete Pipe Culvert Tack Coat U-Ditch Status

34

Total

17

List Dokumen Metode Kerja


Metode Kerja Pekerjaan Gedung
No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 Metode Kerja Aluminium Clading Bagage Handling System Fire Alarm Instalasi Eskalator Instalasi Lift Instalasi Listrik Instalasi Telepon-PABX Penempatan TC Pas. Panel Gypsum Bekisting Cape Bekisting System beton perkasa bored pile chemical anchor Floor hardener Granit dan marmer king post Mechanical joint Pas.keramik Pasangan bata Pasangan celcon Pembesian pengecatan pengecoran plat lantai dg concrete pump plaster + acian celcon Plaster Bata Railing Screed Pengecoran dengan placing boom plumbing sound system waterproofing coating Waterproofing Membrane Curtain wall Dinding Keramik Erection Tower Crane Mini Pile Pancang (HSPD) Pemancangan Kusen Pintu jendela aluminium Pile Cap Plafond Gypsum Plafond Plywood Secant Pile Pemasangan Fire Fighting dewatering Status 44