You are on page 1of 3

CONTENTS PAGE NO.

Chapter 1 INTRODUCTION Chapter 2: ABOUT THE PLANT Chapter 3: WORKING PRINCIPAL Chapter 4: COAL HANDLING PLANT 4.2 Crusher house 4.3 Conveyer belt Chapter 5: BOILER 5.2 Main part of boiler 5.3 Operating parameters of boiler 5.4Boiler feed water pump 5.5 Steam powered pump Chapter 6:TURBINE 6.1 Types of turbine 6.2 Low pressure turbine Chapter 7: FAN 7.1 ID fan 7.2 FD FAN 7.3 PA FAN Chapter 8: SWITCHGEAR 8.1 Switch yard and different switching equipment 8.2 Types of switch gear Chapter 9: ELECTRIC GENERATOR 9.1 Generator component 9.1.1 Rotor 9.1.2 Rotor winding 9.1.3 Rotor balancing Chapter 10: COOLING TOWER 10.1D.M Plant 10.2 Boiler feed pump 10.3Condenser Chapter 11: WATER TREATMENT PLANT 11.1 Test of water 24-26 22-23 17-21 14-17 13 9-12 6-9 1 2 3-4 4-6

Chapter 12: ASH HANDLING PLANT 12.1 Introduction Chapter 13: CONTROL AND INSTRUMENTATION 13.1 INTRODUCTION Chapter 14: ENVIRONMENTAL POLICY 14.1 Introduction Chapter 15: CONCLUSION Chapter 16: References

27-28

29-32

33-35

36 37

LIST OF FIGURES PAGE NO. 1 2 3 4 5 6 7 8 9 View of plant, Bathinda Schematic diagram of thermal power plant Track hopper Crusher house Conveyer belt Water tube boiler & fire tube boiler Outer view of turbine Electrical Generator Cooling Tower 1 4 5 5 6 7 11 17 22 23

10 Condenser

You might also like