You are on page 1of 8

European Logistics

Protocol

Between
SUPPLIER:
Site:
And
METZELER AUTOMOTIVE PROFILE SYSTEMS (MAPS)
Site:

DRAFTING
2005, August 5th

METZELER Logistics Manager

APPROVAL
METZELER Logistics Manager

2005, August 5th

Suppliers Logistic Manager

LOG-EUR

European Logistics Protocol_rev02_2005_08_05


Revision 2 August 05, 2005

Page 1 of 8

TABLE OF CONTENTS

Introduction......................................................................................................... 3
1.1 Objective ....................................................................................................... 3
1.2 Scope............................................................................................................. 3
1.3 Reference documents .................................................................................. 3
2 Contact information............................................................................................ 3
2.1 The Customer ............................................................................................... 3
2.2 The Supplier .................................................................................................. 4
2.3 The Haulier .................................................................................................... 4
3 Contractual commitment between MAPS and the SUPPLIER ....................... 5
3.1 Material planning & scheduling................................................................... 5
3.2 Other transmissions..................................................................................... 5
3.3 Flexibility and capacity control ................................................................... 6
3.4 Transport and deliveries .............................................................................. 6
3.5 Packaging and pallets (per product family) ............................................... 7
3.6 Delivery Documents ..................................................................................... 7
3.7 Labelling........................................................................................................ 7
3.8 Specific stocks (per reference or product family) ..................................... 8
3.9 Logistics Audit.............................................................................................. 8

LOG-EUR

European Logistics Protocol_rev02_2005_08_05


Revision 2 August 05, 2005

Page 2 of 8

Introduction

1.1

Objective

This logistics protocol defines the logistics requirements that are applicable to the supplier of Metzeler
Automotive Profile Systems (MAPS).

1.2

Scope

This protocol only applies to the supplier mentioned on page 1 and only for the deliveries to the MAPS
site mentioned on page 1. This protocol will be updated whenever significant changes on logistics
operations will be decided, either on MAPS or on suppliers initiative with agreement by MAPS.

1.3

Reference documents

The standard MAPS Terms and Conditions of Purchase formalises the agreement with the
supplier. All definitions of terms used in this documents and general rules are defined in the document
Logistics Agreement .

Contact information

2.1

The Customer

MAPS
SITE :
Germany, Lindau
DIVISION :
Metzeler Automotive Profile Systems GmbH
ADRESS :
Bregenzer Str. 133, 88131 Lindau
CORRESPONDENTS :
NAME

LOG-EUR

FUNCTION
Plant Director

PHONE

FAX

EMAIL
@maps-eu.com

Logistic Manager

@maps-eu.com

Logistics Corresp.

@maps-eu.com

Quality Manager

@maps-eu.com

Purchasing Man.

@maps-eu.com

EDI Manager

@maps-eu.com

European Logistics Protocol_rev02_2005_08_05


Revision 2 August 05, 2005

Page 3 of 8

2.2

The Supplier

COMPANY:
HEADQUARTERS OFFICE:
PRODUCTION SITES ADRESSES :
CORRESPONDENTS :
NAME

FUNCTION
Plant Director

_________________________
_________________________
_________________________
_________________________
PHONE

MOBILE

FAX

EMAIL

Logistics Manager
Quality Manager
Logistics Corresp.
EDI Manager
Sales Manager

Telephone Emergency (24h & 7days):

2.3

The Haulier

LOG-EUR

European Logistics Protocol_rev02_2005_08_05


Revision 2 August 05, 2005

Page 4 of 8

3
3.1

Contractual commitment between MAPS and the SUPPLIER


Material planning & scheduling

Requirement programs frequency from MAPS:


Daily
Weekly
On ________
Monthly
On ________
Others (please specify) _______________

Transmission mode of requirement programs by MAPS:


Mail
Fax
EDI

EDI Norm:
ODETTE (DELINS)

WebEDI

EDIFACT (DELFOR)
OTHER _______________
Sending hour by MAPS:
________
Collecting hour by the SUPPLIER: ________

Receipt confirmation of the requirements programs by the SUPPLIER:


YES
NO
Maximum delay for confirmation after programs reception:
1 day
Transmission mode: Mail Fax
EDI
WEB EDI

Requirement programs horizon:

Program firm period:

3.2

___ months or 12 weeks

3 days

Other transmissions
EDI transmission of BLs before shipping:
Format: ODETTE (AVIEXP)

YES
NO
EDIFACT (DESADV)

EDI transmission of invoices (INVOIC):


YES
Invoicing frequency: At reception Weekly

IP Address of the Supplier:

LOG-EUR

OTHER __________

NO
Monthly

European Logistics Protocol_rev02_2005_08_05


Revision 2 August 05, 2005

Page 5 of 8

3.3

Flexibility and capacity control


Flexibility level on material release (several percentages possible on different horizons):
10 % of material release quantities
25 % of material release quantities
Application level:

3.4

Reference

Horizon: 5 days
Horizon: 1 month
Product families

Capacity control:

Transport and deliveries

Delivery frequency: Daily


Delivery window:
Weekly
On ______
Monthly
On ______
Other (e.g. multi deliveries per week): ______________

Delivery location: __________________________________________

Reception hours at MAPS site:


From Monday to Friday:

Global supplier

from _______until _______

From 6.00 H to 15.00 H and from ___ H to ___ H

Transport:
Responsibility
Haulier name:
________________
Circuit:
Direct
Transport mode:
Ex - Works

MAPS
Supplier
: ________________
Grouped
DDP
DDU

Other haulier responsibilities: ______________________________________

Unloading specifications:
Truck type:
Unloading type:
Unloading by supplier:
Unloading equipment:

LOG-EUR

Classic
Back
YES
MAPS

Mega

Other ______

Side
NO
Haulier

European Logistics Protocol_rev02_2005_08_05


Revision 2 August 05, 2005

Page 6 of 8

3.5

Packaging and pallets (per product family)


Packaging types:
One way packs

Type: ___________________

Returnable packs
Type: ___________________
Dimensions: _____ x _____ x _____ cm
Transport responsibility:
METZELER
Investment responsibility:
Inventory frequency:
Alternative packaging:

Pallets types:
Dimensions:

Supplier

MAPS contact: ________

METZELER
Supplier
_______________ on __________
____________________________

Max. height:
_______ cm
Max. weight: _______ kg
Stability device (wood, cover...):
________________________________
Stacking authorised:
YES
Level: _____
NO

3.6

Delivery Documents
The following information on the delivery note is required:

3.7

_____ x _____ cm

MAPS article No.


Delivered quantity per packaging unit
No. & type of packaging (pallets, boxes)

Purchase Order No.

Labelling
Labelling according to ODETTE / VDA norm:
Including barcode:

YES
YES

NO
NO

If not according to ODETTE / VDA min. required information:


MAPS article No.

LOG-EUR

European Logistics Protocol_rev02_2005_08_05


Revision 2 August 05, 2005

Page 7 of 8

3.8

Specific stocks (per reference or product family)

Safety stock required:


YES
NO
Level:
_______ days
or quantity: ________
Address: ___________________________________________________
___________________________________________________

VMI (Vendor Managed Inventory) or consignment stock: VMI


Consignment
Minimum level :
10 days
Maximum level :
15 days
Address : ___________________________________________________
___________________________________________________

3.9

Logistics Audit
The supplier carried out the following audits linked to logistics:
Self Assessment

MAPS Audit

External Audit

1) Full Assessment Supplier Rating

2) Run @ Rate Plant Readiness


Questionnaire

3) ODETTE Logistics Evaluation


Version 2 Release 2

4) Global MMOG / LE

5) Other: _________________

The supplier is expected to perform a self assessment audit according to his strategic importance
to MAPS*:
Global MMOG / LE:

YES

until ____/ 2005

NO

*Remark: The Logistic Evaluation may also be required in case of repetitive delivery problems or
major logistics incidents.

LOG-EUR

European Logistics Protocol_rev02_2005_08_05


Revision 2 August 05, 2005

Page 8 of 8