4 Nos. 85 Wp Solar Module, 4 Nos. 80 Ah Industrial Battery, 1 4 hours 1,66,000 No. 1000VA pv-Inverter.
Daily cow Working dung Size hours of required one single (kg) burner
5000 Taka
9000 Taka
5805 Taka
1590 Taka
7135 m3 gives 796 kw So per meter cube gives 0.111562719 kw and per kw require 8.9635 meter cube gas Installation cost for biomass 250 kw will require 2240.875 meter cube gas Plant required: 467 plants Total Installation cost of 467 plants= Tk 22275900 Operation cost = 600000 taka Income = 900000 taka Daily cow dung needed 60710 kg Generator cost: 2500000 taka Daily poultry dropping required: 31756 kg Total plant required to meet