FORMATO N 01(b) - PSDI - UZSM

CARGAS DE TRABAJO POR ACTIVIDAD

A.C.M.V "CAMINANTES DEL PONAZA"


DEPARTAMENTO : CAMINO : LONGITUD : VECINAL 6.59 KM UNIDAD DE MEDIDA : CUADRILLA : SAN MARTIN PICOTA SHAMBOYACU TOTAL DE DIAS TRABAJADOS : N DE HORAS POR DA : ACTIVIDAD:

30 08

PERIODO : 01/06/13 al 30/06/13

M2

PROVINCIA : DISTRITO :

01

Bacheo

NOMBRES Y APELLIDOS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

DIAS
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

TOTAL MES 0.00 0.00 0.00 0.00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

MARCOS MORI VASQUEZ RODIL RENGIFO FABATA DOYLIT LOSANO DEL CASTILLO JAIME ENRRIQUE DEL AGUILA TORRES

CANTIDAD DE TRABAJO EJECUTADO TOTAL DE SOCIOS REND. POR SOCIO


Nota:

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0 4.0 0.0

0.0 124.00 0.00

La Informacin consignada en el Presente Formato debe Coincidir con los trabajos asentados diariamente en el Cuaderno de Obra y con el Rendimieto por Socio (Formato Anexo N 02 PSDI - UZSM - PCR)