KOTA MEDAN
Tahun 2009
SATUAN
NO.
URAIAN
HARGA
SATUAN
(RP.)
UPAH:
Tukang
hari
75,000
Kepala Tukang
hari
87,500
Pekerja
hari
50,000
hari
62,500
Mandor
BAHAN/MATERIAL:
Amplas Biasa
lbr.
4,000
Amplas Niken
lbr.
5,000
bh.
750
Batu Kali
m3
158,000
Besi Beton
kg.
14,950
bh.
5,000
Cat Dasar
kg.
16,300
Cat Kilat
kg.
52,500
kg.
26,000
10
Cat Tembok
kg.
24,500
11
bh.
6,200
12
Grendel 4"
bh.
9,500
13
Kawat Pengikat
kg.
17,450
14
Kayu Gelam
btg
4,800
15
Kayu Klas II
m3
1,200,000
16
m3
800,000
17
Kayu Klas IV
m3
600,000
18
Keramik 30 x 30 cm
bh.
5,800
19
Koral Beton
m3
190,000
20
m'
6,500
21
Minyak Cat
ltr.
11,400
22
Paku Asbes
bh.
350
23
kg
15,500
24
Paku Beton
bh.
550
25
Paku Biasa
kg.
15,500
26
Paku Plywood
kg.
16,750
27
Paku Seng
kg.
21,100
28
Pasir Pasang
m3
84,000
29
Pasir Urug
m3
67,000
30
Perekat/Adukan/Spesi
m3
408,765
31
m'
30,900
32
m'
51,700
33
Plamir Kayu
kg.
5,000
34
Plamir Tembok
kg.
4,000
35
Plywood 3 mm
m2
43,000
36
Plywood 4 mm
m2
53,750
KET.
37
Split
m3
231,000
38
zak
54,000
39
Semen Putih
zak
104,000
40
Seng Gelombang
m2
16,500
41
Seng Plat
m2
54,000
42
Tanah Urug
m3
65,000
43
Ter / Residu
ltr.
6,800
44
Thinner
ltr.
10,500
45
Ls
14,000
46
btg
11,500
47
Seng 7 Kaki
kpg
61,750
48
Tanah Puru
m3
33,000
49
unit
350,000
50
unit
300,000
51
Kusen Type P1
unit
150,000
52
Kusen Type P2
unit
100,000
53
Kusen Type J2
unit
200,000
54
Kusen Type V2
unit
100,000
55
Kusen Type A1
unit
250,000
56
bh.
350,000
57
bh.
150,000
58
bh.
200,000
59
Jendela 70x162 cm
bh.
150,000
60
Jendela 65x114 cm
bh.
125,000
61
Jendela 58x64 cm
bh.
100,000
VII.
PEKERJAAN SALURAN
@Rp.
750.00
Rp.
33,750.00
0.0920 Zak
3
0.0130 M
@Rp.
54,000.00
Rp.
4,968.00
Pasir Pasang
@Rp.
84,000.00
Rp.
1,092.00
0.1500
Tukang
@Rp.
75,000.00
Rp.
11,250.00
0.0150
Kepala Tukang
@Rp.
87,500.00
Rp.
1,312.50
0.4500
Pekerja
@Rp.
50,000.00
Rp.
22,500.00
0.0225
Mandor
@Rp.
62,500.00
Rp.
1,406.25
Rp.
76,278.75
Rp.
150,000.00
VIII.
PEKERJAAN PINTU
1. Analisa Pintu
3 Unit
Pintu Kerang-kerang
@Rp.
50,000.00
IX.
PEKERJAAN PLAFOND DAN RANGKA
1. Analisa 1 M2 Plafond Plywood 4 mm
1.0000 m2
Plywood 4 mm
@Rp.
53,750.00
Rp.
53,750.00
0.0100 m3
Kayu Klas II
@Rp.
1,200,000.00
Rp.
12,000.00
0.2000 Kg
Paku Biasa
@Rp.
15,500.00
Rp.
3,100.00
0.0500 Kg
Paku Plywood
@Rp.
16,750.00
Rp.
837.50
0.8000
Tukang
@Rp.
75,000.00
Rp.
60,000.00
0.0800
Kepala Tukang
@Rp.
87,500.00
Rp.
7,000.00
0.2800
Pekerja
@Rp.
50,000.00
Rp.
14,000.00
0.0140
Mandor
@Rp.
62,500.00
Rp.
875.00
Rp.
151,562.50
65,000.00
@Rp.
6,500.00
Rp.
0.1000 Kg
Paku Biasa
@Rp.
15,500.00
Rp.
1,550.00
0.8000
Tukang
@Rp.
75,000.00
Rp.
60,000.00
0.0800
Kepala Tukang
@Rp.
87,500.00
Rp.
7,000.00
0.2800
Pekerja
@Rp.
50,000.00
Rp.
14,000.00
0.0140
Mandor
@Rp.
62,500.00
Rp.
875.00
Rp.
148,425.00
Rp.
14,842.50
X.
PEKERJAAN PENGECATAN
1. Analisa 10 M2 Pengecatan Tembok 3x sapu
3.5000 Kg
Cat Tembok
@Rp.
24,500.00
Rp.
85,750.00
2.0000 Kg
Plamir Tembok
@Rp.
4,000.00
Rp.
8,000.00
2.0000 Lbr
Amplas Biasa
@Rp.
4,000.00
Rp.
8,000.00
2.0000
Tukang
@Rp.
75,000.00
Rp.
150,000.00
0.2000
Kepala Tukang
@Rp.
87,500.00
Rp.
17,500.00
1.5000
Pekerja
@Rp.
50,000.00
Rp.
0.0750
Mandor
@Rp.
62,500.00
Rp.
4,687.50
Rp.
348,937.50
Rp.
34,893.75
Untuk 1 M2
75,000.00
Cat Kilat
@Rp.
52,500.00
Rp.
149,100.00
1.4200 Kg
Cat Dasar
@Rp.
16,300.00
Rp.
23,146.00
2.0000 Ltr
Minyak Cat
@Rp.
11,400.00
Rp.
22,800.00
1.2000 Kg
@Rp.
26,000.00
Rp.
31,200.00
0.8000 Kg
Plamir kayu
@Rp.
5,000.00
Rp.
4,000.00
3.0000 Lbr
Amplas Niken
@Rp.
5,000.00
Rp.
15,000.00
2.2500
Tukang
@Rp.
75,000.00
Rp.
168,750.00
0.2250
Kepala Tukang
@Rp.
87,500.00
Rp.
19,687.50
1.5000
Pekerja
@Rp.
50,000.00
Rp.
75,000.00
0.0750
Mandor
@Rp.
62,500.00
Rp.
4,687.50
Rp.
513,371.00
Rp.
51,337.10
Untuk 1 M2
Cat Tembok
@Rp.
24,500.00
Rp.
68,600.00
1.0000 Ls
@Rp.
14,000.00
Rp.
14,000.00
1.5000
Tukang
@Rp.
75,000.00
Rp.
112,500.00
0.1500
Kepala Tukang
@Rp.
87,500.00
Rp.
13,125.00
1.0000
Pekerja
@Rp.
50,000.00
Rp.
50,000.00
0.0500
Mandor
@Rp.
62,500.00
Rp.
3,125.00
Rp.
261,350.00
Rp.
26,135.00
Untuk 1 M2
XI.
PEKERJAAN LAIN-LAIN
1. Analisa Dokumentasi + Laporan
1 Ls
Dokumentasi + Laporan
@Rp.
250,000.00
Rp.
250,000.00
@Rp.
500,000.00
Rp.
500,000.00
As Bulit Drawing
2
Pekerja
@Rp.
50,000.00
Rp.
37,500.00
0.0375
Mandor
@Rp.
62,500.00
Rp.
2,343.75
Rp.
39,843.75
Rp.
3,984.38
Untuk 1 M2 = 1/10
DAFTAR BOBOT
PEMBANGUNAN RUMAH TINGGAL TYPE 48
I.
PEKERJAAN PERSIAPAN
BOBOT
SAT
180
36
1
M2
M'
Ls
1
2
3
4
5
PEKERJAAN PONDASI.
Galian Tanah Pondasi
Urugan Pasir Bawah Pondasi
Pasangan Pondasi Batu Kosong 5 - 7
Pasangan batu kali 1 : 4
Urugan Tanah Kembali bekas Galian
60.333
2.673
7.49
17.6
12.676
M3
M3
3
M
M3
3
M
1
2
3
4
5
6
1.323
1.62
0.61551
2.384
0.441
1.62
M3
M3
M3
3
M
M3
M3
1
2
3
4
5
133.0404
82.8
31.04
266.0808
165.6
M2
M2
M2
2
M
M2
1
2
3
4
5
6
7
8
9
PEKERJAAN ATAP
Balok Dinding 8/12 Kayu Klas II
Kuda-kuda Kayu Klas II
Gording 6/10 Kayu Klas II
Bubungan dan Jurai 8/12 Kayu Klas II
Rangka Atap Kayu Klas II
Atap Genteng Beton
Nok Genteng Beton
Baut Konstruksi f12 mm
Listplank 3/30 Kayu Klas II
0.2196
0.5338
0.164
0.341
97.0842
97.0842
31.39
1
11.91
M3
3
M
M3
M3
M2
M2
M'
Pek
1 Pembersihan Lapangan
2 Pasangan Bouwplank / Pengukuran
3 Biaya Air Kerja
II.
III.
VI.
VI.
VI.
PEKERJAAN LANTAI.
M2
4.8
2.4
51
3
2.096
M3
M3
M2
2
M
M3
27.34
M2
PEKERJAAN PINTU
Kusen Type PJ2a
Kusen Type PJ2b
Kusen Type P1
Kusen Type P2
Kusen Type J2
Kusen Type V2
Kusen Type A1
Pintu Panil 85x210 cm
Pintu Double Plywood 80x210 cm
Pintu Double Plywood lapis Seng 70x210 cm
Jendela 70x162 cm
Jendela 65x114 cm
Jendela 58x64 cm
1
1
2
1
2
1
1
2
2
1
2
4
2
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Unit
80.76
127.1
M2
M2
246.8804
11.91
80.76
M2
M2
2
M
6.3
3.6
M
M2
1
1
180
Ls.
Ls.
1
2
3
4
5
X.
XI.
PEKERJAAN PENGECATAN
1 Pengecatan Dinding dan Kolom
2 Pengecatan Listplank
3 Pengecatan Plafond Luar dan Dalam
PEKERJAAN PAGAR
1 Luas Pagar Besi
2 Luas Pintu Pagar Besi
XII.
1
2
3
PEKERJAAN LAIN-LAIN
Dokumentasi + Laporan
As built Drawing
Pembersihan Akhir
M2
I.
URAIAN PEKERJAAN
Bobot
SAT
harga satuan
JUMLAH
(Rp)
(Rp)
PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan
2 Pas. Bouwplank / Pengukuran
3 Biaya Air Kerja
180.00
M2
3,984.38
717,187.50
36.00
M'
13,262.50
477,450.00
1.00
Ls
50,000.00
50,000.00
1,244,637.50
II.
PEKERJAAN PONDASI.
60.33
M3
2.67
M3
96,025.00
256,674.83
7.49
M3
724,299.00
5,424,999.51
17.60
M3
724,299.00
12,747,662.40
12.68
39,062.50
95,062.50
2,356,757.81
1,205,012.25
21,991,106.80
III.
M3
4,080,085.00
5,397,952.46
1.32
M3
4,080,085.00
5,397,952.46
0.62
M3
4,080,085.00
2,511,333.12
0.62
M3
4,080,085.00
2,511,333.12
0.44
4,080,085.00
1,799,317.49
0.44
M3
4,080,085.00
1,799,317.49
17,617,888.63
IV.
133.04
M2
76,278.75
10,148,155.41
133.04
M2
76,278.75
10,148,155.41
31.04
M2
45,224.00
1,403,752.96
266.08
M2
39,645.70
10,548,959.57
266.08
M2
39,645.70
10,548,959.57
32,249,023.36
V.
PEKERJAAN ATAP
0.22
M3
2,816,250.00
618,448.50
0.53
M3
2,816,250.00
1,503,314.25
0.16
M3
2,816,250.00
461,865.00
0.34
M3
2,816,250.00
960,341.25
97.08
M2
37,602.50
3,650,608.63
97.08
M2
97,425.00
9,458,428.19
31.39
M'
105,772.00
3,320,183.08
1.00
Pek
1,609,500.00
1,609,500.00
11.91
M2
109,825.00
1,308,015.75
22,890,704.65
VI.
PEKERJAAN LANTAI.
4.80
M3
96,025.00
460,920.00
2.40
M3
850,500.00
2,041,200.00
51.00
M3
136,922.25
6,983,034.75
2.10
M3
949,260.00
1,989,648.96
11,474,803.71
VII.
PEKERJAAN SALURAN
27.34
M'
76,278.75
2,085,461.03
1.00
Unit
350,000.00
350,000.00
1.00
Unit
300,000.00
300,000.00
3 Kusen Type P1
2.00
Unit
150,000.00
300,000.00
4 Kusen Type P2
1.00
Unit
100,000.00
100,000.00
5 Kusen Type J2
2.00
Unit
200,000.00
400,000.00
6 Kusen Type V2
1.00
Unit
100,000.00
100,000.00
7 Kusen Type A1
1.00
Unit
250,000.00
250,000.00
2.00
Unit
350,000.00
700,000.00
2.00
Unit
150,000.00
300,000.00
1.00
Unit
200,000.00
200,000.00
11 Jendela 70x162 cm
2.00
Unit
150,000.00
300,000.00
12 Jendela 65x114 cm
4.00
Unit
125,000.00
500,000.00
13 Jendela 58x64 cm
2.00
Unit
100,000.00
200,000.00
4,000,000.00
IX.
80.76
M2
151,562.50
12,240,187.50
127.10
M'
14,842.50
1,886,481.75
14,126,669.25
X.
PEKERJAAN PENGECATAN
246.88
M2
34,893.75
2 Pengecatan Listplank
11.91
M2
51,337.10
611,424.86
80.76
M2
26,135.00
2,110,662.60
8,614,582.96
11,336,670.42
X.
PEKERJAAN PAGAR
6.30
M2
34,893.75
219,830.63
3.60
M2
26,135.00
94,086.00
313,916.63
XI.
PEKERJAAN LAIN-LAIN
1 Dokumentasi + Laporan
1.00
Ls
250,000.00
250,000.00
2 As built Drawing
1.00
Ls
500,000.00
500,000.00
3 Pembersihan Akhir
180.00
3,984.38
717,187.50
1,467,187.50
REKAPITULASI
PEMBANGUNAN RUMAH TINGGAL TYPE 48
I.
PEKERJAAN PERSIAPAN
Rp.
1,244,637.50
II.
PEKERJAAN PONDASI.
Rp.
21,991,106.80
Rp.
17,617,888.63
Rp.
32,249,023.36
V.
Rp.
22,890,704.65
Rp.
11,474,803.71
Rp.
2,085,461.03
Rp.
4,000,000.00
Rp.
14,126,669.25
X.
Rp.
11,336,670.42
Rp.
11,336,670.42
Rp.
1,467,187.50
Rp.
151,820,823.25
PPN 10%
Rp.
15,182,082.33
TOTAL BIAYA
Rp.
167,002,905.58