You are on page 1of 1

A

350

KETERANGAN
A. B. C. LANTAI KERAMIK 40X40 WARNA TERANG, POLISH LANTAI KERAMIK 40X40 WARNA GELAP, UNPOLISH LANTAI KERAMIK 30X30 WARNA GELAP, UNPOLISH PEMERINTAH KABUPATEN KUTAI TIMUR DINAS PEKERJAAN UMUM BIDANG CIPTA KARYA

KEGIATAN

PERENCANAAN PEMBANGUNAN TAHUN 2012


PEKERJAAN

PERENCANAAN MESS SATUAN POLISI PAMONG PRAJA KABUPATEN KUTAI TIMUR


LOKASI
C 11/+173,0 SANGATTA

165

KETERANGAN
- TOC : TOP OF CONCRETE (LEVEL ATAS BETON/STRUKTUR) - BOC : BOTTOM OF CONCRETE (LEVEL BAWAH BETON/STRUKTUR) - TOF : TOP OF FINISHING (LEVEL ATAS FINISHING) - BOF : BOTTOM OF FINISHING (LEVEL BAWAH FINISHING)

RAILLING HOLLOW 5/5

DIPERIKSA
C 10/+155,5

PEJABAT PEMBUAT KOMITMEN


C 12/+190,5

400

27

C 9/+138,0

C 13/+208,0

27

H. NOVIAN PRANATA, ST., MM. NIP: 19750211 200212 1 002

MENGETAHUI
C 8/+120,5 C 14/+225,5 27

KEPALA BIDANG CIPTA KARYA DINAS PEKERJAAN UMUM KABUPATEN KUTAI TIMUR

C 7/+103,0

27

C 15/+243,0

ASWANDINI EKA TIRTA, ST., MT. NIP: 19710105 199703 1 007

C 6/+85,5

27

PERENCANA
C 16/+260,5

C 5/+68,0

27

C 17/+278,0

PENANGGUNG SESTHY S. BUMBUNGAN, ST JAWAB ARSITEKTUR STRUKTUR ASMADI, ST A. HERMAWATI, ST WILDAN YASIN, ST SYAMSUNAR KASIM, ST A. HERFIANAH, ST

C 4/+50,5

27

C 18/+295,5

ME ESTIMATOR

C 3/+33,0

DIGAMBAR

C 19/+313,0

27

NAMA GAMBAR
- DENAH DETAIL TANGGA

SKALA
1 : 20

C 2/+15,5

C 20/+330,5

27

DENAH DETAIL TANGGA


C 1/-2,00 B 21/+348,0 B -5,00 162,5 10 162,5 27

Scale 1:20

TANGGAL

NO. LEMBAR

JML. LEMBAR

REV.

CAD FILE :

.DWG