Replace Belle Chasse Tunnel & Bridge

Stage 1 Environmental Assessment


State Project No. 700-38-0108 H.004791 Federal Aid Project No. DE-3806(500) RPC Contract No. BCTunnel

HCIA Infrastructure Committee Meeting Thursday, July 18, 2013 Conference Room 111 Grefer Lane, Harvey, LA

AGENDA
I. II. III. IV. V. VI. VII. Welcome Project Status Summary

a. b.

Public Information Meeting Maritime Operations Meeting

Current Project Alternatives Funding Availability Public Hearing Questions and Comments Adjourn

REPLACE BELLE CHASSE TUNNEL & BRIDGE STAGE 1 ENVIRONMENTAL ASSESSMENT State Project No. 700-38-0108 H.004791 Federal Aid Project No. DE-3806(500) RPC Contract No. BCTunnel

PUBLIC INFORMATION MEETING


MEETING STATISTICS
Open House Format Meeting held February 26, 2013 5:30 8:00 pm in the Belle Chasse Auditorium
Community residents started arriving at 5:15 pm Last community resident left just before 8:00 pm

Total Sign-in Attendance: 159 Residents; 5 Elected Officials (and Staff); 11 Agency Representatives, 4 Members of the Press Advertisements in The Times-Picayune and The Plaquemines Gazette combined with:
235 Direct Mail Post Cards (to Agencies, Stage 0 Meeting Participants, Commenters on-line) PSAs in local media outlets (TV, Radio, Newspaper) Newspaper articles in The Plaquemines Gazette

REPLACE BELLE CHASSE TUNNEL & BRIDGE STAGE 1 ENVIRONMENTAL ASSESSMENT State Project No. 700-38-0108 H.004791 Federal Aid Project No. DE-3806(500) RPC Contract No. BCTunnel

MARITIME OPERATIONS MEETING


FOLLOW-UP TO PUBLIC INFORMATION MEETING
Purpose: Review technical results of Marine Vessel Study regarding industry recommendations for the bridge horizontal clearance Meeting held on March 14, 2013 at RPC Offices Meeting included representatives of US Coast Guard, Gulf Intracoastal Canal Association, NO Gulf Coast Railroad and DOTD Bridge Section, DOTD District 02, RPC and project team

GICA NOT OPPOSED TO SIZING NEW BELLE CHASSE BRIDGE REPLACEMENT WITH A 150 FT. HORIZONTAL
CLEARANCE

REPLACE BELLE CHASSE TUNNEL & BRIDGE STAGE 1 ENVIRONMENTAL ASSESSMENT State Project No. 700-38-0108 H.004791 Federal Aid Project No. DE-3806(500) RPC Contract No. BCTunnel

Alt #1- 100 FT Fixed Bridge Northern Section

Legend
Business/Industrial Site Residence

Photo updated with Google Earth Imagery, 10/5/12

Alt #1- 100 FT Fixed Bridge Central Section

Chauvin Bros. Tractor Sales

Vacant

Casino

Legend
Business/Industrial Site Residence

Tuboscope

Alt #1- 100 FT Fixed Bridge Southern Section

Shopping Center (5)

Stratus Systems

Rubion Tires

Legend
Business/Industrial Site Residence
Photo updated with Google Earth Imagery, 10/5/12

Alt #2- 70 FT Moveable Bridge Northern Section

State Oil Fuel Center

Chauvin Bros. Tractor Sales

Vacant

TUBOSCOPE

Legend
Business/Industrial Site Residence

Alt #2- 70 FT Moveable Bridge Southern Section

Shopping Center (5)

Stratus Systems

Rubion Tires

Legend
Business/Industrial Site Residence
Photo updated with Google Earth Imagery, 10/5/12

Alt #3- 60 FT Moveable Bridge Northern Section

Chauvin Bros. Tractor Sales

Vacant

Legend
Business/Industrial Site Residence

Alt #3- 60 FT Moveable Bridge Southern Section

Shopping Center (5)

Legend
Business/Industrial Site Residence
Photo updated with Google Earth Imagery, 10/5/12

Alt #4- 73 FT Fixed Bridge Northern Section

Chauvin Bros. Tractor Sales State Oil Fuel Center

Vacant

Legend
Business/Industrial Site Residence

Tubascope

Alt #4- 73 FT Fixed Bridge Southern Section

Shopping Center (5)

Stratus Systems

Legend
Business/Industrial Site Residence
Photo updated with Google Earth Imagery, 10/5/12

ORDER OF MAGNITUDE COST ESTIMATES


preliminary NOT FINAL Alternative & Description Alt 1: Alt 2a: Alt 2b: Alt 3a: Alt 3b: Alt 4: 100 Ft. Fixed Bridge 70 Ft. Bascule Bridge 70 Ft. Vertical Lift Bridge 60 Ft. Bascule Bridge 60 Ft. Vertical Lift Bridge 73 Ft. Fixed Bridge 5 % Approach Grades $168.8 million $164.7 million $161.9 million $140.9 million $139.7 million $125.3 million 6 % Approach Grades $152.5 million $150.3 million $148.0 million $130.8 million $133.6 million $110.6 million

included in the ongoing Stage 1 Environmental Study. Cost estimates incorporate a 20% Contingency factor, as well as utilizing LADOTD unit costs based upon bid tabulations and general trend averages. As of July 16, 2013.

Costs include removal of the existing lift span and closure of the existing tunnel. Costs shown are considered for planning purposes only. Cost estimates reflect refinements to project alternatives made as a result of the analysis of alternatives

REPLACE BELLE CHASSE TUNNEL & BRIDGE STAGE 1 ENVIRONMENTAL ASSESSMENT State Project No. 700-38-0108 H.004791 Federal Aid Project No. DE-3806(500) RPC Contract No. BCTunnel

FUNDING AVAILABILITY
FROM PROJECT PURPOSE & NEED
Comply with Fiscal Constraint Objectives Improve efficiency with lower O&M Costs

FUTURE FUNDING HAS YET TO BE FULLY IDENTIFIED


MAP-21 in effect through FY 2014
In making funding projections for the 2040 Metropolitan Transportation Plan, the RPC assumed that there would be very few, if any, new funding sources available. The program identified, therefore, is limited to what could reasonably be funded given historic funding levels from federal, state, and local sources.
Regional Planning Commission 2040 Metropolitan Transportation Plan (pg. 45)

REPLACE BELLE CHASSE TUNNEL & BRIDGE STAGE 1 ENVIRONMENTAL ASSESSMENT State Project No. 700-38-0108 H.004791 Federal Aid Project No. DE-3806(500) RPC Contract No. BCTunnel

EXISTING GIWW BRIDGE AND STRUCTURE OPENINGS

REPLACE BELLE CHASSE TUNNEL & BRIDGE STAGE 1 ENVIRONMENTAL ASSESSMENT State Project No. 700-38-0108 H.004791 Federal Aid Project No. DE-3806(500) RPC Contract No. BCTunnel

EXISTING GIWW BRIDGE AND STRUCTURE OPENINGS


Map Number Location Algiers Lock Highway 407 Belle Chasse Bridge NOGRR Bridge Type Navigation Control Structure Fixed Bridge Moveable Bridge Moveable Bridge Water Control Structure Moveable Bridge Fixed Bridge Fixed Bridge Fixed Bridge Moveable Bridge Pontoon Bridge Fixed Bridge Fixed Bridge Fixed Bridge Tunnel Moveable Bridge Horizontal Clearance 75 feet 250 feet 125 feet 125 feet 225 feet 150 feet 300 feet 150 feet 150 feet 125 feet 125 feet 125 feet 125 feet 125 feet -n/a125 feet Vertical Clearance 100 feet 100 feet 100 feet 95 feet 73 feet 73 feet 73 feet 73 feet 73 feet 73 feet

1 2 3

4 5

West Control Structure Lapalco Boulevard Bridge Westbank Expressway Bridge

6 7

Crown Point/ LA 3134 Bridge LA 308 Bridge LA 1 Bridge

8 9 10

LA 316 Bridge LA 3087 Bridge Park Avenue Bridge Main Street Bridge

11 12

Houma Intracoastal Waterway LA 315 Bridge

REPLACE BELLE CHASSE TUNNEL & BRIDGE STAGE 1 ENVIRONMENTAL ASSESSMENT State Project No. 700-38-0108 H.004791 Federal Aid Project No. DE-3806(500) RPC Contract No. BCTunnel

PUBLIC HEARING

Pictures from Public Information Meeting, Stage 0 Feasibility Study, 2008

REPLACE BELLE CHASSE TUNNEL & BRIDGE STAGE 1 ENVIRONMENTAL ASSESSMENT State Project No. 700-38-0108 H.004791 Federal Aid Project No. DE-3806(500) RPC Contract No. BCTunnel

Replace Belle Chasse Tunnel & Bridge


Stage 1 Environmental Assessment
State Project No. 700-38-0108 H.004791 Federal Aid Project No. DE-3806(500) RPC Contract No. BCTunnel

Harvey Canal Industrial Association Meeting Thursday, July 18, 2013

Thanks for your attendance!