PT.

BANGUN PERKASA ADHITAMASENTRA

MAINTENANCE SECTION

MAINTENANCE TOOLS LIST

Seksi : Mekanik NO 1 2 3 4 5 6 7 8 9 10 11 COMPONENT NAME Blender (Cutting toos) Bor Melling Bor tangan kecil merk Bosch Gunting plat krisbow Gurinda table Gurinda tangan merk Bosch Takel 1 ton Takel 3 ton Takel 5 ton Trafo las besar Trafo las kecil
Penanggungjawab,

rev : 0 QTY 11 pcs 1 pcs 1 pcs 1 pcs 1 pcs 2 pcs 1 pcs 2 pcs 1 pcs 12 pcs 2 pcs

Inspection Date : 26 April 2009

STATUS OK NO
Disetujui,

REMARKS

Mengetahui,

Ukat S

Yudi F

Rofiq S

PT. BANGUN PERKASA

MAINTENANCE SECTION

MAINTENANCE TOOLS
Seksi :Mekanik NO COMPONENT NAME SATUAN rev : 0 QTY
Inspection Date :

STATUS OK NO

Service Tank Pump

unit

2 3 4 5 6 7 8 9 10 11 12 13 14

Chest Pulp I SOH 152-32 Sunny King Chest Pulp 3-4 SOH 150-25 Sunny King Pulper Pump SOH 125-25 Sunny King Sedimen Pump SOH 125-25 Sunny King Chest Pump 2 SOH 125-25 Sunny King Mixing Pump SOH 125-25 Sunny King
Waste Mixer Pump SOH 125-25 Sunny King

unit unit unit unit unit unit unit unit unit unit unit unit unit

1 2 1 1 1 1 1 4 2 1 1 1 1

Vacum Pump Conveyor Pump Overflow Pump Wire Cyl Cleaning Pump Velt Cleaning Pump Sealing Liquid Pump

Dicek oleh

Disetujui,

MAINTENANCE SECTION

Inspection Date :

REMARKS
Ebara, Type 80x65x FS4K-10HP-3Ph-Max Head 25M-Cap. 20M3/min- Glan paking 75Hp, Head 40M, Cap. 5m3/min, In-Out 8"x6", Glan Packing 20Hp, Head 20M, Cap.3.33m3/min, Presser 2.0 bar Cap.25m3/hr., Gland paking Cap.25m3/hr., Gland paking Cap.25m3/hr., Gland paking Cap.3m3/min., 25Hp, 4pole Cap.3m3/min., 15Hp, 4pole Cap.21.3m3/min., 50Hp, 4pole Cap.8.5m3/min., 75Hp, 4pole Cap.3m3/min., 15Hp, 4pole Cap.2m3/min., 50Hp, 4pole Cap.2m3/min., 50Hp, 4pole Cap.0.8m3/min., 5Hp, 4pole

Mengetahui,

PT. BANGUN PERKASA ADHITAMASENTRA

MAINTENANCE SECTION

MAINTENANCE TOOLS LIST


Seksi :Mekanik NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 COMPONENT NAME Dongkrak 6 ton Air compressor swan 3 HP Air gun Alat isi angin ban Box tool Chain hoist Kawasaki 1T-6M Chain hoist Kawasaki 2T-6M Chain hoist Kawasaki 5T-6M Chaliper inner ukuran 300mm Clamp selang acetylin 3/8" Clamp selang oksigen 1/4" Clamp seling 2.5mm Corong Alumunium 8" Cutting Tip no 2 Cutting Tip Ukuran 102 no 3 Dirigen putih 25 ltr Flash back Gagang gergaji besi takero Gagang Tap Gunting butterfly no 5 Gunting butterfly no 8 Hamer lock 3/8" Hand pallet 3 ton Hand Tap 14 x 2 SKC Hand Tap 16 x 2 SKC Hand Tap 20 x 2 SKC Hand tap M10 x 1.75 Hand Tap M12 x 1.75 Hand tap M4 Hand tap M5 Hand tap M6 Hand tap M8 Helm proyek Hose naple 3/8" Isolasi Unbel Kabel NYYHY 2c x 2.5mm rev : 0 QTY 1 pcs 1 unit 2 unit 1 set 3 pcs 1 set 1 set 1 set 1 pcs 4 pcs 4 pcs 4 pcs 1 pcs 1 pcs 4 Unit 6 pcs 4 pcs 1 pcs 1 pcs 1 pcs 1 pcs 4 pcs 2 unit 2 set 2set 1 set 1 set 1 set 1 set 1 set 1 set 1 set 36 pcs 2 pcs 4 roll 140 M
Inspection Date :

STATUS OK NO

REMARKS
sudah SPB sudah SPB

sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB

sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB

sudah SPB u/ compressr sudah SPB sudah SPB

37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82

Kabel NYYHY 4c x 10mm Kabel NYYHY 4c x 2.5mm kabel skun 10mm Kabel skun 35mm Kabel Welding 50 mm Kawat seling 10mm Kawat seling 2.5mm Kedok Las Kepala Kunci Filter Forklif Kunci inggris 12" Kunci inggris 18" Kunci L 20mm Kunci L ukuran 16mm Kunci L ukuran 2 - 20mm Kunci L ukuran12mm Kunci Pipa 18" Kunci ring pas no 26 Kunci ring pas no 27 Kunci ring pas no 28 Kunci ring pas no 30 Kunci ring pas no 32 Kunci ring pas no 34 Kunci ring pas no 36 Kunci ring pas no 38 Kunci ring pas no 6 Kunci ring pas no 6 Kunci ring pas no 7 Kunci ring pas no 7 Kunci ring pas no 8 - 24 Kunci ring pas no 8 - 24 Kunci roda forklif J Kunci roda belakang forklif C Kunci roda forklif K Kunci Sock 1/2" ukuran 10-32 Krisbow Kunci sock no 6 Kunci sock no 7 Kunci sock no 8-32 Kunci sock no 8-32 Lathing belt 2" x 8 Linggis 80cm Literan 5 ltr Lot Mata bor besi Nachi 10mm Mata bor besi Nachi 12mm Mata bor besi Nachi 14mm Mata bor besi Nachi 16mm

60 M 15 M 24 pcs 8 pcs 60 M 12 M 50 M 6 pcs 2 pcs 2 pcs 2 pcs 1 pcs 1 pcs 1 set 1 pcs 2 pcs 2 pcs 2 pcs 2 pcs 2 pcs 2 pcs 2 pcs 2 pcs 2 pcs 2 pcs 2 pcs 2 pcs 2 pcs 2 set 2 set 1 pcs 1 pcs 1 pcs 1 set 2 pcs 2 pcs 2 set 1 pcs 5 pcs 2 pcs 2 pcs 2 pcs 2 pcs 2 pcs 2 pcs 2 pcs

sudah SPB u/ compressor

u/ trafo las u/ trafo las


sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB

sudah SPB

sudah SPB sudah SPB sudah SPB

sudah SPB

sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB

83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127

Mata bor besi Nachi 18mm Mata bor besi Nachi 20mm Mata bor besi Nachi 6mm Mata bor besi Nachi 8mm Mata bor beton GMT G9638 10mm Mata bor beton GMT G9638 11mm Mata bor beton GMT G9638 12mm Mata bor beton GMT G9638 13mm Mata bor beton GMT G9638 14mm Mata bor beton GMT G9638 16mm Mata bor beton GMT G9638 18mm Mata bor beton GMT G9638 20mm Mata bor beton GMT G9638 22mm Mata bor beton GMT G9638 24mm Mata bor beton GMT G9638 26mm Mata bor beton GMT G9638 28mm Mata bor beton GMT G9638 30mm Mata gergaji besi manual Sanflex Mesin Bor Beton GMT 9638 Mesin bor tangan Makita 13mm 2 arah Mesin Bor tangan Makita 19mm
Mesin Gerinda tangan GWS 6-100 Bosch

Mesin potong type MT 240 Maktek Meteran 5 Meter Meteran 50 meter Meteran 7.5 M Mounting ukuran shaft 24mm Multi tester type 4 x 360 TRF Sanwa
Nepel hose 3/8" u/ stang blender acetylin

Obeng - besar Obeng - medium Obeng + besar Obeng + medium Palu besi 5 kg Palu besi 1 kg Palu besi 2kg Palu besi 2kg Palu besi 500 Palu karet keras Palu plastik 1kg Pompa greace Rantai seling 5 ton Regulator acetilyn Regulator LPG Regulator Oksigen

2 pcs 2 pcs 1 pcs 1 pcs 1 pcs 1 pcs 1 pcs 1 pcs 1 pcs 1 pcs 2 pcs 1 pcs 1 pcs 1 pcs 1 pcs 4 pcs 1 unit 1 unit 1 unit 2 set 2 unit 2 pcs 1 roll 4 pcs 2 pcs 1 unit 4 pcs 1 pcs 1 pcs 1 pcs 1 pcs 3 pcs 3 pcs 1 pcs 2 pcs 5 pcs 1 pcs 2 pcs 2 pcs 12 M 4 Unit 2 set 4 Unit

sudah SPB

sudah SPB sudah SPB

sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB

sisa pry
sudah SPB

sudah SPB sudah SPB

2 pcs sisa Pry

sudah SPB sudah SPB sudah SPB

128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163

Safty Belt sarung tang Kulit Las Selang air bening 8mm Selang angin 1/4" Selang angin 8mm Selang oksigen + Acetilin Senai Pipa manual - sampai 2" Shakle 3ton Sigmat 300mm mitutoyo 0,02 Siku Tukang 300mm Span skrup 1" Span skrup 10mm Span skrup 6mm Stang Blender koike MK 100 Stang kunci sock Stang las listrik 60A JRM Steker Arde Stop kontak 3 lubang Tabung Apar powder 6Kg Tang kombinasi 8" Tang potong Tang potong takero Tang press Tang snap ring dalam 8" Tang snap ring luar 8" Terpal biru 4 x 6 M Tespen DC 6V-12V-24V Thermo gauge 6" (0-300C)Romberg Tracker 12" tiga kaki Tracker 6" tiga kaki Trafo Las AC-315 220/380 Krisbow Tread gauge matrik dan inchi
Water pas kombinasi no 180-907 Mitutoyo

Water pass SK200 skala valve 0,02 Water Pass 500mm

6 pcs 4 pcs 50 M 12 M 40M 12 M 1 set 1 pcs 1 pcs 2 pcs 2 pcs 4 pcs 4 pcs 4 Unit 1 btg 5 pcs 6 pcs 6 pcs 1 tbg 2 pcs 1 pcs 1 pcs 1 pcs 1 pcs 1 pcs 11 lbr 1 pcs 1 pcs 1 set 1 set 4 set 1 set 1 set 1 set 2 pcs

sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB

sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB

sudah SPB

sisa pry

sudah SPB sudah SPB sudah SPB sudah SPB

Dicek oleh

Disetujui,

Mengetahui,

PT. BANGUN PERKASA ADHITAMASENTRA

MAINTENANCE TOOLS LIST


rev : 0 COMPONENT NAME QTY 1 unit 2 unit 1 set 1 pcs 6 pcs 1 pcs 1 set 3 pcs 1 pcs 1 pcs 1 set 1 pcs 1 pcs 1 pcs 1 pcs 1 pcs 1 pcs 1 pcs 1 pcs 1 pcs 1pcs 1 set 1 pcs 1 set 1 set 1 set 2 pcs 1 pcs 1 pcs 1 pcs 1 pcs 1 set 1 pcs 1 pcs 1 pcs 1 pcs

MAINTENANCE SECTION

ARMADA

Seksi : Mekanik NO 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

Inspection Date :

STATUS OK NO

REMARKS

Air compressor swan 3 HP Air gun Alat isi angin ban Box tool Dirigen putih 25 ltr Gunting butterfly no 8 Gagang gergaji Besi Kunci Filter Forklif Kunci Inggris 12" Kunci inggris 18" Kunci L ukuran 2 - 10mm Kunci Ring pass no 6 Kunci Ring pass no 7 Kunci ring pas no 26 Kunci ring pas no 27 Kunci ring pas no 28 Kunci ring pas no 30 Kunci ring pas no 32 Kunci ring pas no 34 Kunci ring pas no 36 Kunci ring pas no 38 Kunci ring pas no 8 - 24 Kunci sock no 8-32 Kunci Roda Forklif J Kunci Roda Forklif K Kunci Roda Belakang Forklif C Literan corong alumunium 5 ltr Obeng - medium Obeng + medium Palu besi 2kg Pompa greace tekiro Puller Tang snap ring dalam 8" Tang snap ring luar 8" Tang kombianasi Tang press

Penanggung Jawab

Disetujui,

Mengetahui,

M. Nur

Z. Hakim

Agung S.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45

Dongkrak 6 ton 1 pcs Air compressor swan13unit HP Air gun 2 unit Alat isi angin ban 1 set Box tool 3 pcs Chain hoist Kawasaki 11T-6M set Chain hoist Kawasaki 12T-6M set Chain hoist Kawasaki 15T-6M set Chaliper inner ukuran 1 300mm pcs Clamp selang acetylin 4 pcs 3/8" Clamp selang oksigen 4 pcs 1/4" Clamp seling 2.5mm4 pcs Corong Alumunium 8" 1 pcs Cutting Tip no 2 1 pcs Cutting Tip Ukuran 102 4 Unit no 3 Dirigen putih 25 ltr 6 pcs Flash back 4 pcs Gagang gergaji besi 1 takero pcs Gagang Tap 1 pcs Gunting butterfly no 5 1 pcs Gunting butterfly no 8 1 pcs Hamer lock 3/8" 4 pcs 2 unit Hand Tap 14 x 2 SKC 2 set Hand Tap 16 x 2 SKC 2set Hand Tap 20 x 2 SKC 1 set Hand tap M10 x 1.751 set Hand Tap M12 x 1.75 1 set Hand tap M4 1 set Hand tap M5 1 set Hand tap M6 1 set Hand tap M8 1 set Helm proyek 36 pcs Hose naple 3/8" 2 pcs Isolasi Unbel 4 roll Kabel NYYHY 2c x 2.5mm 140 M Kabel NYYHY 4c x 10mm 60 M Kabel NYYHY 4c x 2.5mm 15 M kabel skun 10mm 24 pcs Kabel skun 35mm 8 pcs Kabel Welding 50 mm 60 M Kawat seling 10mm 12 M Kawat seling 2.5mm 50 M Kedok Las Kepala 6 pcs Kunci Filter Forklif 2 pcs

sudah SPB sudah SPB

sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB

sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB

sudah SPB u/ compressr sudah SPB sudah SPB sudah SPB u/ compressor

u/ trafo las u/ trafo las


sudah SPB sudah SPB sudah SPB sudah SPB

##### sudah SPB

46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90

Kunci inggris 12" 2 pcs Kunci inggris 18" 2 pcs Kunci L 20mm 1 pcs Kunci L ukuran 16mm 1 pcs Kunci L ukuran 2 - 20mm 1 set Kunci L ukuran12mm 1 pcs Kunci Pipa 18" 2 pcs Kunci ring pas no 262 pcs Kunci ring pas no 272 pcs Kunci ring pas no 282 pcs Kunci ring pas no 302 pcs Kunci ring pas no 322 pcs Kunci ring pas no 342 pcs Kunci ring pas no 362 pcs Kunci ring pas no 382 pcs Kunci ring pas no 6 2 pcs Kunci ring pas no 6 2 pcs Kunci ring pas no 7 2 pcs Kunci ring pas no 7 2 pcs Kunci ring pas no 8 - 2 24 set Kunci ring pas no 8 - 2 24 set Kunci roda forklif J 1 pcs Kunci roda belakang 1 forklif pcs C Kunci roda forklif K 1 pcs Kunci Sock 1/2" ukuran 1 set 10-32 Krisbow Kunci sock no 6 2 pcs Kunci sock no 7 2 pcs Kunci sock no 8-32 2 set Kunci sock no 8-32 1 pcs Lathing belt 2" x 8 5 pcs Linggis 80cm 2 pcs Literan 5 ltr 2 pcs Lot 2 pcs Mata bor besi Nachi 2 10mm pcs Mata bor besi Nachi 2 12mm pcs Mata bor besi Nachi 2 14mm pcs Mata bor besi Nachi 2 16mm pcs Mata bor besi Nachi 18mm Mata bor besi Nachi 20mm Mata bor besi Nachi 2 6mm pcs Mata bor besi Nachi 2 8mm pcs Mata bor beton GMT1G9638 pcs 10mm Mata bor beton GMT1G9638 pcs 11mm Mata bor beton GMT1G9638 pcs 12mm Mata bor beton GMT1G9638 pcs 13mm

sudah SPB

sudah SPB sudah SPB sudah SPB

sudah SPB

sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB

sudah SPB

91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135

Mata bor beton GMT1G9638 pcs 14mm Mata bor beton GMT1G9638 pcs 16mm Mata bor beton GMT1G9638 pcs 18mm Mata bor beton GMT1G9638 pcs 20mm Mata bor beton GMT2G9638 pcs 22mm Mata bor beton GMT1G9638 pcs 24mm Mata bor beton GMT1G9638 pcs 26mm Mata bor beton GMT1G9638 pcs 28mm Mata bor beton GMT1G9638 pcs 30mm Mata gergaji besi manual 4 pcsSanflex Mesin Bor Beton GMT 1 unit 9638 Mesin bor tangan Makita 1 unit 13mm 2 arah Mesin Bor tangan Makita 1 unit 19mm Mesin Gerinda tangan GWS 2 set 6-100 Bosch Mesin potong type MT 2 unit 240 Maktek Meteran 5 Meter 2 pcs Meteran 50 meter 1 roll Meteran 7.5 M 4 pcs Mounting ukuran shaft 2 pcs 24mm Multi tester type 4 x 360 1 unit TRF Sanwa Nepel hose 3/8" u/ stang 4 pcs blender acetylin Obeng - besar 1 pcs Obeng - medium 1 pcs Obeng + besar 1 pcs Obeng + medium 1 pcs Palu besi 5 kg 3 pcs Palu besi 1 kg 3 pcs Palu besi 2kg 1 pcs Palu besi 2kg 2 pcs Palu besi 500 5 pcs Palu karet keras 1 pcs Palu plastik 1kg 2 pcs Pompa greace 2 pcs Rantai seling 5 ton 12 M Regulator acetilyn 4 Unit Regulator LPG 2 set Regulator Oksigen 4 Unit Safty Belt 6 pcs sarung tang Kulit Las 4 pcs Selang air bening 8mm 50 M Selang angin 1/4" 12 M Selang angin 8mm 40M Selang oksigen + Acetilin 12 M Senai Pipa manual -1 sampai set 2" Shakle 3ton 1 pcs

sudah SPB sudah SPB

sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB

sisa pry
sudah SPB

sudah SPB sudah SPB

2 pcs sisa Pry

sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB

136 137 138 139 140 141 142 143 144 145 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163

Sigmat 300mm mitutoyo 1 pcs 0,02 Siku Tukang 300mm2 pcs Span skrup 1" 2 pcs Span skrup 10mm 4 pcs Span skrup 6mm 4 pcs Stang Blender koike 4 MK Unit 100 Stang kunci sock 1 btg Stang las listrik 60A JRM 5 pcs Steker Arde 6 pcs Stop kontak 3 lubang 6 pcs Tabung Apar powder16Kg tbg Tang kombinasi 8" 2 pcs Tang potong 1 pcs Tang potong takero 1 pcs Tang press 1 pcs Tang snap ring dalam 1 8" pcs Tang snap ring luar 8" 1 pcs Terpal biru 4 x 6 M 11 lbr Tespen DC 6V-12V-24V 1 pcs Thermo gauge 6" (0-300 1 pcsC)Romberg Tracker 12" tiga kaki 1 set Tracker 6" tiga kaki 1 set Tread gauge matrik dan 1 set inchi Water pas kombinasi no 1 set 180-907 Mitutoyo Water pass SK200 skala 1 set valve 0,02 Water Pass 500mm 2 pcs

sudah SPB sudah SPB sudah SPB

sudah SPB sudah SPB sudah SPB sudah SPB sudah SPB

sudah SPB

sisa pry

sudah SPB sudah SPB sudah SPB sudah SPB

#####
Dicek oleh Disetujui, Mengetahui,