ABSTRACT FOR VRB AND DLRB ON MAIN, D

S.No
Description
1 EW
Hard Soil
Soft Rock
Hard Rock
2

Sub Structure
P.C.C M10
M 15 Conc

Unit

KUWA
3.665
5
Qtty

KUWA
1.500
6
Qtty

KUWA
0.465
7
Qtty

5.643
11.285
39.498

11.726
23.452
82.082

13.688
27.377
95.819

12.166
24.332
85.161

13.340
26.680
93.381

Cum
Cum

13.715

19.257

7.344

13.715

14.640

13.644

14.268

44.197

60.907

21.379

44.197

50.759

45.555

49.167

53.956

47.710

13.833

55.158

81.634

68.413

76.595

4.579

5.933

2.016

4.152

5.760

5.376

5.544

2785.262

2478.932

255.546

2879.216

4526.888

3732.340

60960.938

10.080

10.080

0.000

10.080

10.080

10.080

10.080

Cum

Gravel

KUWA
11.545
4
Qtty

13.450
26.900
94.149

Wearing Coat
M20
M30

KUWA
11.585
3
Qtty

11.726
23.452
82.082

Cum
Cum
Cum

HYSD Steel

KUWA
18.042
2
Qtty

Cum
Cum
Cum

Super Structure
M 15
M 20
M 25
RCC M-20

KUWA
18.909
1
Qtty

Kg
Cum

R VRB AND DLRB ON MAIN, DISTRIBUTRIES AND MINORS OF KUWA


KUWA
14.633
8
Qtty

KUWA
7.715
9
Qtty

KUWA
14.125
10
Qtty

KUWA
19.875
11
Qtty

D1
9.825
12
Qtty

D1-M3
0.499
13
Qtty

D1-M3
4.025
14
Qtty

D1-M3
4.836
15
Qtty

D1-M3
8.310
16
Qtty

TOTALS
17
Qtty

14.782
0.000
103.473

11.726
23.452
82.082

13.329
26.659
93.306

12.455
24.910
87.184

5.643
11.285
39.498

9.812
19.623
68.681

5.643
11.285
39.498

9.812
19.623
68.681

5.37336
10.74672
37.61352

170.313
311.061
1192.188

20.573

13.715

14.256

13.968

7.344

12.770

7.344

12.770

7.344

206.665

80.865

44.197

49.118

46.419

19.584

39.323

19.584

31.537

19.584

666.370

77.826

55.398

78.905

68.732

21.821

28.290

20.870

23.738

13.3845

786.265

8.184

4.728

5.544

5.376

2.976

2.832

2.832

2.832

2.016

70.680

2478.932

2879.216

4349.026

3743.566

5744.638

1288.974

1287.164

1288.974

10.080

10.080

10.080

10.080

0.000

10.080

0.000

10.080

2035.638 #########
0.000

120.960

DESIGN FEATURES OF BT CROSSING AT K.M. 18.909 ON


KUWA BRANCH CANAL OF INDIRA SAGAR PROJECT
LEVEL
S NO

DESCRIPTION

UNIT

Earth Work Excavation

NO

LENGTH

WIDTH

DEPTH
/HEIGHT

in mts
6

in mts
7

in mts
8

in mts
9

TOP

BOTTOM

in mts
5

QUANTITY REMARKS
in Cum
10

U/S Wing Walls

Cum

176.206

173.641

1.66

3.2

2.565

27.234

D/S Wing Walls

Cum

176.206

173.641

1.66

3.2

2.565

27.234

Abutment

Cum

176.206

173.641

6.8

1.8

2.565

Total

Cum

117.259

Excavation for Hard Soil

Cum

11.726

Excavation for Soft Rock

Cum

23.452

Earth work in Hard Rock

Cum

82.082

Earth Filling

Cum

82.082

CC M10 Grade Concrete : Sub Structure

62.791

U/S Wing Walls

Cum

173.941

173.641

1.66

3.2

0.300

3.185

D/S Wing Walls

Cum

173.941

173.641

1.66

3.2

0.300

3.185

Abutment

Cum

173.941

173.641

6.8

1.8

0.300

PCC M15 Sub Structure

Cum

7.344
13.715

CC - M15 Grade Super Structure

U/S Wing Walls

Cum

176.206

173.941

0.829

3.275

2.265

12.306

D/S Wing Walls

Cum

176.206

173.941

0.829

3.275

2.265

12.306

Abutment

Cum

175.141

173.941

6.8

1.2

1.200

19.584

Total

Cum

44.197

RCC M20 for Bed Block over Abutment

i)

0.3m Thick

Cum

176.206

175.141

6.800

0.3

1.065

4.345

ii)

0.6m Thick

Cum

175.441

175.141

6.800

0.6

0.300

2.448

Total

Cum

Approach Slab

Cum

173.941

173.791

3.5

6.4

0.150

8.34 m Slab & Kerb

Cum

Parapet Wall

Cum

6.793

Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08


2

176.706

176.206

16.54

0.2

0.500

RCC M-20

6.720
37.134
3.308
53.956

10

Wearing Coat in C.C. M30

Cum

176.206

176.131

9.54

6.4

0.075

4.579

11

225MM THICK GRAVEL

Cum

176.056

175.831

3.5

6.4

0.225

10.080

Hard Soil

Cum

11.726

Soft Rock

Cum

23.452

Hard Rock

Cum

82.082

Sub Structure
P.C.C

Cum

M 10 Conc

Cum

Super Structure

Cum

M 20

Cum

44.197

RCC M-20

Cum

53.956

Wearing Coat

Cum

4.579

HYSD Steel

Kg

2785.26

Gravel

Cum

10.080

13.715

11

STEEL REINFORCEMENT ESTIMATION

Sl. No.
I

Description

Bar
Mark/Type

Nos

Length
(m)

Total
Length

6mm 8mm
(0.22) (.39)
0.22 0.39

10 mm
(0.62)
0.62

12 mm
(0.89)
0.89

16 mm
(1.58)
1.58

20mm
(2.47)
2.47

25mm
(2.47)
3.86

Remarks
Total( Kg)

Bed Blocks

12 No.10mm at Top and Bottom

Straight Bar

2.000

12.000

6.800

163.200

5 No's of 12mm

Straight Bar

2.000

5.000

6.800

68.000

10mm 200mm C/C

2.000

34.000

2.200

149.600

92.752

92.752

10mm 200mm C/C

2.000

34.000

2.530

5.060

3.137

3.137

II
1

101.184

101.184
60.520

60.520

Slabe and Kerb


Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

2527.669
Grand Total=

0.39

197.69

61.41

1.58

2.47

3.86

2785.26

ESTIMATE OF VILLAGE ROAD BRIDGE AT K.M. 18.042 ON


KUWA BRANCH CANAL OF INDIRA SAGAR PROJECT
LEVEL
S NO

DESCRIPTION

UNIT

Earth Work Excavation

NO

LENGTH

WIDTH

DEPTH
/HEIGHT

in mts
6

in mts
7

in mts
8

in mts
9

TOP

BOTTOM

in mts
5

QUANTITY REMARKS
in Cum
10

U/S Wing Walls

Cum

177.573

175.208

1.54

3.2

2.365

23.294

D/S Wing Walls

Cum

177.573

175.208

1.54

3.2

2.365

23.294

Abutment

Cum

177.573

175.208

6.8

1.8

2.365

57.895

Pier

Cum

174.304

172.804

8.7

2.3

1.500

Total

Cum

134.499

Excavation for Hard Soil

Cum

13.450

Excavation for Soft Rock

Cum

26.900

Earth work in Hard Rock

Cum

94.149

Earth Filling

Cum

94.149

CC M10 Grade Concrete : Sub Structure

U/S Wing Walls

Cum

175.508

175.208

1.54

3.2

0.300

2.955

D/S Wing Walls

Cum

175.508

175.208

1.54

3.2

0.300

2.955

175.508

175.208

6.8

1.8

0.300

7.344

173.104

172.804

8.7

2.3

0.300

Abutment

Cum

Pier

Cum

PCC M10 Sub Structure

Cum

30.015

6.003
19.257

CC - M15 Grade Super Structure

U/S Wing Walls

Cum

177.573

175.508

0.769

3.275

2.065

10.408

D/S Wing Walls

Cum

177.573

175.508

0.769

3.275

2.065

10.408

Abutment

Cum

176.708

175.508

6.500

1.2

1.200

18.720

Pier

i)

Rectangular

Cum

176.143

173.104

6.4

0.9

3.039

17.505

ii)

Semi Circular

Cum

176.143

173.104

3.039

3.867

Total

Cum

0.636

60.907

RCC M20 for Bed Block over Abutment

i)

0.3m Thick

Cum

177.573

176.708

6.500

0.3

0.865

3.374

ii)

0.6m Thick

Cum

177.008

176.708

6.500

0.6

0.300

2.340

175.508

175.358

3.5

6.4

0.150

Total

Cum

Approach Slab

Cum

10.26 m Slab & Kerb

Cum

Parapet Wall

Cum

5.714

Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08


2

178.073

177.573

0.2

0.500

RCC M-20

6.720
33.877
1.400
47.710

10

Wearing Coat in C.C. M30

Cum

177.573

177.498

12.36

6.4

0.075

5.933

11

225MM THICK GRAVEL

Cum

177.423

177.198

3.5

6.4

0.225

10.080

Hard Soil

Cum

13.450

Soft Rock

Cum

26.900

Hard Rock

Cum

94.149

Sub Structure
P.C.C

Cum

M 10 Conc

Cum

Super Structure

Cum

M 20

Cum

60.907

RCC M-20

Cum

47.710

Wearing Coat

Cum

5.933

HYSD Steel

Kg

2478.93

Gravel

Cum

10.080

19.257

11

STEEL REINFORCEMENT ESTIMATION

Sl. No.
I

Description

Bar
Mark/Type

Nos

Length
(m)

Total
Length

6mm 8mm
(0.22) (.39)
0.22 0.39

10 mm
(0.62)
0.62

12 mm
(0.89)
0.89

16 mm
(1.58)
1.58

20mm
(2.47)
2.47

25mm
(2.47)
3.86

Remarks
Total( Kg)

Bed Blocks

12 No.10mm at Top and Bottom

Straight Bar

2.000

12.000

1.539

36.936

5 No's of 12mm

Straight Bar

2.000

5.000

1.539

15.390

10mm 200mm C/C

2.000

7.695

2.200

33.858

20.992

20.992

10mm 200mm C/C

2.000

7.695

0.400

0.800

0.496

0.496

II
1

22.900

22.900
13.697

13.697

Slabe and Kerb


Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

2420.847
Grand Total=

0.39

45.01

14.59

1.58

2.47

3.86

2478.93

DESIGN FEATURES OF VILLAGE ROAD BRIDGE AT K.M. 11.585 ON D-1 DISTRIBUTORY OF


KUWA BRANCH CANAL OF INDIRA SAGAR PROJECT
LEVEL
S NO

DESCRIPTION

UNIT

NO

LENGTH

WIDTH

DEPTH
/HEIGHT

in mts
6

in mts
7

in mts
8

in mts
9

170.911

6.8

1.8

2.305

TOP

BOTTOM

in mts
5

173.216

QUANTITY REMARKS
in Cum
10

Earth Work Excavation

Abutment

Cum

Total

Cum

56.426

Excavation for Hard Soil

Cum

5.643

Excavation for Soft Rock

Cum

11.285

Earth work in Hard Rock

Cum

39.498

Earth Filling

Cum

39.498

CC M10 Grade Concrete : Sub Structure

Abutment

Cum

PCC M10 Sub Structure

Cum

CC - M15 Grade Super Structure

Abutment

Cum

Total

Cum

171.211

170.911

6.8

1.8

0.300

56.426

7.344
7.344

172.521

171.211

6.8

1.2

1.310

21.379
21.379

RCC M20 for Bed Block over Abutment

i)

0.3m Thick

Cum

173.216

172.411

6.800

0.3

0.805

3.284

ii)

0.6m Thick

Cum

172.711

172.411

6.800

0.6

0.300

2.448

Total

Cum

3.00 m Slab & Kerb

Cum

Parapet Wall

Cum

5.732
Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08
2

173.716

173.216

4.2

0.2

0.500

RCC M-20
10

Wearing Coat in C.C. M30

7.261
0.840
13.833

Cum

173.216

173.141

4.2

6.4

0.075

2.016

11

DESIGN FEATURES OF CT CROSSING AT K.M. 11.545 ON


KUWA BRANCH CANAL OF INDIRA SAGAR PROJECT
LEVEL
S NO

DESCRIPTION

UNIT

Earth Work Excavation

NO

LENGTH

WIDTH

DEPTH
/HEIGHT

in mts
6

in mts
7

in mts
8

in mts
9

TOP

BOTTOM

in mts
5

QUANTITY REMARKS
in Cum
10

U/S Wing Walls

Cum

194.054

191.489

1.66

3.2

2.565

27.234

D/S Wing Walls

Cum

194.054

191.489

1.66

3.2

2.565

27.234

Abutment

Cum

194.054

191.489

6.8

1.8

2.565

62.791

Total

Cum

117.259

Excavation for Hard Soil

Cum

11.726

Excavation for Soft Rock

Cum

23.452

Earth work in Hard Rock

Cum

82.082

Earth Filling

Cum

82.082

CC M10 Grade Concrete : Sub Structure

U/S Wing Walls

Cum

191.789

191.489

1.66

3.2

0.300

3.185

D/S Wing Walls

Cum

191.789

191.489

1.66

3.2

0.300

3.185

Abutment

Cum

191.789

191.489

6.8

1.8

0.300

PCC M10 Sub Structure

Cum

7.344
13.715

CC - M15 Grade Super Structure

U/S Wing Walls

Cum

194.054

191.789

0.829

3.275

2.265

12.306

D/S Wing Walls

Cum

194.054

191.789

0.829

3.275

2.265

12.306

Abutment

Cum

192.989

191.789

6.8

1.2

1.200

19.584

Total

Cum

44.197

RCC M20 for Bed Block over Abutment

i)

0.3m Thick

Cum

194.054

192.989

6.800

0.3

1.065

4.345

ii)

0.6m Thick

Cum

193.289

192.989

6.800

0.6

0.300

2.448

Total

Cum

Approach Slab

Cum

8.65 m Slab & Kerb

Cum

Parapet Wall

Cum

6.793
2

191.789

191.639

3.5

6.4

0.150

Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08


2

194.554

194.054

15.65

0.2

0.500

RCC M-20

6.720
38.515
3.130
55.158

10

Wearing Coat in C.C. M30

Cum

194.054

193.979

8.65

6.4

0.075

4.152

11

225MM THICK GRAVEL

Cum

193.904

193.679

3.5

6.4

0.225

10.080

Hard Soil

Cum

11.726

Soft Rock

Cum

23.452

Hard Rock

Cum

82.082

Sub Structure
P.C.C

Cum

M 10 Conc

Cum

Super Structure

Cum

M 20

Cum

44.197

RCC M-20

Cum

55.158

Wearing Coat

Cum

4.152

HYSD Steel

Kg

2879.22

Gravel

Cum

10.080

13.715

11

STEEL REINFORCEMENT ESTIMATION

Sl. No.
I

Description

Bar
Mark/Type

Nos

Length
(m)

Total
Length

6mm 8mm
(0.22) (.39)
0.22 0.39

10 mm
(0.62)
0.62

12 mm
(0.89)
0.89

16 mm
(1.58)
1.58

20mm
(2.47)
2.47

25mm
(2.47)
3.86

Remarks
Total( Kg)

Bed Blocks

12 No.10mm at Top and Bottom

Straight Bar

2.000

12.000

6.800

163.200

5 No's of 12mm

Straight Bar

2.000

5.000

6.800

68.000

10mm 200mm C/C

2.000

34.000

2.200

149.600

92.752

92.752

10mm 200mm C/C

2.000

34.000

2.530

5.060

3.137

3.137

II
1

101.184

101.184
60.520

60.520

Slabe and Kerb


Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

2621.623
Grand Total=

0.39

197.69

61.41

1.58

2.47

3.86

2879.22

DESIGN FEATURES OF VILLAGE ROAD BRIDGE AT K.M. 3.665 ON


KUWA BRANCH CANAL OF INDIRA SAGAR PROJECT
LEVEL
S NO

DESCRIPTION

UNIT

Earth Work Excavation

NO

LENGTH

WIDTH

DEPTH
/HEIGHT

in mts
6

in mts
7

in mts
8

in mts
9

TOP

BOTTOM

in mts
5

QUANTITY REMARKS
in Cum
10

U/S Wing Walls

Cum

203.016

200.211

1.90

3.2

2.805

34.109

D/S Wing Walls

Cum

203.016

200.211

1.90

3.2

2.805

34.109

Abutment

Cum

203.016

200.211

6.8

1.8

2.805

Total

Cum

136.884

Excavation for Hard Soil

Cum

13.688

Excavation for Soft Rock

Cum

27.377

Earth work in Hard Rock

Cum

95.819

Earth Filling

Cum

95.819

CC M10 Grade Concrete : Sub Structure

68.666

U/S Wing Walls

Cum

200.511

200.211

1.90

3.2

0.300

3.648

D/S Wing Walls

Cum

200.511

200.211

1.90

3.2

0.300

3.648

Abutment

Cum

200.511

200.211

6.8

1.8

0.300

PCC M10 Sub Structure

Cum

7.344
14.640

CC - M15 Grade Super Structure

U/S Wing Walls

Cum

203.016

200.511

0.950

3.275

2.505

15.587

D/S Wing Walls

Cum

203.016

200.511

0.950

3.275

2.505

15.587

Abutment

Cum

201.711

200.511

6.8

1.2

1.200

19.584

Total

Cum

50.759

RCC M20 for Bed Block over Abutment

i)

0.3m Thick

Cum

203.016

201.711

6.800

0.3

1.305

5.324

ii)

0.6m Thick

Cum

202.011

201.711

6.800

0.6

0.300

2.448

Total

Cum

Approach Slab

Cum

200.511

200.361

3.5

6.4

0.150

10.80 m Slab & Kerb

Cum

Parapet Wall

Cum

7.772

Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08


2

203.516

203.016

19.00

0.2

0.500

RCC M-20

6.720
63.342
3.800
81.634

10

Wearing Coat in C.C. M30

Cum

203.016

202.941

12.00

6.4

0.075

5.760

11

225MM THICK GRAVEL

Cum

202.866

202.641

3.5

6.4

0.225

10.080

Hard Soil

Cum

13.688

Soft Rock

Cum

27.377

Hard Rock

Cum

95.819

Sub Structure
P.C.C

Cum

M 10 Conc

Cum

Super Structure

Cum

M 20

Cum

50.759

RCC M-20

Cum

81.634

Wearing Coat

Cum

5.760

HYSD Steel

Kg

4526.89

Gravel

Cum

10.080

14.640

11

STEEL REINFORCEMENT ESTIMATION

Sl. No.
I

Description

Bar
Mark/Type

Nos

Length
(m)

Total
Length

6mm 8mm
(0.22) (.39)
0.22 0.39

10 mm
(0.62)
0.62

12 mm
(0.89)
0.89

16 mm
(1.58)
1.58

20mm
(2.47)
2.47

25mm
(2.47)
3.86

Remarks
Total( Kg)

Bed Blocks

12 No.10mm at Top and Bottom

Straight Bar

2.000

12.000

6.800

163.200

5 No's of 12mm

Straight Bar

2.000

5.000

6.800

68.000

10mm 200mm C/C

2.000

34.000

2.200

149.600

92.752

92.752

10mm 200mm C/C

2.000

34.000

3.010

6.020

3.732

3.732

II
1

101.184

101.184
60.520

60.520

Slabe and Kerb


Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

4268.700
Grand Total=

0.39

198.29

61.41

1.58

2.47

3.86

4526.89

ESTIMATE OF VILLAGE ROAD BRIDGE AT K.M. 1.50 ON


KUWA BRANCH CANAL OF INDIRA SAGAR PROJECT
LEVEL
S NO

DESCRIPTION

UNIT

Earth Work Excavation

NO

LENGTH

WIDTH

DEPTH
/HEIGHT

in mts
6

in mts
7

in mts
8

in mts
9

TOP

BOTTOM

in mts
5

QUANTITY REMARKS
in Cum
10

U/S Wing Walls

Cum

200.824

198.149

1.73

3.2

2.675

29.532

D/S Wing Walls

Cum

200.824

198.149

1.73

3.2

2.675

29.532

Abutment

Cum

200.824

198.149

6.5

1.8

2.675

62.595

Total

Cum

121.659

Excavation for Hard Soil

Cum

12.166

Excavation for Soft Rock

Cum

24.332

Earth work in Hard Rock

Cum

85.161

Earth Filling

Cum

85.161

CC M10 Grade Concrete : Sub Structure

U/S Wing Walls

Cum

198.449

198.149

1.73

3.2

0.300

3.312

D/S Wing Walls

Cum

198.449

198.149

1.73

3.2

0.300

3.312

Abutment

Cum

198.449

198.149

6.5

1.8

0.300

PCC M10 Sub Structure

Cum

7.020
13.644

CC - M15 Grade Super Structure

U/S Wing Walls

Cum

200.824

198.449

0.863

3.275

2.375

13.417

D/S Wing Walls

Cum

200.824

198.449

0.863

3.275

2.375

13.417

Abutment

Cum

199.649

198.449

6.5

1.2

1.200

18.720

Total

Cum

45.555

RCC M20 for Bed Block over Abutment

i)

0.3m Thick

Cum

200.824

199.649

6.500

0.3

1.175

4.583

ii)

0.6m Thick

Cum

199.949

199.649

6.500

0.6

0.300

2.340

Total

Cum

Approach Slab

Cum

10.00 m Slab & Kerb

Cum

Parapet Wall

Cum

6.923
2

198.449

198.299

3.5

6.4

0.150

Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08


2

201.324

200.824

18.2

0.2

0.500

RCC M-20

6.720
51.130
3.640
68.413

10

Wearing Coat in C.C. M30

Cum

200.824

200.749

11.2

6.4

0.075

5.376

11

225MM THICK GRAVEL

Cum

200.674

200.449

3.5

6.4

0.225

10.080

Hard Soil

Cum

12.166

Soft Rock

Cum

24.332

Hard Rock

Cum

85.161

Sub Structure
P.C.C

Cum

M 10 Conc

Cum

Super Structure

Cum

M 20

Cum

45.555

RCC M-20

Cum

68.413

Wearing Coat

Cum

5.376

HYSD Steel

Kg

3732.34

Gravel

Cum

10.080

13.644

11

STEEL REINFORCEMENT ESTIMATION

Sl. No.
I

Description

Bar
Mark/Type

Nos

Length
(m)

Total
Length

6mm 8mm
(0.22) (.39)
0.22 0.39

10 mm
(0.62)
0.62

12 mm
(0.89)
0.89

16 mm
(1.58)
1.58

20mm
(2.47)
2.47

25mm
(2.47)
3.86

Remarks
Total( Kg)

Bed Blocks

12 No.10mm at Top and Bottom

Straight Bar

2.000

12.000

6.500

156.000

5 No's of 12mm

Straight Bar

2.000

5.000

6.500

65.000

10mm 200mm C/C

2.000

32.500

2.200

143.000

88.660

88.660

10mm 200mm C/C

2.000

32.500

2.750

5.500

3.410

3.410

II
1

96.720

96.720
57.850

57.850

Slabe and Kerb


Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

3485.700
Grand Total=

0.39

189.41

58.74

1.58

2.47

3.86

3732.34

DESIGN FEATURES OF VILLAGE ROAD BRIDGE AT K.M. 0.465 ON


KUWA BRANCH CANAL OF INDIRA SAGAR PROJECT
LEVEL
S NO

DESCRIPTION

UNIT

Earth Work Excavation

NO

LENGTH

WIDTH

DEPTH
/HEIGHT

in mts
6

in mts
7

in mts
8

in mts
9

TOP

BOTTOM

in mts
5

QUANTITY REMARKS
in Cum
10

U/S Wing Walls

Cum

204.378

201.573

1.80

3.2

2.805

32.367

D/S Wing Walls

Cum

204.378

201.573

1.80

3.2

2.805

32.367

Abutment

Cum

204.378

201.573

6.8

1.8

2.805

68.666

Total

Cum

133.401

Excavation for Hard Soil

Cum

13.340

Excavation for Soft Rock

Cum

26.680

Earth work in Hard Rock

Cum

93.381

Earth Filling

Cum

93.381

CC M10 Grade Concrete : Sub Structure

U/S Wing Walls

Cum

201.873

201.573

1.80

3.2

0.300

3.462

D/S Wing Walls

Cum

201.873

201.573

1.80

3.2

0.300

3.462

Abutment

Cum

201.873

201.573

6.8

1.8

0.300

PCC M10 Sub Structure

Cum

7.344
14.268

CC - M15 Grade Super Structure

U/S Wing Walls

Cum

204.378

201.873

0.901

3.275

2.505

14.792

D/S Wing Walls

Cum

204.378

201.873

0.901

3.275

2.505

14.792

Abutment

Cum

203.073

201.873

6.8

1.2

1.200

19.584

Total

Cum

49.167

RCC M20 for Bed Block over Abutment

i)

0.3m Thick

Cum

204.378

203.073

6.800

0.3

1.305

5.324

ii)

0.6m Thick

Cum

203.373

203.073

6.800

0.6

0.300

2.448

Total

Cum

Approach Slab

Cum

10.35 m Slab & Kerb

Cum

Parapet Wall

Cum

7.772
2

201.873

201.723

3.5

6.4

0.150

Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08


2

204.878

204.378

0.2

0.500

RCC M-20

6.720
60.703
1.400
76.595

10

Wearing Coat in C.C. M30

Cum

204.378

204.303

11.55

6.4

0.075

5.544

11

225MM THICK GRAVEL

Cum

204.228

204.003

3.5

6.4

0.225

10.080

Hard Soil

Cum

13.340

Soft Rock

Cum

26.680

Hard Rock

Cum

93.381

Sub Structure
P.C.C

Cum

M 10 Conc

Cum

Super Structure

Cum

M 20

Cum

49.167

RCC M-20

Cum

76.595

Wearing Coat

Cum

5.544

HYSD Steel

Kg

60960.94

Gravel

Cum

10.080

14.268

11

STEEL REINFORCEMENT ESTIMATION

Sl. No.
I

Description

Bar
Mark/Type

Nos

Length
(m)

Total
Length

6mm 8mm
(0.22) (.39)
0.22 0.39

10 mm
(0.62)
0.62

12 mm
(0.89)
0.89

16 mm
(1.58)
1.58

20mm
(2.47)
2.47

25mm
(2.47)
3.86

Remarks
Total( Kg)

Bed Blocks

12 No.10mm at Top and Bottom

Straight Bar

2.000

12.000

6.800

163.200

5 No's of 12mm

Straight Bar

2.000

5.000

6.800

68.000

10mm 200mm C/C

2.000

34.000

2.200

149.600

92.752

92.752

10mm 200mm C/C

2.000

34.000

3.010

6.020

3.732

3.732

II
1

101.184

101.184
60.520

60.520

Slabe and Kerb


Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

60702.750
Grand Total=

0.39

198.29

61.41

1.58

2.47

3.86

60960.94

DESIGN FEATURES OF BT CROSSING AT K.M. 14.633 ON


KUWA BRANCH CANAL OF INDIRA SAGAR PROJECT
LEVEL
S NO

DESCRIPTION

UNIT

Earth Work Excavation

NO

LENGTH

WIDTH

DEPTH
/HEIGHT

in mts
6

in mts
7

in mts
8

in mts
9

TOP

BOTTOM

in mts
5

QUANTITY REMARKS
in Cum
10

U/S Wing Walls

Cum

192.145

189.650

1.62

3.2

2.495

25.820

D/S Wing Walls

Cum

192.145

189.650

1.62

3.2

2.495

25.820

Abutment

Cum

192.145

189.650

6.8

1.8

2.495

61.078

Pier

Cum

187.395

185.895

2.6

1.500

Total

Cum

147.818

Excavation for Hard Soil

Cum

14.782

Excavation for Soft Rock

Cum

35.100

Earth work in Hard Rock

Cum

103.473

Earth Filling

Cum

103.473

CC M10 Grade Concrete : Sub Structure

U/S Wing Walls

Cum

189.950

189.650

1.62

3.2

0.300

3.105

D/S Wing Walls

Cum

189.950

189.650

1.62

3.2

0.300

3.105

Abutment

Cum

189.950

189.650

6.8

1.8

0.300

7.344

Pier

Cum

186.195

185.895

2.6

0.300

PCC M10 Sub Structure

Cum

7.020
20.573

CC - M15 Grade Super Structure

U/S Wing Walls

Cum

192.145

189.950

0.808

3.275

2.195

11.624

D/S Wing Walls

Cum

192.145

189.950

0.808

3.275

2.195

11.624

Abutment

Cum

191.150

189.950

6.500

1.2

1.200

18.720

Pier

i)

Rectangular

Cum

191.075

186.195

6.4

4.880

31.232

ii)

Semi Circular

Cum

191.075

186.195

4.880

7.665

Total

Cum

0.785

80.865

RCC M20 for Bed Block over Abutment

i)

0.3m Thick

Cum

192.145

191.150

6.500

0.3

0.995

3.881

ii)

0.6m Thick

Cum

191.450

191.150

6.500

0.6

0.300

2.340

Total

Cum

Approach Slab

Cum

189.950

189.800

3.5

6.4

0.150

14.85 m Slab & Kerb

Cum

Parapet Wall

Cum

6.220

Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08


2

192.645

192.145

24.05

0.2

0.500

RCC M-20

6.720
60.076
4.810
77.826

10

Wearing Coat in C.C. M30

Cum

192.145

192.070

17.05

6.4

0.075

8.184

11

225MM THICK GRAVEL

Cum

191.995

191.770

3.5

6.4

0.225

10.080

Hard Soil

Cum

14.782

Soft Rock

Cum

0.000

Hard Rock

Cum

103.473

Sub Structure
P.C.C

Cum

M 10 Conc

Cum

Super Structure

Cum

M 20

Cum

80.865

RCC M-20

Cum

77.826

Wearing Coat

Cum

8.184

HYSD Steel

Kg

2478.93

Gravel

Cum

10.080

20.573

11

STEEL REINFORCEMENT ESTIMATION

Sl. No.
I

Description

Bar
Mark/Type

Nos

Length
(m)

Total
Length

6mm 8mm
(0.22) (.39)
0.22 0.39

10 mm
(0.62)
0.62

12 mm
(0.89)
0.89

16 mm
(1.58)
1.58

20mm
(2.47)
2.47

25mm
(2.47)
3.86

Remarks
Total( Kg)

Bed Blocks

12 No.10mm at Top and Bottom

Straight Bar

2.000

12.000

1.617

38.808

5 No's of 12mm

Straight Bar

2.000

5.000

1.617

16.170

10mm 200mm C/C

2.000

8.085

2.200

35.574

22.056

22.056

10mm 200mm C/C

2.000

8.085

0.400

0.800

0.496

0.496

II
1

24.061

24.061
14.391

14.391

Slabe and Kerb


Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

4092.474
Grand Total=

0.39

47.23

15.28

1.58

2.47

3.86

4153.48

DESIGN FEATURES OF BT CROSSING AT K.M. 7.715 ON


KUWA BRANCH CANAL OF INDIRA SAGAR PROJECT
LEVEL
S NO

DESCRIPTION

UNIT

Earth Work Excavation

NO

LENGTH

WIDTH

DEPTH
/HEIGHT

in mts
6

in mts
7

in mts
8

in mts
9

TOP

BOTTOM

in mts
5

QUANTITY REMARKS
in Cum
10

U/S Wing Walls

Cum

196.169

193.604

1.66

3.2

2.565

27.234

D/S Wing Walls

Cum

196.169

193.604

1.66

3.2

2.565

27.234

Abutment

Cum

196.169

193.604

6.8

1.8

2.565

62.791

Total

Cum

117.259

Excavation for Hard Soil

Cum

11.726

Excavation for Soft Rock

Cum

23.452

Earth work in Hard Rock

Cum

82.082

Earth Filling

Cum

82.082

CC M10 Grade Concrete : Sub Structure

U/S Wing Walls

Cum

193.904

193.604

1.66

3.2

0.300

3.185

D/S Wing Walls

Cum

193.904

193.604

1.66

3.2

0.300

3.185

Abutment

Cum

193.904

193.604

6.8

1.8

0.300

PCC M10 Sub Structure

Cum

7.344
13.715

CC - M15 Grade Super Structure

U/S Wing Walls

Cum

196.169

193.904

0.829

3.275

2.265

12.306

D/S Wing Walls

Cum

196.169

193.904

0.829

3.275

2.265

12.306

Abutment

Cum

195.104

193.904

6.8

1.2

1.200

19.584

Total

Cum

44.197

RCC M20 for Bed Block over Abutment

i)

0.3m Thick

Cum

196.169

195.104

6.800

0.3

1.065

4.345

ii)

0.6m Thick

Cum

195.404

195.104

6.800

0.6

0.300

2.448

Total

Cum

Approach Slab

Cum

8.65 m Slab & Kerb

Cum

Parapet Wall

Cum

6.793
2

193.904

193.754

3.5

6.4

0.150

Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08


2

196.669

196.169

16.85

0.2

0.500

RCC M-20

6.720
38.515
3.370
55.398

Wearing Coat in C.C. M30

Cum

196.169

196.094

9.85

6.4

0.075

4.728

10

225MM THICK GRAVEL

Cum

196.019

195.794

3.5

6.4

0.225

10.080

Hard Soil

Cum

11.726

Soft Rock

Cum

23.452

Hard Rock

Cum

82.082

Sub Structure
P.C.C

Cum

M 10 Conc

Cum

Super Structure

Cum

M 20

Cum

44.197

RCC M-20

Cum

55.398

Wearing Coat

Cum

4.728

HYSD Steel

Kg

2879.22

Gravel

Cum

10.080

13.715

11

STEEL REINFORCEMENT ESTIMATION

Sl. No.
I

Description

Bar
Mark/Type

Nos

Length
(m)

Total
Length

6mm 8mm
(0.22) (.39)
0.22 0.39

10 mm
(0.62)
0.62

12 mm
(0.89)
0.89

16 mm
(1.58)
1.58

20mm
(2.47)
2.47

25mm
(2.47)
3.86

Remarks
Total( Kg)

Bed Blocks

12 No.10mm at Top and Bottom

Straight Bar

2.000

12.000

6.800

163.200

5 No's of 12mm

Straight Bar

2.000

5.000

6.800

68.000

10mm 200mm C/C

2.000

34.000

2.200

149.600

92.752

92.752

10mm 200mm C/C

2.000

34.000

2.530

5.060

3.137

3.137

II
1

101.184

101.184
60.520

60.520

Slabe and Kerb


Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

2621.623
Grand Total=

0.39

197.69

61.41

1.58

2.47

3.86

2879.22

DESIGN FEATURES OF VILLAGE ROAD BRIDGE AT K.M. 4.125 ON


KUWA BRANCH CANAL OF INDIRA SAGAR PROJECT
LEVEL
S NO

DESCRIPTION

UNIT

Earth Work Excavation

NO

LENGTH

WIDTH

DEPTH
/HEIGHT

in mts
6

in mts
7

in mts
8

in mts
9

TOP

BOTTOM

in mts
5

QUANTITY REMARKS
in Cum
10

U/S Wing Walls

Cum

202.814

200.009

1.80

3.2

2.805

32.314

D/S Wing Walls

Cum

202.814

200.009

1.80

3.2

2.805

32.314

Abutment

Cum

202.814

200.009

6.8

1.8

2.805

Total

Cum

133.294

Excavation for Hard Soil

Cum

13.329

Excavation for Soft Rock

Cum

26.659

Earth work in Hard Rock

Cum

93.306

Earth Filling

Cum

93.306

CC M10 Grade Concrete : Sub Structure

68.666

U/S Wing Walls

Cum

200.309

200.009

1.80

3.2

0.300

3.456

D/S Wing Walls

Cum

200.309

200.009

1.80

3.2

0.300

3.456

Abutment

Cum

200.309

200.009

6.8

1.8

0.300

PCC M10 Sub Structure

Cum

7.344
14.256

CC - M15 Grade Super Structure

U/S Wing Walls

Cum

202.814

200.309

0.900

3.275

2.505

14.767

D/S Wing Walls

Cum

202.814

200.309

0.900

3.275

2.505

14.767

Abutment

Cum

201.509

200.309

6.8

1.2

1.200

19.584

Total

Cum

49.118

RCC M20 for Bed Block over Abutment

i)

0.3m Thick

Cum

202.814

201.509

6.800

0.3

1.305

5.324

ii)

0.6m Thick

Cum

201.809

201.509

6.800

0.6

0.300

2.448

Total

Cum

Approach Slab

Cum

200.309

200.159

3.5

6.4

0.150

10.35 m Slab & Kerb

Cum

Parapet Wall

Cum

7.772

Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08


2

203.314

202.814

18.55

0.2

0.500

RCC M-20

6.720
60.703
3.710
78.905

10

Wearing Coat in C.C. M30

Cum

202.814

202.739

11.55

6.4

0.075

5.544

11

225MM THICK GRAVEL

Cum

202.664

202.439

3.5

6.4

0.225

10.080

Hard Soil

Cum

13.329

Soft Rock

Cum

26.659

Hard Rock

Cum

93.306

Sub Structure
P.C.C

Cum

M 10 Conc

Cum

Super Structure

Cum

M 20

Cum

49.118

RCC M-20

Cum

78.905

Wearing Coat

Cum

5.544

HYSD Steel

Kg

4349.03

Gravel

Cum

10.080

14.256

11

DESIGN
FEATUR

STEEL REINFORCEMENT ESTIMATION

Sl. No.
I

Description

Bar
Mark/Type

Nos

Length
(m)

Total
Length

6mm 8mm
(0.22) (.39)
0.22 0.39

10 mm
(0.62)
0.62

12 mm
(0.89)
0.89

16 mm
(1.58)
1.58

20mm
(2.47)
2.47

25mm
(2.47)
3.86

Remarks
Total( Kg)

Bed Blocks

12 No.10mm at Top and Bottom

Straight Bar

2.000

12.000

6.800

163.200

5 No's of 12mm

Straight Bar

2.000

5.000

6.800

68.000

10mm 200mm C/C

2.000

34.000

2.200

149.600

92.752

92.752

10mm 200mm C/C

2.000

34.000

3.010

6.020

3.732

3.732

II
1

101.184

101.184
60.520

60.520

Slabe and Kerb


Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

4090.838
Grand Total=

0.39

198.29

61.41

1.58

2.47

3.86

4349.03

DESIGN FEATURES OF VILLAGE ROAD BRIDGE AT K.M. 19.875 ON


KUWA BRANCH CANAL OF INDIRA SAGAR PROJECT
LEVEL
S NO

DESCRIPTION

UNIT

Earth Work Excavation

NO

LENGTH

WIDTH

DEPTH
/HEIGHT

in mts
6

in mts
7

in mts
8

in mts
9

TOP

BOTTOM

in mts
5

QUANTITY REMARKS
in Cum
10

U/S Wing Walls

Cum

177.245

174.570

1.73

3.2

2.675

29.532

D/S Wing Walls

Cum

177.245

174.570

1.73

3.2

2.675

29.532

Abutment

Cum

177.245

174.570

6.8

1.8

2.675

65.484

Total

Cum

124.548

Excavation for Hard Soil

Cum

12.455

Excavation for Soft Rock

Cum

24.910

Earth work in Hard Rock

Cum

87.184

Earth Filling

Cum

87.184

CC M10 Grade Concrete : Sub Structure

U/S Wing Walls

Cum

174.870

174.570

1.73

3.2

0.300

3.312

D/S Wing Walls

Cum

174.870

174.570

1.73

3.2

0.300

3.312

Abutment

Cum

174.870

174.570

6.8

1.8

0.300

PCC M10 Sub Structure

Cum

7.344
13.968

CC - M15 Grade Super Structure

U/S Wing Walls

Cum

177.245

174.870

0.863

3.275

2.375

13.417

D/S Wing Walls

Cum

177.245

174.870

0.863

3.275

2.375

13.417

Abutment

Cum

176.070

174.870

6.8

1.2

1.200

19.584

Total

Cum

46.419

RCC M20 for Bed Block over Abutment

i)

0.3m Thick

Cum

177.245

176.070

6.800

0.3

1.175

4.794

ii)

0.6m Thick

Cum

176.370

176.070

6.800

0.6

0.300

2.448

Total

Cum

Approach Slab

Cum

10.00 m Slab & Kerb

Cum

Parapet Wall

Cum

7.242
2

174.870

174.720

3.5

6.4

0.150

Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08


2

177.745

177.245

18.2

0.2

0.500

RCC M-20

6.720
51.130
3.640
68.732

10

Wearing Coat in C.C. M30

Cum

177.245

177.170

11.2

6.4

0.075

5.376

11

225MM THICK GRAVEL

Cum

177.095

176.870

3.5

6.4

0.225

10.080

Hard Soil

Cum

12.455

Soft Rock

Cum

24.910

Hard Rock

Cum

87.184

Sub Structure
P.C.C

Cum

M 10 Conc

Cum

Super Structure

Cum

M 20

Cum

46.419

RCC M-20

Cum

68.732

Wearing Coat

Cum

5.376

HYSD Steel

Kg

3743.57

Gravel

Cum

10.080

13.968

11

STEEL REINFORCEMENT ESTIMATION

Sl. No.
I

Description

Bar
Mark/Type

Nos

Length
(m)

Total
Length

6mm 8mm
(0.22) (.39)
0.22 0.39

10 mm
(0.62)
0.62

12 mm
(0.89)
0.89

16 mm
(1.58)
1.58

20mm
(2.47)
2.47

25mm
(2.47)
3.86

Remarks
Total( Kg)

Bed Blocks

12 No.10mm at Top and Bottom

Straight Bar

2.000

12.000

6.800

163.200

5 No's of 12mm

Straight Bar

2.000

5.000

6.800

68.000

10mm 200mm C/C

2.000

34.000

2.200

149.600

92.752

92.752

10mm 200mm C/C

2.000

34.000

2.750

5.500

3.410

3.410

II
1

101.184

101.184
60.520

60.520

Slabe and Kerb


Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

3485.700
Grand Total=

0.39

197.97

61.41

1.58

2.47

3.86

3743.57

DESIGN FEATURES OF DOUBLE LANE ROAD BRIDGE AT K.M. 9.825 ON D-1 DISTRIBUTORY OF
KUWA BRANCH CANAL OF INDIRA SAGAR PROJECT
LEVEL
S NO

DESCRIPTION

UNIT

NO

LENGTH

WIDTH

DEPTH
/HEIGHT

in mts
6

in mts
7

in mts
8

in mts
9

174.471

6.8

1.8

2.305

TOP

BOTTOM

in mts
5

176.776

QUANTITY REMARKS
in Cum
10

Earth Work Excavation

Abutment

Cum

Total

Cum

Excavation for Hard Soil

Cum

5.643

Excavation for Soft Rock

Cum

11.285

56.426
56.426

Earth work in Hard Rock

Cum

39.498

Earth Filling

Cum

39.498

CC M10 Grade Concrete : Sub Structure

Abutment

Cum

PCC M10 Sub Structure

Cum

CC - M15 Grade Super Structure

Abutment

Cum

Total

Cum

174.771

174.471

6.8

1.8

0.300

7.344
7.344

175.971

174.771

6.8

1.2

1.200

19.584
19.584

RCC M20 for Bed Block over Abutment

i)

0.3m Thick

Cum

176.776

175.971

6.800

0.3

0.805

3.284

ii)

0.6m Thick

Cum

176.271

175.971

6.800

0.6

0.300

2.448

Total

Cum

5.00 m Slab & Kerb

Parapet Wall

5.732

Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08


Cum

177.276

176.776

6.2

0.2

14.849
0.500

RCC M-20
1

10

Wearing Coat in C.C. M30

Cum

Hard Soil

Cum

5.643

Soft Rock

Cum

11.285

Hard Rock

Cum

39.498

Sub Structure
P.C.C

Cum

M 10 Conc

Cum

Super Structure

Cum

M 20

Cum

19.584

RCC M-20

Cum

21.821

Wearing Coat

Cum

2.976

HYSD Steel

Kg

5744.64

1.240
21.821

7.344

176.776

176.701

6.2

6.4

0.075

2.976

11

STEEL REINFORCEMENT ESTIMATION

Sl. No.
I

Description

Bar
Mark/Type

Nos

Length
(m)

Total
Length

6mm 8mm
(0.22) (.39)
0.22 0.39

10 mm
(0.62)
0.62

12 mm
(0.89)
0.89

16 mm
(1.58)
1.58

20mm
(2.47)
2.47

25mm
(2.47)
3.86

Remarks
Total( Kg)

Bed Blocks

12 No.10mm at Top and Bottom

Straight Bar

2.000

12.000

6.800

163.200

5 No's of 12mm

Straight Bar

2.000

5.000

6.800

68.000

10mm 200mm C/C

2.000

34.000

2.200

149.600

92.752

92.752

10mm 200mm C/C

2.000

34.000

0.550

1.100

0.682

0.682

II
1

101.184

101.184
60.520

60.520

Slabe and Kerb


Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

5489.500
Grand Total=

0.39

195.24

61.41

1.58

2.47

3.86

5744.64

DESIGN FEATURES OF M T ROAD AT K.M. 0.499 ON MINOR M-3 OF D-1 DISTRIBUTORY OF


KUWA BRANCH CANAL OF INDIRA SAGAR PROJECT
LEVEL
S NO

DESCRIPTION

UNIT

NO

LENGTH

WIDTH

DEPTH
/HEIGHT

in mts
6

in mts
7

in mts
8

in mts
9

TOP

BOTTOM

in mts
5

QUANTITY REMARKS
in Cum
10

Earth Work Excavation

U/S Wing Walls

Cum

193.133

190.828

1.41

3.2

2.305

20.845

D/S Wing Walls

Cum

193.133

190.828

1.41

3.2

2.305

20.845

Abutment

Cum

193.133

190.828

6.8

1.8

2.305

56.426

Total

Cum

98.116

Excavation for Hard Soil

Cum

9.812

Excavation for Soft Rock

Cum

19.623

Earth work in Hard Rock

Cum

68.681

Earth Filling

Cum

68.681

CC M10 Grade Concrete : Sub Structure

U/S Wing Walls

Cum

191.128

190.828

1.41

3.2

0.300

2.713

D/S Wing Walls

Cum

191.128

190.828

1.41

3.2

0.300

2.713

Abutment

Cum

191.128

190.828

6.8

1.8

0.300

7.344

PCC M10 Sub Structure

Cum

CC - M15 Grade Super Structure

12.770

U/S Wing Walls

Cum

193.133

191.128

0.751

3.275

2.005

9.869

D/S Wing Walls

Cum

193.133

191.128

0.751

3.275

2.005

9.869

Abutment

Cum

192.328

191.128

6.8

1.2

1.200

19.584

Total

Cum

39.323

RCC M20 for Bed Block over Abutment

i)

0.3m Thick

Cum

193.133

192.328

6.800

0.3

0.805

3.284

ii)

0.6m Thick

Cum

192.628

192.328

6.800

0.6

0.300

2.448

Total

Cum

Approach Slab

Cum

191.128

190.978

3.5

6.4

0.150

6
7

4.70 m Slab & Kerb

Cum

Parapet Wall

Cum

5.732

Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08


2

193.633

193.133

9.4

0.2

0.500

RCC M-20

6.720
13.958
1.880
28.290

10

Wearing Coat in C.C. M30

Cum

193.133

193.058

5.9

6.4

0.075

2.832

11

225MM THICK GRAVEL

Cum

192.983

192.758

3.5

6.4

0.225

10.080

12

Reinforcement

Hard Soil

Cum

9.812

Soft Rock

Cum

19.623

Hard Rock

Cum

68.681

Sub Structure
P.C.C

Cum

11

STEEL REINFORCEMENT ESTIMATION

Sl. No.
I

Description

Bar
Mark/Type

Nos

Length
(m)

Total
Length

6mm 8mm
(0.22) (.39)
0.22 0.39

10 mm
(0.62)
0.62

12 mm
(0.89)
0.89

16 mm
(1.58)
1.58

20mm
(2.47)
2.47

25mm
(2.47)
3.86

Remarks
Total( Kg)

Bed Blocks

12 No.10mm at Top and Bottom

Straight Bar

2.000

12.000

6.800

163.200

5 No's of 12mm

Straight Bar

2.000

5.000

6.800

68.000

10mm 200mm C/C

2.000

34.000

2.200

149.600

92.752

92.752

10mm 200mm C/C

2.000

34.000

2.010

4.020

2.492

2.492

II
1

101.184

101.184
60.520

60.520

Slabe and Kerb


Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

1032.026
Grand Total=

0.39

197.05

61.41

1.58

2.47

3.86

1288.97

DESIGN FEATURES OF C T ROAD AT K.M. 4.025 ON MINOR M-3 OF D-1 DISTRIBUTORY OF


KUWA BRANCH CANAL OF INDIRA SAGAR PROJECT
LEVEL
S NO

DESCRIPTION

UNIT

NO

LENGTH

WIDTH

DEPTH
/HEIGHT

in mts
6

in mts
7

in mts
8

in mts
9

180.676

6.8

1.8

2.305

TOP

BOTTOM

in mts
5

182.981

QUANTITY REMARKS
in Cum
10

Earth Work Excavation

Abutment

Cum

Total

Cum

56.426

Excavation for Hard Soil

Cum

5.643

Excavation for Soft Rock

Cum

11.285

Earth work in Hard Rock

Cum

39.498

Earth Filling

Cum

39.498

CC M10 Grade Concrete : Sub Structure

Abutment

Cum

PCC M10 Sub Structure

Cum

CC - M15 Grade Super Structure

Abutment

Cum

Total

Cum

180.976

180.676

6.8

1.8

0.300

56.426

7.344
7.344

182.176

180.976

6.8

1.2

1.200

19.584
19.584

RCC M20 for Bed Block over Abutment

i)

0.3m Thick

Cum

182.981

182.176

6.800

0.3

0.805

3.284

ii)

0.6m Thick

Cum

182.476

182.176

6.800

0.6

0.300

2.448

Total

Cum

4.70 m Slab & Kerb

Cum

Parapet Wall

Cum

5.732
Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08
2

183.481

182.981

5.9

0.2

0.500

RCC M-20
1

Wearing Coat in C.C. M30

Cum

Hard Soil

Cum

5.643

Soft Rock

Cum

11.285

Hard Rock

Cum

39.498

Sub Structure
P.C.C

Cum

M 10 Conc

Cum

Super Structure

Cum

M 20

Cum

19.584

RCC M-20

Cum

20.870

Wearing Coat

Cum

2.832

HYSD Steel

Kg

1287.16

1.180
20.870

10

13.958

7.344

182.981

182.906

5.9

6.4

0.075

2.832

11

STEEL REINFORCEMENT ESTIMATION

Sl. No.
I

Description

Bar
Mark/Type

Nos

Length
(m)

Total
Length

6mm 8mm
(0.22) (.39)
0.22 0.39

10 mm
(0.62)
0.62

12 mm
(0.89)
0.89

16 mm
(1.58)
1.58

20mm
(2.47)
2.47

25mm
(2.47)
3.86

Remarks
Total( Kg)

Bed Blocks

12 No.10mm at Top and Bottom

Straight Bar

2.000

12.000

6.800

163.200

5 No's of 12mm

Straight Bar

2.000

5.000

6.800

68.000

10mm 200mm C/C

2.000

34.000

2.200

149.600

92.752

92.752

10mm 200mm C/C

2.000

34.000

0.550

1.100

0.682

0.682

II
1

101.184

101.184
60.520

60.520

Slabe and Kerb


Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

1032.026
Grand Total=

0.39

195.24

61.41

1.58

2.47

3.86

1287.16

DESIGN FEATURES OF M T ROAD AT K.M. 4.836 ON MINOR M-3 OF D-1 DISTRIBUTORY OF


KUWA BRANCH CANAL OF INDIRA SAGAR PROJECT
LEVEL
S NO

DESCRIPTION

UNIT

Earth Work Excavation

NO

LENGTH

WIDTH

DEPTH
/HEIGHT

in mts
6

in mts
7

in mts
8

in mts
9

TOP

BOTTOM

in mts
5

QUANTITY REMARKS
in Cum
10

U/S Wing Walls

Cum

181.359

179.054

1.41

3.2

2.305

20.845

D/S Wing Walls

Cum

181.359

179.054

1.41

3.2

2.305

20.845

Abutment

Cum

181.359

179.054

6.8

1.8

2.305

56.426

Total

Cum

Excavation for Hard Soil

Cum

9.812

Excavation for Soft Rock

Cum

19.623

98.116

Earth work in Hard Rock

Cum

68.681

Earth Filling

Cum

68.681

CC M10 Grade Concrete : Sub Structure

U/S Wing Walls

Cum

179.354

179.054

1.41

3.2

0.300

2.713

D/S Wing Walls

Cum

179.354

179.054

1.41

3.2

0.300

2.713

Abutment

Cum

179.354

179.054

6.8

1.8

0.300

PCC M10 Sub Structure

Cum

7.344
12.770

CC - M15 Grade Super Structure

U/S Wing Walls

Cum

181.359

179.354

1.213

3.275

2.005

15.930

D/S Wing Walls

Cum

181.359

179.354

0.756

3.275

2.005

9.935

Abutment

Cum

180.554

179.354

1.970

1.2

1.200

Total

Cum

5.672
31.537

RCC M20 for Bed Block over Abutment

i)

0.3m Thick

Cum

181.359

180.554

1.970

0.3

0.805

0.951

ii)

0.6m Thick

Cum

180.854

180.554

1.970

0.6

0.300

0.709

Total

Cum

Approach Slab

Cum

179.354

179.204

3.5

6.4

0.150

4.70 m Slab & Kerb

Cum

Parapet Wall

Cum

1.660

Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08


2

181.859

181.359

0.2

0.500

RCC M-20

6.720
13.958
1.400
23.738

10

Wearing Coat in C.C. M30

Cum

181.359

181.284

5.9

6.4

0.075

2.832

11

225MM THICK GRAVEL

Cum

181.209

180.984

3.5

6.4

0.225

10.080

Hard Soil

Cum

9.812

Soft Rock

Cum

19.623

Hard Rock

Cum

68.681

Sub Structure
P.C.C

Cum

M 10 Conc

Cum

Super Structure

Cum

M 20

Cum

31.537

RCC M-20

Cum

23.738

Wearing Coat

Cum

2.832

HYSD Steel

Kg

1288.97

Gravel

Cum

10.080

12.770

11

STEEL REINFORCEMENT ESTIMATION

Sl. No.
I

Description

Bar
Mark/Type

Nos

Length
(m)

Total
Length

6mm 8mm
(0.22) (.39)
0.22 0.39

10 mm
(0.62)
0.62

12 mm
(0.89)
0.89

16 mm
(1.58)
1.58

20mm
(2.47)
2.47

25mm
(2.47)
3.86

Remarks
Total( Kg)

Bed Blocks

12 No.10mm at Top and Bottom

Straight Bar

2.000

12.000

6.800

163.200

5 No's of 12mm

Straight Bar

2.000

5.000

6.800

68.000

10mm 200mm C/C

2.000

34.000

2.200

149.600

92.752

92.752

10mm 200mm C/C

2.000

34.000

2.010

4.020

2.492

2.492

II
1

101.184

101.184
60.520

60.520

Slabe and Kerb


Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

1032.026
Grand Total=

0.39

197.05

61.41

1.58

2.47

3.86

1288.97

DESIGN FEATURES OF C T ROAD AT K.M. 8.31 ON MINOR M-3 OF D-1 DISTRIBUTORY OF


KUWA BRANCH CANAL OF INDIRA SAGAR PROJECT
LEVEL
S NO

DESCRIPTION

UNIT

NO

LENGTH

WIDTH

DEPTH
/HEIGHT

in mts
6

in mts
7

in mts
8

in mts
9

152.936

6.8

1.8

2.195

TOP

BOTTOM

in mts
5

155.131

QUANTITY REMARKS
in Cum
10

Earth Work Excavation

Abutment

Cum

Total

Cum

53.734

Excavation for Hard Soil

Cum

5.373

Excavation for Soft Rock

Cum

10.747

Earth work in Hard Rock

Cum

37.614

Earth Filling

Cum

37.614

CC M10 Grade Concrete : Sub Structure

Abutment

Cum

PCC M10 Sub Structure

Cum

CC - M15 Grade Super Structure

Abutment

Cum

Total

Cum

153.236

152.936

6.8

1.8

0.300

53.734

7.344
7.344

154.436

153.236

6.8

1.2

1.200

19.584
19.584

RCC M20 for Bed Block over Abutment

i)

0.3m Thick

Cum

155.131

154.436

6.800

0.3

0.695

2.836

ii)

0.6m Thick

Cum

154.736

154.436

6.800

0.6

0.300

2.448

Total

Cum

3.00 m Slab & Kerb

Cum

Parapet Wall

Cum

5.284
Concrete Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08
2

155.631

155.131

4.2

0.2

0.500

RCC M-20
1

Wearing Coat in C.C. M30

Cum

Hard Soil

Cum

5.373

Soft Rock

Cum

10.747

Hard Rock

Cum

37.614

Sub Structure
P.C.C

Cum

M 10 Conc

Cum

Super Structure

Cum

M 20

Cum

19.584

RCC M-20

Cum

13.385

Wearing Coat M30

Cum

2.016

HYSD Steel

Kg

2035.64

0.840
13.385

10

7.261

7.344

155.131

155.056

4.2

6.4

0.075

2.016

11

STEEL REINFORCEMENT ESTIMATION

Sl. No.
I

Description

Bar
Mark/Type

Nos

Length
(m)

Total
Length

6mm 8mm
(0.22) (.39)
0.22 0.39

10 mm
(0.62)
0.62

12 mm
(0.89)
0.89

16 mm
(1.58)
1.58

20mm
(2.47)
2.47

25mm
(2.47)
3.86

Remarks
Total( Kg)

Bed Blocks

12 No.10mm at Top and Bottom

Straight Bar

2.000

12.000

6.800

163.200

5 No's of 12mm

Straight Bar

2.000

5.000

6.800

68.000

10mm 200mm C/C

2.000

34.000

2.200

149.600

92.752

92.752

10mm 200mm C/C

2.000

34.000

0.550

1.100

0.682

0.682

II
1

101.184

101.184
60.520

60.520

Slabe and Kerb


Steel Quantity according to IRC: SP20 - 2002/ PLATE NO.: 7.08

1780.500
Grand Total=

0.39

195.24

61.41

1.58

2.47

3.86

2035.64