Professional Documents
Culture Documents
** Enter the value in the red ** Transformer Rated Maximum power P.F. _ Before P.F. _ After P.F. Charge rate Line voltage Capacitor Bank price Loss (Trans+Power cord) Capacitor Loss Electricity Rate (Average)
(PF1) (PF2)
kVA. kW
Current Rate of Transformer kVA _ Before kVAR _ Before Current _ Before kVA _ After kVAR _ After Current _ After Loss (Trans+Copper) _ After Total Loss Capacitor required
P.F. Charge Energy charge reduce Save costs *** Payback period ***
269,808.84
Baht / Year
2) When entering values in the table completely. The calculated values and payback period.