SUMMARY STATISTICS - 2012

Number of Power Stations


(with PPP)

Units

2011

No.

139

GENERATION STATISTICS
Annual
2012 Percentage
Change
159

14.4%

Installed Capacity (with PPP)

MW.

3146

3312

5.3%

Maximum Demand (with PPP)

MW.

2163

2146

-0.8%

Gross Generation (with PPP)

GWh.

11528

11801

2.4%

Self Generation Scheme

GWh.

Trans. & Dstri. Losses


(On Net Generation)
Gross Units Sold

11.72

10.67

-1.1%

10,023

10,474

4.5%

Average Selling Price per Unit

Rs/kWh

13.21

15.56

17.8%

Average Cost per Unit


(at selling point)
Revenue from Billed Sales
(with FAC)
Fuel Adjustment Charge

Rs/kWh

Consumer Accounts
No. of Area Offices

GWh.

16.21

22.13

36.5%

m.Rs.

132,373

162,956

23.1%

m.Rs.

25,532

No.

4,717,448

4,979,862

5.6%

No.

55

60

No. of CSCs

No.

194

204

10

No.of POS Centers Operated by CEB

No.

47

49

% of Household Electrified

91.0 (a)

94.0 (a)

3.0%

System Load Factor

60.8

62.8

2.0%

Total Employed (as at the year end)

No.

16,192

16,709

3.2%

Capital Investments

m.Rs.

63,817

91,318

Net Fixed Assets in Operation (average)

m.Rs.

421,855

480,870

Rate of Return on fixed assets

-2.49*

-7.17*

No. of Consumers per Employee

No./Employee

291

298

Av. Elect:Consumption per Capita

kWh/Person

480

515

No.of Consumers per length of dist.line

No./ km.

34.7

35.2

1.0

0.7

Electricity Elasticity (w.r.t. GDP)


Total Energy Consumption in Sri Lanka

KTOE

439(b)

Share of Elect. to Total Energy Supply

9.6(b)

CSC -

Consumer Service Centres

2.3%
7.3%

*- Tariff effective during 2011 & 2012 being below cost.

POS - Point of Sales


(a) - Estimated.

(b) - Provisional

C.E.B. - Total
- Hydro

No.of Power Stations

Installed Capacity in MW.


%

2012

Change

2011

2012

Change

24

25

4.2%

2064

2214

7.3%

16

17

6.3%

1207

1357

12.4%

- Thermal-Oil

0.0%

554

554

0.0%

- Thermal-Coal

0.0%

300

300

0.0%

- Wind

0.0%

0.0%

P.P.P. - Total

115

134

16.5%

1082

1098

1.5%

- Hydro-Small

91

109

19.8%

194

227

17.3%

- Thermal-Oil

11

-27.3%

842

784

-6.8%

13

17

30.8%

47

87

84.6%

139

159

14.4%

3146

3312

5.3%

- NCRE
Total

NCRE - Non Conventional Renewable Energy (Solar, Dendro, Biomass, Wind)

Gross Generation in GWh


Ownership & Source
C.E.B. - Total

2012 % increase
6162
-6.0%

- Hydro

4018

2727

- Thermal-Oil

1494

2029

- Thermal-Coal

1038

2011
57%

2012
52%

-32.1%

35%

23%

35.8%

13%

17%

1404

35.2%

9%

12%

-13.0%

0%

0%

4976
601

5639
565

13.3%
-6.0%

43%
5%

48%
5%

- Thermal-Oil
- NCRE
Total Generation

4254
122
11528

4906
169
11801

15.3%
38.6%
2.4%

37%
1.1%
100%

42%
1.4%
100%

Av. Daily Generation - GWh/day

31.58

32.24

2.1%

2011

2012

2012

Fuel

m. Rs. Rs/kWh

m. Rs.

Rs/kWh

2011

K.P.S.(small GT)
K.P.S.(new GT)
K.P.S.(C.Cy.)

L.A.D.
L.A.D.
L.A.D.
Naphtha
L.H.F.
L.A.D.
L.H.F.
L.A.D.
L.A.D.
L.A.D.
Coal

3,436
7,159
3,136
4,154
3,804
132
4,246
93
187
331
6,410
33,088

4,692
3,361
13,823
7,421
5,609
130
7,011
60
170
207
10,906
53,389

47.93
27.93
24.15

40
84
33
63
95
1
106
1
2
4
395
430

SP.P.S.(Diesel) - B
Chunnakam - Diesel
Puttamm - Coal

4618

3291

-28.7%

1401

1584

Thermal-Oil & Coal

6785

8338

22.9%

1695

1638

-3.4%

124

171

37.5%

50

90

79.6%

11528

11801

2.4%

3146

3312

5.3%

* - At Friday 20th May, 2011

Self Generation Scheme - GWh

Day Maximum Demand in MW.

1626.6

1759.2

8.2%

Night Maximum Demand in MW. 2163.1*

2146.4**

-0.8%

13.1%

RURAL ELECTRIFICATION SCHEMES


No: of

* *- At Wednesday 9th May, 2012

YEAR
Hydro Reservoir Capacity in GWh 1259

1259

Schemes

2006

422

2007

460

2008

346

2009

487

2010

526

Private Power Purchase.

Note -

(1) All financial data are provisional.

2011

561

(2) Revenue in 2012 includes FAC (Domestic - up to 30 = 25%, 31 to 60 = 35%,

2012

694

(3) Local standard time was adjusted to +5 1/2 GMT in April, 2006.
(4) Tariff changed effective from 01/01/2011.

9.56
8.69
28.20
6.49
13.07

14.62
13.26
32.94
7.92
15.55

C.E.B.

2012

Colombo City
North Western
North Central
Northern
Region - 1 Total
Western-North
Central
Eastern
Region - 2 Total
Western-South II
Uva
Sabaragamuwa
Region - 3 Total
Western-South I
Southern
Region - 4 Total
Bulk Sup. to LECO
TOTAL

2011
1239
1003
356
199
2797
1659
739
446
2844
1019
370
457
1846
511
759
1269
1267
10023

46
41
124
91
91
1
114
1
2
2
625(M.kg)
513

Percentage
Change
2011/12
0.6%
4.6%
7.6%
7.0%
3.4%
5.8%
5.0%
5.9%
5.6%
5.2%
3.0%
6.3%
5.0%
5.3%
5.5%
5.4%
2.7%
4.5%

C.E.B.
2012
1247
1049
384
213
2892
1755
776
472
3003
1072
381
485
1938
537
801
1338
1302
10474

Percentage
of Total
2012
11.9%
10.0%
3.7%
2.0%
27.6%
16.8%
7.4%
4.5%
28.7%
10.2%
3.6%
4.6%
18.5%
5.1%
7.6%
12.8%
12.4%
100.0%

Monthly
Av.Sales
kWh/Cons.
2012
645
132
94
94
178
270
99
107
160
253
79
93
136
186
105
127
175

NO.OF CONSUMER ACCOUNTS BY PROVINCE


Province

Domestic
Religious
General Total
Small
Medium
Large
Hotel Total
Small
Small T.D.
Medium
Medium T.D.
Large
Large T.D.
Industrial Total
Small
Small T.D.
Medium
Medium T.D.
Large
Large T.D.
Bulk Supply to LECO
L2 -11kV & above
Street Lighting
TOTAL

C.E.B.
2011
3379
51
1927
1002
704
221
159
1
92
2*
65
3131
252
0.05*
1556
18*
1275
31*

Percentage
Change
2011/12
4.2%
5.9%
6.0%
7.2%
5.1%
3.1%
0.5%
-9.3%
9.2%
-9.1%
4.9%
8.1%
4.6%
8.6%
-

1267
109
10023

2.7%
0.2%
4.5%

* - Due to 3 part tariff introduced effective from 01/01/2011.

C.E.B. Percentage
of Total
2012
2012
3522
33.6%
55
0.5%
2042
19.5%
1074
10.3%
740
7.1%
228
2.2%
160
1.5%
1
0.0%
100
1.0%
0.2*
0.0%
59
0.6%
3285
31.4%
272
2.6%
0.04*
0.0%
1627
15.5%
1*
0.0%
1385
13.2%
-*
1302
109
10474

12.4%
1.0%
100.0%

Monthly
Av.Sales
kWh/Cons.
2012
67
151
335
178
17,289
216,139
33,491
535
45,131
698,012
5,393
488
1,667
32,568
12,583
610,743
175

C.E.B.

Colombo City
North Western
North Central
Northern
Region - 1 Total
Western-North
Central
Eastern
Region - 2 Total
Western-South II
Uva
Sabaragamuwa
Region - 3 Total
Western-South I
Southern
Region - 4 Total
Bulk Sup. to LECO
TOTAL

ELECTRICITY SALES By TARIFF IN GWh (million kWh)


Tariff

P.P.P. -

Above 60 = 40% Industrial & Hotel = 15% ; GP = 25%).

44.86
29.37
28.51

Province
in m. Litres

625

Installed Capa. by Source in MW.

Hydro

Total Generation

Type of

Power Station

TOTAL

P.P.P. - Total
- Hydro-Small

NCRE

Name of

SP.P.S.(Diesel) - A

2011

ELECTRICITY SALES BY PROVINCE IN GWh( million kWh)

Fuel Used

Percentage of Total
2011
6552

- Wind

Fuel Cost

2011

Gross Generation by Source in GWh.

8,927(b)

Per Capita Energy Consumption in Sri Lanka kg OE/Person

Ownership & Source


of Power Station

DATA ON FUEL USED FOR THERMAL GENERATION


C. E. B.

2011
157,600
627,289
314,523
166,051
1,265,463
524,998
626,460
337,287
1,488,745
338,861
373,819
403,359
1,116,039
230,717
616,482
847,199
1
4,717,448

Increase
in Accounts
2012
3,418
36,225
24,428
22,233
86,304
17,497
27,452
29,655
74,604
13,601
27,906
30,610
72,117
9,624
19,765
29,389
262,414

Percentage
Change
2011/12
2.2%
5.8%
7.8%
13.4%
6.8%
3.3%
4.4%
8.8%
5.0%
4.0%
7.5%
7.6%
6.5%
4.2%
3.2%
3.5%
5.6%

C.E.B.
2012
161,018
663,514
338,951
188,284
1,351,767
542,495
653,912
366,942
1,563,349
352,462
401,725
433,969
1,188,156
240,341
636,247
876,588
1
4,979,862

Percentage
of Total
2012
3.2 %
13.3 %
6.8 %
3.8 %
27.1 %
10.9 %
13.1 %
7.4 %
31.4 %
7.1 %
8.1 %
8.7 %
23.9 %
4.8 %
12.8 %
17.6 %
100.0 %

NO.OF CONSUMER ACCOUNTS BY TARIFF


Tariff

C.E.B.

2011
Domestic
4,165,738
Religious
28,320
General Total
475,380
Small
471,991
Medium
3,308
Large
81
Hotel Total
479
Small
306
Small T.D.
Medium
164
Medium T.D.
2*
Large
7
Large T.D.
Industrial Total
47,529
Small
43,367
Small T.D.
2*
Medium
3,977
Medium T.D.
10*
Large
173
Large T.D.
-*
Bulk Supply to LECO
L2 - 11kV & above
1
Street Lighting
1
TOTAL
4,717,448

Increase
in Accounts
2012
225,707
1,689
31,867
31,603
257
7
(80)
(99)
21
0
3,231
3,033
186
16
-

Percentage
Change
2011/12
5.4%
6.0%
6.7%
6.7%
7.8%
8.6%
-16.7%
-32.4%
12.8%
0.0%
6.8%
7.0%
0.0%
4.7%
9.2%
-

262,414

5.6%

Note - Trans. Bulk Supply to LECO Accounts are accounted as one from 2011.
* - Due to 3 part tariff introduced effective from 01/01/2011.

Province

Colombo City
North Western
North Central
Northern
Region - 1 Total
Western-North
Central
Eastern
Region - 2 Total
Western-South II
Uva
Sabaragamuwa
Region - 3 Total
Western-South I
Southern
Region - 4 Total
Bulk Supply to LECO
TOTAL

C.E.B.
2011
24,206
11,684
4,239
2,642
42,771
21,352
8,933
5,337
35,622
13,367
4,294
5,194
22,854
7,500
8,767
16,267
14,859
132,373

Percentage
Change
2011/12
21.7%
22.5%
27.8%
30.5%
23.1%
20.9%
23.7%
25.9%
22.4%
22.8%
19.1%
23.4%
22.2%
24.4%
23.5%
23.9%
25.4%
23.1%

C.E.B.
(With FAC)
2012
29,464
14,313
5,415
3,449
52,642
25,824
11,049
6,719
43,591
16,412
5,112
6,411
27,935
9,332
10,828
20,159
18,628
162,956

Percentage
of Total
2012
18.1%
8.8%
3.3%
2.1%
32.3%
15.8%
6.8%
4.1%
26.8%
10.1%
3.1%
3.9%
17.1%
5.7%
6.6%
12.4%
11.4%
100.0%

Ave.Price
Rs./kWh
2012
23.63
13.65
14.11
16.20
18.20
14.71
14.24
14.22
14.51
15.31
13.42
13.21
14.41
17.36
13.52
15.07
14.31
15.56

REVENUE FROM ELECTRICITY SALES BY TARIFF IN m.Rs.

C.E.B. Percentage
of Total
2012
2012
4,391,445
88.2%
30,009
0.6%
507,247
10.2%
503,594
10.1%
3,565
0.1%
88
negli.%
399
0.01%
207
negli.%
185
negli.%
-*
7
negli.%
50,760
1.0%
46,400
0.9%
2*
negli.%
4,163
0.1%
6*
negli.%
189
negli.%
-*
1
1
4,979,862

REVENUE FROM ELECTRICITY SALES BY PROVINCE IN m.Rs.

negli.%
negli.%
100%

negli. - negligible.

Tariff

Domestic
Religious
General Total
Small
Medium
Large
Hotel Total
Small
Small T.D.
Medium
Medium T.D.
Large
Large T.D.
Industrial Total
Small
Small T.D.
Medium
Medium T.D.
Large
Large T.D.
Bulk Supply to LECO
L2 -11kV & above
Street Lighting
TOTAL

C.E.B.
2011
33,138
358
41,682
20,852
16,132
4,698
2,362
30
1,408
27*
897
39,974
2,750
0*
21,220
283*
15,336
385*

Percentage
Change
2011/12
29.4%
5.1%
25.5%
28.1%
22.6%
23.9%
13.3%
-0.5%
22.8%
1.9%
15.3%
21.6%
15.1%
19.2%
-

14,859
132,373

25.4%
23.1%

C.E.B. Percentage
(With FAC)
of Total
2012
2012
42,887
26.3%
377
0.2%
52,309
32.1%
26,716
16.4%
19,772
12.1%
5,820
3.6%
2,676
1.6%
30
0.0%
1,729
1.1%
3*
0.0%
914
0.6%
46,079
28.3%
3,344
2.1%
0.5*
0%
24,433
15.0%
15*
0.0%
18,288
11.2%
0*
0.0%

* - Due to 3 part tariff introduced effective from 01/01/2011.


Note - No FAC for the year 2011.

18,628
162,956

11.4%
100.0%

Ave.Price
Rs./kWh
2012
12.18
6.91
25.62
24.87
26.73
25.50
16.69
22.31
17.26
16.83
15.58
14.03
12.30
12.15
15.02
16.17
13.20
14.31
15.56

LECO ELECTRICITY SALES


SALES BY TARIFF IN GWh.
%

GENERAL STATISTICS

CONSUMER ACCOUNTS BY TARIFF


%

2011

2012

Change

2011

2012

Change

538

531

-1.3%

412,858

419,150

1.5%

Domestic
Religious
General Total

1.8%

2,325

2,360

1.5%

367

374

1.9%

67,634

69,358

2.5%

Small

214

219

2.5%

66,750

68,424

2.5%

Medium

148

150

1.0%

881

931

5.7%

Large

1.5%

0.0%

Hotel Total

37

38

2.8%

42

46

9.5%

Small
Medium+T.D
Large +T.D
Industrial Total
Small
Medium +T.D.
Large +T.D
Temporary Connections

0.0%

0.0%

36

2.9%

40

44

10.0%

0.6%

0.0%

241

236

-2.2%

3,356

3,257

-2.9%

25

24

-4.1%

2,841

2,742

-3.5%

192

187

-2.5%

507

508

0.2%

24

25

2.1%

-12.5%

-12.8%

614

403

-34.4%

23

29

27.6%

3,188

3,218

0.9%

1216

1217

0.2%

490,017

497,792

1.6%

Street Lighting
TOTAL

0
35

Note - Three part tariff was introduced for bulk customers as tariff change w.e. from 01/01/2011.

C.E.B. ELECTRICITY SALES BY TARIFF


2011
13.5%

13.7%

DOM+RP

DOM+RP

34.1%

34.2%

31.4%

31.2%
GENERAL

Hotel

GENERAL

Hotel

19.2%

1.6%

19.5%

1.5%

C.E.B.CONSUMER ACCOUNTS BY TARIFF


2012
DOM+RP

DOM+RP

88.9%

BULK +S.L.

0.0%
INDUSTRIAL

1.0%
Hotel

88.8%

15.4%

FUEL RATE AND THERMAL EFFICIENCY


Fuel Rate in Litres/kWh
2011
2012
0.53
0.47
0.34
0.34
0.37
0.48
0.23
0.23
0.26
0.32
0.21
0.21
0.34
0.23
0.39
0.28
0.38
0.45
0.42
0.45

K.P.S.(smallGT - L.A.D)
K.P.S.(new GT - L.A.D)
SP.P.S. - A ( L.A.D.)
SP.P.S. - A (L.H.F.)
SP.P.S.- B (L.A.D.)
SP.P.S.- B (L.H.F.)
K.P.S. - C.Cy. (L.A.D.)
K.P.S. - C.Cy. (Naptha)
Puttlam - Coal
Puttlam - LAD

Av: Thermal Efficiency


2011
2012
17.9%
19.9%
27.4%
27.5%
25.3%
19.6%
40.2%
40.1%
36.5%
29.0%
43.6%
43.7%
27.4%
41.8%
31.1%
44.4%
35.7%
30.7%
22.5%
21.4%

L.A.D.- Lanka Auto Diesel

SP.P.S. - Sapugaskande Power Station

L.H.F. - Lanka Heavy Fuel.

C.P.S.- Chunnakam Power Station.

C.Cy. - Combined Cycle.

BULK +S.L.

0.0%
INDUSTRIAL

1.0%
Hotel

0.0%

0.0%

GENERAL

GENERAL

10.1%

10.2%

220 kV Route Length O.H.


132 kV Route Length O.H.
132 kV Route Length U.G.
33 kV Route Length O.H.
33 kV Route Length U.G.
11 kV Route Length O.H.
11 kV Route Length U.G.
Low Voltage Circuit Length O.H.& U.G.-Total
Single Phase O.H. & U.G.
Two Phase O.H. & U.G.
Three Phase O.H. & U.G.

2011

2012

%
Change

483
1,724
50
25,257
35
1,544
754
108,468
33,859
3,697
70,912

501
1,791
50
26,053
36
1,583
761
112,995
34,861
3,492
74,642

3.8%
3.9%
0.0%
3.2%
2.9%
2.5%
0.9%
4.2%
3.0%
-5.5%
5.3%

Note:- 1. Excludes 141 route km of 132 kV transmission lines which is being re-constructed in the North.
2. Includes only distribution lines & substations rehabilitated and used from 1998 in Northern Province.

NUMBER AND CAPACITY OF SUBSTATIONS


Grid S.S. (132/33 kV)
Capacity
Grid S.S.(220/132/33kV)
Capacity
Grid S.S.(220/132kV)
Capacity
Grid S.S. (132/11 kV)
Capacity
Primary S.S. (33kV/11kV )
Capacity
Distribution S.S.(33kV/LV & 11kV/LV)
Capacity
Total number of substations
Total capacity

C.E.B. TARIFF - EFFECTIVE FROM 01-01-2011 TO 31-12-2012


DOMESTIC Block 1 Block 2 Block 3 Block 4 Block 5 Block 6 -

Unit Rate
(for each 30 days billing period)
First 30 units
@ Rs 3.00 per unit
31 - 60 units
@ Rs 4.70 per unit
61 - 90 units
@ Rs 7.50 per unit
91 - 120 units @ Rs 21.00 per unit
121 - 180 units @ Rs 24.00 per unit
Above 180 units @ Rs 36.00 per unit

Block 1 Block 2 Block 3 Block 4 Block 5 -

First 30 units
31 - 90 units
91 - 120 units
121 - 180 units
Above 180 units

OTHER CONSUMER
CATEGORIES

Units

2011

2012

% Change

No.
MVA
No.
MVA
No.
MVA
No.
MVA
No.
MVA
No.
MVA
No.
MVA

46
3,043
5
2100/500
2
405
5
369
123
1,096
22,839
4,973
23,020
12,486

47
3,138
5
2100/500
2
405
5
369
122
1,074
24,322
5,152
24,503
12,738

2.2%
3.1%
0.0%
0.0%
0.0%
0.0%
0.0%
0.0%
-0.8%
-2.0%
6.5%
3.6%
6.4%
2.0%

Province/
Region

2011

Distribution Line Length by Province & Region

2012

2011

2012

CSC
8
21
10
11

POS
4
5
1
2

Area
4
7
3
2

CSC
8
22
10
11

POS
4
5
1
2

Region - 1
Western - North
Central
Eastern

14
6
7
4

50
18
23
18

12
5
4
2

16
6
10
4

51
18
31
18

12
5
5
2

Region - 2
Western - South 2
Uva
Sabaragamuwa

17
5
4
6

59
13
16
20

11
5
4
2

20
5
4
6

67
13
17
20

12
6
4
2

Region - 2 Total
Western-South II
Uva
Sabaragamuwa

6,831
1,051
2,889
2,757

649
16
0
37

29,159
4,954
9,431
10,978

7,047
1,076
3,025
2,821

664
17
0
16

30,225
5,615
10,132
11,431

Region - 3
Western - South 1
Southern

15
3
6

49
10
26

11
4
5

15
3
6

50
10
26

12
4
5

Region - 3 Total
Western-South I
Southern

6,697
661
3,368

53
58
200

25,363
3,286
18,564

6,922
810
3,300

33
58
236

27,178
3,358
18,599

Region - 4 Total

4,029

258

21,850

4,110

294

21,957

TOTAL

25,292

2,298

108,468

26,089

2,344

112,995

Region - 4

36

36

TOTAL

55

194

47*

60

204

49*

*- Added 4 centers managed by CEB Head Office.

Province /
Region
Colombo City
North Western
North Central
Northern
Region - 1 Total
Western-North
Central
Eastern

33 kv
Route km
25
3,860
2,755
1,095

11 kv
Route km
593
272
285
188

L.V.
Circuit km
831
19,179
8,319
3,767

33 kv
Route km
25
3,962
2,825
1,199

11 kv
Route km
601
276
287
188

L.V.
Circuit km
844
19,994
8,605
4,193

7,735
1,608
3,224
1,999

1,338
126
142
381

32,096
9,152
13,314
6,693

8,011
1,610
3,297
2,140

1,352
126
141
397

33,636
9,268
13,368
7,589

+25%
+35%
+40%
+40%
+40%
+40%

Fixed Charge
+
+
+
+
+
+

Rs. 30.00
Rs. 60.00
Rs. 90.00
Rs. 315.00
Rs. 315.00
Rs. 315.00

220 kV
Under implementation

Transmission
Network
2012

132 kV
220 kV/ 132 kV Grid Substation
Hydro Power Plant

@ Rs 1.90
@ Rs 2.80
@ Rs 6.75
@ Rs 7.50
@ Rs 9.40

per unit
per unit
per unit
per unit
per unit

+
+
+
+
+

Rs. 30.00
Rs. 60.00
Rs. 180.00
Rs. 180.00
Rs. 240.00

General
Purpose
(FAC = 25%)

Industrial
(FAC = 15%)

Hotel
(FAC = 15%)

19.50
+
240.00

10.50
+
240.00

19.50
+
240.00

Statistical Digest
2012

Thermal Power Plant

Rate - 1
Supply at 400/230V
Contract demand
< or = 42 kVA
Unit Charge
(Rs/unit)
Fixed Charge(Rs./Month)
Rate - 2
Supply at 400/230V
Contract demand
above 42 kVA
Unit Charge
(Rs/unit)

Demand Charge
(Rs/kVA)

Area
4
5
3
2

FAC

RELIGIOUS & CHARITABLE INSTITUTIONS:-

19.40

G.T. - Gas Turbines.

Colombo City
North Western
North central
Northern

2011

%
sq.km.
Rs/US $

2012*
20,328
7,433,954
2,987,628
7,582,376
3,047,277
373,001
2,923
162.9
8.9
65,610
127.60

No. of Areas, Consumer Service Centres & POS Centres in CEB

INDUSTRIAL

INDUSTRIAL

Population (Mid Year)


GNP at Current Prices
GNP at Constant (2002) Prices
GDP at Current Prices
GDP at Constant (2002) Prices
Per Capita GDP at Market Prices
Per Capita GDP at Market Prices
CCPI Index (2006/07 = 100)
GDP Deflator (1996 = 100)
Area of Sri Lanka
Average Exchange Rate
* - Provisional

2011
20,869
6,471,968
2,832,189
6,544,009
2,863,715
313,576
2,836
151.5
7.9
65,610
110.57

Note:- K.P.S. - Kelanitissa Power Station.

2012
BULK +S.L.

BULK +S.L.

Units
Thous.
Rs.m.
Rs.m.
Rs.m.
Rs.m.
Rs.
U.S.$

LENGTH OF TRANSMISSION AND DISTRIBUTION LINES IN km.


%
Change
-2.6%
14.9%
5.5%
15.9%
6.4%
19.0%
3.1%
7.5%
1.0%

Fixed Charge(Rs./Month)

+
850.00

Demand Charge
(Rs/kVA)
Fixed Charge(Rs./Month)

Day - 13.00
(5.30 am to
6.30 pm) +
Peak- 16.90
(6.30 pm to
10.30 pm) +
Off-Peak - 9.10
(10.30 pm to
5.30 am)
+
850.00

Bowatenna
Ukuwela
Pallekelle
Victoria
Randenigala

Veyangoda

+
3000.00

+
3000.00

+
3000.00

+
750.00

Day - 10.25
(5.30 am to
6.30 pm) +
Peak- 13.40
(6.30 pm to
10.30 pm) +
Off-Peak - 7.15
(10.30 pm to
5.30 am)
+
750.00

Day - 12.60
(5.30 am to
6.30 pm) +
Peak- 16.40
(6.30 pm to
10.30 pm) +
Off-Peak - 8.85
(10.30 pm to
5.30 am)
+
750.00

+
3000.00

+
3000.00

+
3000.00

19.10

Note - 1. Eligible Government Instititions shall be entitled to a 25% discount on energy charges.
2. Imposed Fuel Adjustment Charge effective from Feb., 2012.

AES
Kelanitissa

Inginiyagala

Rantembe

Kotmale

Kerawalapitiya

Rate - 3
Supply at 11 kV & above
Unit Charge
(Rs/unit)

Day - 10.45
(5.30 am to
6.30 pm) +
Peak- 13.60
(6.30 pm to
10.30 pm) +
Off-Peak - 7.35
(10.30 pm to
5.30 am)
+
850.00

Heladhanavi
Puttalam
Coal

Polpitiya Laxapana
Wimalasurendra
New Lax

CPPL
Kotahena
APPL
Fort
Sapugaskanda
Kollupitiya
Kolonnawa
Maradana
Havelock Town
Sri Jayewardenepura
Dehiwela

Padukka

Canyon

Monaragala

ACE

Samanala Wewa

Ratmalana

Kukule
ACE

ACE

ACE

Beliatta

Matara

C E Y L O N E L E C T R I C I T Y
C o l o m b o 0 0 2 0 0 S r i
w w w. c e b . l k

B O A R D
L a n k a