Payback period calculate table.

Payback period of improving the power factor. (New installation)


MEA and PEA will be charged for the power factor (PF) and type 3 consumers Medium Business Large Category 4 and Category 5, the Company will be specifically charged by the kVAR PF maximum In excess of percentage 61.97 (PF <0.85) of the energy demand peak in the rate of kVAR at 56.07 baht (fraction of kVAR, if less than 0.5 kVAR dropped from 0.5 kVAR up. To represent 1 kVAR)

** Enter the value in the red ** Transformer Rated Maximum power P.F. _ Before P.F. _ After P.F. Charge rate Line voltage Capacitor Bank price Loss (Trans+Power cord) Capacitor Loss Electricity Rate (Average)

(PF1) (PF2)

1,600 1,000 0.70 0.95 56.07 400 350,000 20 0.5 3.02

kVA. kW

Baht / kVAR V Baht / Set kW W/kVAR Baht / Unit

Current Rate of Transformer kVA _ Before kVAR _ Before Current _ Before kVA _ After kVAR _ After Current _ After Loss (Trans+Copper) _ After Total Loss Capacitor required

(S1) (Q1) (I1) (S2) (Q2) (I2)

2,309 1,429 1,020 2,062 1,053 329 1,519 14 5.7 692

A kVA kVAR A kVA kVAR A kW kW kVAR

P.F. Charge Energy charge reduce Save costs *** Payback period ***

22,484.07 22,616.96 338,112.1 1.0

Baht / Month kWh / Year Baht / Year Years

269,808.84

Baht / Year

1) Values in red text of the electric bill.


1) 2) 3) 4) 5) 6) 7) 8) 9) 10) 11)

2) When entering values in the table completely. The calculated values and payback period.