Sr No

Ref. to MoRTH Spec. A 225 mm dia a) Labour Supervisor Mason Unskilled Labour b) Material Sand at site Cement at site

Description

Unit

Quantity

Rate KShs

Cost KShs

Remarks/ Input ref.

day day day cum tonne metre cum

0.360 1.000 8.000 0.140 0.100 25.000 12.500

1500.00 1000.00 650.00 3960.00 23743.00 1100.00 1000.00

540.00 1000.00 5200.00 554.40 2374.30 27500.00 12500.00 9933.74 4768.20 64370.64 5149.65

L-12 L-11 L-13 M-005 M-081 M-149 M-009

RCC pipe NP-4/prestressed concrete pipe including collar at site Granular material passing 5.6 mm sieve for bedding c) d) Overhead charges @ 20% on (a+b) Contractor's profit @ 08% on (a+b+c)

Cost for 12.5 metres = a+b+c+d Rate per metre = (a+b+c+d)/12.5 Note 1. In case of cement craddle bedding, quantity of PCC M15 is to be calculated as per design and priced separately and added . 2. The rate analysis does not include excavation, cement /masonry works in head walls, backfilling, protection works and parapet walls. The same are to be calculated as per approved design and drawings and priced separately on rates available under respective sections say

5150.00