You are on page 1of 2

snag checklist alaram cabel patched properly alaramcabel laid in bat box bts grounded with 25mm battery

bank grounded with 25mm alarm verified dcdu power cabel lugs available emupower cabellugs available ac power cabellugs available in bts ac power cabel lugs available in acdb e1 cabel punched properly bts door open properly cpri cabel routing proper in bts rru power cabel routing proer in bts ac and dc cabelrouting proper in bts all cards ground with 6mm bts bolted cpri roll properly on outdoor ladder power and cpri properly in clamps rru jumper weather and neeto properly rru jumper routing proper checknut of mounts proper acdb gland available 50mm dc lugs available

status

remarks

You might also like