You are on page 1of 4

-

3&4
- UAE
KTI Engineering & Services

UAE 4(4 Units)


. ,

.
1976 LosAngeles Norwalku
Bechtel, Maanshan Plant 5&6 Project Plant Design
Discipline Engineering Supervisor .
( 3&4)
Bechtel . Bechtel
Maanshan 900MW Plant , Plant Copy
Engineering Manhours Saving .

34
.
3&4 1~2 3&4
( 1&2) Bechtel .
3&4 1978 1986 6
100% Power Test &Verification Bechtel
.

Bechtel 3&4
l

1961
California State Poly Technic
University
California State University Long
Beach
California (PE)
ASME
Bechtel Power Corporation
70~
(
87) - 3,4 REO

3&4 Feasibility Study


Team Bechtel (
(KHNP) ).

2010 34

99

-
(

, Plant Copy Project Maanshan

Typical 3&4

Project Engineering Supervisor

).

Bechtel
Project Team Bechtel
3&4 , .
(KNE, KOPEC)

b Copy
.

.
Bechtel
Advisory .
3&4
.

( Pumps, Valves, Vessels, Equipments)

Maanshan Project ,

Wall to Wall .

Georgia Power

Project 3&4

Scope Code

. .

1983 2 Bechtel Expatric

Engineering Group Supervisor .

Major Scope ,

Maanshan Project Copy

Sub-contractors . ,

Project

ASME-Class 1 System Safety Analysis(

) Westinghouse, ASME Class 2&3,

Design Documents Project tytle

Critical System Safety Analysis Bechtel

Maanshan KEPCO-KORI 3&4

Scope, (Piping Supports)

PC , Non-Q

Bechtel
. Bechtel

and PC (KOPEC,
KNE) .

Engineering Manhours

. 3&4

Bechtel .

REO Bechtel Residential

Engineering Organization Team

Sub-contractors Coordination

Bechtel REO() .
REO()

,
.

100

, ()

As-Built Verification REO( )

( As-Built verification 3

Miles Island

NRC Code).

Bechtel
2010 34

3&4
Bechtel Engineers 4

200 54

KNE( KOPEC) 50 Engineer


.

, Scope of Work ,

NRC Code As-Built

. REO-K.Kim(

Verification Report , ,

) ,

Proposal Power Piping Test

Verification .

( ,

Commercial Power .

).

, As-Built Verification Scope


(PiPe Supports) Design

FCR/NCR

Analysis

. REO

FCR(Field

ASME Code Class 1 System

Change Notice) NCR(Non-conformance

Westinghouse Contract Safety Analysis

Change Notice)

, Westinghouse As-

Built Walk-Down Manhours

Q.A. Final Approval

() , Bechtel Q.A.

REO Walk-down

Engineering Approval

As-Built Reports Westinghouse

Final Sign .

Bechte Engineering

Westinghouse .

Westinghouse As-Built

Design Code

Analysis , Engineering

. As-Built

manhours . Bechtel

Engineering .

REO K.Kim Re-analysis

Bechtel Manhours

Re-Analysis .

Manhouse Saving .

FCR/NCR

ASME Class 2&3 Critical System

Engineering As Built

Analysis Scope Bechtel, As-Built-Walk-

Analysis Code Equation

Down Report Re-Analysis

As-Built Approval Bechtel

Manhours

Q.A. Release

. REO

Bechtel Re-Analysis

Dollars .

2 (

Analysis Scope 26 Line

Bechtel Scope

, ).

160 Lines .
2010 34

Scope of Work Westinghouse

2~3 ,

101

Scope , Test
Engineer
. Bechtel Letter
( , Bechtel
.)
3&4

2 Manhours Save .
Bechtel 4 Engineers KNE

manhours

( KOPEC) 50 4

Engineering Scope.

As-Built Verification .

Scope

. KOPEC

Peak Load 200 2

, Work-

Down

(KOPEC) 50 Bechtel Engineer 4

Containment


. As-Built Engineering

12

.
Engineering Engineering

Engineer Engineer 2, 3
. .

.

. 12 .

Analysis
. 4 .
.
Staffs

.

.
3&4

UAE

102

2,000 manhours proposal .

Scope of Work Scope

100% Power Test Verification,

( )

Experience Resume .

. 3&4

2 Keulung Nuclear

34

Power 100% Power Test 3

UAE

100% Power Test

. Bechtel
. Bechtel Engineer K.Kim Test
2010 34

Project
.

You might also like