177275202.xlsx.

ms_office

No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

Nama Struktur
PLAT LANTAI PRA CETAK 170X100X7
TROTOAR BETON TUMBUK
TIANG SANDARAN
BALOK UTAMA
DIAFRAGMA
ABUTMEN
PLAT INJAK
PILAR
WING WALL
TEMBOK PENGARAH
SUMURAN
BORED PILE D50 L=4
STOPPER BLOCK 30 X 30 CM
PONDASI TPT
SLOOF TPT
KOLOM TPT
BALOK TPT
TIANG PANCANG BETON D=50 L17.4 m
ELESTOMERIK 400X280X46
Bearing

UNIT
1.00
2.00
1.00
6.00
5.00
2.00
2.00

REKAP VOLUME BETON


K 175
K 225

4.00
4.00
6.00
10.00
6.00

K 250

K 300

11.40
5.13

92.27

16.92
12.00
34.02
1.26

14.00

TOTAL (m3)

46.02

16.53

110.45

0.00

REKAP TULANGAN
No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

Nama Struktur
PLAT LANTAI dan TROTOAR
TIANG SANDARAN
BALOK UTAMA
DIAFRAGMA
ABUTMENT DAN PLAT INJAK
PILAR
WING WALL
TEMBOK PENGARAH
SUMURAN
TIANG PANCANG (ISI)
STOPPER BLOCK 30X30X1700 cm
PONDASI TPT
SLOOF TPT
KOLOM TPT
BALOK TPT
TOTAL (Kg)

SATUAN

TOTAL

JUMLAH
1&2
1
6
5
2

POLOS
377.77
87.86
497.01
103.07
50.77

ULIR
13063.17
569.41
2444.56
213.93
8982.18

POLOS
377.77
87.86
2982.06
515.35
101.53

ULIR
13063.17
569.41
14667.37
1069.64
17964.36

4
4
6

159.61
71.78
475.87

511.43
166.89
719.64

638.42
287.11

2045.73
667.54

61.97

371.79

0.00

5361.89

50047.22

Iqlal Suriansyah (10/3/2013)

177275202.xlsx.ms_office

REKAP VOLUME BETON


K 350
44.23

81.46
10.20
3.00

138.89

Iqlal Suriansyah (10/3/2013)

177275202.xlsx.ms_office

PENULANGAN PLAT LANTAI


Detail Gambar
(m)

Besi

Panjang
(m)

Spasi (mm)

kg/m

Berat
kg

0.530

200

12

115

0.88781616

108.225

1.95

400

16

58

1.578

357.020

1.32

200

12

115

0.888

269.541

1.48

200

16

115

1.578

537.267

3.5

400

16

58

1.578

3204.030

9.92

200

16

115

1.578

1800.570

9.74

200

16

115

1.578

1767.898

23.54

100

13

98

1.042

2403.697

23.04

100

13

98

1.042

2352.642

jlh
0.04

0.04
0.45
1.4

jlh
2

0.55

jlh

0.22

2
0.55

0.55

jlh
2
1.48
1.55

jlh
10

0.35
1.6
9.92

jlh
1

9.74
jlh
1
23.04

23.54

jlh
1

Total Tulangan Slab


Total Tulangan Slab + Faktor Kehilangan 5%
Polos

377.77 kg

Ulir

13063.17 kg

Perhitungan Volume Beton Plat Lantai


l (m)
22.80

b (m)
9.70

h (m)
0.20

K-350
jlh (unit)
1.00

Perhitungan Volume Beton Trotoar


l (m)
22.80

b (m)
1.00

h (m)
0.25

12800.891
13440.935

Vol (m)
44.23

Vol Total (m)


44.23

K-225
jlh (unit)
2.00

Vol (m)
5.70

Vol Total (m)


11.40

Iqlal Syah (10/3/2013)

177275202.xlsx.ms_office

PENULANGANTIANG SANDARAN
Detail Gambar
(m)
0.22
0.3

0.36

jlh
1

Panjang
(m)

Spasi (mm)

2.310

200

22.8

0.25

Besi

kg/m

Berat
kg

13

115

1.04

276.79

200

13

11

1.04

261.32

100

10

570

0.62

87.86

0.66
0.65
0.12
22.80

jlh
1

jlh
1
0.25

625.972
657.271

TOTAL TULANGAN
TOTAL TULANGAN PELAT + Faktor Kehilangan 5%
Perhitungan Volume Beton Tiang Sandaran
l (m)
22.80

b (m)
0.25

Polos

87.86 kg

Ulir

569.41 kg

h (m)
0.90

jlh (unit)
1.00

K-225
Vol (m)
5.13

Vol Total (m)


5.13

Iqlal Syah (10/3/2013)

177275202.xlsx.ms_office

PENULANGAN GELAGAR INDUK


Detail Gambar
(m)
7.00

Panjang
(m)

Besi

kg/m

Berat
kg

16.96

29.00

5.185

351.834

10.54

29.00

5.185

109.272

10.54

29.00

5.185

109.272

3.37

29.00

5.185

17.490

2.72

29.00

5.185

14.112

2.72

29.00

5.185

14.112

8.41

29.00

5.185

87.181

10.42

29.00

5.185

216.183

10.42

29.00

5.185

324.275

3.37

29.00

5.185

34.980

12.12

29.00

5.185

125.645

10.54

29.00

5.185

382.453

7.13

14

29.00

5.185

517.675

7.00

1.49

1.49
10.54

10.54
3.37
2.72
2.72
8.41
10.42
10.42
3.37
12.12
10.54
7.13
1.04
0.65

4.75

10.00

0.617

17.559

3.78

12

10.00

0.617

27.988

Tumpuan
5.18

52

10.00

0.617

165.040

Lapangan
5.18

90

10.00

0.617

286.423

B
2.00

1.35
A

0.75
0.32

0.32

1.35

1.35
0.31

0.31

0.31

0.31
0.62
TOTAL TULANGAN
TOTAL TULANGAN + 5% Faktor Kehilangan

2801.495
2941.570

Iqlal Suriansyah (2012)

177275202.xlsx.ms_office

Perhitungan Volume Beton Balok Lantai K-350


l (m)

b (m)

h (m)

jlh (unit)

Vol (m)

Vol Total (m)

22.80

0.70

1.45

6.00

13.58

81.46

Vol (m)
2.04

Vol Total (m)


10.20

Polos =
Ulir =

497.01 kg
2444.56 kg

Perhitungan Volume Balok Diafragma K-350


l (m)
8.50

b (m)
0.30

h (m)
0.80

jlh (unit)
5.00

Daftar Pembesian Diafragma Jembatan


Str

No
1
2
3
4

n
3
4
3
58

L
(m)
8.60
8.60
8.60
2.04

(mm)
25
12
25
10

10

12

25
25.8

34.4
25.8
117.64

Total Panjang (m)


Berat Perunit (kg/m)

117.64
0.617

34.40
0.888

51.60
3.853

Jumlah Berat (kg)


Total Berat (kg)

72.53

30.54
301.904

198.83

Total Berat (kg) + Faktor Kehilangan 5%

Polos
Ulir

Bentuk
Tulangan

316.999

103.07 kg
213.93 kg

Perhitungan Volume Beton Plat Lantai Pra Cetak


l (m)
13.60

b (m)
0.07

h (m)
1.00

jlh (unit)
6.00

Vol (m)
0.95

Vol Total (m)


5.71

Iqlal Suriansyah (2012)

177275202.xlsx.ms_office

Daftar Pembesian Abutment


Str No
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

(mm)
16
19
16
19
22
22
16
16
16
16
16
22
16
16
16
10
10
13
13
13
16

(mm)
150
150
200
150
150
150

150
150

150
150
150
150
450
200
200
300
450
300
150

(m)
5.05
4.16
0.65
4.67
2.99
4.16
10.53
10.53
10.53
10.53
10.53
10.53
10.53
10.53
2.98
0.12
0.32
1.02
0.92
3.20
3.76

JLH BTG

22
19 - 150
6.05
5.25
23
19 - 150
24
13 - 100
7.12
25
13 - 400
0.22
Total Panjang (m)
Berat Perunit (kg/m)
Jumlah Berat (kg)
Total Berat (kg)
Total Berat (kg) + Faktor Kehilangan 5%

Total Panjang (m)


10

13

16
358.32

19

71
71
295.03
53
34.52
71
`
331.29
71
71
6
63.19
6
63.19
11
115.85
2
21.06
22
231.70
21
21
221.17
6
63.19
24
71.62
108
13.05
216
69.29
144
147.00
168
154.56
108
345.60
71
267.06
Daftar Pembesian Plat Injak
47
284.51
47
246.75
100
712.00
156
34.32
82.34
1359.16 1510.88 1157.58
0.62
1.04
1.58
2.23
50.77
1416.17 2384.67 2576.42
8602.80
9032.94

Polos

50.77 kg

Ulir

8982.18 kg

22

25

Bentuk Tulangan

212.02
295.61

221.17

728.80
2.98
2174.78

Perhitungan Volume Beton Abutmen K250


l (m)
Luas (m)
14.60
3.16

Vol (m)
46.14

Jumlah
2

Vol Total (m)


92.27

PerhitunganVolume Beton Plat Injak K350


t (m) P
L
Luas (m)
0.30
5.00
12.00
60.00

Vol (m)
1.50

Jumlah
2

Vol Total (m)


3.00

0.00
3.85
0.00

Iqlal Suriansyah (10/3/2013)

177275202.xlsx.ms_office

Daftar Pembesian Wing wall


Str No
1
2
3
3a
4
4a
5
5a
6
6a
7
7a
8
9
10

(mm) (mm)
(m)
16 - 200 3.08
16 - 200 5.94
16 - 300 3.61
12 - 200 3.61
16 - 300 3.41
12 - 200 3.41
16 - 200 6.13
12 - 200 4.21
16 - 300 5.04
12 - 200 3.52
16 - 300 3.15
12 - 200 2.83
10 - 200 0.46
16
2.90
12 - 400 0.97
Total Panjang (m)
Berat Perunit (kg/m)
Jumlah Berat (kg)
Total Berat (kg)
Total Berat (kg) + 5%

t (m)
0.40

JLH BTG
3
3
2
2
7
10
11
11
10
14
10
10
135
3
15

Total Panjang
19

12

16
9.24
17.83
7.22

b=
l1 =
l2 =

3 m
3 m
1.05 m

7.22
23.87
34.10
67.40
46.26
50.43
49.32
31.53
28.33
62.10
8.70
62.100
2.226
138.216

14.55
179.773
0.888
159.605
639.083
671.037

216.216
1.578
341.262

Perhitungan Volume beton Wing wall


Luas (m)
JLH
Vol Total (m)
10.58
4.00
16.92
polos
ulir

159.61 kg
511.43 kg

Iqlal Suriansyah (2012)

177275202.xlsx.ms_office

T.PENGARAH

1.000

2.500

4.000

1.200

STA

(M2)

VOL (M1)

BJ

b=a*a

e=(b/c)*d

2.500

12.000

VOL. TOTAL (M3)

12.000

BERAT/M JUMLAH PANJANG


(Kg)
(UNIT)
(M)
f

JUMLAH BESI
( Batang )

BERAT
(Kg)

i=e*g

Dia 16 mm
0.016

0.0002

0.0002

8,750

1.758

1.700

3.0

8.968

Dia 13 mm
0.013
0.013

0.0001
0.0001

0.0001
0.0001

8,750
8,750

1.161
1.161

5.750
3.200

15.0
12.5

100.121
46.433

0.010

0.0001

0.0001

8,750

0.687

3.200

28.8

63.193

0.010

0.0001

0.0001

8,750

0.687

2.500

5.0

8.586

Dia 10 mm

polos
ulir

Total Berat (Kg)

227.300

Total Berat (Kg) + 5%

238.665

71.78 kg
166.89 kg

Iqlal Suriansyah (2012)

177275202.xlsx.ms_office
Daftar Pembesian Sumuran
L
s
JLH BTG
(mm)
(mm)
(m)
1
16
250 4.950
32
2
16
250 5.150
32
3
12
150 7.854
28
4
12
150 5.969
28
5
12
250
0.38
392
6
25
250
2.2
18
Total Panjang (m)
Berat Perunit (kg/m)
Jumlah Berat (kg)
Total Berat (kg)
Total Berat (kg) + Faktor Kehilangan 5%

Str No

polos
ulir

12

16
158.400
164.800

25

219.911
167.133
148.960
536.004
0.888
475.872

323.200
1.578
510.118
1138.583
1195.513

L=
D1 =
D2 =
S=
d1 =
d2 =

4.000
2.500
1.900
0.3
7.854
5.969

39.600
39.600
3.853
152.593

475.87 kg
719.64 kg
Perhitungan Volume Beton Dinding Sumuran K250
l (m) Luas (m2)
JLH
Vol (m)
Vol Total (m)
49.763
4.00
2.07
6.00
8.29
Perhitungan Volume Beton Isi Sumuran K250
l (m)
2.00

Luas (m2)
2.84

JLH
6.00

Vol (m)
5.67
Total K250 =

Perhitungan Volume beton Sumuran K175


l (m) Luas (m2)
JLH
Vol (m)
2.00
2.84
6.00
5.67

Vol Total (m)


34.023
83.786 m3

Vol Total (m)


34.023

Iqlal Suriansyah

177275202.xlsx.ms_office

ANALISA TEKNIS BETON BERTULANG ( BESI + BEKISTING )


Beton Bertulang
No.

Uraian Beton

Dimensi
Panjang

1.2 Pondasi Foot Plat 180/120/30


0.750 cm

Sloof

1.000

Besi Beton
Volume
m3

Axis

Besi
mm

Berat Kg/m

Panjang

Jumlah

Kolom

1.000

Balok

1.000

Balok

1.000

Lebar
m1

Luas
m2

Pembesian
Kg

Begisting
M2

x Pakai

Perancah
M2

0.750

0.500

0.2813
0.2813

X atas
X bwh
Y atas
Y bwh
Sabuk

12
12
12
12
10

0.888
0.888
0.888
0.888
0.617

0.790
1.630
0.790
1.630
2.780

4
4
2
2
5

2.8053
5.7882
1.4027
2.8941
8.5694
21.4596

3.000
-

0.500
-

1.5000
1.5000

76.3009

1.7778

0.200

0.300

0.0600

Pokok
Extra
Sabuk

12

0.888
-

1.000
1.000
1.000

3.5510
-

1.000

0.600

0.6000

59.1840

3.3333

Beugel

10

0.617

0.900

6.67

3.6990
7.2500

0.6000

61.6500

Pokok
Extra
Sabuk

12
0

0.888
-

1.000
1.000
0.380

4
0

3.5510
-

1.000

1.100

1.1000

47.3472

4.8889

Beugel

10

0.617

0.960

6.66667

3.9456
7.4966

1.1000

52.6080

Pokok
Extra
Sabuk

12
0

0.888
-

1.000
1.000
1.000

4
0

3.5510
-

1.000

0.700

0.7000

71.0208

4.6667

Beugel

10

0.617

0.760

6.66667

3.1236
6.6746

0.7000

62.4720

Pokok
Extra
Sabuk

12
0

0.888
-

1.000
1.000
1.000

5
0

4.4388
-

1.000

0.900

0.9000

49.3200

3.3333

Beugel

10

0.617

1.060

6.66667

4.3566
8.7954

0.9000

48.4067

0.250

0.300

0.0750

0.200

0.250

0.0500

0.0500
c

Panjang
m1

Tinggi

0.0750
c

Jml. Berat
Kg

Lebar

0.0600
b

Volume / 1 m3 Beton

Begisting
Potongan

0.300

0.300

0.0900

0.0900
Pondasi TPT pada oprit
Ukuran
0.75

0.75

Sloof TPT pada oprit


Ukuran
0.20
0.30

Tinggi
0.50

Jumlah
15.20

Sisi
2.00

Volume beton
8.55

besi 1/m3
76.30

total besi
652.37

Tinggi

Panjang
71.00

Sisi
2.00

Volume beton
8.52

besi 1/m3
120.83

total besi
1029.51

Tinggi
1.63

Jumlah
15.20

Sisi
2.00

Volume beton
3.71

besi 1/m3
99.96

total besi
370.33

Tinggi

Panjang
71.00

Sisi
2.00

Volume beton
7.10

besi 1/m3
133.49

total besi
947.80

Tinggi

Panjang
6.98
6.60
1.20

Sisi
2.00
2.00
2.00

Volume beton
1.26
2.38
0.22

besi 1/m3
49.32

total besi
61.97

Kolom TPT pada oprit


Ukuran
0.25

0.30

Balok TPT pada oprit


Ukuran
0.20

0.25

Stop Block
Ukuran
0.30
0.30
0.30

0.30
0.60
0.30

Note : sepanjang balok gelagar di dua tumpuan

panjan 1 stopblock

1.1