Professional Documents
Culture Documents
LOKASI
: KOTA BATAM
URAIAN PEKERJAAN
NO.
JUMALH
PEKERJAAN PEMBONGKARAN
Rp.
60,262.00
II
Rp.
353,772.00
III
PEKERJAAN PLAFOND
Rp.
375,748.80
IV
PEKERJAAN PENGECATAN
Rp.
65,826.00
JUMLAH
Rp
855,608.80
PPN 10%
Rp
85,560.88
JUMLAH A + B
Rp
941,169.68
DIBULATKAN
Rp
941,000.00
LOKASI
: KOTA BATAM
NO
URAIAN PEKERJAAN
VOLUME
3
SATUAN
4
HARGA
JUMLAH
SATUAN
HARGA
(Rp)
(Rp)
PEKERJAAN PEMBONGKARAN
0.620
16,500.00
10,230.00
2.120
23,600.00
50,032.00
Sub. Jumlah
II
60,262.00
0.620
570,600.00
Sub. Jumlah
III
353,772.00
353,772.00
PEKERJAAN PLAFOND
2.120
129,120.00
273,734.40
2.120
48,120.00
102,014.40
Sub. Jumlah
IV
PEKERJAAN PENGECATAN
375,748.80
2.120
31,050.00
65,826.00
Sub. Jumlah
65,826.00
Jumlah
855,608.80
LOKASI
: KOTA BATAM
JUMLAH
HARGA
NO
URAIAN PEKERJAAN
KOEFISIEN/SATUAN
SATUAN
BAHAN
UPAH
PERALATAN
TOTAL
(Rp)
(Rp)
(Rp)
(Rp)
(Rp)
M2
Upah
Pekerja
0.8040
Org/Hr
100,000.00
80,400.00
Tukang Kayu
0.5600
Org/Hr
120,000.00
67,200.00
Bahan/Material
Kayu Meranti (Papan 2/20) Panjang = 3 m
0.0250
3,000,000.00
75,000.00
Triplek 9 mm
0.5000
Lbr
145,000.00
72,500.00
0.5000
Lbr
380,000.00
190,000.00
0.9500
Bh
90,000.00
85,500.00
Paku 1 - 4"
0.0500
Kg
20,000.00
1,000.00
Jumlah
423,000.00
147,600.00
Dibulatkan :
PEKERJAAN PLAFOND
570,600.00
570,600.00
Upah
Mandor
0.0075
Org/Hr
150,000.00
1,125.00
Tukang Besi
0.4000
Org/Hr
120,000.00
48,000.00
Pekerja
0.1500
Org/Hr
100,000.00
15,000.00
Ekafooring
2.5000
Btg
20,000.00
50,000.00
Paku Sekrup
15.0000
Bh
1,000.00
15,000.00
Bahan/Material
Jumlah
65,000.00
64,125.00
Dibulatkan :
129,125.00
129,120.00
M2
Upah
Mandor
0.0024
Org/Hr
150,000.00
360.00
Tukang Kayu
0.1444
Org/Hr
120,000.00
17,328.00
Pekerja
0.0488
Org/Hr
100,000.00
4,880.00
0.3819
Lbr
65,000.00
24,823.50
Paku Sekrup
0.0486
Kg
15,000.00
729.00
Bahan/Material
Jumlah
Dibulatkan :
25,552.50
22,568.00
48,120.50
48,120.00
PEKERJAAN PENGECATAN
M2
Upah
Tukang Cat
0.1500
Org/Hr
120,000.00
18,000.00
0.0100
Org/Hr
130,000.00
1,300.00
0.3500
Kg
25,000.00
8,750.00
0.1000
Bh
3,000.00
300.00
0.0100
Bh
45,000.00
450.00
Dempul Tembok 5 Kg
0.1500
Bh
15,000.00
2,250.00
Bahan/Material
Jumlah
11,750.00
19,300.00
Dibulatkan :
PEKERJAAN PEMBONGKARAN
31,050.00
31,050.00
M2
Upah
Pekerja
0.2000
Org/Hr
100,000.00
20,000.00
Tukang Kayu
0.0300
Org/Hr
120,000.00
3,600.00
Jumlah
23,600.00
Dibulatkan :
23,600.00
23,600.00
M2
Upah
Pekerja
0.1500
Org/Hr
100,000.00
15,000.00
Mandor
0.0100
Org/Hr
150,000.00
1,500.00
Jumlah
Dibulatkan :
16,500.00
16,500.00
16,500.00
LOKASI
: KOTA BATAM
NO
NAMA BAHAN
SATUAN
HARGA SATUAN
Rp
A.
BAHAN
Paku 1 - 4"
Kg
20,000.00
Paku Sekrup
Bh
1,000.00
Paku Sekrup
Kg
15,000.00
Ekafooring
Btg
20,000.00
II
3,000,000.00
Lbr
65,000.00
Triplek 9 mm
Lbr
145,000.00
III
Kg
25,000.00
Dempul Tembok 5 Kg
Bh
15,000.00
Bh
90,000.00
Bh
3,000.00
Bh
45,000.00
IV
INFRASTRUKTUR
Lbr
380,000.00
LOKASI
: KOTA BATAM
NO
URAIAN TENAGA
2
SATUAN
HARGA SATUAN
Rp
B.
UPAH
Pekerja
Org/Hr
100,000.00
Tukang Kayu
Org/Hr
120,000.00
Tukang Besi
Org/Hr
120,000.00
Tukang Cat
Org/Hr
120,000.00
Org/Hr
130,000.00
Mandor
Org/Hr
150,000.00
LOKASI
: KOTA BATAM
NO
NAMA BAHAN
VOLUME
SATUAN
HARGA SATUAN
Rp
JUMLAH
Rp
A.
BAHAN
Paku 1 - 4"
0.1
Kg
20,000.00
2,000.00
Paku Sekrup
32
Bh
1,000.00
32,000.00
Paku Sekrup
0.15
Kg
15,000.00
2,250.00
Ekafooring
Btg
20,000.00
120,000.00
II
Btg
36,000.00
72,000.00
Lbr
65,000.00
65,000.00
Triplek 9 mm
Lbr
145,000.00
145,000.00
III
Kg
25,000.00
25,000.00
Dempul Tembok 5 Kg
Bh
15,000.00
15,000.00
Bh
90,000.00
90,000.00
Bh
3,000.00
3,000.00
Bh
45,000.00
45,000.00
Lbr
380,000.00
380,000.00
IV
1
INFRASTRUKTUR
Lapisan Finising HPL Motif Kayu (1220 mm x 2440 mm)